26190 - Tennis & Basketball Court Renovation IDQ FY27

Description

Construction and full rehabilitation of new & existing tennis, pickleball, and outdoor basketball courts. SCHEDULE OF UNIT PRICES For Tennis & Basketball Court Renovation IDQ FY27 INDEFINITE QUANTITY CONTRACT (CITY FUNDED – NON DAVIS-BACON WAGES) OWNER: CITY of NORFOLK, VIRGINIA The unit prices have been computed in accordance with Paragraph 7.3.3.2 of the General Conditions of the Contract for Construction (as amended). Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. The prices quoted shall include, without exception, all materials, labor, equipment, appliances, clean-up, applicable sales, use and other taxes, building permits or fees, and the Contractor's labor, overhead, profit, mobilization, and other mark-ups, and in full accordance with the Specifications. Include allowance for waste where appropriate. The unit prices shall be maintained throughout the contract period. Unit prices shall be used in determining additions or deductions from the TOTAL CONTRACT AWARD amount in the event of changes in the work. NOTE: The basis of award for this project will solely be based off the City Funded – Non-Davis Bacon Wages Listing. The Davis Bacon Wages form will also be required to be completed and submitted as part of this bid form.) Mobilization ( $5000 total fee) - Note: Unit Price will be $500 and Extension will be $2,500. No other pricing will be allowed for this line item. Silt Fence Tree Protection Hi-Viz (Norfolk Std HS-602) Tree Protection Chain Link (Norfolk Std HS-602) Inlet Protection Construction Entrance Excavation (up to 4ft deep, less than 15cy) Excavation (up to 4ft deep, more than 15cy) Woven Geotextile Fabric Select Fill Material (min CBR=20) Drainage Sand Closed Graded Aggregate Base Material (VDOT Std 21A) Open Graded Aggregate Base (VDOT No. 57 or 68 Stone) Grass Seed and Topsoil (Norfolk Std HS-601) Place Mulch Saw Cut (up to 6-in Depth) Saw Cut (6-in to 12-in Depth) Asphalt Pavement Milling ( = 2-in) Asphalt Pavement Removal ( = 3-in) Asphalt Pavement Removal (3-in to 6-in) Reclaim/Pulverize Asphalt to Use as Aggregate Base Material (Full-Depth Reclamation) Removal of 6-in Concrete Curb Removal of 30-in Concrete Curb & Gutter Removal of Concrete Sidewalk (4-in) Removal of Asphalt Sidewalk Removal Concrete Pavement ( = 6-in Thick) Removal of Concrete Pavement (6-in to 12-in Thick) Rough Grading Fine / Laser Grading Hot Mix Asphalt Placement ( = 20-SY) Hot Mix Asphalt Placement ( 20-SY) Type I Roadway Patch Type II Roadway Patch Type III Roadway Patch Hot Poured Polymeric Modified Asphalt Sealant Cold Self Leveling Silicone Sealant Install Concrete Sidewalk (4in) (Norfolk Std HS-206) Install ADA Curb Ramps (VDOT CG-12 type A, B, & C) 24-in Wide x 6-in Thick Concrete Perimeter Mowing Strip around Fence Line Install 6-in Concrete Curb (Norfolk Std CI-03) SCHEDULE OF UNIT PRICES For Tennis & Basketball Court Renovation IDQ FY27 INDEFINITE QUANTITY CONTRACT (DAVIS-BACON WAGES) OWNER: CITY of NORFOLK, VIRGINIA The unit prices have been computed in accordance with Paragraph 7.3.3.2 of the General Conditions of the Contract for Construction (as amended). Bidder acknowledges that estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities provided, determined as provided in the Contract Documents. The prices quoted shall include, without exception, all materials, labor, equipment, appliances, clean-up, applicable sales, use and other taxes, building permits or fees, and the Contractor's labor, overhead, profit, mobilization, and other mark-ups, and in full accordance with the Specifications. Include allowance for waste where appropriate. The unit prices shall be maintained throughout the contract period. Unit prices shall be used in determining additions or deductions from the TOTAL CONTRACT AWARD amount in the event of changes in the work. NOTE: The basis of award for this project will solely be based off the City Funded – Non-Davis Bacon Wages Listing. The Davis Bacon Wages form will also be required to be completed and submitted as part of this bid form.) Mobilization ( $5000 total fee) - Note: Unit Price will be $500 and Extension will be $2,500. No other pricing will be allowed for this line item. Silt Fence Tree Protection Hi-Viz (Norfolk Std HS-602) Tree Protection Chain Link (Norfolk Std HS-602) Inlet Protection Construction Entrance Excavation (up to 4ft deep, less than 15cy) Excavation (up to 4ft deep, more than 15cy) Woven Geotextile Fabric Select Fill Material (min CBR=20) Drainage Sand Closed Graded Aggregate Base Material (VDOT Std 21A) Open Graded Aggregate Base (VDOT No. 57 or 68 Stone) Grass Seed and Topsoil (Norfolk Std HS-601) Place Mulch Saw Cut (up to 6-in Depth) Saw Cut (6-in to 12-in Depth) Asphalt Pavement Milling ( = 2-in) Asphalt Pavement Removal ( = 3-in) Asphalt Pavement Removal (3-in to 6-in) Reclaim/Pulverize Asphalt to Use as Aggregate Base Material (Full-Depth Reclamation) Removal of 6-in Concrete Curb Removal of 30-in Concrete Curb & Gutter Removal of Concrete Sidewalk (4-in) Removal of Asphalt Sidewalk Removal Concrete Pavement ( = 6-in Thick) Removal of Concrete Pavement (6-in to 12-in Thick) Rough Grading Fine / Laser Grading Hot Mix Asphalt Placement ( = 20-SY) Hot Mix Asphalt Placement ( 20-SY) Type I Roadway Patch Type II Roadway Patch Type III Roadway Patch Hot Poured Polymeric Modified Asphalt Sealant Cold Self Leveling Silicone Sealant Install Concrete Sidewalk (4in) (Norfolk Std HS-206) Install ADA Curb Ramps (VDOT CG-12 type A, B, & C) 24-in Wide x 6-in Thick Concrete Perimeter Mowing Strip around Fence Line Install 6-in Concrete Curb (Norfolk Std CI-03) Project Details Important Bid Details Work to be Substantially Completed in: 365 calendar days Liquidated Damages: .2% of Work Order Value per day/per work order per day Performance Bond: $1,500,000.00 Payment Bond: $1,500,000.00 Bid Bond: five percent (5%) Closing Date/Time: Monday, November 23, 2026 4:00 pm Physical Correspondence All physical correspondence will be sent to the address shown below and include the Project ID and Project Title. Ken Peacock , Design & Construction Contracting Specialist Project - 26190 : 26190 - Tennis & Basketball Court Renovation IDQ FY27 City of Norfolk, Public Works 810 Union St, 7th Floor Norfolk VA, 23510 Plan Holders List / Project Followers Upon request, contact Ken Peacock at kenneth.peacock@norfolk.gov . Please also check the Followers Tab on this e-Procurement Portal. Other Methods to Receive Bidding Documents Bidding Documents are available from the Department of Public Works at no cost by download at https://procurement.opengov.com/portal/norfolk/projects/320472 or from the City of Norfolk’s website, http://www.norfolk.gov/bids.aspx . A Bid Bond, certified check, or cashier’s check made payable to the Treasurer, City of Norfolk, for five percent (5%) of total bid must accompany each bid. Offerors shall upload a copy of the bid guarantee with the Offeror’s acknowledgement to mail the original sealed document to the Owner, within two (2) business days. State Contractor registration class and number is required by electronic bidding via the Vendor Questionnaire. The City reserves the right to cancel the bid opening or to reject any or all bids in whole or part, when it is in the best interest of the City. The right to waive informalities and to determine responsiveness of any bid and responsibility of all bidders is reserved to the City. Withdrawal of bids will be in accordance with Section 33.1-42.1 of the Norfolk City Code and Section 11-54 of The Code of Virginia, 1950 (as amended). Introduction Summary Background Contact Information Timeline Vendor Questionnaire Unit Price Bid Bid Award shall be based on the lowest responsive and responsible Total Bid regardless of whether the City elects to award any or all of the Add Alternates. Attachments

Published attachments
Addenda and notices
  • Addendum #1 · 1

    ADDENDUM NO. 1 Dated: November 16, 2026 26190 - Tennis & Basketball Court Renovation IDQ FY27 Except as may be otherwise described, bidding requirements, materials, and workmanship for the work described herein shall conform to all requirements of the original Contract Documents. The following Addendum to the drawings and specifications are made a part of the project and takes precedence over the section of the specifications, in part, and/or drawings, as originally written. This Addendum consists of four (4) pages. ITEM NO. DESCRIPTION QUESTIONS AND RESPONSES Bid Opening Question: Good Morning, Will there be a public bid opening? If so, will it be onsite or online? Answered by Ken Peacock: Online. Project notices and updates will always be available from the City Public facing procurement portal. Post-Tension Concrete Question: Would Post-Tension Concrete be considered in lieu of asphalt? Post-Tension Concrete is built to last 50+ years with no structural cracks, offering a better return on investment compared to asphalt. Answered by David Pfiffer: Post-tension concrete courts will not be considered as part of this active bid & award process, but could be considered as an asphalt material substitution with the apparent low bidder after the time of contract award. Unit Price Bid Requirements Question: Are bidders required to provide unit pricing for every item listed in the Schedule of Unit Prices, or may bidders submit pricing for only the items within their scope of services? If certain items are left unpriced, will the bid be considered nonresponsive and rejected? Answered by Ken Peacock: A complete Schedule of Unit Prices is required. Incomplete responses will be considered nonresponsive and rejected. Approved Equal Coating Manufacturer Question: The specifications reference SportMaster as the coating manufacturer. Will the city accept an approved equal acrylic sports surfacing system from another manufacturer, provided the proposed materials meet or exceed the specified performance and quality requirements? Answered by David Pfiffer: Any material substitutions will not be considered during the bid and award process, but would be considered and reviewed during the material submittal process after the award of contract to winning bidder. Practice Wall System Question: Please confirm whether Rally Master Backboards are the required manufacturer for the tennis practice wall system, or whether an approved equal will be accepted. Answered by David Pfiffer:

Public questions and answers
  • Good Morning, Will there be a public bid opening? If so, will it be onsite or online?

    Online. Project notices and updates will always be available from the City Public facing procurement portal.

  • Would Post-Tension Concrete be considered in lieu of asphalt? Post-Tension Concrete is built to last 50+ years with no structural cracks, offering a better return on investment compared to asphalt.

    Post-tension concrete courts will not be considered as part of this active bid & award process, but could be considered as an asphalt material substitution with the apparent low bidder after the time of contract award.

  • Are bidders required to provide unit pricing for every item listed in the Schedule of Unit Prices, or may bidders submit pricing for only the items within their scope of services? If certain items are left unpriced, will the bid be considered nonresponsive and rejected?

    A complete Schedule of Unit Prices is required. Incomplete responses will be considered nonresponsive and rejected.

  • The specifications reference SportMaster as the coating manufacturer. Will the city accept an approved equal acrylic sports surfacing system from another manufacturer, provided the proposed materials meet or exceed the specified performance and quality requirements?

    Any material substitutions will not be considered during the bid and award process, but would be considered and reviewed during the material submittal process after the award of contract to winning bidder.

  • Please confirm whether Rally Master Backboards are the required manufacturer for the tennis practice wall system, or whether an approved equal will be accepted.

    Any material substitutions will not be considered during the bid and award process, but would be considered and reviewed during the material submittal process after the award of contract to winning bidder.

  • I do not see the online link for the public bid opening. Would you be able to let me know where it is please?

    All status updates for can be found on the City Solicitation Page. There is no formal link for the bid opening. Once the due date closes pricing results will be released.

  • For fence items 68–75, we understand bidders must include the current detail’s 9-gauge chain-link fabric and maximum 8-foot post spacing for 10- and 12-foot fencing. For a consistent bidding basis, may bidders assume 4-inch outside-diameter SS40 terminal posts and 3-inch outside-diameter SS40 line posts, with a rectangular enclosure and two 4-foot-wide pedestrian gates per 400 linear feet of fence? Please confirm whether additional gates, wider gates, or configurations requiring additional terminal/corner posts may be separately negotiated as non-prepriced work, with prior written approval and credit for any scope already included in the scheduled unit price.

    4" O.D. SS40 terminal posts and 3" O.D. SS40 line posts are acceptable for bid purposes. The number of fence gates needed varies per court layout, and the per Linear-foot cost submitted for each type of fence shall include the various number of gates required by the city on a per project basis.

  • For storm-pipe and drainage-structure items, may bidders assume that dewatering included in the unit prices consists of routine sump pumping and surface-water diversion? If a dedicated wellpoint or other engineered groundwater-control system is required, may that system be excluded from the base unit-price allowance and separately negotiated as non-prepriced work, subject to prior written approval and credit for dewatering already included in the unit price?

    Any required dewatering is considered incidental to any of the Unit Price line items within this contract.

  • For items 99–102 and 104, may bidders assume the City will furnish the bollards, bike racks and court signs? Contractor prices would cover installation, including required anchors, foundations and installation hardware. Item 104 is described as “Procure/Install New Court Signs.” Please confirm whether procurement remains the contractor’s responsibility or whether this item will also be City-furnished and contractor-installed. For contractor-furnished products, please provide the required product specifications and installation details, including court-sign size, material and graphics.

    Per the Bid Item descriptions, all materials will be supplied by the contractor unless specifically stated that the city will supply any given materials. Contractor supplies all materials for items 99, 100, 104, and the city supplies the bike racks and existing court signs for items 101, 102, 103. New court signs for item 104 can be assumed 36" x 24" aluminum panels with (2) color graphics to be identified by the city as needed for each project.

  • For this contract, may bidders assume the City will waive right-of-way, traffic-control and trade permit fees? Please confirm whether land-disturbance permit fees remain payable. For fees that are not waived, may bidders include a separately negotiated non-prepriced allowance in each applicable work order? This allowance would require prior written approval. If not, please identify where bidders must include these fees in the scheduled unit prices.

    Any Right-of-Way permit fees are waived for a city project, Land Disturbance fees will still be bore by the contractor and are considered incidental to all the line items within a given Work Order.

  • Section 2.1-1 describes athletic-court construction and renovation. Except for the contract’s declared-emergency provisions, may bidders assume that scheduled items, including but not limited to traffic control, storm drainage, and Type I, II and III roadway patches, will be ordered only in connection with athletic-court projects and associated site improvements? If not, please clarify whether these unit prices may also be used for standalone roadway, drainage or other public works projects unrelated to athletic courts.

    The purpose of this contract is for the construction of courts and athletic surfaces, and associated site improvements. Applicable line items from the contract could be incorporated into select, separate, stand-alone projects such as roadway or drainage projects on a limited basis, if the scope and line-item prices were agreed to by both parties.

  • For item 21, “Reclaim/Pulverize Asphalt to Use as Aggregate Base Material (Full-Depth Reclamation),” may bidders assume a maximum total processing depth of 10 inches, including the existing asphalt and underlying aggregate base? If not, please specify the depth bidders must include in the scheduled unit price. If a work order requires reclamation beyond that depth, may the additional work be separately negotiated as non-prepriced work, subject to prior written approval and credit for any scope already included in the scheduled unit price?

    Please refer to Bid Item 21 in the Bid Item descriptions section for assumed depth of pavement/base stone reclamation.

  • The Form of Bid and vendor questionnaire state that performance and payment bonds are required in the amount of $1,500,000 each. The technical specifications describe first-year coverage of aggregate work orders up to $2,500,000 and $2,500,000 bonds for renewal years. Please confirm the required initial amount of each bond and explain when riders or replacement bonds are required as work orders are issued and paid. Please also confirm whether the 5% bid guarantee is calculated solely on the City-funded, non-Davis-Bacon schedule, plus any applicable additive alternates.

    The IDQ Annual limit is projected at $2,500,000.00. Individual Work Order limits are $1,500,000.00. Should work orders reach the bond limit and/or exceed then we would request riders to move the bonds up to the next anticipated increase needs/level. As stated in bid package the basis of the award for this project will solely be based off the City Funded – Non-Davis Bacon Wages Listing. The 5% would come from this section. The Project Manager has requested that the Davis-Bacon Item listing be completed as part of this bid package.