2026 Large Main Cleaning

Description

In general, this project will consist of cleaning and televising approximately 100,135 linear feet of large diameter sanitary sewer mains, ranging from 24 inches to 96 inches in diameter throughout the City of Pueblo’s sewer collection system, as detailed in the plans and specifications. Work will include all activities necessary to properly clean the designated sewer mains, remove debris and obstructions for disposal at the James R. Dilorio Water Reclamation Facility, perform PACP compliant video inspections to document cleaned conditions, providing the digital video files, and a WinCan VX SQLite database for the City's asset management and rehabilitation planning efforts. ADVERTISEMENT FOR BIDS (AS PUBLISHED) The City of Pueblo is soliciting bids for the following project. Project No.: 26-066 (WWAN02) Project Name: 2026 Large Main Cleaning In general, this project will consist of cleaning and televising approximately 100,135 linear feet of large diameter sanitary sewer mains, ranging from 24 inches to 96 inches in diameter throughout the City of Pueblo’s sewer collection system, as detailed in the plans and specifications. Work will include all activities necessary to properly clean the designated sewer mains, remove debris and obstructions for disposal at the James R. Dilorio Water Reclamation Facility, perform PACP compliant video inspections to document cleaned conditions, providing the digital video files, and a WinCan VX SQLite database for the City's asset management and rehabilitation planning efforts. Complete solicitation information can be obtained on the City of Pueblo Purchasing Department website at www.pueblo.us/purchasing or the OpenGov portal at https://procurement.opengov.com/portal/pueblo . Published: Tuesday, October 27, 2026 , in The Pueblo Chieftain Newspaper INTRODUCTION Summary Background Contact Information Timeline SPECIAL PROVISIONS GENERAL INSTRUCTIONS All specifications included in the Special Provisions shall have precedence over and will govern in the event of a conflict with other sections contained in this document. Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Failure to do so will not relieve a Bidder from any obligation or responsibility to understand and comply with all requirements and conditions for this project. Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening. Downloaded plans/drawings must be printed as “Actual Size”; scaling is NOT correct when printed using other options. It is the Bidder’s sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidder’s failure to follow this requirement. Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award. The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Bidders must follow the submittal procedures outlined in the bid documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. RESPONSIBILITY AND CAPACITY TO PERFORM CONCURRENT WORK In determining responsibility, the City may review each Bidder’s capacity to perform multiple City projects concurrently, including staffing, equipment, bonding, financial resources, current workload, and performance history. Bidder’s failure to adequately demonstrate such capacity shall be grounds for determining bidder not responsible. STANDARD CONSTRUCTION SPECIFICATIONS AND STANDARD DETAILS The 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado , adopted January 12, 2026, and as most recently amended, shall control the construction and quality of materials for this project except where specifically modified by the Special Provisions. Unless specifically modified by the Special Provisions, the 2026 Standard Construction Specifications and Standard Details shall control with respect to any inconsistencies with the Plans. The 2026 Standard Construction Specifications and Standard Details are not included in this bid package but are available on the City of Pueblo’s website at 2026 Standard Construction Specifications and Standard Details . By submitting a bid, the Contractor acknowledges possession of a copy of said document. SPECIFICATION LANGUAGE Specifications may be written in abbreviated style with incomplete sentences. Omission of words such as “The General Contractor shall”, “Conforming to”, “shall be”, etc., are intentional; omitted words shall be supplied by inference. Where words “approved”, “satisfactory”, “directed”, “submitted”, etc., are used it shall be assumed that the words “Project Manager” follows, such as “approved by the Project Manager”. DEFINITION OF ENGINEER The term “Engineer” in GENERAL PROVISIONS shall mean the Director of Public Works or their designated appointee. APPROVED EQUAL An approved equal, where noted, may be considered by the City. For consideration as an approved equal, a Request for Substitution must be submitted through the OpenGov portal by Tuesday, November 17, 2026 at 5:00 pm (MT). Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. If approved, an addendum will be issued that lists all approved equal products or materials. No other products or materials will be considered. INCONSISTENCIES Any inquiries regarding seeming inconsistencies between the Plans and Specifications for this project must be made by Tuesday, November 17, 2026 at 5:00 pm (MT). PREPAYMENT OF CITY SALES AND USE TAX (This section applies to public improvement construction projects $100,000 and over.) The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded, including Base Bid plus those Alternates selected. Application and prepayment shall be made within fourteen (14) days of the date authorized to proceed with construction of the Project as set forth in the Notice to Proceed. All applications and prepayments shall be coordinated directly with City’s Division of Sales and Use Tax, Attention: Tax Audit Manager, 101 W. Riverwalk, Pueblo, Colorado 81003. Finance Department policy sets the threshold at $100,000. Any contractual obligations below this amount will not generally be required to make a pre-payment of Use Tax. PERA LIABILITY Contractor shall reimburse the City for the full amount of any employer contribution required to be paid by the City of Pueblo to the Public Employees’ Retirement Association (“PERA”) for salary or other compensation paid to a PERA retiree performing contracted services for the City under this Agreement. Awarded Contractor will be required to submit a completed Colorado PERA Questionnaire form. This form is available to view at Colorado PERA Questionnaire and is included by reference in this Contract. CONTRACTOR EVALUATION The performance of the awarded Contractor will be evaluated using the Contractor Evaluation Form. This form is available to view at Contractor Evaluation Form and is included by reference in this Invitation for Bid. The evaluation will be utilized to review Contractor’s performance, increase communication, and foster positive business relationships. The completed evaluation form will serve to document Contractor’s overall performance. Material failure to perform in accordance with the terms of one or more contracts, or materially unsatisfactory performance of one or more contracts, may be justification for disqualifying future bids by Contractor pursuant to Pueblo Municipal Code, Title 1, Chapter 10, Section 1-10-4(d). SITE INVESTIGATION By submitting a bid, Contractor acknowledges the nature and location of the work, the general and local conditions, particularly those bearing upon transportation, disposal, handling and storage of materials, availability of labor, water, electric power, uncertainties of weather, physical conditions at the site, the character/quality of surface and subsurface materials to be encountered, the character of equipment and facilities needed prior to and during the work, and all other matters which can in any way affect the work or the cost thereof under this Contract. Failure by Contractor to acquaint themself with all the available information concerning these conditions will not relieve them from responsibility for estimating properly the difficulty or cost of successfully performing the work. SAFETY REGULATIONS The Contractor shall be aware of and shall comply with all State and Federal Safety regulations which are applicable to the work included under this Contract. Enforcement will be by the proper State and Federal regulatory agencies. If any construction activity is deemed to be unsafe for inspection, Contractor shall, upon notification, discontinue work until the deficiencies are corrected and the job can be properly inspected. EMERGENCY REPAIR OR PROTECTIVE WORK BY THE CITY OF PUEBLO As referenced in PROTECTION OF THE PUBLIC, WORK, AND PROPERTY and ACCIDENT PREVENTION of the GENERAL PROVISIONS , it is the Contractor’s responsibility to provide adequate barricades, protective devices and safety measures, and to employ other precautionary means for the adequate protection of the public, the work, and public/private property from injury or loss. Should the City become aware of any condition or circumstance arising from the work, or with respect to any excavation or areas disturbed by Contractor which, in the opinion of the Project Manager, creates or results in any imminent or unreasonable risk to the health/safety of the public or to public/private property, the City may undertake emergency work or repairs. Such work may include, by way of illustration, provision of barricades, traffic control devices or flagmen, deployment or warning signs, repair of lines under construction, repair of collapsed excavations or sinkholes, placement of sandbags or dams, and other emergency efforts. The determination of the necessity during the construction and warranty periods for the City to do any such emergency work or repairs shall rest entirely with the Project Manager. The cost of emergency work done by the City, including the actual cost of labor, equipment, and materials, plus 100 percent, shall be deducted from any amounts otherwise owed to Contractor, or may be invoiced to Contractor, or the same amount shall be recovered from Contractor’s performance bond. REPRESENTATIVE AVAILABLE FOR EMERGENCY CALLS The Contractor shall provide the name, address and phone number of a representative who may be reached at any time during the life of the Contract regarding repairs, detours, barricading, etc. This information shall be furnished in writing to the Project Manager. DUST PREVENTION During construction and until final acceptance by the Project Manager, Contractor shall be responsible for controlling dust emissions in the construction area. No earthwork activities shall be performed when the wind speed exceeds thirty (30) miles per hour. All fill areas shall be compacted on a daily basis to 95% of a Standard Proctor laboratory maximum density. Any mud or dirt carried out onto paved surfaces shall be cleaned up on a daily basis. Contractor shall promptly comply with all directives from the Project Manager relating to dust control. If Contractor fails to comply or provide adequate means to control dust, a stop-work order will be issued until the problem is corrected. SITE RESTORATION AND CLEANUP Contractor shall maintain and/or repair any damage done to all existing properties, public or private, adjacent to site improvements, including but not limited to, curb & gutter, asphalt, base course, utilities, sod, irrigation systems and landscaped areas. In general, disturbed areas shall be replaced to the lines, grades, thickness, and like materials of the existing conditions unless otherwise stated on the plans. Restoration shall be consistent with that of areas adjacent to the limits of construction. Grass and other plant areas shall be restored, maintained, and irrigated until final acceptance by the Project Manager. Fabric shall be installed under all rock landscape areas. Any landscape material salvaged by Contractor for reuse will not be acceptable if contaminated by dirt or different landscape material. Slopes to match from the new improvements to existing improvements shall not exceed a 4:1 slope. Site restoration and cleanup will not be measured or paid separately but shall be included in the unit prices for each bid item. Partial payments will not be made on any bid item until the restoration and cleanup associated with that item is satisfactorily complete and acceptable to the Project Manager. UTILITY LOCATIONS The accuracy of information furnished in regard to underground utilities is not guaranteed. The utility locations are approximate and may not include all utilities. Contractor shall determine the exact location of all utilities before commencing work. Contractor shall be fully responsible for any damage which might occur due to Contractor’s failure to locate and protect all utilities. Contractor shall repair or have repaired, at no cost to the City, any damage to utilities. Existing utilities include gas, water, service lines, meters, meter cans, buried telephone cables, buried power lines, pedestals, utility poles, sanitary sewer, manholes and services, and any other existing utility. ABANDONED UTILITIES If during construction an abandoned utility is encountered Contractor shall contact and coordinate with the Project Manager to arrange for the removal of the utility. If Contractor elects to remove the utility without contacting the Project Manager, Contractor shall do so at no cost to the City. OVERHEAD AND/OR UNDERGROUND HIGH VOLTAGE POWER LINES Unless danger against contact with high voltage overhead and/or underground lines has been effectively guarded against, Contractor shall not perform any function/activity upon any land, building, highway, or other premises if at any time during the performance of any function/activity it could move or be placed within ten (10) feet of any high voltage overhead and/or underground line. If work is to be performed within ten (10) feet of high voltage overhead and/or underground lines, the public utility must first be notified to arrange for safety provisions. Contractor may perform the work only after arrangements, including coordination and payment of fees, if applicable, have been made with the utility company. CONCRETE PERMITS If required, a “no fee” permit shall be obtained from the City Engineering Division at 211 E. “D” Street. Any concrete work placed without benefit of both permit and inspection by the Public Works Department will not be paid for. COORDINATION OF CONSTRUCTION ACTIVITIES Contractor and subcontractors shall coordinate work with all other construction activities and contractors; and cooperate with them to facilitate general progress of the work. Each trade shall afford other trades every reasonable opportunity for installation and storage of materials. WORK BY OTHERS Contractor shall coordinate work on the project with all work shown on the plans which is to be done by “others”. It is the Contractor’s responsibility to coordinate work with each entity and incorporate it into the project schedule. COMPLETE WORK ON TIME Failure to complete the work by the allotted 180 calendar days shall result in the assessing of liquidated damages according to GENERAL PROVISIONS . LAYING OUT WORK Contractor shall locate all general reference points and take such action as necessary to prevent their destruction. Contractor shall lay out their own work and be responsible for all lines, elevations, and measurements of the building, grading, utilities, and other work executed under this Contract. Contractor shall exercise proper precaution to verify figures shown on the drawing before laying out work and will be responsible for any error resulting from failure to exercise such precautions. HOURS OF WORK The Project Manager and the Inspection Division are available from 7:00 a.m. to 12:00 p.m. and 1:00 p.m. to 4:00 p.m., Monday through Friday, excluding holidays. Any work done outside of these hours must be approved by the Project Manager. Video Inspections during low flow times at night are encouraged. MOBILIZATION This item shall consist of mobilizing of personnel, equipment, and supplies to the project site in preparation for work on the project. Item shall include all costs incurred which must be performed prior to beginning the other items. Partial payments for mobilization will be made each month as the work progresses. These payments will be made as follows: When ten percent (10%) of the project bid amount is earned, fifty percent (50%) of the amount bid for mobilization will be paid. When fifty percent (50%) of the project bid amount is earned, one hundred percent (100%) of the amount bid for mobilization will be paid. The sum of all payments shall not exceed the original amount bid for the item, regardless of the fact that Contractor may have, for any reason, shut down the work on the project or moved equipment away and then back again. Note: Payments for materials on hand will be included as a percent of original project bid amount earned until said materials have been incorporated into the work and accepted and paid for by the City. CONSTRUCTION TRAFFIC CONTROL Contractor shall submit a traffic control plan prepared by a Certified Traffic Control Supervisor at the preconstruction conference for approval by the City’s Traffic Engineer. Where possible, crosspans may be constructed full width with proper street closures; however, the time of closure must be kept to a minimum. To expedite the curing, the minimum 28-day compressive strength shall be increased to 4500 psi (increased to seven (7) sacks per cubic yard). The additional cost for the added cement shall be paid by the Contractor. All traffic control procedures, signing, lighting and barricades shall conform to the latest edition of the Manual on Uniform Traffic Control Devices, and shall be set up and maintained by a Certified Traffic Control Supervisor. Constructio

Published attachments
Addenda and notices
  • Addendum #1 · 1

    An option to attend the mandatory pre-bid meeting virtually has been added. Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: Pre-Bid Meeting Information · 1

    The following is a list of attendees at the pre-bid meeting: Contractors Reid Ruprecht, National Power Rodding, rruprecht@nationalpowerrodding.com Brian Conroy, Dukes, 800-447-6687, Brian@dukes.com Matt Moss, Rhino Engineering Solutions, 626-800-8843, info@rhinoengineeringsolutions.com Ben Bonnell, Pipe View America, 630-956-2408, ben@pipeviewmamerica.com Isaac Camarillo, Pro Pipe, 909-568-7070, isaac.camarillo@pro-pipe.com Clint Eaks, Miller Pipeline, 719-252-8840 Joe Cerletahi, Sunbelt Rentals, 720-402-2889 Joe Moya, Inliner Solutions, 303-419-7648 Julian Rios, Rhino Engineering, julian@rhinoengineering.com D J Guildner, 303-875-6803, dguildner@azuni.com Claudia Bradshaw, Inliner Solutions, 303-214-3423, claudia.bradshaw@puris.com Vericonia Alvarez, Rhino Engineering, 310-886-9890, info@rhinoengineeringsolutions.com City of Pueblo Representatives Dennis Wells, 719-320-2904, dwells@pueblo.us Abel Santistevan, 719-565-9433, asantistevan@pueblo.us Sonia Mondragon, 719-553-2890, smondragon@pueblo.us Note: A copy of the handwritten list may be requested by emailing purchasing@pueblo.us . We are unable to post online due to accessibility issues.

  • Addendum #2 · 2

    The following changes have been made: The question deadline and due dates have been extended. ATTACHMENTS Attachment C - 26-066 Large Main Cleaning Mapping has been replaced in its entirety. Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    The final Question and Answer Report is attached.

Public questions and answers
  • Are there historical cleaning records on the respective lines with debris levels from the last cleaned date ?

    As stated in Special Provision Item 3.39 (Existing Flow and Debris Conditions), it is the Contractor's responsibility to independently evaluate existing pipe conditions and debris levels. However, for general reference only, maintenance records indicate the following last confirmed cleanings with TVI inspection: Line A - July 2012 Line B - Cleaning history varies from June 2012 to October 2025 with most segments last cleaned in 2012 Line C - Cleaning history varies from September 2012 to August 2017 with most segments last cleaned between 2012 and 2014 Line D - Cleaning history varies from August 2012 to March 2015 Line E - Cleaning history varies from July 2012 to August 2020 Line F - June 2012 Line G - July 2025 Line H - Cleaning history varies from June 2012 to May 2022 with most segments last cleaned in 2012

  • Based on experience or data the city has collected, can you please advise which pipe segments does the city expect will need bypass pumping for cleaning and CCTV inspection?

    The City has not identified specific pipe segments requiring bypass pumping. The Contractor is responsible for evaluating existing flow conditions and determining the appropriate flow control method necessary.

  • Can you please identify where bypass pumping will be required on this project, by segment ID, manhole-to-manhole run, or map reference?

    No, The City has not identified the specific pipe segments requiring bypass pumping.

  • Does the City expect every segment to be bypassed for cleaning and inspection? If not, please state the flow conditions or depth thresholds that would require bypass.

    The need for bypass pumping is up to the discretion of the Contractor. Other flow control methods (plugging, inspection timing, drawdown, etc.) are acceptable for an accurate inspection. Depth of flow levels should be less than 25% of the total diameter of the pipe (d/D 0.25) for CCTV inspection.

  • Can the City please change the bid form, so bypass pumping is bid per each (EA) setup?

    No, the payment for Bypass Pumping will be made on a lump sum basis for the entire project. Contractors are responsible for evaluating the project conditions to determine the need for bypass flow setups and include associated costs in the pay item.

  • In high-flow segments, will the city accept CCTV inspection with a float-mounted or skid camera instead of bypass pumping? If so, are there any limits on flow depth, footage, or segment type for that method?

    The City has not specified a specific CCTV inspection method for this project. However as stated in Question 6, depth of flow should be less than 25% of the pipe diameter during CCTV inspection.

  • Before the project starts, will the city make sure every manhole in the scope is located, exposed, and accessible, including any that are buried, paved over, or in easements?

    No, however the City can locate any manhole that cannot be found with at least 24 hour notice.

  • Will the City repair or replace broken or damaged manhole frames and covers before work begins? If not, how should the contractor document and report them?

    Should any manhole frame or cover be found to be broken or damaged prior to the start of work, the Contractor shall document the manhole and inform the City Wastewater Department. The Wastewater Department will provide and install a new frame and cover.

  • If lid bolts are seized, stripped, or broken and cannot be removed with normal tools, can the contractor bill extra work (cutting, drilling, extracting hardware) as a change order or unit-price item? Please describe how this work will be measured and paid.

    No separate payment will be made for dealing with seized, stripped, or broken lid bolts encountered during the course of the work. The City has not established a separate pay item for this work and it will not be measured separately for payment. This work shall be considered incidental to the contract bid items required to complete this project. The bid opening date will be adjusted to allow the Contractor to perform field inspections in the scope of this project.

  • Can the City please share the Engineer's estimate or the City's budget for bypass pumping?

    No, the City will not release the internal cost estimate for individual bid items. Contractors shall prepare their bids based on their evaluation of project conditions and information in the Contract Documents.

  • For segments requiring bypass, can flow rates be provided?

    No, as stated in Special Provisions section 3.43 Bypass Pumping. The contractor shall be responsible to obtain existing flows in all mains that will be affected by bypass to determine a bypass plan.

  • Due to the number of questions and overall complexity of the project, would the city be willing to provide a bid extension?

    The bid opening date will be adjusted to provide more time for potential bidders.

  • Is there GIS available to assist with building bypass plans?

    The City cannot provide GIS for the collection system at this stage, however updated mapping in PDF format will be uploaded showing adjacent sewer lines.

  • Are there any parallel lines or diversion structures to reduce flows?

    The only parallel line within the scope of work is segment 505048.6-504945.1 within Line “C”.

  • The specifications state that 95% cross sectional cleaning, during the pre-bid meeting the city stated 95% visual during inspection. Can this be clarified?

    Each pipe segment shall be cleaned to a minimum of 95% of its cross sectional area to be verified with the television inspection.

  • Due to the complexity of the project and potential for substantial bypass; that could potentially be every pipe segment listed, can the timeframe for completion be extended to 545 days.

    No, the contract completion time will remain at 180 calendar days. The City has not determined that bypass pumping will be required on every pipe segment.

  • Can the city provide proposed bypass plans?

    The selected bidder shall be responsible for preparing any required bypass plans to be submitted to the City for review at the pre-construction conference prior to the commencement of work.

  • For bidding purposes, can the amount of debris to expect in the sewer lines be defined?

    No, the City cannot guarantee the amount or type of debris that may be encountered within the sewer mains in this project. As stated in Special Provisions section 3.39 Existing Flow and Debris Conditions, the Contractor is responsible for evaluating existing flow and debris levels for bidding.

  • Can a separate bid item be added for Heavy cleaning by the hour?

    No, the bid form will not be revised at this time. As stated above, the City cannot guarantee the amount or type of debris that may be encountered.

  • In regard to bypass pumping, what amount of flow is acceptable to have in the sewer main while cleaning and televising is being completed? If 100% of the flow is required to be bypass while cleaning the cost of bypass will be extremely high.

    The City does not require that 100% of the flow be bypassed in all pipe segments. The Contractor is responsible for determining the appropriate flow control method necessary to complete the work. During video inspection, the flow depth should be generally less than 25% of the pipe diameter (d/D 0.25).

  • Can the flows for the sewer lines be provided? This is needed to provide accurate pricing.

    The City does not have flow monitoring data available for all sewer mains included in this project. Performing inspections at low flow times is encouraged.

  • Can maps of the surrounding sewer lines be provided to aid in planning bypass setup and costs?

    Yes to assist bidders in evaluating potential bypass pumping locations and planning of means & methods, updated PDF mapping uploaded now includes the location, size, and material of sewers mains adjacent to the project segments.

  • Would the city consider a force account for bypass? This would allow for a more consistent and fair bidding for everyone.

    No, the bid form will not be revised at this time. As stated in Special Provisions section 3.43 Bypass Pumping, the Contractor is responsible for evaluating conditions and their proposed means and methods to determine necessary flow control measures.

  • Would the city consider a force account for traffic control? This would allow for a more consistent and fair bidding for everyone.

    No, the bid form will not be revised at this time. The Contractor is responsible for determining traffic control requirements associated with their chosen means and methods.

  • 180 calendar days (approximately 128 working days) for a project of this size will be difficult to accomplish. Would the city consider 365 calendar days?

    No, the City has reviewed the request and determined that a contract duration extension is not warranted. Contractors should prepare bids based on the completion time as indicated.

Plain text

OpenGov categories

  • 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
  • 91345 · Construction, Sewer and Storm Drain
  • 91356 · Construction, Utility/Underground Projects
  • 91381 · Maintenance and Repair, Sewer and Storm Drain (Including Removal)
  • 91389 · Maintenance and Repair, Utility/Underground Projects