2027 Sanitary Sewer Spot Repair and Rehabilitation Project
Description
General work description: The work consists of sanitary sewer inspection, point repairs, open trench replacements, and /or pipe bursting, as well as manhole rehabilitation or replacement, and reconnection of existing laterals, located at various streets within the Sunshine Garden, Lindenville and Orange Park neighborhoods in South San Francisco, CA. The engineer’s estimate for the base bid in this work is $4.95M and the engineer’s estimate for the alternate bid is $627K. A detailed scope of work is included in the bid documents. Base Bid Table Mobilization and Demobilization Traffic Control and Construction Signs Storm Water Pollution Prevention Plan Sheeting, Shoring, and Bracing Sewer Flow Control (Bypass Pumping) 6" PVC (SDR 26) Spot Repair (5 LF) 8" PVC (SDR 26) Spot Repair (5 LF) 10" PVC (SDR 26) Spot Repair (5 LF) 12" PVC (SDR 26) Spot Repair (5 LF) 15" PVC (SDR 26) Spot Repair (5 LF) 6"HDPE (SDR 17) Pipe Bursting 8" HDPE (SDR 17) Pipe Bursting 21" HDPE (SDR 17 ID) Pipe Bursting 6" HDPE (SDR 17) Open Trench Repair & Replacement 8" HDPE (SDR 17) Open Trench Repair & Replacement 10" HDPE (SDR 17) Open Trench Repair & Replacement 15" HDPE (SDR 17 ID) Open Trench Repair & Replacement 18" HDPE (SDR 17) Open Trench Repair & Replacement Reconnect Existing SS Laterals Rehabilitate Existing Manhole (Allowance) Replace Existing Manhole (Allowance) Potholing Alternate Bid Table Mobilization and Demobilization Traffic Control and Construction Signs Storm Water Pollution Prevention Plan Sheeting, Shoring, and Bracing Sewer Flow Control (Bypass Pumping) 6" PVC (SDR 26) Spot Repair (5 LF) 6"HDPE (SDR 17) Pipe Bursting 8" HDPE (SDR 17) Pipe Bursting 10" HDPE (SDR 17) Pipe Bursting 21" HDPE (SDR 17 ID) Pipe Bursting 8" HDPE (SDR 17) Open Trench Repair & Replacement 10" HDPE (SDR 17) Open Trench Repair & Replacement Reconnect Existing SS Laterals Replace Existing Manhole Potholing Project Details Important Instructions for Electronic Submittal The City is accepting electronic bid submissions. Bidders shall create a FREE account with ProcureNow by signing up at https://secure.procurenow.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Introduction Summary Background Contact Information Timeline Vendor Submissions Pricing Table Attachments
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. And review, sign and upload the addendum notice.
Public questions and answers
Where is the Bid Items List in the proposal docs?
The Bid Item table is listed in the procurement website; under Project Documents and the Pricing Table.
WHO IS RESPONSIBLE FOR COMPACTION TESTING ON THIS PROJECT? CITY OR CONTRACTOR?
The City is responsible for compaction testing. See the Technical Specifications - Item 1.04 - C on page 31 23 33 - 2 for more detail.
Multiple locations on this project require work on private property. Has the City obtained any right-of-entry agreements for work located on private property? If so, please provide copies and identify the related work locations. If not, confirm that obtaining right-of-entry agreements is the Contractor's responsibility.
Please refer to Addendum No.1 as the Contractor shall obtain Temporary Right-of-Entry (ROE) and written property owner permissions prior to entering private property.
All plan sheets have the following note” FOR SEGMENTS LOCATED WITHIN SIDEWALKS OR PRIVATE PROPERTY. CONTRACTOR SHALL OBTAIN AND/OR VERIFY ALL NECESSARY PROPERTY OWNER PERMISSIONS, PERMITS, AND EASEMENTS PRIOR TO CONSTRUCTION.” Has the City confirmed appropriate easements for work on private property? Are property owners aware of the repair work that is going to be taking place on their property? What happens if the property owner does not give contractor right of entry?
If a property owner refuses to grant right-of-entry, the City will work in good faith with the Contractor to assist in obtaining the necessary access.
At the locations listed below the plans call for open trench replacement of the existing sewer main. The open cut replacement at these locations have significant conflicts with existing fire hydrants, multiple large trees, power poles, existing structures, private home owner landscaping, retaining walls, storm drain curb inlets, sidewalk and curb ramps. How will the removal and replacement of all these items be quantified and paid for? Does the City have approval for the items that need to be removed on private property, and has this project been coordinated with the utility providers whose power poles will be affected by this project? Detail 3 on Drawing CS-20A Detail 1 on Drawing CS-23A Detail 3 on Drawing CS-24B Detail 2 and 3 on Drawing CS-27A
Please refer to Addendum No. 1 for changes to the plan set. Detail 3/CS-20A revised to pipe bursting under sidewalk. Detail 1/CS-23A removed from project, spot repair added to Sheet CS-10. Detail 3/CS-24B will remain as is, Contractor responsible for replacing any fencing removed. Detail 2 and 3/CS-27A revised to pipe bursting. As stated in the drawings and specs, it is the responsibility of the Contractor to repair any damage landscaping/sidewalk/curb ramps/utilities as part of the bid items. It is also the responsibility of the Contractor to coordinate with PG&E for protecting the existing poles.
The Plan Note for this location states Spot Repair is 70LF upstream from MH 1491 which makes it appear to be in Colma Creek. Is this in fact the location of the repair?
The proposed spot repair is estimated to be located north of the creek's top of bank, within the landscaped area. The Contractor shall verify the final repair location in the field prior to commencing work.
These sizes are not produced to our knowledge. Please advise
The bid schedule identifies the pipe sizes by ID (inside diameter), indicating the minimum required inside diameter. Accordingly, the anticipated HDPE pipe sizes are 16-inch OD for the 15-inch ID requirement and 24-inch OD for the 21-inch ID requirement.