State and local · OpenGov
300 Burr St - Demolition of Commercial Building and Parking Lots
Description
The objective of this Request for Quotation is for 300 Burr St - Demolition of Commercial Building and Parking Lots . 300 BURR ST - DEMOLITION OF COMMERCIAL BUILDING AND PARKING LOTS Lump sum must include all labor, materials, equipment, associated fees and permits for this project GREENING COSTS: DIRT GREENING COSTS: GRADE GREENING COSTS: SEED GREENING COSTS: SIDEWALK DEM0LITION COST ASBESTOS ABATEMENT COST Special Conditions - Demolition Project Timeline Release Project Date: October 20, 2026 Response Submission Deadline: October 27, 2026, 10:00am Completion Date: December 30, 2026 Winter Work - only if determined by City of Jackson: May 1, 2027 Completion timeline: Full project completion no later than December 30, 2026. If winter weather prevents full completion and is confirmed by the City of Jackson, a minimum of a quality level grade must be installed to the full site by the listed completion date. Final topsoil/seed/straw/concrete/trees must be completed no later than May 1, 2027, and a pay ratio of 70/30 Winter Work, will apply. To include: 1) Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment. 2) Compact all clean backfill material with a hoe-pack or vibrating roller compactor. 3) Remove 4 drive approaches: curb cut and entry approach ( 24/24/60/12 lineal ft). 4) Install 155 lineal feet of curb and gutter ( 30/33/70/25 lineal ft). If road is in disrepair, Contractor will need to cut street and have forms installed to form front gutter pan and then repair road with hot patch asphalt upon completion of concrete work. 5) Remove and replace 200 lineal ft of cracked, heaved and broken public sidewalks. 6) See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to ensure that neighboring water and sewer services are operational at the conclusion of the demolition. Trees/shrubs: Remove all brush, branches and overgrowth from property. Remove 1 large tree in right of way to SW. Remove far E tree stump. Clear all trees along E property line. Plant 11 Japanese Lilac or Bradford Pear trees with 6 evenly spaced along N. property line, 2 on Burr St ROW and 3 along the MLK St ROW. Miscellaneous: Remove all wood, chain link fencing, shed, tables, phone booth and poles to SW. Remove all concrete from entire site including all materials N of building and concrete driveway to the E. Remove all gravel parking areas a minimum of 6” deep and grade full site and install 3” topsoil/seed/straw. NOTE: Inspection required to verify full removal of all hard surfaces and gravel and hard surface before site grading/fill/topsoil is installed. Property Photo Invitation to Bid Sealed proposals for 300 Burr St - Demolition of Commercial Building and Parking Lots will be received by the City of Jackson Purchasing Coordinator, Kari Kerstetter, via the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . The work includes the following partial listing of items with approximate quantities: Demolition of 300 Burr St - Commercial Building and Parking Lots Bidders may obtain Instructions to Bidders, Proposal Forms, Specifications and Contract Forms on the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . The City of Jackson does not discriminate on the basis of race, religion or national origin, color, age, sex, height, weight, marital status, and physical or mental handicap as to: access, availability, employment, or participation in any of its programs and activities. City of Jackson Heather Ehnis Purchasing Agent SPECIFICATIONS: All Quotes must be submitted via the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . Questions about this invitation to quote should be initiated in the Questions and Answers section of the project. All Contractors shall complete the Quote and Award page(s) and submit all information requested herein in order for a Quote to be responsive. Late Quotes will not be considered. ADDITIONAL INSTRUCTIONS TO CONTRACTORS: 1. EXAMINATION OF QUOTE DOCUMENT: Before submitting a Quote, Contractors shall carefully examine the specifications and shall fully inform themselves as to all existing conditions and limitations. The Contractor shall indicate in the Quote the sum to cover the cost of all items included on the Quote form. 2. COMMUNICATIONS: All communications, any modifications, clarifications, amendments, questions, responses, or any other matters related to the Invitation for Quote (IFQ) must be made only through the Purchasing Department Contact noted on the cover of this IFQ. A violation of this provision is cause for the City to reject a Company’s Quote. No contact with other City employees is permitted and may be grounds for disqualification. 3. INVITATION FOR QUOTE MODIFICATIONS: Clarifications, modifications, or amendments may be made to the IFQ at any time prior to the Quote Deadline at the discretion of the City. It is the Contractor’s responsibility to periodically check the City’s e-Procurement website at: http://procurement.opengov.com/portal/cityofjackson until the posted Quote Deadline to obtain any issued addenda. 4. PREPARATION OF QUOTE: The Quote shall be legibly prepared. The Quote shall be legally signed, and the completed address of the Contractor given thereon. 5. QUOTE SUBMISSION: Submit offer on Pricing Table provided. Contractors are required to complete entire Invitation to Bid and include attachments. Quotes must be submitted via the City of Jackson e-Procurement Portal, https://procurement.opengov.com/portal/cityofjackson . It is the Contractor’s responsibility to ensure their Quote is received prior to the Quote Due Date and Time deadline. Submission of a Quote establishes a conclusive presumption that the Contractor is thoroughly familiar with the Invitation for Quote and that the Contractor understands and agrees to abide by each, and all of the stipulations and requirements contained therein. The opening and reading of a Quote does not constitute the City’s acceptance of the Contractor as a responsive and responsible Contractor. All costs incurred in the preparation and presentation of the Quote, as well as any resulting contract, is the Contractor’s sole responsibility; no pre-award costs will be reimbursed to any Contractor. 6. EXPLANATION TO CONTRACTORS: Any information given to a prospective Contractor concerning the IFQ will be furnished to all prospective Contractors as an amendment or addendum to the IFQ if such information would be prejudicial to uninformed Contractors. Receipt of amendments or addenda by a Contractor must be acknowledged in the Quote. Oral explanation or instructions given prior to the opening will not be binding. 7. WITHDRAWAL OF QUOTE: Quotes may be withdrawn by written notice or in person by a Contractor or their authorized representative, provided their identity is made known and a receipt is signed for the Quote, but only if the withdrawal is made prior to the Quote Due Date and Time. No Quote may be withdrawn for at least ninety (90) days after the Quote Due Date and Time. 8. ALTERNATE QUOTES: Contractors are cautioned that any alternate Quote, unless specifically requested, or any changes, insertions, or omissions to the terms and conditions, specifications, or any other requirement of this IFQ may be considered non- responsive, and at the option of the City, may result in rejection of the alternate Quote. 9. LATE QUOTES: Any Quote received for this project after the exact date and time specified for receipt, will not be considered. 10. DUPLICATE QUOTES: No more than one (1) Quote from any Contractor, including its subsidiaries, affiliated companies, and franchises will be considered by the City. In the event multiple Quotes are submitted in violation of this provision, the City will have the right to determine which Quote will be considered, or at its sole option, reject all such multiple Quotes. 11. REJECTION: The City Manager reserves the right to reject any and all Quotes and to waive minor irregularities and/or technicalities in the Quotes. A Contractor’s failure to provide any additional information requested by the City prior to a Contractor selection may result in rejection of the Quote. The City may reject any Quote from any person, firm or corporation in arrears or in default to the City on any contract, debt, or other obligation, or if the Contractor is debarred by the City from consideration for a contract award. The City reserves the right to reject all nonconforming, nonresponsive, unbalanced, or conditional Quotes. 12. UNIT PRICES: If there is a discrepancy between unit prices and their extensions, unit prices shall prevail. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. 13. NON-DISCRIMINATION: The City of Jackson will not contract with any person or firm that discriminates against employees or applicants for employment because of any factor not related to job performance. The Contractor must comply with all federal, state, and local laws and policies that prohibit discrimination in employment contracts. The Contractor must include in its subcontracts provisions that prohibit subcontractors from discriminating in their employment practices. 14. QUOTE SIGNATURES: An authorized official must sign Quotes. Each signature represents a binding commitment upon the Contractor to provide the goods and/or services offered to the City if the Contractor is determined to be the lowest responsible Contractor. The Contractor must complete, sign, and have notarized the form regarding Authorization to Submit Quotes attached to this IFQ. 15. FOIA REQUIREMENTS: Quotes are subject to public disclosure after the deadline for submission in accordance with state law. 16. DISQUALIFICATION OF CONTRACTORS: Any one or more of the following causes may be considered for the disqualification of a Contractor as non-responsiv SPECIFICATIONS AND/OR SCOPE OF WORK: 1 . INTRODUCTION: Through this Invitation for Quote (IFQ) the City of Jackson hereby invites businesses who meet the qualifications and specifications set forth herein to submit Quotes for asbestos abatement, demolition of residential buildings and accessory structures, and site restoration at various locations throughout the City of Jackson. 2. EXAMINATION OF CONTRACT DOCUMENTS AND SITE: It is the responsibility of each Contractor before submitting a Quote to: a. Examine the contract documents thoroughly b. Study and understand the contract documents as they relate to each site in this IFQ that may in any manner affect the cost, progress, or performance of work c. Attend the Pre-Quote meeting, if scheduled d. Visit each site in this IFQ to familiarize themselves with local conditions that may in any manner affect the cost, progress, or performance of the work e. Consider federal, state, and local laws and regulations that may affect the cost, progress, performance, or furnishing the work f. Promptly notify the City of Jackson in writing of all conflicts, errors, omissions, ambiguities, or discrepancies which the Contractor has discovered in or between the contract documents and such related documents 3. Before submitting Quotes each Contractor will, at their own expense, make such additional investigations and tests as the Contractor may deem necessary to determine their Quote for performance of the work in accordance with the time, price, and other terms and conditions of the contract documents. 4. The locations of existing utilities are taken from records believed to be reliable. The City of Jackson, or any employee of the City of Jackson, will not be responsible for any omissions or variations from the indicated location of existing utilities which may be encountered in the work. 5. The submission of a Quote will constitute an incontrovertible representation by the Contractor that they have complied with every requirement of this section, that without exception the Quote is based upon performing and furnishing the work required by the contract documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown, indicated or required by the contract documents, that Contractor has given the City of Jackson Purchasing Agent written notice of all conflicts, errors, ambiguities and discrepancies that the Contractor has discovered in the contract documents and that the contract documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performing and furnishing the work, and that the time stated in the proposal is sufficient to complete the project. 6. This IFQ includes the abatement of asbestos, the demolition and removal of the residential buildings and accessory structures, and site improvements as indicated in the attachments for the properties listed below. 7. Professional inspections, surveys, and lab tests of these structures have been completed to determine the presence, types, quantities, and locations of asbestos: containing materials (ACM), mercury, and household hazardous waste. A report is included in the attachment for each property. Proper removal of any and all such materials shall be the responsibility of the successful demolition Contractor and all costs for removal shall be included in the Quote for each site. Please invite any potential subcontractors to attend the mandatory pre-Quote inspections. Area given is the total floor area as shown in the City Assessor database. 8. Contract documents require that all work on this project be completed as follows: full site demolished, trees and fencing removed with quality bladed rough grade no later than the completion date listed in the Timeline, liquidated damages of one thousand dollars ($1,000) per calendar day, thereafter. 9. The Contractor understands that no work may commence until all bonds, licenses and certificates of insurance have been provided to the City. Said documents shall be provided within ten (10) calendar days after receipt of Notice of Award. The Contractor agrees to complete all work detailed herein and to conform with the terms of this contact and all applicable laws, ordinances, rules, and regulations within the schedule outlined above. Abatement of hazardous material may not begin before a Hazardous Material Abatement permit is issued by the Department of Community Development. Demolition may not begin before a demolition permit is issued by the Department of Community Development. 10. Failure to provide all required documents within ten (10) days of receipt of Notice of Award, or failure to complete all required work within the time specified above shall constitute a breach of this contract and justify cancellation by the City. Upon cancellation of the contract, the Contractor shall be liable to the City for any increased cost caused by the Contractors’ breach. Contractors declared in breach will also be removed from the active Contractors list maintained by the City until such time as any costs have been reimbursed to the City and/or the matter is otherwise fully resolved to the satisfaction of the City. 11. Contractor shall provide all of the information as requested herein with their Quote. Failure to do so and/or failure to provide post-Quote requested information may be cause for rejecting the Quote as non-responsive. SCOPE OF SERVICES: The successful Contractor will be responsible for providing the following services for each Property included in this project: 1. Abatement of asbestos indicated in the attached Asbestos Containing Material and Hazardous Materials Inspection Report by a licensed asbestos abatement contractor in accordance with state and federal regulations prior to demolition. a. The demolition contractor is strictly prohibited from beginning demolition of the structure prior to receiving clearance to proceed from the City. The City has hired an independent contractor to conduct hazardous material clearance inspections in order to verify that all hazardous materials have been abated prior to demolition. The demolition contractor must provide an air monitoring report and notify the City when all hazardous material has been abated. There will be a $5,000.00 fine for beginning demolition of the structure prior to the hazardous material clearance inspection and authorization to proceed with the demolition from the City. The contractor will not be paid for the demolition of any structure if they begin demolition of the structure prior to the hazardous material clearance inspection and authorization to proceed with the demolition from the City. 2. Provide the requisite environmental insurance that will cover the Contractor, its subcontractors, and the City from any claim arising out of the abatement and demolition process in addition to other required insurance required in this IFQ. If the Contractor has subcontracted the work to a licensed asbestos abatement firm, the subcontractor’s insurance may meet this requirement. 3. Demolition of all structure(s) and abatement of hazardous materials shall be in accordance with the following: 4. Prior to commencing abatement provide the following: a. Submit for the City’s approval a project schedule for the abatement of hazardous materials, completion of the demolition and all special conditions, and site restorations as required by this Agreement. This schedule shall include allowances for periods of time required for the City’s review. Time limits established in the schedule approved by the City shall not be exceeded by the Contractor. b. 10-day Michigan Department of Environmental Quality (DEQ)/National Emissions Standards for Hazardous Air Pollutants (NESHAP) notice to abate. c. 10-day Michigan Department of Licensing and Regulatory Affairs (LARA) (Michigan Occupational Safety and Health Administration (MIOSHA) notice to abate. d. Provide revised notifications if applicable. e. Obtain abatement permit from the Department of Community Development. 5. Prior to commencing demolition, the Contractor shall: a. Abate hazardous materials identified in the attached assessment reports for each structure in accordance with local, state, and federal regulations. b. Provide air monitoring report for all abatement activity. Dates must match the appropriate LARA (MIOSHA) abatement notification dates. c. Provide a Non-Hazardous Special Waste and Asbestos Manifest for disposal of hazardous material in an approved Type II landfill (see attached example). d. Request Visual Clearance inspection from the Department of Community Development. e. Provide 10-day DEQ notice to demolish. f. Provide revised 10-day DEQ notice to demolish if applicable. g. Arrange for proper abandonment of all utility services. Contact Miss Dig prior to demolition. h. Submit a completed demolition permit application. i. Verify existing condition of streets, sidewalks, curbs, fences, and other infrastructure and site improvements with the Department of Community Development and provide photographs of all damages that exist prior to mobilizing equipment on-site. j. Install storm water inlet filters on storm drain inlets at the demolition site and the first two (2) storm drain inlets downstream of the demolition site or as directed by the Department of Community Development. k. Coordinate the closure of any public street with the Department of Public Works. l. Install safety measures to limit access to the demolition. m. Install soil erosion control measures as site conditions warrant. 6. During Demolition: a. Request a pre-demolition inspector prior to commencing demolition activities.
OpenGov categories
- 57847 · Hazardous Materials (Hazmat, Green Material, etc.), (Not Otherwise Classified)
- 91219 · Clearing and Grubbing Services
- 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
- 91240 · Demolition Services
- 91319 · Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
- 91382 · Maintenance and Repair, Sidewalk and Driveway (Including Removal)
- 96888 · Tree and Shrub Removal Services
- 96897 · Wrecking and Removal Services
- 98852 · Landscaping (Including Design, Fertilizing, Planting, etc., But Not Grounds Maintenance or Tree Trimming Services)