970 E Main Street Demolition Project - Reissued

Description

The City of Bartow Community Redevelopment Agency (CRA) is soliciting proposals from qualified, licensed, and experienced demolition contractors to provide comprehensive demolition services for the commercial building at 970 E. Main Street, Bartow, Florida 33830. The demolition contractor will provide all labor, supervision, equipment, materials, transportation, permits, disposal, and related services needed to complete these tasks and must subcontract the project-branding component of the privacy screen installation per the scope of work. The CRA has established a maximum project budget of One Hundred Thousand Dollars ($100,000.00) for the services described in this Invitation to Bid (ITB). SCOPE OF WORK Overview The City of Bartow Community Redevelopment Agency (CRA) is soliciting proposals from qualified, licensed, and experienced demolition contractors to provide comprehensive demolition services for the commercial building at 970 E. Main Street, Bartow, Florida 33830. The demolition contractor will provide all labor, supervision, equipment, materials, transportation, permits, disposal, and related services needed to complete these tasks and must subcontract the project-branding component of the privacy screen installation per the scope of work. The CRA has established a maximum project budget of One Hundred Thousand Dollars ($100,000.00) for the services described in this Invitation to Bid (ITB). Project Background & Site Conditions PROPERTY INFORMATION Property Address: 970 E. Main Street, Bartow, Florida 33830 Parcel ID: 25-30-05-366500-004020 Legal Description: BURROWS ADD PB 4, PG 80, Block 4, Lots 2–8, 13–19, and Alley Between Same Existing Building: Approximately 15,360 square feet Redevelopment Site: Approximately 3.04 acres, consisting of multiple parcels associated with the 970 E. Main Street redevelopment site Property Owner: Bartow Community Redevelopment Agency and City of Bartow Existing Use: Commercial/Municipal Property Zoning: C-2 – Community Commercial Project Timeline The Contract Time is as follows: 30 CALENDAR DAYS from the Notice to Proceed. The contract will be complete once Final Completion is reached and all final documentation, including the final application for payment, has been received and processed. The Contractor shall provide a project schedule identifying milestones and anticipated completion dates. Qualifications 1. The Contractor submitting a bid must have been in business under the same name & TIN/FEIN number for the past five (5) years . 2. The Bidder must hold all active licenses, registrations, and certifications required to perform the project, including a General Contractor (GC) license . 3. The Bidder must hold a City of Bartow (if located within Bartow) or Polk County Local Business Tax Receipt for those located outside of the City of Bartow. 4. The Contractor shall provide three (3) references from clients for whom the bidder has served as the prime contractor on projects of similar size and scope within the past five (5) years . At least two (2) of the three (3) references must be from a governmental entity, such as a municipality, county, state agency, or other public-sector organization. Please refer to the Reference Form provided under the Vendor Submittal Forms. 5. Subcontractors are permitted; however, the prime Contractor must self-perform a minimum of sixty percent (60%) of the total contract value . 6. Alternative materials or supplies will not be accepted unless expressly authorized by the City in the solicitation documents or by written addendum. 7. The Bidder must meet all applicable federal, state, and local requirements necessary to perform the project, including licensing, registration, permitting, insurance, and any other requirements applicable to the project. 8. Because asbestos-containing materials have been identified in the building to be demolished, the Contractor must meet the following additional requirements: The Contractor or its subcontractor performing asbestos abatement must hold a current and valid Florida Asbestos Contractor License (per Florida Statutes Chapter 469) or be a licensed Asbestos Abatement Contractor as required by state and federal regulations. All personnel performing asbestos abatement must be properly trained and certified per OSHA, EPA, and Florida Department of Environmental Protection (FDEP) requirements. The Contractor must comply with all applicable regulations related to asbestos handling, abatement, removal, transportation, and disposal, including but not limited to NESHAP , OSHA 29 CFR 1926.1101 , and FDEP asbestos program requirements . The Contractor is responsible for submitting all required notifications, including FDEP and local notifications, before commencing any asbestos-related activities. Proof of asbestos qualifications, licenses, and certifications must be included with the bid. Minimum Required Services The demolition contractor will be responsible for providing all labor, supervision, equipment, materials, transportation, permits, disposal, and related services necessary to complete the project for: Building Demolition, Removal, and Disposal. Existing Sign Removal and Site Cleanup. Site Grading and Stabilization. Fence Installation, Privacy Screen, and Project Branding. Detailed Scope of Services The Contractor shall perform all work necessary to complete the demolition project, including, but not limited to, the following: (a) Project Mobilization and Permitting Prior to commencing any work, the Contractor shall: Conduct a site visit and field verification of existing conditions. Obtain all required demolition permits, licenses, and regulatory approvals. Coordinate all required inspections and notifications. Verify all utilities have been disconnected prior to commencement of demolition activities, where necessary. Prepare and implement all required safety measures in accordance with OSHA standards. Install temporary barriers, fencing, signage, and other public safety measures necessary to secure the project site. MOT and traffic control will be handled by a road closure permit. Coordinate the permit with the Bartow Police Department for closing adjacent roads. Submit a work schedule identifying major activities, anticipated milestones, and completion dates. Coordinate project activities with the CRA throughout the duration of the project. (b) Environmental Compliance and Asbestos Abatement An asbestos inspection report has been completed for the property and is included as Attachment A: Asbestos Inspection Report. The report identifies areas and materials requiring attention before or during demolition. The Contractor shall thoroughly review report and include the costs of all required asbestos abatement and associated compliance activities in the Pricing Table. The Contractor shall: Review the asbestos inspection report prior to submitting a proposal. Identify the asbestos-related work necessary to complete the demolition in accordance with the report and applicable regulations. Ensure that required asbestos abatement is completed before demolition activities disturb the affected materials. Obtain required permits, licenses, certifications, notifications, and approvals associated with the work. Ensure regulated materials are handled, transported, and disposed of in accordance with applicable requirements. Provide required disposal records, manifests, clearances, or other closeout documentation as applicable. Include all costs associated with asbestos abatement, environmental compliance, transportation, and disposal in the proposed price. Include all costs associated with environmental compliance within the proposal. (c) Demolition The Contractor shall provide complete demolition and removal of the existing commercial building, approximately 15,360 square feet, including: Roof systems. Structural framing and exterior walls. Interior partitions and associated building components. Concrete slabs and foundations. Mechanical, electrical, and plumbing systems. Miscellaneous site improvements associated with the structure. Other materials and components necessary to complete the demolition and leave the property in the condition specified in this ITB. The Contractor shall perform demolition using methods that minimize dust, noise, vibration, and impacts to adjacent properties. Appropriate dust suppression and site safety measures shall be maintained throughout the work. The Contractor shall coordinate demolition activities with required asbestos abatement. (d) Removal and Disposal The Contractor shall remove all demolition debris from the project site, including: Concrete and masonry. Structural steel and metal. Wood and roofing materials. Interior building materials and miscellaneous construction debris. Slabs, footings, and foundations removed as part of the project. Regulated materials requiring separate handling and disposal. All other debris generated by the demolition activities. All materials shall be transported to an approved landfill, recycling facility, or other authorized disposal location, as applicable. The Contractor shall include all hauling, transportation, landfill, recycling, and disposal fees in its proposal and provide disposal documentation upon request. No demolition debris or unauthorized stockpile material shall remain on the property at project completion. (e) Existing Sign Removal The Contractor shall remove and properly dispose of the existing steel roadside sign, including: Sign structure. Support posts. Concrete footing. Associated hardware and materials. The affected area shall be backfilled and restored as necessary to meet the site grading requirements. (f) Site Grading and Stabilization Following demolition and removal of the building and associated foundations, the contractor shall restore the site to a smooth, graded, and stable condition suitable for future redevelopment. The Contractor shall perform all work necessary to complete the demolition project, including, but not limited to, the following: Remove remaining building pad materials and unsuitable debris. Backfill excavated areas and voids with suitable fill material. Compact fill in appropriate lifts, 12" maximum, using suitable equipment and methods consistent with applicable specifications and site conditions. Fill Dirt is 95% Modified Proctor. The finished site shall be free of depressions, construction debris, and unsafe conditions. (g) Chain Link Fence Installation Upon completion of grading activities, the Contractor shall furnish and install: Six-foot (6') galvanized chain-link fencing around the interior perimeter of the property. Two (2) lockable vehicle access gate points. Provide two sets of locks with two sets of keys. The contractor may select the locks. All necessary posts, braces, hardware, and concrete footings. Fence installation shall comply with applicable City standards and manufacturer recommendations. (h) Privacy Screen Installation and Project Branding The Contractor shall install a green privacy screen along the entire perimeter of the newly installed chain-link fence. See Attachment B. The Contractor shall provide and install: Six (6) vinyl mesh banners. Banner dimensions: 60 inches by 36 inches. The Contractor is responsible for contracting the services of a qualif Contractor Responsibilities The Contractor shall be solely responsible for: Furnishing all labor, supervision, equipment, tools, materials, transportation, and supplies. Obtaining all permits, licenses, and inspections. Maintaining site security throughout construction. Providing traffic control when required. Protecting adjacent public and private property. Repairing any damage caused by demolition operations. Maintaining compliance with all OSHA safety requirements. Coordinating utility disconnections and notifications (if applicable). Maintaining appropriate insurance throughout the duration of the project. Pre-Bid Meeting and Site Evaluation (non-mandatory) The CRA will conduct an on-site pre-bid meeting (non-mandatory) and site walkthrough to provide prospective contractors with an opportunity to inspect the property, evaluate existing conditions, and review the demolition requirements. The meeting shall include access to the building's interior to the extent permitted by site safety conditions and access arrangements. Contractors should examine the building, slab foundations, site, access points, and other conditions that may affect the proposed work, schedule, or pricing. This Pre-Bid Meeting will be conducted on November 13, 2026 @ 9:00 AM. Each contractor is responsible for conducting its own due diligence and incorporating the anticipated costs associated with observed site conditions into its proposal. Questions and requests for clarification shall be submitted in accordance with the ITB's questions and answer procedure. Any clarification that modifies the solicitation requirements shall be issued through a written addendum. Deliverables At project completion, the Contractor shall provide: Final permit approvals. Inspection approvals. Documentation of debris disposal. Warranty information for fencing materials, if applicable. Final site acceptance by the CRA. Applicable Standards All work shall comply with, but is not limited to: Florida Building Code. Florida Fire Prevention Code. OSHA Standards. Florida Department of Environmental Protection (FDEP) requirements. Polk County regulations. City of Bartow Land Development Regulations. All applicable Federal, State, and Local Laws governing demolition and construction activities. INTRODUCTION AND BACKGROUND INFORMATION Purpose of Solicitation The City of Bartow Community Redevelopment Agency (CRA) is soliciting proposals from qualified, licensed, and experienced demolition contractors to provide comprehensive demolition services for the commercial building at 970 E. Main Street, Bartow, Florida 33830. The demolition contractor will provide all labor, supervision, equipment, materials, transportation, permits, disposal, and related services needed to complete these tasks and must subcontract the project-branding component of the privacy screen installation per the scope of work. The CRA has established a maximum project budget of One Hundred Thousand Dollars ($100,000.00) for the services described in this Invitation to Bid (ITB). City Background Information PROPERTY INFORMATION Property Address: 970 E. Main Street, Bartow, Florida 33830 Parcel ID: 25-30-05-366500-004020 Legal Description: BURROWS ADD PB 4, PG 80, Block 4, Lots 2–8, 13–19, and Alley Between Same Existing Building: Approximately 15,360 square feet Redevelopment Site: Approximately 3.04 acres, consisting of multiple parcels associated with the 970 E. Main Street redevelopment site Property Owner: Bartow Community Redevelopment Agency and City of Bartow Existing Use: Commercial/Municipal Property Zoning: C-2 – Community Commercial INSTRUCTIONS TO BIDDERS - CONSTRUCTION Bid Schedule ITB-CON Solicitation Issued: November 6, 2026 Pre-Proposal Meeting (Non-Mandatory): November 13, 2026, 9:00am 970 E Main Street Bartow, FL Question Submission Deadline: November 17, 2026, 4:00pm Bids Due: November 25, 2026, 2:00pm Bid Opening It is the responsibility of the bidder to assure that their bid is delivered or submitted at the proper time and place prior to the bid opening. All bid openings shall be public, following 2:00 pm , on the date specified in the solicitation. Bids which for any reason are not so delivered or submitted electronically through the City’s e-procurement system, will not be considered. Bid Submittals Using Facsimile or Email Will Not Be Accepted. Note: In accordance with Florida Statute 119.071, a listing of vendors that provided a bid submittal shall be posted to the City’s e-procurement platform OpenGov. All bids shall remain exempt from disclosure, including bid amounts, until recommendation of award or 30 days after bid opening, whichever event occurs first. Should the City reject all bids, before the recommendation of award or 30 days after bid opening, and concurrently provide notice of the City’s intent to reissue the bid, the rejected bids will remain exempt from Florida Statute 119.07 until such time as the City provides notice of recommendation of award of the reissued bid or until the City withdraws the reissued bid. The bid is not exempt for longer than 12 months after the notice of rejection of all bids. Execution of Bid Bid must contain an original signature of an authorized representative in the space provided on the signature page. Bid must be typed or printed in black ink. Erasable ink is not permitted. Corrections made by the bidder to any bid entry must be initialed by the person who signs the bid. Bid Submittals Submittal may be withdrawn by notifying the City, in writing, at any time prior to the deadline for bid submittal. After the deadline, the bids become a record of the City and will not be returned to the Contractor unless the bid is cancelled. It is the responsibility of the Contractor to make a written request for return of the Bid Submittal after notification of cancellation. Absent this written request, the City shall destroy the submittal. Negligence on the part of the Contractor in preparing their Bid Submittal confers no right of withdrawal or modification of their Bid Submittal after such Bid Submittal has been opened by City Staff at the appointed time and place. Bid Submittals and any bid security shall be in force for a period of not less than ninety (90) calendar days after the bid opening time. At the time and place specified for the opening of Bid Submittals (see above), every Bid Submittal properly delivered within the time specified for receiving Bid Submittals will be opened and publicly read aloud, irrespective of any irregularities found therein. Bidders and other people interested may be present or represented. Bid Submittal -Exhibits & Forms Supplementary Conditions, Special Conditions, Plans, Drawings, Instructions to Bidders, the Conditions of the Contract, Exhibits, the Bid Submittal, Technical Specifications, any resulting addenda issued, and the Contract together therein identified constitute the entire “bid package” and upon award shall constitute the Contract Documents concerning this present bid matter. The following documents, collectively, comprise the “Bid Submittal” which, when tendered, on or before the Bid due date and time, must include: Bid Sheet(s) Bid pricing must be submitted through the City’s e-procurement system, OpenGov. A printed copy may also be included with the physical bid submission, if applicable. Contractors shall not deviate from the Pricing Table unless expressly authorized by the City of Bartow Procurement Contact. Any unauthorized deviation from the provided Pricing Table may result in the bid being deemed non-responsive. With th e signature of an authorized representative of the company or their designee, all information requested below shall be uploaded and submitted with your bid in accordance with the requirements of this bid/project (Contractors are to Refer to Section 8: Vendor Submittal Forms): Bidder Incorporation Information Reference Form Acknowledgement Form Exhibit I – Bid Bond, when applicable Exhibit IV – Non-Collusion Affidavit of Prime Bidder. Exhibit VI – Affidavit of Percentage of Work (this requirement does not include Exhibit VI-A – Subcontractor List Exhibit VI-B – Good Faith Effort Documentation). Exhibit VII – Trench Safety Act Compliance Exhibit VIII – Equal Employment Opportunity Exhibit IX – Drug-Free Workplace Form Exhibit X – Safety Requirements/Regulations Exhibit XVIII – Certificate of Compliance Exhibit XIX – Affidavit Certification Immigration Laws Exhibit XX – Contractor Certification regarding Scrutinized Companies List Exh

Published attachments
Public questions and answers
  • Since the estimated bid amount for this project is $100,000, would a Bid Bond and Construction Performance and Payment Bonds be required? The bid documents indicate these bonds are required for projects over $150,000. Please confirm whether these bonding requirements apply to this solicitation or whether they may be waived based on the estimated project value.

    Based on the requirements outlined in the bid documents, a Bid Bond and Construction Performance and Payment Bonds are only required for projects with a value in excess of $150,000. Since the estimated value of this project is $100,000, these bonding requirements are not applicable to this solicitation.

  • The estimated costs associated with demolition, asbestos abatement, and fence installation may exceed the stated maximum project budget of $100,000.00. Please confirm whether the $100,000.00 budget is a firm funding limitation or whether the City will consider and evaluate bids that exceed this amount. Additionally, please clarify whether the City reserves the right to award the contract based on available funding or, if necessary, adjust the scope of work to remain within the established budget.

    The established project budget is $100,000.00. Respondents should structure their bids to remain within this amount. If proposed costs exceed the budget, respondents must clearly identify the additional costs and provide supporting documentation. The CRA reserves the right to evaluate the bids and determine the most cost-effective and responsible approach to completing the project.

  • Please clarify whether the City will accept temporary rental panel fencing with posts anchored into the ground, without concrete footings, as an alternative to permanent fencing. The proposed temporary fencing would include two gates, windscreen, and graphic elements and could remain in place for six months to one year before removal. Would this temporary fencing option be acceptable, provided it meets the project requirements for security, stability, durability, and appearance? Additionally, please confirm whether the City intends for the fencing to be temporary or permanently installed, as permanent fencing may significantly increase project costs and could exceed the maximum available budget.

    The CRA intends for the fencing to be permanently installed. Temporary rental panel fencing will not be accepted as an alternative. Contractors should include the cost of permanent fencing within the proposed project budget and are expected to work within the maximum available budget of $100,000. If the cost of permanent fencing, demolition, or other required project components exceeds the available budget, respondents must clearly identify the additional costs and provide supporting documentation. The CRA reserves the right to determine the most cost effective and responsible approach to completing the project.

  • Please clarify whether the existing asphalt parking lot must be protected from damage during demolition and removal of the existing building, slab, and foundation. Demolition activities may damage the asphalt immediately surrounding the building footprint. Would the City permit this limited area to be disturbed, provided that any damaged asphalt is removed and the affected area is left clean and free of demolition debris?

    The existing parking lot asphalt does not need to be protected from potential damage during demolition activities. However, the contractor is expected to take reasonable precautions when operating heavy machinery and equipment on site. Any asphalt damaged or displaced as a result of demolition activities must be properly removed if in large quantities, and the affected area left clean and free of debris. The respondent must ensure that loose or damaged asphalt, smaller pieces, does not create a safety hazard or become airborne during high winds.

  • During the site visit, bidders were advised that all utilities serving the building had been disconnected. Please confirm that all utilities, including electrical, water, sewer, gas, telephone, and data services, have been properly disconnected. Additionally, we observed no fire sprinkler riser during the site visit. Please confirm whether the building has a fire sprinkler system and, if so, whether it has been disconnected and properly capped. Please identify any remaining active utilities or connections, if applicable, that the Contractor should be aware of prior to commencing demolition activities.

    All utilities serving the building have been disconnected, as previously communicated during the site visit. The Contractor is responsible for independently verifying the status of all utility connections before commencing demolition activities and coordinating with the appropriate utility providers as needed. The Contractor should conduct their own due diligence to verify whether a fire sprinkler system or any remaining utility connections are present and take the necessary precautions to ensure all services are properly disconnected, capped, and secured before demolition begins. If you have any questions regarding utilities at the City of Bartow, please contact Shaun Gelissen at sgelissen@cityofbartow.net.

  • The asbestos survey report identifies carpet mastic containing less than 1% asbestos. Although the asbestos content is below the 1% threshold, please clarify whether this solicitation requires removal and proper disposal of this material. If removal is required, please confirm whether the Contractor must follow applicable asbestos abatement procedures and regulations for removing, handling, transporting, and disposing of the material.

    The Contractor is responsible for ensuring that all asbestos-containing materials identified in the survey, including materials containing less than 1% asbestos, are addressed in accordance with all applicable federal, state, and local requirements. Any required removal, handling, transportation, and disposal of asbestos-containing materials must comply with applicable asbestos abatement regulations and proper disposal procedures. The Contractor must also provide documentation verifying the proper removal, transportation, and disposal of all asbestos-containing materials, including applicable disposal receipts and manifests, to the CRA upon completion of the work.