State and local · OpenGov
2027 Tree Pruning Services
Description
The RFP seeks competitive proposals from qualified Firms to provide clearance pruning of approximately 20,000 trees within the public right-of-way and/or private property trees and shrubs that overhang onto public right-of-way on selected streets . Completion of the pruning must be completed by June 30, 2027. ACHD shall be entitled to "Liquidated Damages" of $250.00 for each calendar day of delay in the completion of the work. Complete Work and Requirements to prune trees/shrubs as per Contract Document SCOPE OF WORK Special Provisions and Scope of Work GENERAL SPECIFICATIONS All work shall comply with applicable Ada County Highway District (ACHD) requirements and Boise City Parks and Recreation Department requirements where applicable to the assigned work. The Contractor shall obtain and maintain the licenses and permits required for the work and the jurisdiction in which it is performed. SCOPE OF WORK The Contractor shall provide all labor, supervision, equipment, tools, materials, traffic control, notifications, hauling, and disposal necessary to prune all or a selected portion of the trees, bushes, and shrubbery in the project areas shown on the solicitation maps. ACHD reserves the right to add or delete locations. After award, ACHD will issue the work list identifying addresses or other location identifiers, tree or shrub type, and required pruning type. If a listed tree or shrub has already been pruned to the required condition before the Contractor arrives, the Contractor shall notify ACHD. Once verified by ACHD, the location will be recorded as complete without Contractor payment. The Contractor shall not prune or invoice an unassigned location without written ACHD authorization. At the end of each working day, the Contractor shall remove equipment, tools, wood, trimmings, brush, chips, and other work-related debris, except where the Contract expressly allows otherwise. Sweep affected areas clean and leave the site as clean as or cleaner than its pre-work condition. Remove debris from the work site and dispose of it lawfully. Elm disposal is subject to Section 10. The Contractor shall bid one all-inclusive Average Unit Price for the pruning work. That price shall include all requirements of this Contract. Payment shall equal the awarded Average Unit Price multiplied by the actual authorized and accepted payable units under Exhibit C. The evaluated bid price will use ACHD's estimated quantity; award will be determined under Exhibit D rather than solely by the lowest extended price. 1. WORK SCHEDULING The Contractor shall coordinate the work sequence with ACHD and provide daily notice to the agencies below of work locations and planned street closures. Closure notices shall identify the primary street, affected cross streets, and expected closing and opening times. Notify the agencies before each closure and immediately after reopening. Agency Telephone Community Forestry 208-384-4083 Ada County Highway District 208-387-6350 Boise City/Ada County Dispatch 208-384-4300 Submit a proposed schedule and work plan with the bid as required by Exhibit D. After award, coordinate the final sequence, priority areas, and notification schedule with ACHD. Revised scheduling does not extend the completion date without a formal written extension from ACHD. 2. SAFETY STANDARDS Equipment and operations shall comply with applicable Occupational Safety and Health Administration (OSHA) regulations, ANSI Z133-2026, Safety and Health Requirements for Arboricultural Operations, and applicable federal, state, and local laws. Use relevant National Institute for Occupational Safety and Health (NIOSH) recommendations as safety guidance. The Contractor is responsible for pedestrian and vehicular safety within and around the work area. Provide required permits, bonds, traffic control personnel, warning devices, barricades, signage, and accessible pedestrian routing. Traffic control shall comply with the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD), as applicable in Idaho, and ACHD-approved requirements. Obtain Boise City Police Department approval where required. ACHD Traffic Engineering shall approve the traffic control plan before ACHD issues the Notice to Proceed. The Contractor shall contact ACHD Zone Inspection Coordinator Jim Pickard at 208-387-6308 regarding traffic control requirements for work within the public right-of-way. Before starting at each location, evaluate traffic, pedestrians, overhead utilities, tree condition, equipment setup, and the drop zone. Use personnel qualified for their assigned tasks and protect turf, trees, structures, utilities, and other improvements. Stop the affected work and coordinate with ACHD and the utility owner when an electrical hazard or other unsafe condition cannot be addressed within the crew's qualifications. Maintain emergency access and implement the Contractor's site-specific safety and rescue procedures. 3. LIABILITY FOR DAMAGES OR INJURY The Contractor shall be responsible for damages and injuries resulting from work performed under this Contract, including damage to curbs, sidewalks, streets, buildings, structures, signs, utilities, sprinklers, sod, and plant materials within or adjacent to the work area, whether on public or private property. Report all damage immediately to ACHD. Complete repairs within seventy-two (72) hours. Repairs, replacements, or monetary restitution shall be completed to the satisfaction of the affected agency, utility, property owner, or authorized representative before disbursement of the applicable funds. The Contractor shall indemnify and hold harmless ACHD from damages resulting from work performed under this Contract, subject to the terms of the executed Agreement. Tree damage is also addressed in Section 9. 4. TIME OF COMPLETION Work shall begin within ten (10) calendar days after the Notice to Proceed and shall be completed by June 30, 2027, unless ACHD grants a formal written extension. ACHD may assign specific completion dates to individual project areas to accommodate its work schedule. The Contractor shall organize staffing, equipment, notices, and work sequencing to meet these dates. Exhibit B summarizes the schedule requirements. 5. ACCEPTANCE OF WORK Bidders shall inspect the proposed work areas and become familiar with the conditions and scope. The Contractor remains responsible for meeting all specifications. ACHD's failure to immediately reject unsatisfactory work or identify a deviation does not constitute acceptance or relieve th NOTICE Ada County Highway District REQUEST FOR PROPOSAL 2027 Tree Pruning Services MO27-16 Sealed proposals for 2027 Tree Pruning Services will be received within the Ada County Highway District (ACHD) eProcurement portal, https://procurement.opengov.com/portal/achdidaho , until 3:00 pm (local time), Wednesday, December 2, 2026 , at which time the proposals will be publicly opened via Zoom. ACHD will conduct the bid openings scheduled for that date and time individually and in an order established solely by ACHD that best suits its business needs. All proposals must be electronically sealed and submitted via ACHD's eProcurement portal https://procurement.opengov.com/portal/achdidaho . Manual/Paper bids will be deemed non-responsive. The RFP seeks competitive proposals from qualified Firms to provide clearance pruning of approximately 20,000 trees within the public right-of-way and/or private property trees and shrubs that overhang onto public right-of-way on selected streets . All questions or requests for clarification regarding this Request for Proposal (RFP), including the content and requirements of the RFP and Documents, must be submitted in writing through the "Question and Answer" section of the ACHD eProcurement Portal no later than 12:00 pm on Wednesday, November 18, 2026 . Questions submitted by any other method, including phone calls, manual delivery or email, will not be accepted , nor will questions be accepted after the designated Question and Answer deadline. Respondents are strongly advised to observe the stated deadline for submitting inquiries. To ensure timely receipt of updates, respondents are encouraged to select “Follow” on this Proposal within the eProcurement Portal to receive automated email notifications when responses are posted. Notwithstanding such notifications, it remains the sole responsibility of each bidder to monitor the eProcurement Portal for updates and responses regularly. Any interpretation, clarification, or modification of the RFP that may affect its substance will be issued only in writing in the form of an Addendum and will be made available through the eProcurement Portal. It is the Respondent's responsibility to review and acknowledge all Addenda before submitting a Proposal. Final Addendum will be issued to all registered Respondent Holders no later than 4:00 pm on Friday, November 20, 2026 . The successful Bidder may be required, upon issuance of the Notice of Award, to furnish supply, material, payment, and performance bonds, each in an amount equal to one hundred percent (100%) of the total Contract value. No such bonds shall be required at the time of bid submission. ACHD has prepared the RFP Documents, and copies must be obtained from the eProcurement Portal . ACHD reserves the right to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD. Award of a contract pursuant to this procurement may be delayed, without penalty, for up to sixty (60) calendar days after the date of submission. Dated Tuesday, November 10, 2026 ADA COUNTY HIGHWAY DISTRICT Dates of Publication: November 10 and 17, 2026 INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO RESPONDENTS MULTIPLE DOCUMENTS TO MAKE UP ENTIRE AGREEMENT All Sections as well as the notice, taken together, shall make up the entire Agreement between the Ada County Highway District (ACHD) and the successful Respondent. The Respondent should carefully read and understand all these documents. By signing and submitting the Authorized Representative Signature Form, the successful respondent does herein agree to abide by the terms and conditions of the entire Agreement. COMPLIANCE The proposal submitted must comply with the Specifications and the General Terms and Conditions included herein, and any addendum issued. Failure to comply will result in rejection of the proposal as void and non-responsive. PROPOSAL SUBMITTAL Sealed proposals will be received for 2027 Tree Pruning Services through the Ada County Highway District’s eProcurement Portal located at https://procurement.opengov.com/portal/achdidaho The Ada County Highway District's (ACHD) e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Responses will not be accepted after the submission deadline regardless of any technical difficulties, such as internet connectivity issues. Submissions will not be considered, even if attempted within the final thirty (30) minutes , nor will exceptions be made for calls made to procurement close to the deadline. The Ada County Highway District strongly recommends that all respondents complete and submit their Request for Proposals (RFP) well in advance of the specified deadline. Respondents are solely responsible for ensuring that their RFP's are timely submitted to ACHD via the eProcurement Portal. ACHD assumes no responsibility for any failures of computer systems or equipment that may result in partial or incomplete submissions, nor for failure to meet the required deadline as outlined in the solicitation. Should any technical issues arise during the submission of the Request for Proposals within OpenGov (ACHD e-Procurement Portal), please utilize the "chat" feature of the "contact us" section under OpenGov Support for assistance. Neither OpenGov nor ACHD guarantees uninterrupted access to the OpenGov website or error-free services. Furthermore, neither party will be held liable for any inadvertent disclosure of repository information or unauthorized access by third parties. "Disruption to electronic communications" or "service loss" refers to unplanned events that significantly hinder or entirely prevent the normal functionality of electronic communications systems, such as cyberattacks, intentional disruptions (e.g., government shutdowns), power outages, or natural disasters. It does not apply to other technical issues, including operator errors or internet connectivity problems. In the event of a disruption to electronic communications or service loss by OpenGov within four (4) hours of submission deadline, ACHD will investigate the reported incident in coordination with OpenGov. If the disruption is confirmed, ACHD will work to provide the best possible resolution to ensure respondents have the opportunity to submit their responses. ACHD will notify all affected parties via email through OpenGov regarding any incidents and the resolutions. PROPOSAL FORMS Respondents must provide all information required in the Proposal and submit the Proposal by the date and time specified. If supporting documentation is required, such documentation must be submitted with the response to this solicitation. If addenda have been issued in relation to the solicitation, respondents must acknowledge all addenda. Failure to submit these required documents will be a basis for rejecting the submission as non-responsive. The respondent shall sign the Authorized Representative Signature Form. If the respondent is a corporation, the legal name of the corporation shall be entered together with the original signature of an agent authorized to sign contracts on behalf of the corporation. If the respondent is a partnership, the true name of the firm shall be entered together with the original signature of the partner(s) authorized to sign contracts on behalf of the partnership All blank spaces in the proposal form must be filled in. No changes may be made in the phraseology of the forms nor may the respondent add any phraseology conditioning the acceptance of the award. In case of a discrepancy between unit and total prices, unit prices shall govern. A proposal will be deemed unresponsive if it contains omissions, erasures, or alterations not initialed by the firm signatory, additions of any kind, prices not called for, prices which are obviously unbalanced, or items which fail to conform to the conditions of the Request for Proposal. INTERPRETATIONS OF QUANTITIES IN COST SCHEDULE The quantities appearing in the cost schedule are approximate and are prepared for the comparison of proposal. The scheduled quantities may be increased, decreased, or omitted. ACHD retains the right to place multiple orders throughout the duration of the agreement. Furthermore, ACHD may elect to extend the duration of the agreement. PROPOSAL OPENING Proposals will be opened at the date, time, and place specified in the Introduction . No person will be denied the right to be present during the proposal opening process. Proposals may be received up to but not later than Wednesday, December 2, 2026 at 3:00 pm via the eProcurement Portal . The ACHD eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. ACHD strongly recommends completing your response well ahead of the deadline. MODIFICATION OF PROPOSAL In all instances, a Respondent may modify their Proposal at any time prior to the scheduled closing date and time for the receipt of proposals. WITHDRAWAL OF PROPOSAL Any proposal may be withdrawn prior to the scheduled date and time set for proposal opening by clicking un-submit within the eProcurement portal by the respondent or their authorized agent. No proposal may be withdrawn after the date and/or time set for the submission deadline. BID SECURITY If Bid Security is required, proposals must be accompanied by an original certified check, cashier's check, or a bid bond (collectively referred to hereafter as “Bid Security”) issued by a surety authorized to issue such bonds in the State of Idaho, in the amount of ten percent (10%) of the total amount of the proposal submitted. Failure to include an original Bid Security as required with the bid, and/or submission of photocopies or electronic versions, e.g. PDF, FAX, etc. of the Bid Security, will, if not waived per Item 26, render said proposal void and non-responsive. Special Note: Bid Security: If required by this solicitation, each bid shall be accompanied by the bid security specified in the solicitation documents. If Bid security is required, it will be listed under the "Vendor Questionnaire" section. If the Bid Security is not being requested under the Vendor Questionnaire Section, then please disregard. RETURN OF BID SECURITY If Bid Security is required, within 15-calendar days after award of the contract, ACHD will return Bid Securities, other than bid bonds, to all Bidders whose proposals are not to be further considered in awarding the contract. The Bid Security, including bid bond if applicable, of the Successful Bidder shall be retained until the contract has been fully executed and the Successful Bidder has furnished all required contract security and met all other conditions of the Notice of Award. Any guarantees which have been forfeited shall be retained. ADDENDA Prior to the proposal opening, any interpretation or change in the RFP Documents will be made only in writing in the form of addenda. Addenda, if any, will be furnished to all respondents receiving a set of the documents from ACHD through the eProcurement Portal. It is the responsibility of all respondents to check the eProcurement portal for all addenda. ACHD will not be responsible for any other explanation or interpretation of the RFP Documents. Any oral explanations, instructions, and interpretations given to respondents prior to the proposal opening will not be binding on ACHD unless supplemented by written addenda. BURDEN OF PROOF It is the respondent's responsibility to furnish ACHD with sufficient data to determine whether or not the product(s), service(s), and/or supplies offered conform to the specified requirements. ACHD is not liable for any costs incurred by respondents prior to issuance of a purchase order or execution of the Agreement. FIRM COSTS Prices submitted are to be considered firm. No cash discounts can be accepted or used in determining a low cost. DATA TO BE FURNSHISED WITH PROPOSALS The following submittal shall be provided with the proposal: List of additions, deletion or variation from the specification Description of service availability. Complete statements of all applicable warranties. SERVICE REQUIRED The successful respondent shall be able to provide service to ACHD, where applicable, for the items bid and delivered. EXECUTION OF AGREEMENT The successful respondent must execute an Agreement with ACHD within 15 days after award by ACHD. FOREIGN ENTITIES If respondent is an entity not organized and existing under the laws of the State of Idaho, that it will be appropriately authorized, registered, qualified, certified or otherwise in compliances with the laws of the State of Idaho relating to doing business in Idaho as a foreign entity prior to any award of a contract under this RFP. At any time after the proposal opening, at the request of ACHD, the respondent will provide ACHD with proof of compliances within five (5) business days following the request. The proposal may be rejected if respondent does not provide such proof prior to the date scheduled for the award. PROTESTS FROM THE RESPONDENT Any protests concerning the specifications, procurement procedures or metho
Published attachments
Public questions and answers
RFP Section III, Non-Responsive Criteria, requires "proof of licensure (if applicable)." Does ACHD consider the work under MO27-16 to be "public works construction" requiring an Idaho Public Works Contractor License under Idaho Code Title 54, Chapter 19? If so, what license type and class does ACHD require, and must it be held at proposal submission?
ACHD does not consider the work under MO27-16 to be public works construction. This contract does not require a Public Works Contractor License.
If a license is not required, please confirm that a proposer without a Public Works Contractor License will be considered responsive. If a license is required, will ACHD accept a license obtained before award or before the Notice to Proceed?
A bidder without a Public Works Contractor License will be considered responsive, as this contract does not require one.
RFP Scope of Work, Section 6 (Pruning), specifies 14 feet of vertical clearance above the street surface but does not state a clearance requirement over sidewalks or pedestrian paths. Please confirm whether a minimum vertical clearance over sidewalks is required (for example, 8 feet), and whether sidewalk-side overhang is included in the payable units for each location.
Yes. A minimum vertical clearance of eight (8) feet is required over sidewalks. ACHD’s clearance requirements are available on our Tree Pruning webpage: https://www.achdidaho.org/community-resources/seasonal-street-services/tree-pruning. The unit price shall include all pruning necessary to bring the tree into compliance with ACHD’s clearance requirements, including branches overhanging the street and sidewalk. Sidewalk-side pruning is included in the applicable payable unit for each location and will not be measured or paid for separately.
RFP Scope of Work, Section 2 (Safety Standards), requires ACHD Traffic Engineering to approve the traffic control plan before Notice to Proceed. Will ACHD accept a single typical-application traffic control plan (MUTCD short-duration and mobile operations) covering all residential-street locations, or is a site-specific plan required for each street or closure? Are ACHD right-of-way or lane-closure permit fees required for work under this contract?
Yes. ACHD will accept a single typical-application traffic control plan covering residential-street locations, provided the plan adequately addresses the proposed operations and site conditions. The plan must be reviewed and approved by ACHD Traffic Engineering before issuance of the Notice to Proceed. A separate site-specific plan is not required for each street when the work and conditions are covered by the approved typical application. No ACHD right-of-way or lane-closure permit fees will be charged for work performed under this contract, as the Contractor will be working on behalf of ACHD. The Contractor must still obtain any required permits and approvals before beginning the applicable work.
On the 2027 Preliminary Mapbook (PMZ Zone 1), please confirm that the pruning scope is limited to streets shown in green (1/4 inch chip) and red (3/8 inch chip), and that black streets (major roads and pavement management) are not included. Also, are streets shown in blue (obliterations) or purple (FYP projects) part of the pruning scope?
The pruning scope includes all roads within PMZ Zone 1, as identified by the orange-highlighted area on the 2027 Preliminary Mapbook, regardless of street color or treatment designation. This includes streets shown in green, red, black, blue, and purple that fall within the designated area.
Exhibit C, which describes how payable units are counted, was not included in the solicitation documents. How is a payable unit defined, especially for continuous hedges or shrub rows? Can ACHD provide Exhibit C?
Exhibit C of the Sample Agreement in the Attachments Section shall read as follows. ACHD agrees to pay CONTRACTOR an amount not to exceed TBD United States Dollars ($TBD). See the attached Vendor Proposal.
What is the expected mix of light (pole-saw) versus medium/heavy (bucket-truck) pruning across the estimated 20,000 units? A percentage or count by category would help bidders price accurately.
ACHD does not have a verified breakdown of the estimated 20,000 units by light (pole-saw) versus medium/heavy (bucket-truck) pruning and cannot provide reliable percentages or counts for these categories. Pruning requirements and equipment needs will vary by location, and the estimated total quantity does not represent a specific mix of pruning categories. Respondents should develop their proposed unit prices based on the Scope of Work and their assessment of conditions within the designated work area, accounting for the range of pruning necessary to meet the specified clearance requirements.
What unit price and total contract value did ACHD pay on the most recent prior tree pruning contract?
Please submit a Public Records Request to obtain a copy of the Bid/Cost Tabulation and Prior Contract proposal/bid associated with this particular solicitation. For your convenience, you may copy and paste the link below into your web browser to access the Public Records Request page directly and submit your request: https://adacountyhwydistrictid.justfoia.com/publicportal/home/newrequest Please provide sufficient information about the solicitation or project when submitting the request so we can identify and process the appropriate records.
Is there a guaranteed minimum quantity or a not-to-exceed budget for this contract?
There is no guaranteed minimum quantity at this time. The not-to-exceed budget for this contract must follow the below: Please submit a Public Records Request to obtain a copy of the Bid/Cost Tabulation and Prior Contract proposal/bid associated with this particular solicitation. For your convenience, you may copy and paste the link below into your web browser to access the Public Records Request page directly and submit your request: https://adacountyhwydistrictid.justfoia.com/publicportal/home/newrequest Please provide sufficient information about the solicitation or project when submitting the request so we can identify and process the appropriate records.
What are the anticipated award and Notice to Proceed dates for this contract?
Per the Scope of Work: "Work shall begin within ten (10) calendar days after the Notice to Proceed and shall be completed by June 30, 2027" Evaluation of proposals typically takes about 2 weeks after the bid opening (December 2, 2026), putting an anticipated award date on December 21, 2026. Considering the holidays, the contract should be fully executed at the beginning of January 2027.
Are there any interim completion deadlines for specific maintenance areas tied to the 2027 chip-seal schedule, or does only the June 30, 2027 final completion date apply?
ACHD's 2027 chip seal program is anticipated to begin in late May. During the pre-construction meeting, ACHD will review the proposed chip seal schedule with the successful bidder to identify areas requiring priority pruning. The Contractor will be expected to coordinate its work accordingly to ensure pruning operations do not interfere with chip seal activities. While June 30, 2027, remains the final completion deadline, certain areas may need to be completed earlier to accommodate ACHD's chip seal schedule.
Is a City of Boise tree service license required for this work? If so, does using an ISA-certified arborist subcontractor who holds that license meet the requirement?
A City of Boise Tree Service License is not required for work performed under this contract.