Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

27T2, Bus Planning and Routing Software

Description

General work description: Frederick County Public Schools (FCPS) is seeking proposals from qualified firms to provide bus routing and planning software. This is the base scope of this solicitation, and Offerors' base pricing shall be limited to bus routing/planning only. The following are explicitly out of scope for this procurement, as FCPS uses separate, existing systems for these functions: fleet maintenance management. Offerors should not include these modules in their proposal or base pricing. FCPS is additionally interested in the following as separately priced, optional features that FCPS may elect to add at time of award or at any point during the contract term, at the Offeror's proposed rates: GPS/telematics tracking service for the FCPS student transportation (bus) fleet. GPS/telematics tracking extended to FCPS support/service vehicles ("white fleet"). Parent notification / bus-tracking mobile app for parents to track a bus to their stop. Student ridership monitoring, whether manual (driver-logged) or automated (e.g., RFID card, NFC, or barcode scanning). Offerors proposing an automated option shall separately describe and price any required in-vehicle hardware (e.g., tablets, card readers) and student card/credential issuance. Field trip management Employee/driver data integration Offerors shall price each option as a distinct add-on line item, separate from base bus routing pricing, so FCPS can evaluate base cost independently of optional features. Project Details Important Instructions for Electronic Submittal The FCPS is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Introduction Summary Background Contact Information Timeline Vendor Questionnaire Attachments

Published attachments
Addenda and notices
Public questions and answers
  • With regard to the SOC 2 report requirements in the RFP, we can include those with FCPS as long as we have an executed NDA with the district. Can we provide our NDA to FCPS for review and signature and if so, what is the best way to do that?

    If your company requires an NDA for the SOC 2, please provide that via email to purchasing@fcps.org. We will review the language and return a signed copy.

  • Regarding the 12 users mentioned in the RFP under 6b. Training, please confirm that only 12 users will need training, and for each user, specify the type of user that will require training and how many users of each type will require training.

    12 Users will be for the training on the usage of the routing software. 2-3 of this number will be FCPS IT staff, who will need to be trained on how to support the system going forward.

  • Regarding Scope of Services b. Requirements – Bus Routing and Planning (Optional), requirement ii. Mobile App for administration to review work: Please clarify what this feature is specifically being used for.

    This would be a mobile application that can be utilized by Transportation staff to access, navigate, and perform work in the main software, if it is available.

  • Please confirm the first day of school for FCPS for the 2027-2028 school year.

    August 18, 2027.

  • Regarding Scope of Services b. Requirements – Bus Routing and Planning (Optional), requirement i. Single Sign On capability with FCPS network: Please confirm what SSO FCPS uses so our company can address the specific capabilities in our response.

    Cloud based applications FCPS uses Microsoft Entra. Non-cloud based is Microsoft ADFS.

  • The RFP indicates that Bids will be "opened and publicly read on Microsoft Teams". Please clarify what information will be read aloud at the bid opening - (i.e., will only bidder names be read publicly? Will pricing be read publicly?)

    For an RFP of this type, the vendor name will be read aloud as well as a determination if the paperwork appears to be in order. Pricing will not be read aloud as it will not be opened until an evaluation of the technical proposals has been completed.

  • In the prebid call, it was indicated that we can provide pricing in our own format and no standard pricing form is required for this response. Can you please confirm this is accurate, and if not, can you provide the preferred form or format in which pricing should be provided?

    This is confirmed.

  • For Student Ridership and GPS tracking, please provide the number of vehicles requiring tablets, mounts, and RFID readers, as well as the number of vehicles requiring GPS devices.

    GPS would be on all FCPS buses. Please refer to the Bus Fleet attachment from Addendum 1. For Student Ridership, tablets would be required for all "route buses", approx 362. This assumes that tablets are portable. Mounts would be required in all buses. RFID readers would be required in all buses. GPS tracking would also be included for all "white-fleet" vehicles, provided that option is chosen.

  • Does the fleet currently have any hardware (e.g. tablets, GPS) installed? If so, what make and model are they?

    FCPS buses have GPS units installed. Please reference Section II Item 10.

  • Does the district currently pay for any tablet or GPS data, and would it continue to do so (e.g. should the vendor price that into our plans or not)?

    Should FCPS choose either of those options, FCPS would discontinue use of the current GPS program.

  • Regarding RFP 3. Preparation of Bid, letter E, it states that vendors are required to submit “Proposal pages completely and accurately filled out: Verify all mathematical calculations. Strike through errors, initial them, and make corrections.” Can you clarify what you are expecting to see for this requirement - for example, are you expecting to see the RFP documentation in its entirety included with the response, with any exceptions noted in context and with the forms at the end, or are you expecting something else?

    There are specific upload areas for some forms to be uploaded. All other uploads will go under Proposal. Cost/Fee proposals have their own upload section. FCPS is not requiring an upload of the RFP documentation. This language is typically used on non-digital documents that are scanned and uploaded.

  • Per the RFP, “Bidders or offerors shall be required, pursuant to COMAR 21.07.01.22, to be licensed to do business in the State of Maryland and must provide a tax certification number.” Can you clarify if the "tax certification number" in this context is the Department ID number from www.Egov.maryland.gov/BusinessExpress, the FEIN number, or something else? Or, does checking off that the vendor is registered in the state of Maryland on the STATUTORY AFFIDAVIT AND NON-COLLUSION CERTIFICATION form satisfy this requirement?

    The Business Express identifier is correct in this context.

  • Does the District intend to own the tablets purchased through this contract? Or does the District intend that the awarded vendor will retain ownership of the hardware proposed?

    FCPS would purchase the tablets.

  • The RFP indicates that the “current transportation software environment” is “Mapnet, Busology”. Can you confirm that the District is currently using Mapnet, Busology as its primary system specifically for routing and that system is currently in full use? If no and another routing system is being used, can you indicate what system that is and if that is currently in full use?

    Mapnet is the software, Busology is the vendor. This is the primary system.

  • Regarding RFP Scope of Services a. Base Requirements, Requirement v. “Integration capability with Bus Stars, or the creation of a compatible export file for upload” - Please clarify what functionality the District currently uses “Bus Stars” for in this context.

    Bus Stars is the FCPS Transportation Operational software. The routing info from the routing software would populate the driver start and end times into the Bus Stars manifest.

  • Does the District currently provide a parent app? If so, which one, and how widely is it used?

    No.

  • Regarding c. Optional Features - “Employee/driver data management – operational suite that include employee data, payroll management, and dispatch functionality” - What HR system(s) does FCPS currently use for employee data / payroll for which the vendor could integrate our solution?

    FCPS uses a combination of Bus Stars and PeopleSoft HCM 9.2 to track bus drivers and driver aids for employee data and pay. Mainly, Bus Stars is for time sheet tracking. That info is uploaded into PeopleSoft HCM 9.2 so the drivers and aids can be paid.

  • As part of this RFP request, is the district interested in a public website with school, eligibility, and stop information for parents/realtors?

    FCPS currently hosts a webpage with the stop information. Vendors may provide an additional solution, or replacement solution as part of their solicitation.

  • How many students are transported daily?

    Approx. 31K students.

  • For home-to-school transportation, in which counties are you transporting students?

    FCPS serves primarily Frederick County. Other counties may include: Baltimore, Washington, Montgomery, and Prince George's Counties. Baltimore City is another potential area. Additional counties may be added by Federal requirements.

  • How many users would need editing rights to route/map data in the routing software?

    Approx 12.

  • Does the district own and operate the school bus fleet or are private contractors used? If contracted, how many and what bus contractors are used?

    We own our fleet.

  • Does the district intend to continue using its current GPS technology?

    Not if the district chooses the GPS tracking option offered by the vendor.

  • Please confirm the district would like the white fleet GPS quote to be based on 207 vehicles, which is the total number from full list provided with RFP (note that list does include one bus).

    The white-fleet GPS quote can be made on that number, but the actual number of vehicles may vary.

  • Will the district require install teams to remove any existing devices? If so, how many?

    No.

  • Are all vehicles located at one location for removal/installation purposes?

    No.

  • Does the district have any tablets currently installed on district vehicles? If so, what type/model tablets are they and how many vehicles have them?

    No.

  • Is the district interested in upgrading or purchasing new tablets as part of this request? If so, how many vehicles would you plan to equip with tablets?

    Should FCPS choose the option, we would purchase the tablets. Please see question 8.

  • Would you be looking for the vendor to install the tablets? If so, would any old tablets or hardware need to be removed by the vendor as well?

    Please provide a price for installation. FCPS will make a decision based on price.

  • Would any tablets need to be installed on 3rd party contractor vehicles? If so, does the district have a contract to allow them to do that?

    No.

  • Does the district have a preferred cell carrier through a district contract?

    Verizon.

  • Does the district need any additional mounts? If so, how many? (Some clients opt to purchase tablets for primary buses and then purchase extra mounts for spare vehicles so tablets can be transferred as needed.)

    There are no mounts in any FCPS vehicle.

  • How many vehicles does the district plan to equip with student ridership scanners?

    Should this option be chosen, all buses in the current bus fleet would require RFID scanners.

  • How many students would be issued ridership cards?

    Approx 23K cards.

  • How many total drivers, including substitute drivers, aides, etc. would need access to the in-vehicle tablet for student tracking purposes?

    FCPS has approx 400 drivers and 140 aides.

  • Is it the district’s intent that district staff will place the district's existing stops and build the district's existing bus runs in the system during the training process, or does the district expect the vendor will implement everything noted above?

    The vendor will implement.

  • a. If it is the district's intent that district STAFF will place the stops and build the runs, then the below questions can be disregarded. b. If it is the district’s intent that the VENDOR will implement everything noted above, please answer the following questions: 1. Regarding the route structure for your bus runs, are you picking up K-12 all in one bus run (i.e., single tier)? Do you pick up high school students and drop them off, then pick up middle school students and drop off, and then elementary school (i.e., three tiers)? 2. What is the total number of individual runs/trips performed by all general education buses in the morning? (Ex: If 15 vehicles do a High School / Middle School run, then 17 vehicles do an Elementary run, that is 32 AM runs/trips total.) 3. How many general education runs/trips in the afternoon? 4. Are the afternoon bus runs essentially a 'mirror' of the morning runs? (Same core stop locations? Buses generally run in the same area AM & PM?) 5. How many special needs runs operate in the morning? How many in the afternoon?

    1. Multi-tier. 2. Approx 690 trips (HS, MS, ES) 3. Approx 690 trips (HS, MS, ES) 4. For the most part, yes. 5. Approx 120 trips (HS, MS, ES)

  • Section 17a of the RFP prohibits assignment of the contract without the District’s prior consent. The bidder would like to have the right to freely assign the contract in the event it were acquired. Section 17d also prohibits the assignment of any of the funds payable under the contract. The bidder would like to have the ability to assign the right to receipt of payments to a third party. Is the District amenable to either or both of these?

    The company would need to provide additional information in their solicitation before FCPS can make a determination.

  • Section 20 of the RFP includes a unilateral termination right for the District if the bidder (essentially) is in uncured breach of the agreement. Would the District consider making this provision mutually applicable so that in the (unlikely) event of the District’s uncured breach, the bidder had these same rights?

    If a vendor has items that would like to have addressed in regards to adjustments to the contract language, those should be submitted as part of the bid submission.

  • Section 21 of the RFP allows the District to terminate the agreement for convenience on written notice to the bidder. The bidder prefers to enter into agreements with committed durations given the expenditures involved. Would the District consider removing this termination for convenience right, and if not, to extending the notice period to at least 90 days?

    FCPS is unable to remove the term as it is required by Maryland COMAR. The vendor may address adjustments to the contract language as part of the bid submission.

  • Section 30 of the RFP contains an IP indemnity from the bidder to the District but does not contain standard IP indemnity carveouts. The bidder would request that the following be excluded from such indemnification obligations: (a) use of the bidder’s technology platform in a modified form or in combination with materials not furnished by the bidder; (b) services performed according to the District’s specifications; and (c) any content, information, or data provided by the District. Is the District amenable to these?

    If a vendor has items that would like to have addressed in regards to adjustments to the contract language, those should be submitted as part of the bid submission.

  • There is no provision limiting either party’s liability. The bidder prefers to include a standard limitation of liability related to data breach that is a multiple of the fees paid by its customer over the prior 12 months. Would the District be amenable to such a liability construct?

    If a vendor has items that would like to have addressed in regards to adjustments to the contract language, those should be submitted as part of the bid submission.

  • Does the district plan to conduct finalist presentations for vendors that are selected to move on to that phase? If so, is there targeted timing and would they be held in person or virtually?

    Yes, software presentations are part of the evaluation process. Scheduling would be between 12/9 and 12/18. These could be held in person or virtually, depending on the availability of the vendor and FCPS staff.

  • What is the desired date for taking delivery of the software and starting training?

    FCPS would review the vendor's proposed implementation time frame for these dates.

  • Regarding page 42, “Offerors shall submit a detailed implementation plan including a proposed timetable, expressed both per-bus and for the full project, covering installation, configuration, data/route conversion, testing, and go-live.” Could the district please clarify what you mean by "per-bus" when it comes to a timetable? Could an example be provided?

    Per-bus would be on any implementation of the optional items that would need to be installed on a vehicle, i.e. installation time for gps units per bus.

  • Can you please provide a breakdown of your transportation department with the types of roles and number of people in each role group?

    Director of Transportation: 1 Transportation Managers: 7 Fleet Manager: 1 Asst. Fleet Manager: 1 Sr. Routing Specialist: 1 Admin Assistants: 5 Route Surveyor: 6 Dispatcher: 2 Driver trainers: 5 Operational Support: 2 Parts Lead: 1 Parts Specialists: 2 Foreman: 1 Lead Mechanic: 1

  • Section II.5.a.iii references historical data storage for “a minimum of one five (5) year.” Please confirm the required retention period.

    Five (5) years.

  • For optional feature vi (employee/driver data management), which payroll and HR system does FCPS use?

    Please see question 17.

  • Section II.7.d.i requires an itemized fee schedule. Will FCPS provide a Cost Proposal form, or should proposers submit their own format?

    Vendors should submit their own format.

  • Regarding SPECIFIC TERMS AND CONDITIONS SECTION II - IMPLEMENTATION, TRAINING, AND SUPPORT, the RFP states "Offerors shall describe: . . .(c) response time, escalation procedures, and hours of availability, ideally documented in a service level agreement": - Please confirm if vendor need to include a sample SLA with our response to meet this requirement.

    Vendors may provide a sample in lieu of a description.

Plain text

OpenGov categories

  • 20937 · Data Processing Software, Mini/Mainframe Computer
  • 92032 · Intelligent Transportation System Software (To Include Design, Development, and Maintenance Services)