State and local · OpenGov
300 West Huron Water & Gas Line Relocation
Description
The City of Pontiac is soliciting sealed bids from qualified and experienced contractors to furnish all labor, supervision, materials, equipment, tools, permits, transportation, and incidentals necessary to complete the relocation of the existing domestic water service at the City-owned facility located at 300 W. Huron Street, Pontiac, Michigan . The project consists of relocating the existing 6-inch domestic water service from the building foundation wall into the utility tunnel, installing a new restrained ductile iron water service header with associated valves, fittings, supports, and sleeves, reconnecting the existing water meter and reduced pressure zone (RPZ) backflow prevention assembly, extending electrical service to the RPZ air-gap pump, performing all required testing and certifications, and restoring the domestic water service to full operation. The contractor shall also coordinate all required water shutdowns, inspections, and certifications with the City of Pontiac and the Oakland County Water Resources Commission (WRC). PART 1: PROJECT SCOPE AND REQUIREMENTS Scope of Work 1. Project Overview The Contractor shall furnish all labor, supervision, project management, materials, equipment, tools, transportation, permits, testing, inspections, certifications, disposal services, and incidentals necessary to complete the relocation and modification of existing natural gas and domestic water utilities at the City of Pontiac Municipal Complex located at 300 W. Huron Street. The project includes the relocation of the building's natural gas service to a new Consumers Energy meter location and the relocation of the domestic water service into the utility tunnel. Work shall be performed in accordance with the project drawings, applicable codes, utility requirements, and the specifications contained herein. All work shall be completed during the weekend (Friday - Sunday). 2. General Requirements The Contractor shall: Obtain all required permits and schedule all inspections. Coordinate all required utility shutdowns, reconnects, inspections, and testing with Consumers Energy, the City of Pontiac, and the Water Resource Commission (WRC), as applicable. Provide all traffic control, safety measures, temporary protection, barricades, and housekeeping required to safely perform the work. Furnish dumpsters and remove all demolished piping, obsolete materials, and construction debris from the site. Protect existing building systems that remain in service throughout construction. Coordinate work to minimize disruption to building operations. Restore affected areas upon completion of construction. 3. Natural Gas System Relocation The Contractor shall perform all work necessary to relocate and reconnect the building's natural gas distribution system, including but not limited to: Interior Gas Piping Mobilize and stage materials near the future Consumers Energy gas meter rack. Furnish and install a new 4-inch Schedule 40 carbon steel natural gas piping system with welded joints extending from the future gas meter rack through Floor 3 and down to Floor 2. Route piping above the existing structure and reduce to a 2-inch branch near the existing unit heater. Cut into the existing natural gas distribution loop and install a tee connection serving all downstream gas-fired equipment. Furnish and install a new 2-inch pressure regulator to reduce gas pressure to match the existing building operating pressure. Fire-stop all wall and floor penetrations in accordance with applicable fire-resistance requirements. Exterior Gas Main Install a new 4-inch exterior natural gas main from the loading dock area up the north building wall. Continue piping over the parapet and across the roof. Install an isolation valve and flanged cap for future connection of new boilers and rooftop HVAC equipment. Existing Gas Service Removal Following successful commissioning of the new gas service: Disconnect and cap the existing gas service in the boiler house tunnel. Remove obsolete gas piping back to the existing gas meter in preparation for future demolition activities. Gas System Testing The Contractor shall: Pressure test the new gas piping. Perform all required commissioning. Coordinate final connection with Consumers Energy. Paint all exposed natural gas piping yellow to match the existing facility piping system. 4. Domestic Water Service Relocation The Contractor shall relocate the existing domestic water service from the foundation wall into the utility tunnel. Work shall include, but is not be limited to: Preparation and Demolition Mobilize personnel, equipment, and materials. Remove abandoned steam return piping, steam supply piping, and existing domestic water piping necessary to provide a clear installation path. Remove and dispose of demolished materials. Fabricate and install pipe supports, strut framing, and ductile iron spool pieces. Provide crane services for lowering piping and materials into the Boiler House. Modify and reconnect the RPZ air-gap pump discharge piping to the sanitary system as specified. Water Service Installation The Contractor shall: Coordinate shutdown of the domestic water service with WRC. Drain and isolate the existing domestic water system. Remove the existing water meter, RPZ assembly, gate valve, and associated piping. Cut the existing 6-inch galvanized water service. Furnish and install approximately 25 linear feet of new restrained ductile iron water main complete with all fittings, supports, and anchors. Install: New 6-inch flanged gate valve Blind flange for future connection Tee fitting 2-inch branch piping New true-union ball valve 8-inch PVC sleeve with Link-Seal assembly through the utility tunnel wall. Reinstallation and Restoration The Contractor shall: Flush the new water service for a minimum of one hour. Reinstall the existing water meter and RPZ assembly at the new location. Reconnect the existing building domestic water system. Restore domestic water service. Inspect all joints and fittings for leaks. Field test and certify the relocated RPZ assembly in accordance with local cross-connection control requirements. Submit certification documentation to WRC. Install a new 120V, 20A electrical circuit serving the RPZ air-gap pump. Test the pump for proper operation. Clean the work area and remove all debris. 5. Testing and Commissioning The Contractor shall perform all required testing and commissioning necessary to place both utility systems into service, including: Natural gas pressure testing Gas system commissioning Domestic water flushing Leak testing RPZ certification Functional testing of the RPZ air-gap pump Verification of all valves, regulators, controls, and piping connections Correction of deficiencies identified during testing prior to final acceptance. 6. Coordination The Contractor shall coordinate all work with: City of Pontiac Consumers Energy Water Resource Commission (WRC) Any required inspectors Other contractors working on-site All utility interruptions shall be scheduled in advance and approved by the Owner. 7. Closeout Requirements Prior PART 1: DESCRIPTION OF NEEDS, FUNDING AND CONTRACTING INFORMATION PROJECT REQUEST / BACKGROUND The City of Pontiac is soliciting sealed bids from qualified and experienced contractors to furnish all labor, supervision, materials, equipment, tools, permits, transportation, and incidentals necessary to complete the relocation of the existing domestic water service at the City-owned facility located at 300 W. Huron Street, Pontiac, Michigan . The project consists of relocating the existing 6-inch domestic water service from the building foundation wall into the utility tunnel, installing a new restrained ductile iron water service header with associated valves, fittings, supports, and sleeves, reconnecting the existing water meter and reduced pressure zone (RPZ) backflow prevention assembly, extending electrical service to the RPZ air-gap pump, performing all required testing and certifications, and restoring the domestic water service to full operation. The contractor shall also coordinate all required water shutdowns, inspections, and certifications with the City of Pontiac and the Oakland County Water Resources Commission (WRC). NO VALUE CONTRACT TERM The term of the resultant Contract shall be for a period of The contract term will be for three months with a possible extension. from the date of executing the contract for services that will be rendered, with approval by the City Council. This Contract includes the option to renew for N/A , which may be exercised at the discretion of the City. CONTRACT AWARD Through this solicitation process, the City seeks to award one contract. The City will award a contract to the lowest responsive and responsible bidders based on the evaluation process described in this IFB. REQUIRED MEETINGS The Purchasing Division may schedule a kick-off meeting prior to contract commencement for the review of the contract requirements and proposed delivery. The Contract Administrator may request meetings at any time, and meetings may be regularly scheduled. There should be an appropriate forum for discussing performance, cost, efficiency, and progress toward goals. Supplier must schedule meetings and confirm dates with parties involved when requested by the Contract Administrator. Schedule periodic progress meetings to review service delivery, invoices, and changes; to discuss specific operations that may affect the quality, time or cost of work; or to provide notice of work that may impact the contract. BILLING AND INVOICES It is required that the Supplier provide monthly invoices to the City in electronic form. All invoices must be prepared in clear and concise format approved by the City. All invoices must include the following information: Supplier's name and address and a phone number and email for questions about the invoice. Supplier’s invoice number. Invoice date and period. City of Pontiac contract number and purchase order number. An itemized list of goods and/or services provided and hours provided. Any additional information required in the finalized contract as an Exhibit. The City will pay invoices within 30 calendar days. The thirty calendar days begins on the date the invoice is received by the City’s Accounts Payable Manager, unless otherwise provided in the finalized contract. All invoices must be emailed to AccountsPayable@pontiac.mi.us . COMPENSATION AND METHOD OF PAYMENT Firm Fixed Price : The City will pay the Contractor a fixed amount as agreed in the contract for the delivery of all services outlined. This amount will not change regardless of the actual costs incurred by the Contractor in the fulfillment of the required services. PRICING STRUCTURE AND ADJUSTMENT PROVISIONS The compensation agreed upon under this Firm Fixed Price contract shall remain unchanged for the duration of the agreement. No price adjustments or escalations will be allowed or accepted unless mutually agreed upon by both parties in response to changes in the project scope documented via formal amendments. FUNDING REQUIREMENTS Funding of the work described in this solicitation is not guaranteed. Fluctuations in funding year to year should be expected. The City cannot assure that any particular level of work will be assigned, and the contract will permit the City to add or remove work as necessary depending on availability of funding. INSURANCE REQUIREMENTS The Bidder awarded a Contract as a result of this solicitation will be required to provide a copy of the insurance policy. Additional insurance coverage may be required depending on the key features of service delivery chosen by the Supplier. Final insurance requirements will be subject to negotiation between, and mutual agreement of, the parties prior to contract execution. PART 2: PROCEDURAL INFORMATION REALISTIC BIDS It is the expectation of the City that bidders can fully satisfy the obligations of the bid in the manner and timeframe defined within the bid. Bids must be realistic and must represent the best estimate of time, materials and other costs including the impact of inflation and any economic or other factors that are reasonably predictable. City of Pontiac shall bear no responsibility or increased obligation for a Bidder’s failure to accurately estimate the costs or resources required to meet the obligations defined in the bid. SOLICITATION CLARIFICATION QUESTIONS AND ADDENDUMS Any Bidder requiring clarification of the provisions of this Solicitation must submit specific questions to the City. Bidders must submit all questions through OpenGov by the Deadline to Submit Questions indicated on the cover page of this IFB. The City will issue any addendum responding to questions in accordance with the Procurement Timetable on the cover page of this IFB. Bidders with concerns or requiring clarification on any aspect of this solicitation must submit their questions or concerns through OpenGov prior to the clarification deadline indicated on the solicitation cover page. Bidder shall specify the particular solicitation provision or contract feature in question, explaining any perceived ambiguity, unfairness, or legal issue, or how it might restrict competition. This process ensures that potential issues can be addressed promptly by the City, thereby minimizing disruptions and facilitating a fair and competitive bidding process. Failure to raise concerns by this deadline will be considered as acceptance of all terms and conditions and will waive any future claims regarding the solicitation’s or contract’s clarity, fairness, or compliance with the law. COST OF PREPARATION OF RESPONSE Costs incurred by any Bidder in preparation of a response to this Solicitation is the responsibility of the Bidder. CONFIDENTIALITY Confidential/Proprietary Information. The City is a public entity whose records are subject to Michigan's Freedom of Information Act (FOIA), MCL 15.231 et seq,. Once the City awards a contract, then all bids, whether successful or not, will become public records subject to inspection to public inspection in accordance with FOIA. For this reason, the City requests that respondents DO NOT submit in their bids information that they consider trade secrets, or otherwise confidential or sensitive commercial, financial, personal or security-related (“Confidential Information”) except as absolutely necessary to respond to the IFB. Bidders who decide that they need to submit Confidential Information in order to effectively respond to the IFB will follow this process : Package the Confidential Information that is necessary to the IFB response in a file that is separate from the remainder of the IFB response. Mark the file with “Confidential Information” or similar words. Review the remainder of the bid and ensure that it contains no Confidential Information. Include a statement in the bid that (1) identifies the separately packed information marked “Confidential Information,” and (2) describes the basis on which the bidder wishes to exempt the content of the package from public inspection under FOIA. Following this process may protect some Confidential Information from public disclosure to the extent allowed by FOIA and other applicable law. The City does not guarantee that following this process will in fact protect Confidential Information from FOIA disclosure. After award, the contract executed by the City and the successful Bidder will be a public document subject to disclosure. REFERENCES The City reserves the right to investigate references including customers other than those listed in the Bidder’s submission. Investigation may include past performance of any Bidder with respect to its successful performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of a project on schedule, and its lawful payment to employees and workers or any other criteria as determined by City of Pontiac. PUBLICITY Any publicity giving reference to this project, whether in the form of press releases, brochures, photographic coverage, or verbal announcement, may be done only after prior written approval of City of Pontiac’s Purchasing Manager and Communications Director. DISPUTES In case of any doubt or differences of opinions regarding the items or service to be furnished hereunder, or the interpretation of the provisions of the IFB, the decision of City of Pontiac will be final and binding upon all parties. COLLUSION A Bidder, submitting a bid hereby certifies that no officer, agent, or employee of City of Pontiac has a financial interest in this bid; that the bid is made in good faith without fraud, collusion, or connection of any kind with any other Bidder and that the Bidder is competing solely on its own behalf without connection or obligation to any undisclosed person or firm. CERTIFICATION REGARDING CONFLICT OF INTEREST Bidders are required to certify (in the Bidder Representations and Certifications Attachment) whether the Bidder is or is not aware of any potential organizational conflict of interest (COI). If the Bidder is aware of a conflict, then Bidder is required to provide a disclosure statement in its bid describing all relevant information concerning any past, present, or planned interests bearing on whether it (including its chief executives and any directors, or any proposed consultant or subcontractors) may have a potential organizational conflict of interest. Bidders responding to this solicitation are required to disclose any such business or financial relationships. The disclosure statement must identify and address any actual or potential organizational COI within the Bidder’s entire organization, including parent company, sister companies, affiliates, and subsidiaries. In addition to identifying potential organizational COI, the disclosure statement must describe how any such conflict can be avoided, neutralized, or mitigated. Also, all Suppliers must disclose any actual or potential COI. The City’s Law Director will determine a bidder’s eligibility for an award based on the information provided in the disclosure statement. LOCAL PURCHASING PREFERENCE City of Pontiac desires to employ local businesses in the purchase or lease of any personal property, public improvements, or services to support the local economy in the State of Michigan and the City of Pontiac so that residents benefit from local employment opportunities that are generated. Therefore, the City of Pontiac prefers goods or services that have been manufactured or produced by a Michigan business if price, fitness, availability, and quality is otherwise identical. EEO CERTIFICATION REQUIREMENT Contracts in excess of $10,000 (“Major Purchases”) that originate from this IFB are subject to the City’s Equal Employment Opportunity (EEO) requirements, as outlined in the City of Pontiac’s Municipal Code, Article IV – Executive Branch, 4.304 Centralized Purchasing; Competitive Bidding and the sample City of Pontiac contract attached to this IFB. PART 3: BID EVALUATION, QUESTIONS AND INSTRUCTIONS MANDATORY MINIMUM REQUIREMENTS At the time of bid submission , Bidders must demonstrate that they meet the mandatory minimum requirements, if provided i n Attachment 1, Section 3 of t his solicitation. Only bids meeting the mandatory minimum requirement(s) will be considered for evaluation and award. AWARD RECOMMENDATION The City will post a Notice of Intent to Award on OpenGov. The contract will be awarded to the lowest responsive and responsible bidder. Lowest responsible bidder means that bidder who submits the lowest bid, conforming to specifications, as evaluated, and who is qualified by meeting th e following standards as they relate to the particular contract under consideration. Adequate financial resources for performance, or the ab
Published attachments
Addenda and notices
Official Notice #1: Deadline to Submit Questions · 1
Good afternoon. Please note that the deadline to submit questions for this ITB is today, 11/6/2026 at 4:00 pm.
OpenGov categories
- 91468 · Plumbing
- 93464 · Plumbing Equipment and Fixtures, Maintenance and Repair
- 96760 · Plumbing Equipment, Pipe, Fittings and Fixtures Manufacturing Services
- 96863 · Relocation and/or Removal Services for Utility Works