1674 Southerly Solids Handling Improvements REBID
Description
In general, the work shall consist of construction of the following work: Improvements to the Dissolved Air Flotation Unit Process Installation of a new Liquid Sludge Receiving Station adjacent to the existing Sludge Storage Tanks (SSTs) Replacement of piping, valves, vault demolition, and other appurtenances related to two Easterly Sludge Force Main Vaults Replacement of the existing Waste Heat Boiler (WHB) dry ash pneumatic conveyance system with slurry system, replacement of existing scrubber drain header, and installation of new backup scrubber drain header Cleaning of sludge, grit, and debris from four (4) of the existing SSTs Replacement of exhaust fans in four (4) SSTs Modifications of four (4) SST domes Installation of air bubble mixing systems in four (4) SSTs Replacement of existing Maintenance Building Lift Station Structural repairs to six (6) existing Gravity Thickeners Replacement of the existing eastern Aerated Grit concrete trailer pad Installation of a new employee asphalt parking lot Renovation of Waste Liquor Handling Building including a new bathroom Replacement of grease piping between Dissolved Air Floatation Unit Process and the Renewable Energy Facility Pipe removal and replacement in Tunnel 5 including pipe supports Payment Items Division 01 through 46 Sludge Storage Tank Cleaning and Disposal Allowance General Allowance of 10% (IN UNIT COST COLUMN, ENTER THE TOTAL OF THE 'PAYMENT ITEMS TABLE) Specific Allowance 01 - ADDITIONAL GRAVITY THICKENER REPAIRS Specific Allowance 02 - ADDITIONAL SLUDGE STORAGE TANK CLEANING AND REPAIRS Specific Allowance 03 - ADDITIONAL ELECTRICAL, INSTRUMENTATION, AND CONTROLS Specific Allowance 04 - GREASE PIPING HEAT TRACE SYSTEM UPGRADES Specific Allowance 05 - ADDITIONAL TUNNEL PIPING REPAIRS Bonds Bid, Performance & Payment Bond PROJECT INFORMATION SUMMARY In general, the work shall consist of construction of the following work: Improvements to the Dissolved Air Flotation Unit Process Installation of a new Liquid Sludge Receiving Station adjacent to the existing Sludge Storage Tanks (SSTs) Replacement of piping, valves, vault demolition, and other appurtenances related to two Easterly Sludge Force Main Vaults Replacement of the existing Waste Heat Boiler (WHB) dry ash pneumatic conveyance system with slurry system, replacement of existing scrubber drain header, and installation of new backup scrubber drain header Cleaning of sludge, grit, and debris from four (4) of the existing SSTs Replacement of exhaust fans in four (4) SSTs Modifications of four (4) SST domes Installation of air bubble mixing systems in four (4) SSTs Replacement of existing Maintenance Building Lift Station Structural repairs to six (6) existing Gravity Thickeners Replacement of the existing eastern Aerated Grit concrete trailer pad Installation of a new employee asphalt parking lot Renovation of Waste Liquor Handling Building including a new bathroom Replacement of grease piping between Dissolved Air Floatation Unit Process and the Renewable Energy Facility Pipe removal and replacement in Tunnel 5 including pipe supports BACKGROUND The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams. In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion. NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents. TIMELINE Bid Publish: November 24, 2026 Question Submission Deadline: December 4, 2026, 5:00pm Bid Opening: December 15, 2026, 1:00pm PROJECT DOCUMENTS All project documents can be found in the ATTACHMENTS section BID FORM REQUIRED DOCUMENTS ATTACHMENTS End of Document
Published attachments
- 11.19.26 Signed Resolution to Advertise
- 1674 SSHI Legal Notice - R&R
- Instructions to Bidders
- 72_Hour_Doc_Bidders_Qualification_Questionnaire
- General Conditions
- Agreement Between Owner and Contractor (sample)
- SBE Policy
- 1674_SPE_BID_Appendix4_PrevailingWages_11172026
- 1674_Drawings_ReBid
- 1674_SPE_BID_VOL1_ReBid
- 1674_SPE_BID_VOL2_ReBid
- 1674_SPE_BID_Appendix1_Geotechnical Report
- 1674_SPE_BID_Appendix2_SSHI HMA Report
- 1674_SPE_BID_Appendix3_Tunnel 5 HMA Report
- 1674_SPE_BID_Appendix5_Mercury Free Purchasing Policy
- 1674_SPE_BID_Appendix6_NEORSD_Process_Control_System_Standards_and_Conventions
- 1674_SPE_BID_Appendix7_NEORSD_Standard_Object_Library_User's_Manual
- 72 Hour Doc_Non Collusion Affidavit
- 72 Hour Doc_BOP Data Sheets and Good Faith Efforts Checklist
- 72 Hour Doc_Listing of Proposed BOP Subcontractors
- 1674_Southerly_Solids_Handling_Improvements_REBID.pdf