State and local · OpenGov
2027- 2029 Emergency Sanitary Sewer Point Repair
Description
The purpose of this project is to create an approved contractor list for emergency sanitary sewer point repairs, on an as needed basis. Emergency sanitary sewer point repairs include repairing sanitary sewer mains, supplying all materials, and providing traffic control for each project as contracted. Each contract (site) will be awarded as the need arises, based upon availability and project calculations from submitted unit prices. The term of the approved contractor list is three years, consisting of 2027, 2028, and 2029 with the option to renew for two additional one-year terms. ADVERTISEMENT FOR BIDS (AS PUBLISHED) The City of Pueblo is soliciting bids for the following project. Project No.: 26-063 Project Name: 2027-2029 Emergency Sanitary Sewer Point Repair The purpose of this project is to create an approved contractor list for emergency sanitary sewer point repairs, on an as needed basis. Emergency sanitary sewer point repairs include repairing sanitary sewer mains and/or manholes, supplying all materials, and providing traffic control for each project as contracted. Each contract (site) will be awarded as the need arises, based upon availability and project calculations from submitted unit prices. The term of the approved contractor list is three years, consisting of 2027, 2028, and 2029 with the option to renew for two additional one-year terms. Complete solicitation information can be obtained on the City of Pueblo Purchasing Department website at www.pueblo.us/purchasing or the OpenGov portal at https://procurement.opengov.com/portal/pueblo . Published: Tuesday, November 10, 2026 , in The Pueblo Chieftain Newspaper INTRODUCTION Summary Background Contact Information Timeline SPECIAL PROVISIONS GENERAL INSTRUCTIONS All specifications included in the Special Provisions shall have precedence over and will govern in the event of a conflict with other sections contained in this document. Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Failure to do so will not relieve a Bidder from any obligation or responsibility to understand and comply with all requirements and conditions for this project. Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening. Downloaded plans/drawings must be printed as “Actual Size”; scaling is NOT correct when printed using other options. It is the Bidder’s sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidder’s failure to follow this requirement. Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award. The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Bidders must follow the submittal procedures outlined in the bid documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. RESPONSIBILITY AND CAPACITY TO PERFORM CONCURRENT WORK In determining responsibility, the City may review each Bidder’s capacity to perform multiple City projects concurrently, including staffing, equipment, bonding, financial resources, current workload, and performance history. Bidder’s failure to adequately demonstrate such capacity shall be grounds for determining bidder not responsible. BASIS OF AWARD Approved contractors will be placed on a call list for emergency sanitary sewer point repair projects on an as-needed basis. Wastewater Department staff will estimate the cost of each individual project based on calculations of estimated quantities multiplied by submitted unit prices. Each individual project will be awarded to the contractor who is able to complete the project at the lowest estimated cost within the timeframe necessary to complete the project, as best fits the needs of the City. The City reserves the right to award projects based on Contractor's ability to respond to emergency projects in a timely manner. A notice of award and notice to proceed will be given for each project. TERM/TERMINATION Term. An initial agreement (in the form of the attached contract documents) with Contractor(s) is anticipated and expected to commence on January 1, 2027, and, unless sooner terminated, will terminate on December 31, 2029. The project may be renewed in two (2) successive one-year periods by a separate written amendment signed by both parties. All prices quoted shall be honored through December 31, 2027. Requests for annual increases in prices after this date may not exceed 1) three percent (3%) or, 2) the prior year's United States Bureau of Labor Statistics Consumer Price Index (CPI), whichever of the two options is lower. Price increases greater than this amount will not be considered unless there is an industry-wide price increase, which must be substantiated by a letter from the supplier or manufacturer. Termination. City reserves the right to terminate this Agreement, in whole or in part, at any time, without cause, by written notice to Contractor. Upon receipt of such notice, Contractor shall immediately stop work under the agreement or with respect to the portion of the Agreement terminated and shall take immediate corresponding action with respect to the Contractor's suppliers and subcontractors; if any. Fund Appropriation. City would make any such renewal subject to the appropriation of funds for the continuation of agreement. Upon the failure of City to appropriate such funds, the agreement would immediately be terminated without liability. BID, PERFORMANCE, AND PAYMENT BONDS A Bid Bond and Payment and Performance Bonds are not required for the submittal of the bid. Any and all language regarding bid, performance and payment bonds in General Provisions shall not be applicable for this project if the bid amount is less than $50,000.00. If the total amount for any individual emergency point repair project is $50,000.00 or more, Performance and Payment Bonds will be required at the time of award (per §38-26-106, C.R.S.). If Performance and Payment Bonds are required for a repair, the City of Pueblo will reimburse the Contractor for the cost of the bonds. A copy of the receipt for the bonds must be submitted to the City for reimbursement. No markup will be paid. PROGRESS PAYMENTS Progress payments will not be made. Contractor will be paid only after receipt of a Notice to Proceed, completion of each individually awarded project, and final inspection and approval of each project by Wastewater personnel. A single payment for each individual project will be made upon completion of the entire project after all work is completed, inspected, and approved by authorized Wastewater personnel. All retainage provisions will still apply; final payment will not be made until after final advertisement. STANDARD CONSTRUCTION SPECIFICATIONS AND STANDARD DETAILS The 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado , adopted January 12, 2026, and as most recently amended, shall control the construction and quality of materials for this project except where specifically modified by the Special Provisions. Unless specifically modified by the Special Provisions, the 2026 Standard Construction Specifications and Standard Details shall control with respect to any inconsistencies with the Plans. The 2026 Standard Construction Specifications and Standard Details are not included in this bid package but are available on the City of Pueblo’s website at 2026 Standard Construction Specifications and Standard Details . By submitting a bid, the Contractor acknowledges possession of a copy of said document. SPECIFICATION LANGUAGE Specifications may be written in abbreviated style with incomplete sentences. Omission of words such as “The General Contractor shall”, “Conforming to”, “shall be”, etc., are intentional; omitted words shall be supplied by inference. Where words “approved”, “satisfactory”, “directed”, “submitted”, etc., are used it shall be assumed that the words “Project Manager” follows, such as “approved by the Project Manager”. APPROVED EQUAL An approved equal, where noted, may be considered by the City. For consideration as an approved equal, a Request for Substitution must be submitted through the OpenGov portal by Tuesday, November 24, 2026 at 4:00 pm (MT). Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. If approved, an addendum will be issued that lists all approved equal products or materials. No other products or materials will be considered. INCONSISTENCIES Any inquiries regarding seeming inconsistencies between the Plans and Specifications for this project must be made by Tuesday, November 24, 2026 at 4:00 pm (MT). PREPAYMENT OF CITY SALES AND USE TAX (This section applies to public improvement construction projects $100,000 and over.) The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded, including Base Bid plus those Alternates selected. Application and prepayment shall be made within fourteen (14) days of the date authorized to proceed with construction of the Project as set forth in the Notice to Proceed. All applications and prepayments shall be coordinated directly with City’s Division of Sales and Use Tax, Attention: Tax Audit Manager, 101 W. Riverwalk, Pueblo, Colorado 81003. Finance Department policy sets the threshold at $100,000. Any contractual obligations below this amount will not generally be required to make a pre-payment of Use Tax. PERA LIABILITY Contractor shall reimburse the City for the full amount of any employer contribution required to be paid by the City of Pueblo to the Public Employees’ Retirement Association (“PERA”) for salary or other compensation paid to a PERA retiree performing contracted services for the City under this Agreement. Awarded Contractor will be required to submit a completed Colorado PERA Questionnaire form. This form is available to view at Colorado PERA Questionnaire and is included by reference in this Contract. CONTRACTOR EVALUATION The performance of the awarded Contractor will be evaluated using the Contractor Evaluation Form. This form is available to view at Contractor Evaluation Form and is included by reference in this Invitation for Bid. The evaluation will be utilized to review Contractor’s performance, increase communication, and foster positive business relationships. The completed evaluation form will serve to document Contractor’s overall performance. Material failure to perform in accordance with the terms of one or more contracts, or materially unsatisfactory performance of one or more contracts, may be justification for disqualifying future bids by Contractor pursuant to Pueblo Municipal Code, Title 1, Chapter 10, Section 1-10-4(d). SAFETY REGULATIONS The Contractor shall be aware of and shall comply with all State and Federal Safety regulations which are applicable to the work included under this Contract. Enforcement will be by the proper State and Federal regulatory agencies. If any construction activity is deemed to be unsafe for inspection, Contractor shall, upon notification, discontinue work until the deficiencies are corrected and the job can be properly inspected. EMERGENCY REPAIR OR PROTECTIVE WORK BY THE CITY OF PUEBLO As referenced in PROTECTION OF THE PUBLIC, WORK, AND PROPERTY and ACCIDENT PREVENTION of the GENERAL PROVISIONS , it is the Contractor’s responsibility to provide adequate barricades, protective devices and safety measures, and to employ other precautionary means for the adequate protection of the public, the work, and public/private property from injury or loss. Should the City become aware of any condition or circumstance arising from the work, or with respect to any excavation or areas disturbed by Contractor which, in the opinion of the Project Manager, creates or results in any imminent or unreasonable risk to the health/safety of the public or to public/private property, the City may undertake emergency work or repairs. Such work may include, by way of illustration, provision of barricades, traffic control devices or flagmen, deployment or warning signs, repair of lines under construction, repair of collapsed excavations or sinkholes, placement of sandbags or dams, and other emergency efforts. The determination of the necessity during the construction and warranty periods for the City to do any such emergency work or repairs shall rest entirely with the Project Manager. The cost of emergency work done by the City, including the actual cost of labor, equipment, and materials, plus 100 percent, shall be deducted from any amounts otherwise owed to Contractor, or may be invoiced to Contractor, or the same amount shall be recovered from Contractor’s performance bond. REPRESENTATIVE AVAILABLE FOR EMERGENCY CALLS The Contractor shall provide the name, address and phone number of a representative who may be reached at any time during the life of the Contract regarding repairs, detours, barricading, etc. This information shall be furnished in writing to the Project Manager. DUST PREVENTION During construction and until final acceptance by the Project Manager, Contractor shall be responsible for controlling dust emissions in the construction area. No earthwork activities shall be performed when the wind speed exceeds thirty (30) miles per hour. All fill areas shall be compacted on a daily basis to 95% of a Standard Proctor laboratory maximum density. Any mud or dirt carried out onto paved surfaces shall be cleaned up on a daily basis. Contractor shall promptly comply with all directives from the Project Manager relating to dust control. If Contractor fails to comply or provide adequate means to control dust, a stop-work order will be issued until the problem is corrected. SITE RESTORATION AND CLEANUP Contractor shall maintain and/or repair any damage done to all existing properties, public or private, adjacent to site improvements, including but not limited to, asphalt, base course, utilities, sod, irrigation systems and landscaped areas. In general, disturbed areas shall be replaced to the lines, grades, thickness, and like materials of the existing conditions unless otherwise stated on the plans. Restoration shall be consistent with that of areas adjacent to the limits of construction. Grass and other plant areas shall be restored, maintained, and irrigated until final acceptance by the Project Manager. Fabric shall be installed under all rock landscape areas. Any landscape material salvaged by Contractor for reuse will not be acceptable if contaminated by dirt or different landscape material. Slopes to match from the new improvements to existing improvements shall not exceed a 4:1 slope. All work to relocate existing irrigation sprinklers which conflicts with the new construction shall be considered site restoration. The accuracy of information furnished regarding existing irrigation systems is not guaranteed. The locations are approximate and may not include all irrigation system components. Contractor shall determine the exact location of all irrigation systems before commencing work and shall be fully responsible for any damage resulting from failure to locate and protect all irrigation systems. Site restoration and cleanup will not be measured or paid separately but shall be included in the unit prices for each bid item. Partial payments will not be made on any bid item until the restoration and cleanup associated with that item is satisfactorily complete and acceptable to the Project Manager. UTILITY LOCATIONS The accuracy of information furnished in regard to underground utilities is not guaranteed. The utility locations are approximate and may not include all utilities. Contractor shall determine the exact location of all utilities before commencing work. Contractor shall be fully responsible for any damage which might occur due to Contractor’s failure to locate and protect all utilities. Contractor shall repair or have repaired, at no cost to the City, any damage to utilities. Existing utilities include gas, water, service lines, meters, meter cans, buried telephone cables, buried power lines, pedestals, utility poles, sanitary sewer, manholes and services, and any other existing utility. ABANDONED UTILITIES If during construction an abandoned utility is encountered Contractor shall contact and coordinate with the Project Manager to arrange for the removal of the utility. If Contractor elects to remove the utility without contacting the Project Manager, Contractor shall do so at no cost to the City. OVERHEAD AND/OR UNDERGROUND HIGH VOLTAGE POWER LINES Unless danger against contact with high voltage overhead and/or underground lines has been effectively guarded against, Contractor shall not perform any function/activity upon any land, building, highway, or other premises if at any time during the performance of any function/activity it could move or be placed within ten (10) feet of any high voltage overhead and/or underground line. If work is to be performed within ten (10) feet of high voltage overhead and/or underground lines, the public utility must first be notified to arrange for safety provisions. Contractor may perform the work only after arrangements, including coordination and payment of fees, if applicable, have been made with the utility company. CONCRETE PERMITS The “no fee” permit shall be obtained from the City Engineering Division at 211 E. “D” Street. Any concrete work placed without benefit of both permit and inspection by the Public Works Department will not be paid for. COORDINATION OF CONSTRUCTION ACTIVITIES Contractor and subcontractors shall coordinate work with all other construction activities and contractors; and cooperate with them to facilitate general progress of the work. Each trade shall afford other trades every reasonable opportunity for installation and storage of materials. WORK BY OTHERS Contractor shall coordinate work on the project with all work shown on the plans which is to be done by “others”. It is the Contractor’s responsibility to coordinate work with each entity and incorporate it into the project schedule COMPLETE WORK ON TIME Fail
Published attachments
Addenda and notices
Official Notice #1: Pre-Bid Meeting Information · 1
The following is a list of attendees at the pre-bid meeting: Contractors Stacie Jo Parker, Parker Excavating, Inc., 719-671-7769, stacie.jo@hotmail.com Clint Eaks, Miller Pipeline, 719-252-8840, clint.eaks@millerpipeline.com Bailey Russ, Russ Grading and Excavating, 719-369-9781, bruss.rgx@gmail.com Steven Contrares, CDK Construction, 719-583-2331, info@aaaplumbingcolorado.com City of Pueblo Representatives Dennis Wells, 719-320-2904, dwells@pueblo.us Abel Santistevan, 719-565-9433, asantistevan@pueblo.us Sonia Mondragon, 719-553-2890, smondragon@pueblo.us Note: A copy of the handwritten list may be requested by emailing purchasing@pueblo.us . We are unable to post online due to accessibility issues.
OpenGov categories
- 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
- 91345 · Construction, Sewer and Storm Drain
- 91356 · Construction, Utility/Underground Projects
- 91381 · Maintenance and Repair, Sewer and Storm Drain (Including Removal)
- 91389 · Maintenance and Repair, Utility/Underground Projects