State and local · OpenGov
2026 Sewer Rehabilitation Project
Description
2026 Sewer Rehabilitation Project NOTICE IS HEREBY GIVEN that the CITY OF AMERICAN CANYON, STATE OF CALIFORNIA, will receive Contract Proposals up to the hour of 2:00 pm on Thursday, April 1, 2027 through the City's procurement portal at https://procurement.opengov.com/portal/cityofamericancanyon or in person at the City Clerk's office at American Canyon City Hall located at 4381 Broadway. Proposals will be opened immediately thereafter, in person in the HR Annex (Suite 104), and referred to the City Council for consideration at the next regularly scheduled meeting. For proposals submitted in person, the City Clerk's clock will be used to make the official determination of the time bids are submitted. Sealed proposals should be addressed as follows: City Clerk 2026 Sewer Rehabilitation Project City of American Canyon 4381 Broadway, Suite 201 American Canyon, CA 94503 Scope of Work General Work Description The 2026 SEWER REHABILITATION PROJECT has two distinct work locations and scope. Location A is along the west side of State Route 29 from Crawford Way to Poco Way. Work primarily consists of rehabilitating 2,870 linear feet of existing 10" diameter sewer via pipe-bursting and upsizing to 18” diameter. Location B is on Andrew Road from Donaldson Way to Wilson Way. Work primarily consists of rehabilitating 1,760 linear feet of existing 6" diameter sewer via pipe-bursting and upsizing to 8” diameter. Engineer's Estimate The Engineer's estimate is $2,300,000 . Notice to Bidders Summary 2026 Sewer Rehabilitation Project NOTICE IS HEREBY GIVEN that the CITY OF AMERICAN CANYON, STATE OF CALIFORNIA, will receive Contract Proposals up to the hour of 2:00 pm on Thursday, April 1, 2027 through the City's procurement portal at https://procurement.opengov.com/portal/cityofamericancanyon or in person at the City Clerk's office at American Canyon City Hall located at 4381 Broadway. Proposals will be opened immediately thereafter, in person in the HR Annex (Suite 104), and referred to the City Council for consideration at the next regularly scheduled meeting. For proposals submitted in person, the City Clerk's clock will be used to make the official determination of the time bids are submitted. Sealed proposals should be addressed as follows: City Clerk 2026 Sewer Rehabilitation Project City of American Canyon 4381 Broadway, Suite 201 American Canyon, CA 94503 Contract Proposals All work is to be done under contract, in accordance with the plans, specifications and drawings contained within and accompanying the CONTRACT DOCUMENTS. The Contract Proposal must be completed in its entirety and submitted through on the forms contained in the CONTRACT DOCUMENTS. Any proposal which is incomplete will be rejected. The Contract Documents, including the complete specifications and plans, planholders list and addenda are available for review and/or purchase at www.blueprintexpress.com/amcan or through the procurement portal. Documents will be transmitted electronically or sent via FedEx for an additional shipping charge. Bid results will be available on the City's procurement portal at https://procurement.opengov.com/portal/cityofamericancanyon . License No bid will be accepted from a bidder who is not licensed in the State of California as a Class A, C-34, or C-42 License, (licensed in accordance with the provisions of Division 3, Chapter 9, of the Business and Professions Code of the State of California). Bonds The successful Contractor will be required to furnish, with the Agreement, a Faithful Performance Bond in the amount of one hundred percent (100%) of the Agreement price and a Payment for Labor and Materials Bond in the amount of one hundred percent (100%) of the Agreement price. The successful Contractor will be required to furnish, prior to issuance of a Notice of Completion, a Warrantee Bond in the amount of ten percent (10%) of the final Agreement price. The successful Contractor shall also furnish Certificates of Insurance evidencing that all insurance coverage required by the CONTRACT DOCUMENTS has been so secured. Prevailing Wages Prevailing wages are required on this Contract. The ENGINEER of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR Web site, http://www.dir.ca.gov , or from the Department's Labor Compliance Office of the district in which the work is located. Bid Security All Contract Proposals shall be accompanied by a cashier's or certified check payable to the order of the City of American Canyon, amounting to ten percent (10%) of the bid, or by a Bid Bond in said amount, on the form included within the Contract Proposal. Said check shall be forfeited, or said bond shall become payable, in case the Bidder depositing same does not complete the requirements as defined in the CONTRACT DOCUMENTS in the time set forth herein below. Mandatory Registration Program For Public Works Projects Contractors must comply with the Department of Industrial Relations (DIR) compliance monitoring unit and labor compliance program. Contractors are required to register before bidding on and entering into contracts for state and local public works projects. Mandatory Project Labor Agreement The successful Contractor will be required to agree to be a party to and be bound by the City of American Canyon Project Labor Agreement (PLA) for this project. General Information Requests for information may be directed to the Public Works Department: Engineering Division City of American Canyon 4381 Broadway, Suite 201 American Canyon, CA 94503 For general information, call (707) 647-4559 . All technical questions or requests for information may be submitted via email to Ron Ranada , Senior Civil Engineer , at rranada@americancanyon.gov or through the procurement portal. Technical questions and Requests for Information will not be accepted after 1:00 pm on Friday, March 19, 2027 . Award and Execution The Contractor shall execute required documents within seven (7) calendar days after the Notice of Award; shall begin work within five (5) calendar days of issuance of the Notice to Proceed; and shall complete work within 60 working days of issuance of the Notice to Proceed. The City Council reserves the right to reject any and all proposals, to waive any irregularities, and to award the contract to other than the lowest Bidder. No Bidder may withdraw their Contract Proposal for a period of sixty (60) days after the bid opening. Copies of the CONTRACT DOCUMENTS may be examined or obtained through the procurement portal or at the address stated herein. Contractor Questionnaire Insurance Requirements 1. This is a Summary of Insurance Requirements for this project. By agreeing to perform the work or submitting a bid, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by the City. 2. You should check with your Insurance advisors to verify compliance and determine if additional coverages or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor’s liability under this agreement. The full coverage and limits afforded under Contractor’s policies of Insurance shall be available to the City and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required. 3. If non-standard Insurance forms are used rather than the standard Insurance Services Office (ISO) forms shown, Contractor agrees to pay City for an Independent Expert evaluation and opinion as needed to determine whether or not they are at least equivalent in coverage to the standard ISO forms. The charge shall be $150 for each non-standard endorsement and $575 for each non-standard policy. 4. Contractor or Consultant shall procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder and the results of that work by the Contractor, its agents, representatives, employees or subcontractors. Please refer to the insurance requirements listed below. Commercial General Liability (CGL): Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than two million dollars ($2,000,000) per occurrence for bodily injury, personal injury, and property damage, including without limitation, blanket contractual liability. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. Contractor’s general liability policies shall be primary and non-contributory, and be endorsed using Insurance Services Office form CG 20 10 (or equivalent) to provide that City and its officers, officials, employees, attorneys, and agents shall be additional insureds under such policies. For construction contracts, an endorsement providing completed operations to the additional insured, ISO form CG 20 37, is also required. Workers’ Compensation Insurance: Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance with limits of at least one million dollars ($1,000,000). Contractor shall submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officers, agents, employees, and volunteers. Professional Liability (Errors and Omissions): Contractor shall maintain professional liability insurance that insures against professional errors and omissions that may be made in performing the Services to be rendered in connection with this Agreement, in the minimum amount of two million dollars ($2,000,000) per claim and in the aggregate. Any policy inception date, continuity date, or retroactive date must be before the effective date of this agreement, and Contractor agrees to maintain continuous coverage through a period no less than three years after completion of the services required by this agreement. Builder’s Risk (Course of Construction): Contractor shall provide Builders Risk Insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions. Upon commencement of construction and with approval of City, Contractor shall obtain and maintain Builder’s Risk/Course of Construction insurance. Policy shall be provided for replacement value on an "all-risk" basis. The City shall be named as Loss Payee on the policy and there shall be no coinsurance penalty provision in any such policy. Policy must include: (1) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures, and all other properties constituting a part of the project; (2) coverage with limits sufficient to insure the full replacement value of any property or equipment stored either on or off the project site. Such insurance shall be on a form acceptable to City to ensure adequacy of terms and limits. Contractor shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to City. Contractor’s or Consultant’s Pollution Legal Liability Pollution Coverage shall be provided on a Contractors Pollution Liability form or other form acceptable to City providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than two million dollars ($2,000,000) per claim. All activities contemplated in this agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites. Surety Bonds Contractor shall provide the following Surety Bonds: Bid Bond, Performance Bond, Payment Bond, Warrantee Bond The Payment Bond and Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Warrantee Bond is not necessary. If the warranty period specified in the contracts is for longer than one (1) year a Warrantee Bond equal to ten percent (10%) of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain the following provisions: Additional Insured Status : The insurance policies are to contain, or be endorsed to contain the following provision: The City, its elected and appointed officials, officers, attorneys, agents, and employees are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor or Consultant including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s or Consultant’s insurance (at least as broad as ISO Form CG 20 10 11 85 or if not available, through the addition of both CG 20 10 and CG 20 37 if a later edition is used). Primary Coverage : The insurance policies are to contain, or be endorsed to contain the following provision: For any claims related to this contract, the Contractor’s or Consultant’s insurance coverage shall be primary insurance as respects the City, its elected and appointed officials, officers, attorneys, agents, and employees. Any insurance or self insurance maintained by the City its elected and appointed officials, officers, attorneys, agents, and employees shall be in excess of the Contractor’s or Consultant’s insurance and shall not contribute with it. Notice of Cancellation, Suspension or Otherwise Voiding Policies : Each insurance policy required above shall contain, or be endorsed to contain that coverage shall not be suspended, voided, canceled or reduced in coverage or in limits except with thirty (30) days’ prior written notice by certified mail, return receipt requested to the City. Waiver of Subrogation : Contractor or Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Contractor or Consultant may acquire against the City by virtue of the payment of any loss under such insurance. Contractor or Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. The Workers’ Compensation Policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by Contractor or Consultant, its employees, agents and subcontractors. Deductibles and Self-Insured Retentions : Any deductibles or self-insured retentions must be declared to an approved by City. The City may require the Contractor or Consultant to purchase coverage with a lower deductible or retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. At the option of the City, either (1) the insurer shall reduce or eliminate such deductibles or self‑insured retentions as respects the City, its elected and appointed officials, officers, attorneys, agents, and employees; or (2) the Contractor or Consultant shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. Acceptability of Insurers : Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to City. Subcontractors : Contractor shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a format at least as broad as CG 20 38 04 13. Verification of Coverage : Contractor or Consultant shall furnish the City with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the City before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s or Consultant’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. Failure to Comply : Each insurance policy required above shall contain or be endorsed to contain that any failure to comply with reporting provisions of the policies shall not affect coverage provided to the City, its elected and appointed officials, officers, attorneys, agents, and employees. Applicability of Coverage : Each insurance policy required above shall contain or be endorsed to contain that the Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. Bid Schedule (N/A, pending release of Plans and Specifications 2026 Sewer Rehabilitation Project WW20-0100; WW24-0100 The quantities on the following pages are approximate only and are given for the purpose of comparing proposals. The City does not expressly or by implication agree that the actual amount of work will correspond with quantities given herein, but reserves the right to increase or decrease the amount of any class or portion of the work as may be deemed necessary or advisable by the ENGINEER. Payment will be based upon the actual quantities installed or constructed, unless otherwise specified. General Provisions SECTION 1 - DEFINITIONS AND TERMS 1-01 DEFINITIONS - Whenever the following terms occur in the Contract Documents, the meaning shall be interpreted as follows: ACCEPTANCE -- The formal action by the City Council accepting the work as being complete. ACCEPTED BID -- The Bid Proposal accepted by the City. AGREEMENT (CONTRACT) -- The written agreement (contract) executed between the City and the Contractor covering the performance of the work. BIDDER -- Any person or entity submitting a Bid Proposal for the work contemplated. CITY -- The City Council and their powers of authority in representing the City of American Canyon, State of California, and as identified in the Agreement. CONTRACTOR -- The person or entity that entered into the Agreement with the City for the performance of the work as specified in the Contract Documents. CONSULTANT -- A person or entity either employed by the City or engaged by the City to prepare the Project Plans and Special Provisions for the work involved in the Agreement. CONTRACT DOCUMENTS -- The Contract Documents include Notice Inviting Bids, Contract Proposal, Contractor’s Experience and Financial Qualifications, Bid Schedule, Bid Bond, Agreement, Faithful Performance Bond, Payment For Labor and Materials Bond, Contractor's Certificate Regarding Worker's Compensation, Certificate of Insurance a
Published attachments
Addenda and notices
Addendum #1 · 1
Addendum #2 · 2