Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

2028 Liberty County Mobility Plan

Description

H-GAC, in partnership with Liberty County, seeks a qualified contractor to update the 2022 Liberty County Mobility Study and develop a comprehensive, county-wide mobility plan. The project will address rapid growth through data collection, transportation needs assessment, evaluation of alternatives, and public outreach. The plan will integrate land use and development trends while prioritizing safety, mobility, and an efficient, high-quality roadway network. Scope of Work Overview The Houston-Galveston Area Council (H-GAC) has partnered with Liberty County, Texas, to develop a comprehensive countywide Mobility Plan update. Located approximately 50 miles northeast of downtown Houston, Liberty County is experiencing rapid growth due to its proximity to the expanding metropolitan area, with its population increasing from about 91,600 in 2020 to over 120,000 in 2025 and projected to continue rising through 2035 based on regional growth forecasts from the Houston-Galveston Area Council and population projections from the Texas Demographic Center. H-GAC and Liberty County completed the Liberty County Mobility Study in 2022. Since then, the County continues to experience significant growth and has requested an update to the study to address current and anticipated transportation needs due to rapid development occurring. The Liberty County Mobility Plan will be an update to the 2022 Mobility Study, resulting in a county-wide mobility plan. The goal of this plan is to examine the County’s transportation network holistically rather than by individual segments or modes to maximize the network’s efficiency. The plan will determine existing and future transportation needs by integrating land use and growth scenarios. The plan development will result in the 2028 Liberty County Mobility Plan and will outline short-, medium-, and long-range transportation investments that improve roadway safety, and help mitigate congestion . Note: This is a planning study; no engineering services or stamped drawings are required. Task 1: Project Management and Coordination Project Management Plan Prepare a Project Management Plan (PMP) describing the overall approach and methodology to completing the Study. The PMP will identify work organization, responsibilities, coordination, communication procedures, memorandum and report formats, graphic production standards, quality control procedures, and project schedule. The PMP is a living document and updated as appropriate during project development. Project Administration Progress reports, and updated project schedules must be submitted to H-GAC’s Project Manager monthly. Monthly progress reports are required regardless of whether the Contractor submits an invoice for that month. Monthly progress reports will include a summary of: Activities, ongoing or completed, during the reporting period. Activities planned for the following month. Problems encountered, and remedial actions taken; and Project status report, detailing milestones completed, and a tabulation of percent completed by task. Coordinate bi-weekly project update meetings, either in person or via conference call, with H-GAC and Liberty County to discuss project progress, outstanding tasks and necessary preparations for upcoming events and activities. H-GAC’s Transportation Finance staff will set up a meeting with the Contractor and sub-contractors after the kick-off meeting to discuss the invoicing procedures. All documents submitted to H-GAC must be in an editable format (i.e., Word, Excel, Power Point, GIS, etc.) and will be reviewed and approved by H-GAC prior to distribution. Final decision on project deliverables and content will remain with H-GAC. Sub-Contractor Management Prepare and execute contracts for all sub-Contractor(s) for this study. Monitor sub-Contractor staff activities and make sure sub-Contractor adherence to schedules, as well as review and recommend approval of sub-Contractor invoices. Task 1 Deliverables: Project Management Plan within 30 days of contract execution date Monthly invoices due by the 10th of each month Monthly progress reports to Project Manager by 10th of each month Project schedule ( Gantt Chart) updated as needed Copy of Sub-contractor contracts within 30 days of execution Task 2: Public Outreach and Engagement Public Involvement Plan Develop an extensive outreach plan to foster meaningful participation of the community and facilitate equitable participation within the County. The Contractor will incorporate these concepts into the Public Involvement Plan (PIP). The PIP must be completed within the first 45 days of the contract. To assist with the public outreach, H-GAC will: Coordinate with the County to secure facilities for all meetings Host and maintain a project website throughout the duration of the study effort Establish the Steering Committee with the assistance of Liberty County and the Contractor Distribute notices for Public Meetings via social media or other local sources Approve all contractor developed content before posting or distributing Contractor must: Develop and submit a Public Involvement Plan (PIP) within 45 days of contract execution date Recommend number and type of meetings needed to successfully develop a mobility plan Provide a team member with effective communication and presentation skills to engage a wide variety of audiences and facilitate meetings Prepare meeting notices, agendas, presentations, meeting materials, sign-in sheets, displays, handouts, comment cards, name tags, surveys, and meeting summaries. Develop and submit content to H-GAC for project website. Provide appropriate staffing, including translation services (Spanish) if necessary and other display materials as needed for each meeting. Provide meeting materials to H-GAC and Liberty County at an established interval prior to all public meetings. H-GAC and Liberty County will review and approve all materials one (1) week prior to meetings Print, handout, and display materials for all meetings. A Steering Committee will be established to guide the technical development of the mobility plan. In previous studies, H-GAC required a minimum of three (3) Steering Committee meetings, two (2) “rounds” of Focus Group meetings and two (2) public events for each precinct. One of the Steering Committee meetings will be a Data Analysis Workshop to discuss the existing conditions, identified issues, needs and gaps, analysis tools, and project challenges. The workshop will provide the Steering Committee with a better understanding of the study format, process, and outcomes. In addition, the Contractor must present updates at Commissioners Court, if necessary, and present the final plan at Commissioners Court. Following Commissioners Court approval, H-GAC may present an overview of the Liberty County Mobility Plan to the Technical Advisory Committee (TAC) and/or Transportation Policy Council (TPC) and may request the contractor's presence during those meetings. Note: H-GAC encourages proposers to identify opportunities to coordinate with existing community meetings and other agencies’ outreach efforts. Proposers may recommend efficient engagement approaches that achieve the project’s objectives and should describe those approaches in their proposal. Task 2 Deliverables: Public Involvement Plan (PIP) within 45 days of contract execution date. Meeting summary for all meetings including handouts, exhibits/display boards, sign-in sheets, and presentation within 10 days of the meeting. Survey tool and results. TxDOT meeting exhibit forms updated monthly, as needed Task 3: Identification of Issues, Needs, and Gaps Collect all data necessary to evaluate existing and future conditions. Using the collected data, the contractor will identify the mobility needs issues and gaps in Liberty County roadway network. (Note: Some data such as the Texas Department of Transportation's Crash Records Information System (CRIS), land use, demographic, aerial photography, etc. may be collected by H-GAC staff). The following list of issues is not exhaustive; the Steering Committee, Stakeholders, public and the Contractor Team may discover additional mobility issues as the study progresses. At minimum, the following pre-identified issues must be addressed: Identification of opportunities to enhance overall transportation system safety Addressing rapid population growth and the need for a roadway system that can accommodate increasing traffic demand Identifying rapid growth areas that may impact demographics, land use, and future development needs. Impact of SH 99/Grand Parkway toll road on the existing transportation network Evaluate north-south and east-west connectivity Emergency response and evacuation route capacity and reliability Freight and goods movement and operational considerations Priority corridors and intersections including: SH 321 at SH 105 US 90 at the Union Pacific Rail Crossing SH 573 at the Union Pacific Rail Crossing SH 146 at US 90 US 90 at Winfrey Street FM 1413 and River Ranch Development expansion FM 563 FM 1010 Task 3 Deliverables: Existing Conditions Report (highly graphic) in PDF format summarizing existing conditions, trends, opportunities, constraints, and key findings identified through the analysis Supporting GIS data, mapping files, and analytical datasets developed as part of this task Editable source files for report layout, graphics, maps, and visualization Task 4: Analysis of Identified Issues Identify transportation needs, deficiencies, opportunities, and priorities throughout the study area. Evaluate potential strategies, operational improvements, technology applications, and infrastructure investments that address identified mobility challenges and support the goals and objectives of the study. Develop a comprehensive set of recommendations designed to improve mobility, accessibility, connectivity, safety, and system performance throughout Liberty County. Recommendations should be responsive to existing conditions, expected growth, community input, and stakeholder priorities. Conceptual visualizations, including, but not limited to, roadway cross-sections, corridor typologies, or similar illustrative graphics, may be developed to communicate recommended configurations, right-of-way allocations, and potential corridor treatments. All visualizations must be planning-level in nature and intended solely for illustrative and conceptual purposes. A minimum of three (3) conceptual cross-sections or equivalent visual renderings must be prepared under this task. At a minimum, study recommendations must: Address key mobility challenges and opportunities identified through the Existing Conditions Analysis Consider vehicle, freight, and emerging mobility solutions, as appropriate Identify strategies to improve access to major destinations, activity centers, and employment areas Enhance system connectivity, reliability, safety, and resiliency Consider implementation feasibility, potential funding opportunities, and phasing Be prioritized based on agreed-upon evaluation criteria developed in coordination with H-GAC, Liberty County, and project stakeholders Task 4 Deliverables: Summary of the identified issues proposed improvements with documentation on why the recommendation was chosen or eliminated Prioritized list of recommended projects, programs, policies, and strategies Supporting GIS data, mapping files, and analytical datasets developed as part of this task Task 5: Recommendations Identify short- (0-5 years), intermediate- (6-10 years) and long-range (11+ years) mobility recommendations to address the needs/issues identified in Task 3. Recommendations will be evaluated based on the Plan’s vision and goals and input from the steering committee. Proposed recommendations that are eliminated from further consideration will be documented and included in the final document. At a minimum, the Implementation Strategy must: An overview of the study including existing needs and identified issues to be addressed, resiliency, funding strategies and benefits of the plan. Identify potential funding sources and partnership opportunities Establish performance measures and monitoring strategies to track progress over time List of recommendations with planning level cost estimates Corridor and Intersection Summary Sheets for each recommendation List of projects that were eliminated from further analysis and why Task 5 Deliverables: List of all recommended projects with estimated cost Implementation Strategy Plan in PDF format Implementation matrix summarizing recommended actions, responsible parties, priorities, timeframes, and potential funding sources Supporting GIS data, mapping files, and analytical datasets developed as part of this task Editable source files for report layout, graphics, maps, and visualizations Final Contract Deliverables Provide the following minimum deliverables. The Contractor may provide additional deliverables as needed and should be noted in the proposal. All electronic files must be submitted on a flash drive containing original files in an editable format, including graphics and GIS files (to include .shp, gdb, and .mxd files) utilized to make illustrations. All documents must be submitted to H-GAC in an editable format (i.e. Word, Excel, Power Point, GIS, etc.) and will be reviewed and approved by H-GAC prior to distribution. Final decision on project deliverables and content will remain with H-GAC. A completed public participation plan Online Interactive project map Final Plan Document that includes an executive summary and a summary report of overarching issues, needs, gaps and solutions in Liberty County. The document will be highly graphical, and the Implementation Workbooks will be included in the Appendix along with all collected data, public outreach, and other deliverables mentioned in above tasks. Stand-alone Executive Summary - An executive summary of the final plan that captures the major concepts and recommendations Implementation Workbooks for Liberty County H-GAC Project Tracker populated. All recommendations populated in the Project Tracker will be mapped and added to H-GAC's Subregional Study Recommendations Database Electronic copies of all deliverables, including but not limited to, shapefiles, map packages, images, photographs, graphics, data, text files, and Microsoft Word documents used during the study and in the report, etc. Inquiries and Clarifications Respondents must submit questions by the Questions deadline indicated in this Solicitation. Telephone/email inquiries are not accepted. H-GAC will respond as completely as possible to each question. Questions and answers will be posted as soon as available. The names of respondents who submit questions will not be disclosed. All clarifications will be available in the Question and Answer and/or Addenda Sections in OpenGov, only the information in these sections should be used in preparing a response; verbal communications and other written documents intended to clarify and interpret will not legally bind H-GAC. H-GAC does not assume responsibility for the receipt of any clarifying information. Respondent must carefully examine all Solicitation documents and become thoroughly familiar with all requirements before submission to ensure the response meets the intent of this Solicitation. Respondent is responsible for making all investigations and examinations that are necessary to ascertain conditions affecting the requirements of this Solicitation. Failure to make such investigations and examinations will not relieve the Respondent from the obligation to comply, in every detail, with all provisions and requirements of the Solicitation. Submission Requirements Submissions must be in PDF or Excel format ONLY where indicated and uploaded to the designated section. Documents uploaded into incorrect sections or other formats may be deemed non-responsive and the submission rejected. Additionally, zip files are not allowed. All responses and required documents must be submitted via the OpenGov system before the deadline. The system will close automatically at the specified time, and late or incomplete submissions will not be accepted. The OpenGov system will not transmit partial or incomplete submissions attempted after the deadline date and time specified in this solicitation. Recording of proposal submission time and date occur via OpenGov. To satisfy any required public opening, the respondent list is made available in the OpenGov Public Portal after the deadline. Respondents are strongly encouraged to submit proposals well in advance of any deadline to ensure all uploads and submissions are completed successfully before the cutoff time. Respondents are also encouraged to double-check all uploads to ensure the file is correct and the document is uploaded to the proper section of the response. Respondents may modify submissions that have already been submitted, before the deadline. The H-GAC Procurement and Contracts Department will not respond to emails from potential respondents related to the acceptance or consideration of incomplete, incorrect, or late submissions. Study Area/Service Region-Custom Map Study Area/Service Region The Liberty County Mobility Plan study area encompasses all of Liberty County in southeastern Texas and evaluates transportation needs across the county's diverse rural, growing, and developing communities. Located approximately 40 miles northeast of downtown Houston and 35 miles northwest of Beaumont, Liberty County serves as an important gateway between the Houston metropolitan area and Southeast Texas. The county is bordered by San Jacinto County to the north, Hardin County to the east, Harris County to the southwest, and Jefferson County to the southeast. The study area examines existing and future mobility needs to support anticipated population and economic growth while improving safety, accessibility, connectivity, and overall transportation system efficiency for residents, businesses, and visitors throughout Liberty County. Additional Resources / Website Links Houston-Galveston Area Council (H-GAC) Website: https://www.h-gac.com/Home Additional Reference Documents An H-GAC Sample Contract with standard General Provisions is provided for review. The awarded contract will be the same or similar to the sample. H-GAC reserves the right to update the actual contract with any additional required terms and conditions as required for compliance to agency and funding source requirements. Exceptions to these standard terms and conditions are not allowed, and will not be reviewed. Any special provisions required of any H-GAC funding source will also become part of any subsequent contract. Budget Budget/Funding Funds will not exceed $600,000 total ($600,000* federal). Contract Usage/Term Contract Term H-GAC estimates that the resulting contract will have an initial term of approximately eighteen (18) months. This estimate is provided for planning purposes only, and the actual contract term will be established in the executed contract. The contract may be renewed by mutual agreement of the parties, subject to programmatic needs, funding availability, applicable laws and regulations, and any required Board approvals. H-GAC retains sole discretion regarding the exercise of any contract renewal option. Information contained in this Solicitation regarding contract term, renewal options, or other contractual matters is provided for informational purposes only and does not create any contractual obligation. In the event of any conflict or inconsistency between this Solicitation and the executed contract, the terms and conditions of the executed contract will control. Contract Terms Applicable to Software and Technology H-GAC anticipates that any resulting agreement for software, software-as-a-service (SaaS), licensing, subscription, hosting, maintenance, or technology

Published attachments
Public questions and answers
  • The cover page lists the pre-proposal conference date as “undefined.” Will a pre-proposal conference be held? If so, when, and will materials be posted?

    No, a pre-proposal conference will not be held. No materials will be posted.

  • Please confirm which certifications are required for this proposal, as Section 9. DBE Goal references a 26% DBE Goal, though TxDOT's DBE Interim Final Rule has a current pause in place that delisted all Texas DBE firms from the TUCP directory pending reevaluation. How will this goal be applied/measured during the evaluation process and are subconsultants required to be DBE-certified? Also, please confirm whether Small and Minority Businesses, Women's Business Enterprises, and Labor Surplus Area Firms certifications (listed under Section 10.2.4) will satisfy the 26% DBE requirement.

    DBE certification is not a scored criterion.

  • Are there page limits, font sizes, or formatting requirements for Sections 10.1.1 through 10.1.8? Do resumes and the organizational chart count toward any limit?

    No, and No.

  • Section 10.1.6 has a 3,000-character limit. Is it a text field only, or may respondents also attach a graphic or map?

    A graphic or map may be provided in this field.

  • Please confirm that no cost or fee proposal is to be submitted with the response. Section 10.2.1 refers to a “total fixed price” that stays firm for 180 days, but no pricing section is requested.

    No cost or fee proposal is to be submitted with the response. Respondents must be prepared to provide a detailed budget in a timely fashion should they be awarded the study.

  • What contract type is anticipated: lump sum, cost-plus-fixed-fee, or specified rate? Will payment be milestone-based (Section 14.2) or based on hours invoiced?

    Firm-Fixed-Price. Payment schedule will be discussed with the awardee during the contract phase.

  • Section 8.1 asks for a 12-month schedule, but Section 7.1 estimates an 18-month term. Which duration should the proposed schedule assume ?

    This will be an 18-month term.

  • Is new traffic data collection expected under this contract, such as counts or turning movement counts at the eight priority locations? If so, what is the expected extent?

    Yes. New traffic data collection is expected under this contract and may include, but is not limited to, traffic volume counts and turning movement counts at the eight priority locations. The consultant should determine the appropriate extent of data collection necessary to support the project objectives, analysis, and development of recommendations.

  • Beyond CRIS, land use, demographics, and aerial imagery, which datasets will H-GAC supply, and when will they be available after notice to proceed?

    The referenced datasets, including CRIS data, land use, and demographic information, are publicly available through H-GAC resources and can be accessed by the consultants. H-GAC may provide the Streetlight OD data and INRIX data, subject to their availability at the time of the study, along with the forecast data from the regional travel demand model.

  • Is there a preferred method or source for planning-level cost estimates, such as TxDOT unit costs or an H-GAC cost estimating tool?

    Consultants should develop their own planning-level cost estimates using methodology and data sources they deem appropriate for the proposed recommendations.

  • Liberty County has four commissioner precincts. Should respondents assume the prior-study minimum of three Steering Committee meetings, two rounds of focus groups, and two public events per precinct (eight public events) for level of effort? Or are respondents free to recommend a different number?

    At a minimum, respondents should assume three Steering Committee meetings, two rounds of focus groups, and two public events as part of the required level of effort. The two public events should be conducted in phases and provide opportunities for engagement from communities throughout Liberty County, including representation from all four precincts. Respondents may propose additional meetings or engagement activities if they believe they would add value to the planning process.

  • Which materials should be translated into Spanish, and should respondents assume Spanish interpretation at every public event?

    Public-facing materials should be translated into Spanish as appropriate based on the demographics and language needs of the study area. Respondents should include Spanish interpretation services for public events where warranted by the demographics of the study area and anticipated participation. While Spanish interpretation may not be required at every public event, respondents should budget for and be prepared to provide interpretation services as needed to ensure meaningful access and participation for Limited English Proficiency (LEP) populations in accordance with Title VI requirements.

  • Is new traffic data collection or travel demand modeling expected within the $600,000 budget

    Yes. Any proposed traffic data collection and/or travel demand modeling should be budgeted within the $600,000 project budget.

  • Section 10.2.10 says awarded respondents submit Form 1295, but it is also listed as a required upload. Is the Form 1295 certificate required at submission or only at contract execution?

    A complete 1295 form is required at submission.

  • Is there a contract-specific DBE goal for this project, or only the 26% agency-wide annual goal? If there is a goal, must participating firms be certified through the Texas Unified Certification Program, and is a DBE commitment or utilization form due with the proposal?

    Please refer to Section 10. DBE Goal, and Section 11.2.4. Small and Minority Business, Women's Business Enterprise, and Labor Surplus Affirmation.

  • Insurance limits in Section 14.15 are not specified. What minimum amounts are required for professional liability, general liability, and automobile coverage?

    Insurance limits will be discussed with the awarded contractor.

  • Will H-GAC evaluate the combined transportation experience of the prime and its subconsultants? Will International experience count ?

    Yes. The evaluation will consider the collective experience of the proposed team, as well as the individual experience and expertise of each firm. Respondents should clearly identify the relevant transportation experience, roles, and contributions of both the prime consultant and subconsultants as they relate to the scope of work.

  • Section 8 requires support for indirect rates “based on audited costs.” Will H-GAC accept a provisional rate, a CPA-reviewed rate, or the de minimis indirect rate under 2 CFR 200.414(f) from firms without an audited overhead rate? Does this requirement also apply to subconsultants?

    H-GAC accepts CPA-reviewed indirect cost rates and follows the requirements outlined in 2 CFR Part 200. This requirement applies to both prime consultants and subconsultants.

Plain text

OpenGov categories

  • 55090 · Transportation Systems, Intelligent (An automated information system which provides traffic management, communications, and analysis of data as a minimum)
  • 90664 · Planning, Urban (Community, Regional, Area wide, and State)
  • 90666 · Planning, Site (Installation and Project)
  • 91894 · Traffic Consulting
  • 91896 · Transportation Consulting
  • 92672 · Planning and Advisory Services, Environmental
  • 96889 · Traffic Studies and Analysis Services