State and local · OpenGov
2026 AC Water Main Replacement
Description
The City of Mercer Island (“City”) is issuing a Request for Qualifications (RFQ) to solicit Statements of Qualifications (SOQs) from qualified professional engineering firms to design upgrades to the water system along SE 40th St and E Mercer Way. The awarded firm shall be licensed and lawfully engaged in providing engineering services in the State of Washington pursuant to RCW 39.80.020. SOQs with requirements, as outlined in the RFQ package, must be received no later than 5:00 pm on Tuesday, November 3, 2026 . All SOQs are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/mercerislandwa . SCOPE OF WORK Project Description This project replaces approximately 5,000 linear feet of aging asbestos cement (AC) water mains with ductile iron water mains at the following locations: SE 40th Street from Greenbrier Ln to E Mercer Way, 97th Ave SE from SE 40th St to SE 36th St, and 3700 and 3800 block of East Mercer Way. Other system components such as a PRV vault, fire hydrants, and water services will also be replaced. The project will be divided into two phases to prioritize phase 1 where residents are experiencing low water pressure. Phase 1 consists of water system replacement and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE. Phase 2 consists of water system replacement on SE 40th Street from 97th Ave SE to E Mercer Way, 97th Ave SE from SE 40th St to SE 36th St, and 3700 and 3800 block of East Mercer Way. General Scope of Services The scope of work is expected to include, but not be limited to, the following tasks: Project Management and Coordination Hold regularly scheduled meetings with the City to ensure the project remains on schedule and within budget. During these meetings, the scope of work should be refined as needed. Changes to the scope, schedule, or budget require City approval and, where applicable, a contract amendment Monthly invoices with status reports summarizing work completed, budget status, anticipated work, and issues requiring City direction Data Collection and Review Obtain and review relevant documents and other background information including but not limited to: GIS records, as-built documents, etc. Perform project area survey and potholing as needed Identify potential utility conflicts and coordinate with affected utility owners Geotechnical Investigation as needed City Standard Detail Updates Creation/revisions of CAD City Standard Details for up to 7 details Complete a design for phase 1 and phase 2 of the new water system Phase 1 - 30% design submittal - plans and engineer's estimate Phase 1 - 60% design submittal - plans, specifications, and engineer's estimate Phase 1 - 90% design submittal - plans, specifications, and engineer's estimate Phase 1 - 100% design package - plans, specifications, and engineer's estimate Phase 2 - 30% design submittal - plans and engineer's estimate Phase 2 - 60% design submittal - plans, specifications, and engineer's estimate Phase 2 - 90% design submittal - plans, specifications, and engineer's estimate Phase 2 - 100% design package - plans, specifications, and engineer's estimate Review each design submittal with City staff, incorporate comments into subsequent submittals, and maintain a revision log documenting comments received and how they were addressed Coordinate with HDR, the City’s consultant, to perform a hydraulic analysis at the 60% design milestone Provide permitting support as needed for - Identify required permits, responsible parties, and anticipated review timelines. Prepare supporting technical documents and assist the City with permit applications and responses to agency comments, as needed Provide final design documents in PDF and editable native formats, including CAD files Provide engineering support during the bidding process - run the pre-bid meeting, assisting to answer bid questions and issue addenda's Provide engineering support during construction - RFI review, partial construction inspection support, review submittals and shop drawings for conformance with the design, and evaluate proposed changes and provide technical support for change orders, as needed Project Timeline The City has a goal of completing Phase 1 bid-ready plans, specifications, and a cost estimate by Q2 2027 and starting construction as soon as possible. P hase 2 design is anticipated to begin immediately following completion of Phase 1 design, with the goal of completing bid-ready plans, specifications, and a cost estimate by Q3 2027. The City anticipates completing construction for both phases by Q2 2028 in preparation to accommodate the summer 2028 paving project. Consultants should develop a project timeline with consideration of how best to achieve these goals while maintaining high-quality deliverables and allowing sufficient time for City review and coordination. REQUEST FOR QUALIFICATIONS Notice Date of Release: Tuesday, October 20, 2026 RFQ Submittal Due: Tuesday, November 3, 2026 at 5:00 pm Notice is hereby given that the City of Mercer Island is issuing a Request for Qualifications (RFQ) to solicit Statements of Qualifications (SOQs) from qualified professional firms to design upgrades to the water system along SE 40th St and E Mercer Way. The awarded firm shall be licensed and lawfully engaged in providing engineering services in the State of Washington pursuant to RCW 39.80.020. SOQs with requirements, as outlined in the RFQ package, must be received no later than 5:00 pm on Tuesday, November 3, 2026 . All SOQs are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/mercerislandwa . Non-Mandatory Pre-Submittal Site Visit: A non-mandatory, informational site visit will be conducted on Wednesday, October 28, 2026 , at 9:00 am at the project site located at SE 40th Street and 96th Avenue SE, Mercer Island, WA 98040 . The purpose of this meeting is to provide interested firms with background information which may be helpful in preparing a SOQ. Title VI: The City of Mercer Island, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this advertisement and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Andrea Larson, CMC City Clerk Published: Seattle Daily Journal of Commerce – October 20 and 27, 2026 BACKGROUND The City of Mercer Island is located on an island of the same name in Lake Washington and is home to a population of just over 25,000. Incorporated in 1960, the City is primarily residential, with most of its 6.2 square miles developed with single-family homes. Mercer Island has three commercial areas—Town Center and two neighborhood hubs—that offer a range of business and service amenities. One of the City’s top priorities is to provide safe and reliable drinking water to the community. A major component of achieving that goal is ongoing, planned replacement of portions of the water system that have reached the end of their service life. The City owns and maintains approximately 115 miles of water mains, ranging in size from 4 inches to 30 inches in diameter, including approximately four miles of AC pipe. This material was widely used from the 1940’s to the early 1980’s for both water and sewer systems; however, as this material reaches its middle and late stages of useful life, it becomes increasingly fragile and is prone to sudden failure. For pressurized pipes such as water mains, these failures can be catastrophic in nature, where several feet of the pipe can burst or split open. For this reason, the City has prioritized removing all AC pipe from the water system. Over the past decade, the City has replaced small sections of AC water main through various CIP projects. In 2024, the City began a dedicated AC water main replacement effort and replaced 5,100 feet of pipe, reducing the amount of active AC pipe in the water system from approximately five miles to four miles. Staff plan to replace all known remaining AC water mains by 2030. NON-MANDATORY SITE VISIT A non-mandatory, informational site visit will be conducted on Wednesday, October 28, 2026 at 9:00 am at the project site located at SE 40th Street and 96th Avenue SE, Mercer Island, WA 98040 . The purpose of this meeting is to provide interested firms with background information which may be helpful in preparing a SOQ. Questions raised during the site visit will be documented and posted along with other questions received during the open question period. SUBMITTAL DETAILS Statement of Qualifications Interested firms are invited to submit a SOQ for the work. The SOQ shall include the following information: Letter of Intent: Summarize your firm’s background, resources, commitment to providing the described services, interest in this project and working for the City, and any other information that would assist the City in making its selection. Indicate the address and telephone number of the respondent’s office located nearest to Mercer Island, Washington, and the office from which the services will be managed. Project Team: Provide a brief description of the individuals on the consultant team, including their relevant experience, qualifications, and percentage of time available to work on the project. Additionally, please provide information demonstrating the organizational structure of your team, who will be the principal project manager throughout the process, reporting relationships between members, and the physical location of the offices from which the work will be performed. The team may consist of multiple firms with focused areas of expertise. Project Experience: Provide evidence of relevant experience with similar projects. Include the following information for three (3) relevant projects managed by the proposed project manager within the last five (5) years: Description of project, location, and status: Project results and challenges; Description of professional services provided by the consultant team; Initial project budget, final cost, and end date (if applicable); and Primary client contact for the project (name, title, address, phone number, and email). Project Understanding, Approach, and Schedule: Describe your team’s approach to meeting the City’s needs and how the proposed team will work with City staff to complete the project. Qualified firms and any subconsultants should demonstrate knowledge and understanding of: Designing municipal water main replacement projects, particularly involving asbestos cement (AC) pipe Identifying and resolving utility conflicts Demonstrated knowledge of resolving challenges that impacting cost, feasibility, and schedule Include a timeline that identifies major proposed tasks and products, including how frequently check-in meetings will occur, and when deliverables will be provided. The City requires at least two weeks for document review. The timeline should demonstrate commitment to completing the scope of work per the anticipated timeline outlined in this document. If the proposed target completion is unrealistic, aggressive, or conservative, please include this in your discussion along with a new target completion date. References: Provide three (3) references from clients for whom your firm has performed similar work within the last five (5) years. Include contact name, current phone number, and current e-mail address for all references. Disclosure of Conflict of Interest: Disclose any potential conflict of interest due to any other clients, contracts, or property interests regarding private development of any property within the City of Mercer Island. Submittal Format & Deadline Submit a PDF of your SOQ to the Procurement Portal at https://procurement.opengov.com/portal/mercerislandwa no later than 5:00 pm on Tuesday, November 3, 2026 . All SOQs shall be clearly titled: 2026-RFQ-042 - 2026 AC Water Main Replacement . Please limit submittals to 12 pages using at least 12 pt font (excluding cover letter/statement of interest, references, and project team resumes). All proposals received will become the property of the City and will not be returned. Direct all submittal questions through the Procurement Portal, no later than Thursday, October 29, 2026 at 5:00 pm . Any oral communication will be considered unofficial and non-binding. All questions and responses will be managed through the Procurement Portal. Responses will be posted directly in the portal by Friday, October 30, 2026 at 5:00 pm . It is the obligation and responsibility of the submitter to learn of addendums, responses, or notices issued by the City relative to this RFQ. These will be posted to the Procurement Portal. Conditions of Submittal Costs for Development of Submittals: All costs for developing submittals in response to this RFQ are the obligation of the consultant and are not chargeable to the City. All submittals will become property of the City and will not be returned. Submittals may be withdrawn at any time prior to the published close date. Submittals cannot be withdrawn after the published close date. Agreement Form: The consultant selected by the City will negotiate a scope and fee schedule. The City’s standard professional services agreement (PSA), which is attached as Attachment A will be used for this project. By submitting a SOQ, consultants acknowledge and agree to the terms and conditions. Rights reserved by the City: The City reserves the right to reject any or all responses received for this solicitation; extend the submission due date; modify, amend, reissue, or rewrite this solicitation; and procure any or all services by other means. The City reserves the right to modify the scope of this solicitation. This solicitation does not obligate the City to award a contract to any respondent. The final selection is the sole decision of the City, and the respondents to this formal request have no guaranteed appeal rights or procedures. At its option, the City reserves the right to waive as informality any irregularities in proposals and/or reject any or all proposals. Americans with Disabilities Act (ADA) Information: This material can be made available in an alternate format by calling 206-275-7833. Non-Discrimination: The City of Mercer Island, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. TIMELINE The City anticipates using the following general timeline for evaluating SOQs and initiating a contract in response to this solicitation. RFQ Post Date: October 20, 2026 Site Visit (Non-Mandatory): October 28, 2026, 9:00am SE 40th Street and 96th Avenue SE, Mercer Island, WA 98040 Questions Submission Deadline: October 29, 2026, 5:00pm City Response to Questions Deadline: October 30, 2026, 5:00pm SOQ Submittal Deadline: November 3, 2026, 5:00pm Consultant Selection Date: November 6, 2026 The evaluation period may include developing and notifying a short-list of firms, interviewing selected firms, checking references, and/or other activities the City deems necessary to successfully complete this search. EVALUATION CRITERIA All responses to this request will be screened for eligibility. A selection panel will rate eligible responses, according to the criteria listed above, and may conduct reference checks as part of the process. If there is insufficient information, the City reserves the right to request additional information and to interview firms to discuss their qualifications. This solicitation does not obligate the City to award a contract to any respondent. The final selection is the sole decision of the City, and the respondents to this formal request have no guaranteed appeal rights or procedures. At its option, the City reserves the right to waive as informality any irregularities in proposals and/or to reject any or all proposals. It is anticipated that a firm will be selected from this process and a contract will be negotiated. If the City selects a firm to provide design services, the successful firm shall be issued in writing a Notice of Selection. Submittals will be evaluated using the following criteria: SOQ UPLOAD AND CONFIRMATION ATTACHMENTS
Published attachments
Public questions and answers
What are the limits of the 2028 Overlay? thank you!
The 2028 Overlay project includes SE 40th St and E Mercer Way from SE 40th St to SE36th St as well as other areas outside of the 2026 AC Main project limits.
Since the font size limit is 12 point, we want to know if the proposal can include 11x17 pages for a larger graphic or detailed schedule, etc.? If so, does that count as 1 page or 2 pages? If 11x17 pages are not allowed, would it be acceptable to have smaller font in the schedule, graphic, etc. for it to fit on a standard 8.5x11 page? thank you!
We will allow 11x17, but will count it as 2 pages. Please use 12pt font minimum.
OpenGov categories
- 91360 · Construction, Water System/Plants, Main and Service Line