The City of Napa, a California charter city (“City”), will accept sealed bids for its 2026 Water Main Improvements Project (“Project”), by or before Tuesday, December 8, 2026 , at 2:00 pm , via electronic submission through the procurement portal at https://procurement.opengov.com/portal/cityofnapa , in the manner set forth in the Instructions to Bidders. This Project is presented in four separate plan sets and locations within the City of Napa. 1. Drawing Set W2026-018, Pueblo Ave Water Main Replacement: Main St to Soscol Ave Install approximately 62 LF of 12", 1,479 LF of 8", and 42 LF of 6" C900 PVC DR14 Pressure Class (PC) 305 water mains on Pueblo Avenue (Main Street to Soscol Avenue), including 10 interties, 4-12” butterfly valves, 19-8" gate valves, 6-6" gate valves, reconnect services (with respective valves/corps), set and adjust G-5 valve boxes, abandon existing pipeline and valve cans, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. 2. Drawing Set W2026-019, Pueblo Ave Water Main Replacement: California Blvd to Railroad Install approximately 655 LF of 12" and 846 LF of 8" C900 PVC DR14 Pressure Class (PC) 305 water mains on Pueblo Avenue (California Blvd to before railroad crossing), including 4 interties, 3-12” butterfly valves, 4-8" gate valves, 3-6" gate valves, 1-4" gate valves, reconnect services (with respective valves/corps), set and adjust G-5 valve boxes, abandon existing pipeline and valve cans, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. 3. Drawing Set W2026-020, Old Sonoma Road (3050-3100) Water Main Replacement Install approximately 880 LF of 6" C909 PVCO Pressure Class (PC) 305 water main on Old Sonoma Road, including three interties, one 12” butterfly valve, one 2” air release and vacuum valve, one blow off, a pressure regulating valve, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. Reconnect services, including relocation of two (2) meters. Abandon existing 4-inch steel pipeline. 4. Drawing set W-2026-021, 8" Water Main Installation: 305-312 Soscol Ave Install approximately 85 LF of 8" C900 PVC Pressure Class (PC) 305 water main on Soscol Avenue, including 2 interties, 4 8” gate valve, 1 6" gate valve, set and adjust G-5 valve boxes, abandon existing pipeline and valve cans, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. 2026 Water Main Improvements Bid Schedule Mobilization Control of Work Traffic Control Potholing Existing Utilities Construction Staking Shoring Erosion & Sediment Control 12" C900 DR14 Pipe 8" C900 DR14 Pipe 6" C900 DR14 Pipe 2" Service New 1" Service New 6" Fire Hydrant Assembly Tie-In 1 (Main St) Tie-In 2 (Adrian St) Tie-in 3 (Beard Rd) Tie-in 4 (Yahome St) Tie-in 5 (Azalea St) Tie-In 6 (Beecham St) Tie-In 7 (Coolidge Dr) Tie-In 8 (Michelle Ct, fire hydrant assembly excluded) Tie-In 9 (Trotter Ln, fire hydrant assembly excluded) Tie-In 10 (Soscol Ave) Abandon Valve Box 3” AC Trench Paving (T-cut) 2” Overlay Asphalt Paving (includes trench) Set and Adjust Utility Iron 12" C900 DR14 Pipe 8" C900 DR14 Pipe 6" Service Reconnect 4" Service Reconnect 1.5" Service Reconnect 2" Service New 1" Service New 6" Fire Hydrant Assembly Tie-In 1 (California Blvd) Tie-In 2 (1632 Pueblo Ave) Tie-in 3 (Stadium Ave) Tie-in 4 (Railroad) Abandon Valve Box Subcontractors List Please download the below documents, complete, and upload. SCOPE OF WORK Scope of Work See Plans and Technical Specifications (attachments) and all associated documents in this Invitation for Bids. NOTICE INVITING BIDS Bid Submission The City of Napa, a California charter city (“City”), will accept bids for it's 2026 Water Main Improvements Project ("Project"), by or before Tuesday, December 8, 2026 , at 2:00 pm , via electronic submission on OpenGov, the City's eProcurement System, at https://procurement.opengov.com/portal/cityofnapa , in the manner set forth in the Bid Submission section of the Instructions to Bidders section, at which time bids will be opened by the City. Project Information Location and Description. The Project is located at 3050-3101 Old Sonoma Rd; Pueblo Ave; and Soscol Ave, Napa, CA and is described as follows: This Project is presented in four separate plan sets and locations within the City of Napa. 1. Drawing Set W2026-018, Pueblo Ave Water Main Replacement: Main St to Soscol Ave Install approximately 62 LF of 12", 1,479 LF of 8", and 42 LF of 6" C900 PVC DR14 Pressure Class (PC) 305 water mains on Pueblo Avenue (Main Street to Soscol Avenue), including 10 interties, 2 12” butterfly valves, 13 8" gate valves, 6 6" gate valves, reconnect services (with respective valves/corps), set and adjust G-5 valve boxes, abandon existing pipeline and valve cans, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. 2. Drawing Set W2026-019, Pueblo Ave Water Main Replacement: California Blvd to Railroad Install approximately 655 LF of 12" and 846 LF of 8" C900 PVC DR14 Pressure Class (PC) 305 water mains on Pueblo Avenue (California Blvd to before railroad crossing), including 4 interties, 3 12” butterfly valves, 4 8" gate valves, 3 6" gate valves, 1 4" gate valves, reconnect services (with respective valves/corps), set and adjust G-5 valve boxes, abandon existing pipeline and valve cans, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. 3. Drawing Set W2026-020, Old Sonoma Road (3050-3100) Water Main Replacement Install approximately 880 LF of 6" C909 PVCO Pressure Class (PC) 305 water main on Old Sonoma Road, including three interties, one 12” butterfly valve, one 2” air release and vacuum valve, one blow off, a pressure regulating valve, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. Reconnect services, including relocation of two (2) meters. Abandon existing 4-inch steel pipeline. 4. Drawing set W-2026-021, 8" Water Main Installation: 305-312 Soscol Ave Install approximately 85 LF of 8" C900 PVC Pressure Class (PC) 305 water main on Soscol Avenue, including 2 interties, 4 8” gate valve, 1 6" gate valve, set and adjust G-5 valve boxes, abandon existing pipeline and valve cans, incidental disposal of existing pipe, disinfection, flushing, pressure testing, trench paving, and striping. Time for Final Completion. The Project must be fully completed within 120 working days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about January 15, 2027 , but the anticipated start date is provided solely for convenience and is neither certain nor binding. Estimated Cost. The estimated construction cost is $ 2,500,000 License and Registration Requirements License. This Project requires a valid California contractor’s license for the following classification(s): A – General Engineering Contractor . DIR Registration. City may not accept a Bid from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions. Contract Documents The plans, specifications, bid documents, contract, and other contract documents for the Project, and any addenda thereto (collectively, “Contract Documents”) may be downloaded from the eProcurement Portal at https://procurement.opengov.com/portal/cityofnapa , (See the Electronic Submission Section of the Instructions to Bidders for information on how to register as a vendor on OpenGov.) Bid Security Each bidder must submit bid security equal to ten percent of the maximum bid amount, in the form of a cashier’s or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Bid Submittal section in the manner set forth in the Bid Security section of the Instructions to Bidders. The bid security must guarantee that within ten days after City issues the Notice of Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, and any other submittals required by the Contract Documents and as specified in the Notice of Award. Prevailing Wage Requirements General. Pursuant to California Labor Code § 1720 et seq., this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Rates. The prevailing rates are on file with the City and are available online at http://www.dir.ca.gov/DLSR . Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code § 1771.4. Performance and Payment Bonds The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. Substitution of Securities Substitution of appropriate securities in lieu of retention amounts from progress payments is permitted under Public Contract Code § 22300. Subcontractor List Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form in the Bid Submittal section, including the name, location of the place of business, California contractor license number, DIR registration number, and percentage of the Work to be performed (based on the base bid price) for each Subcontractor that will perform Work or service or fabricate or install Work for the prime contractor in excess of one-half of 1% of the bid price, using the Subcontractor List form included in the Bid Submittal section. Instructions to Bidders All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a Bid. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids. Bidder's Conference A bidders’ conference will be held on Thursday, November 12, 2026 at 1:00 pm , at the following location: 1700 Second St, Suite 100, Napa, CA 94559 , to acquaint all prospective bidders with the Contract Documents and the Worksite. The bidders’ conference is Non-Mandatory . INSTRUCTIONS TO BIDDERS Each Bid submitted to the City of Napa (“City”) for its 2026 Water Main Improvements Project (“Project”) must be submitted in accordance with the following instructions and requirements: Bid Submission General. Each Bid Form must be completed, using the form provided in the Bid Submittal section, signed, and submitted to City, with all required forms and attachments, by or before the date and time set forth in the Bid Submission section of the Notice Inviting Bids, or as amended by subsequent addendum, via electronic submission only, as specified in the Electronic Submission section below. Faxed, hand-delivered, mailed, or emailed Bid Forms will not be accepted, unless otherwise specified. Late submissions will not be considered. City reserves the right to postpone the date or time for receiving or opening bids. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from City. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead. Electronic Submission. OpenGov. The Bid Form and all required forms and attachments must be submitted in PDF format via OpenGov at https://procurement.opengov.com/portal/cityofnapa . The file name of the PDF must include the bidder’s name and its registration number with the California Department of Industrial Relations (“DIR”) for bidding on public works contracts (Labor Code §§ 1725.5 and 1771.1), as follows: [ insert bidder’s company name ] – DIR Reg. No. [ insert DIR Reg. No .] V endor Registration . To participate in the bidding process, each bidder must register with OpenGov at https://procurement.opengov.com/portal/cityofnapa . Once registered, each bidder must subscribe to the City of Napa portal. For instructions on how to register as a vendor with OpenGov, visit the City’s website at: http://www.cityofnapa.org/265/Bidding-Information . Please read the instructions carefully and follow all steps, including registration with OpenGov and subscribing to the City of Napa account. Bid Tabulation . On the next Working Day following the bid opening, City will post the bid tabulation to: https://procurement.opengov.com/portal/cityofnapa . DIR Registration. Subject to limited legal exceptions for joint venture bids and federally-funded projects, City may not accept a Bid from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code § 1725.5. If City is unable to confirm that the bidder is currently registered with the DIR, City may disqualify the bidder without opening its bid. (Labor Code §§ 1725.5 and 1771.1(a).) Bid Form and Enclosures Each Bid Form must be completed legibly using the form included in the Bid Submission section. The Bid Form must be fully completed without interlineations, alterations, or erasures. Any necessary corrections must be clear and legible, and must be initialed by the bidder’s authorized representative. A Bid Form submitted with exceptions or terms such as “negotiable,” “will negotiate,” or similar, will be considered nonresponsive. Each Bid Form must be accompanied by a completed Subcontractor List and Non-Collusion Declaration using the forms included in the Bid Submittal section, a PDF copy of the bid security, and any additional forms required by the Notice Inviting Bids or Instructions to Bidders. In addition to submitting a PDF copy of the bid security, each bidder must also send the original form of bid security to the City, as set forth in the Bid Security section, below. Authorization and Execution Each Bid Form must be signed by the bidder’s authorized representative. A Bid Form submitted by a partnership must be signed in the partnership name by a general partner with authority to bind the partnership. A Bid Form submitted by a corporation must be signed with the legal name of the corporation, followed by the signature and title of two officers of the corporation with full authority to bind the corporation to the terms of the Bid Form, under California Corporations Code § 313. Bid Security Bid Security. Each bid must be guaranteed by bid security of ten percent of the maximum bid amount, in the form of a cashier’s check or certified check made payable to the City, or bid bond using the form included in the Bid Submittal section and executed by a surety licensed to do business in the State of California. Form of Security and Submission. In addition to submitting a PDF copy of the bid security, the wet-inked original bid bond, or cashier’s or certified check, must be sent to the City via U.S. Mail or a reliable overnight delivery service in a sealed envelope addressed to Chris Jones, Utilities Department, 1700 Second St, Ste 100, Napa, CA 94559 and clearly labeled with the bidder’s legal name and address, the Project title, and the date and time of the bid deadline. The envelope containing the original form of bid security must be postmarked or otherwise dated to show that it was submitted to the U.S. Postal Service or overnight delivery service by or before the date of the bid deadline. Bid Guarantee. The bid security must guarantee that, within ten days after issuance of the Notice of Award, the bidder will: execute and submit the enclosed Contract for the bid price; submit payment and performance bonds for 100% of the maximum Contract Price; and submit the insurance certificates and endorsements and any other submittals, if any, required by the Contract Documents or the Notice of Award. A Bid Form may not be withdrawn for a period of 60 days after the bid opening, or as otherwise extended by mutual written agreement between the City, bidder, and the bidder’s bid bond surety (if necessary), without forfeiture of the bid security, except as authorized for material error under Public Contract Code § 5100 et seq. Requests for Information Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted electronically, in writing, via OpenGov at https://procurement.opengov.com/portal/cityofnapa . Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least ten (10) Working Days before the scheduled bid deadline. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum. Pre-Bid Investigation General. Each bidder is solely responsible at its sole expense for diligent and thorough review of the Contract Documents, examination of the Project site, and reasonable and prudent inquiry concerning known and potential site and area conditions prior to submitting a Bid Form. Each bidder is responsible for knowledge of conditions and requirements which reasonable review and investigation would have disclosed. However, except for any areas that are open to the public at large, bidders may not enter property owned or leased by the City or the Project site without prior written authorization from City. Document Review. Each bidder will review the Contract Documents and any informational documents provided “For Reference Only,” e.g., as-builts, technical reports, test data, and the like. A bidder is responsible for notifying City of any errors, omissions, inconsistencies, or conflicts it discovers in the Contract Documents, acting solely in its capacity as a contractor and subject to the limitations of Public Contract Code § 1104. Notification of any such errors, omissions, inconsistencies, or conflicts must be submitted in writing to the City no later than five Working Days before the scheduled bid deadline. (See Section 5, above.) City expressly disclaims responsibility for assumptions a bidder might draw from the presence or absence of information provided by City. Project Site. Questions regarding the availability of soil test data, water table elevations, and the like should be submitted to the City in writing, as specified in Section 5, above. Any subsurface exploration at the Project site must be done at the bidder’s expense, but only with prior written authorization from City. All soil data and analyses available for inspection or provided in the Contract Documents apply only to the test hole locations. Any water table elevation indicated by a soil test report existed on the date the test hole was drilled. The bidder is responsible for determining and allowing for any differing soi
Published attachments
Addenda and notices
Official Notice #1: Pre-Bid Meeting Attendee Sign-in Sheet · 1
The Project Pre-bid meeting was held Thursday, November 12, at 1:00 p.m. See attached.
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. See attachment for additional clarifcation.
Addendum #2 · 2
CITY OF NAPA ADDENDUM NO. 2 CLARIFICATION AND CHANGES TO CONTRACT DOCUMENTS FOR 2026 Water Main Improvements WTR2026-002 CHANGES TO INVITATION FOR BIDS AND CONTRACT DOCUMENTS BID SCHEDULE No Revisions TECHNICAL SPECIFICATIONS Section 10-1.09 MAINTAINING TRAFFIC DELETE: Contractor must provide for the safe and orderly movement of traffic at all times during construction. On all streets, one (1) lane in each direction must be maintained at all times. Temporary street closures or providing only one (1) lane for both directions may be approved by the Engineer provided adequate circulation is maintained and/or adequate flaggers and signage is satisfactory. Any lane closures must be limited to the hours of 9:00 AM to 3:00 PM unless approved by the Engineer. No street closures will be allowed unless directed by the Engineer. If Contractor desires a street closure, Contractor must submit a written request, accompanied with a traffic control plan, to the Engineer for review and approval. The request must state the reason, locations, and times for the closure, and must be submitted a minimum of five (5) working days prior to the requested closure. REPLACE WITH: Contractor must provide for the safe and orderly movement of traffic at all times during construction. On all streets, one (1) lane in each direction must be maintained at all times. Temporary street closures or providing only one (1) lane for both directions may be approved by the Engineer provided adequate circulation is maintained and/or adequate flagmen and signage is satisfactory. Any lane closures must be limited to the hours of 8:00 AM to 5:00 PM unless approved by the Engineer. Street closures to thru traffic may be allowed if approved by the Engineer. If Contractor desires a street closure, Contractor must submit a written request, accompanied with a traffic control plan, to the Engineer for review and approval. The request must state the reason, locations, and times for the closure, and must be submitted a minimum of five (5) working days prior to the requested closure. School starts at 8:05am - 2:20pm Monday, Tuesday, Thursday, Friday. Wednesday is an early release day 8:05am - 12:55pm. One half hour before and after pickup and drop off bell times, one lane of traffic in either direction shall be required. The side parking lot next to O'Brian Park is used as a staff parking lot, accessibility shall be maintained for parking and food service deliveries. Dates of note: Spring break March 22-26, 2027,
Addendum #3 · 3
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
On sheet 3 of 15, the design shows 6" C900 RJ with 10' joints at 1 degree of joint deflection while the bid schedule states 6" C909? Can the City clarify the intent to use 6" C909 PC235 with 20' lengths at 2-degrees of allowable joint deflection which will have a radius of 559'?
An addendum will be issued to address the bid schedule Item #32, which should read C900 DR14 PVC. C909 is not used on this project. Clarification: 1-degree maximum deflection is allowed at pipe bell joints. Piping shall be C900 DR14 material.
What are the liquidated damages and retention on this project?
This information appears in Appendix F, Section 6 of the Terms and Conditions ($700.00/day). The retention value is in the General Conditions, section 8.5 (5%).
Can we directional drill the services
This is allowed with complete submittal documentation as well as utility crossing and depth confirmations.
Please confirm how the required ductile iron pipe relating to water main offsets per City Std W-15 is to be paid.
The project does not add ductile iron pipe unless there is less than 3-ft of cover with a pipeline offset. DIP may be substituted for C900 DR14. Inline offsets that avoid utility conflicts will be factored into LF cost of the pipeline bid item. Offsets shown in tie-in partial plans, when provided, or in a tie in vicinity shall be included in tie-in bid item unit cost.
What bid item are the various depicted proposed wingwalls paid under?
Wing walls and thrust blocks shown in tie-in partial plans, when provided, and a tie in vicinity shall be included in the tie in bid item unit cost.
Will any of the work locations have night time work requirements?
We will be issuing an Addendum 2 shortly with work phasing and night/weekend work requirements. Yes, there will be minimum night and weekend work requirements. Note that Caltrans encroachment permit for work on Soscol is still outstanding and may include additional requirements.
What are the construction hours for the locations in front of the schools?
School starts at 8:05am - 2:20pm Monday, Tuesday, Thursday, Friday. Wednesday is an early release day 8:05am - 12:55pm. One half hour before and after pickup and drop off bell times, one lane of traffic in either direction shall be required. The side parking lot next to O'Brian Park is used as a staff parking lot, accessibility shall be maintained for parking and food service deliveries. Dates of note: Spring break March 22-26, 2027, and Last day of school June 4, 2027. Also see Technical Specifications Section 10-1.09 & 1.10.
Which work site locations will the contractor be able to set up traffic detours for "No Thru Traffic"?
See Question 7 and Technical Specification Sections 10-1.09 and 10-1.10.
Will CMS boards be required for any of the work sites? How many CMS boards at each site?
See Addendum 2 when posted. 2 CMS boards (one in each direction) at each site at least two weeks prior to start of the work on that site.
Referencing the Project Plans, City of Napa General Water Note 17 - Documentation and Record Drawing: "All new water system installations shall be GPS surveyed within 5 business days of installation and before backfill." The contractor will need to backfill on a daily basis in order to open traffic at the end of each work day. Will the surveyor be able to take GPS readings as the contractor installs the pipes, fittings and other appurtenances so there are no delays? Please list any special requirements for the city GPS surveyor, ie will the contractor need to wait until a certain time to backfill while they wait for the GPS points to be collected.
Overall GPS schedule shall be reviewed weekly with the Water Inspector. Contractor shall contact Water Inspector four (4) hours prior to backfilling to coordinate GPS survey of new installations. GPS Survey crew will arrive at the coordinated time to collect the points for the pipe, fittings and appurtenances that were installed that day.
When areas are to be plated overnight, will the road plates need to be recessed into the asphalt?
Road plates will need to recessed per Method A. See City of Napa Standards & Specifications (https://www.cityofnapa.org/DocumentCenter/View/4303) section 2.13.03 TRENCHING, BORING, BACKFILL AND COMPACTION.
For the hot tap installations, the contractor is to install the tapping sleeve and valve and the City will do the hot tap. How will the City like the contractor to prepare the area? Will the City need the contractor to install and prep one day, and plate the area overnight so the city can have access first thing in the morning? Or is there a time deadline where the contractor preps and has a deadline of a certain time of day (ie 11:00am) and as long as the contractor is ready by that deadline the City inspects and performs the hot tap on the same day? Thank you.
Contractor shall call the Water Inspector 5 working days in advance, before excavating, to coordinate hot-tap date and time. Prepare the excavation per City Detail W-16A. Plating direction will be provided by Water Inspector. Typically contractor excavates and preps the area, has it inspected by the City at minimum a day prior to the hot tap and then the City performs the hot tap on the coordinated day.
What are the Fees associated with the hot tap? The Hot-Tap Detail W-16A says "All hot taps shall be by City forces at the Contractor's expense" as well as "Fees shall be paid..."
Contractor shall provide all material and labor (i.e.: for a 24-inch steel pipe, contractor to provide fittings, welding of "top hat" and gate valve). City will not assess the Contractor a tapping fee.