Airfield Pavement Management Program

Description

The Kenton County Airport Board (“KCAB”) will receive proposals for Airfield Pavement Management Program . A pre-proposal meeting will be held on Thursday, November 12, 2026 at 11:30 am at Conference Center D, CVG Centre 77 Comair Blvd. Erlanger, KY 41018 . Questions are due at 11:59 pm on Thursday, November 19, 2026 and answers will be posted no later than Wednesday, November 25, 2026 at 11:59 pm . Proposals must be received by Thursday, December 3, 2026 at 2:00 pm . No proposals will be accepted after that time unless such date or time is extended pursuant to an addendum issued by KCAB. SCOPE OF SERVICES Scope of Services The Cincinnati/Northern Kentucky International Airport (CVG) is seeking qualified firms to provide professional services for the development and implementation of an Airfield Pavement Management Program (APMP). The objective of this program is to ensure the longevity, safety, and efficiency of the airfield pavements through systematic evaluation, maintenance, and rehabilitation planning. The selected firm will be responsible for conducting pavement condition assessments, developing a pavement management system, and providing recommendations for maintenance and rehabilitation activities. The successful proposer ("Consultant") must provide the following services, at a minimum: •The Consultant shall conduct data gathering, generate pavement management system reports, database management, and owner review. Potential additional services include pavement design, bidding assistance, and construction support. •The Consultant shall provide project management services needed to organize efforts of the project described herein the Scope of Services. These services include but are not limited to: project management, milestone and coordination meetings, monthly status / progress reports, sub-consultant procurement/coordination (if needed), scheduling, budget/cost control, resource management, inter-agency coordination, document control, and quality assurance/quality control throughout the contract period. • Inventory – The Consultant shall review and update the established pavement inventory. Priority of pavement branches and sections will be assessed in collaboration with the KCAB prior to the commencement of field inspections. • Inspection – The Consultant must conduct a network level inspection of the Airfield in accordance with methodologies set in FAA Advisory Circular 150/5380-6C, Airport Pavement Management Program (PMP). The Consultant shall visually inspect pavement areas and record the distress types, extents, and severities of defects observed. Locations of defects shall be mapped using geospatial data to allow others to locate the defect for further inspection or repair in the field. Inspection of pavements shall be typically conducted by non-destructive methods. • Evaluation – The Consultant shall provide a pavement condition assessment and determine the corresponding Pavement Condition Index (PCI). Consultant is also asked to perform an analysis of current airside maintenance practices and develop strategies and recommendations for improvement to the Airport Pavement Maintenance System and Program. Recommendations – The Consultant must make recommendations for maintenance, repair, or reconstruction of pavement areas based on field inspection, evaluation, PCI, and priority. Recommendations shall be clearly identified as either maintenance needs or rehabilitative/reconstruction measures. Consultant will provide recommendations for prioritization of future Capital Improvement Projects. • Cost Estimates – The Consultant shall generate cost estimates structured on the maintenance, repair, or reconstruction recommendations identified in the evaluation. Cost estimates must be based on local construction methods, materials, and prices. • Report – Provide report for Airfield Pavements based on inspections, analysis and recommendations. The reports will program work commensurate with priority and available funding in conjunction with collaboration with KCAB representatives. The reports must include exhibits depicting the pavement network and PCI ratings and others as necessary. • GIS Interface – KCAB is currently in the process of developing a comprehensive GIS data management system. Selected consultant must provide PCI data in a format that will seamlessly interface with KCAB’s geodatabase for migration into KCAB’s GIS program. Consultant is also expected to conduct inspections in a manner that allows for GIS mapping of all deficiencies. . • Common Data Environment - create a common data environment, such as dashboards, to serve as a central repository of PMP analytics and easy access for all CVG staff. • Innovation - Highlight any additional value-added services your team can provide that will improve CVG’s ability to manage, analyze, communicate, and maximize the long-term performance of its airfield pavement assets. • Other Services – Provide on call training to KCAB staff on an as needed basis. Topics for training may include inspection procedures, development of PCI data, developing recommendations based on PCI and projecting future PCIs. In addition, software training may be required such as inspection methodology training, dashboards or common data environment navigation , and training in regard to information sharing between other platforms such as INFOR (KCAB’s asset management software) and PM Web (KCAB’s project management platform). Potential Additional Scope Items May Include: • Design Services – Separate design packages may be issued for airfield pavements based on the results of the pavement condition report. Consultant may be required to provide pavement rehabilitation engineering and design services as required for performance of minor to moderate pavement rehabilitation and replacement projects. Services may include, but not be limited to, additional survey, underground utility investigation service, geotechnical testing, pavement testing, specialized pavement investigations, analyses, pavement rehabilitation engineering services, pavement marking and striping design and auditing services, Quality Assurance and Quality Control Services, and other related pavement design and maintenance support services. • Development of updated Pavement Condition Numbers for aprons, taxiways and runways. • The Consultant may be asked to provide bidding services and construction support services. Design services may be retained under this soli Specifications and Standards The selected firm shall adhere to the following detailed specifications and standards: Pavement Condition Assessment Conduct a comprehensive pavement condition survey of all airfield pavements, including runways, taxiways, and aprons. Utilize the Pavement Condition Index (PCI) methodology as outlined in ASTM D5340-12. Document and categorize pavement distresses in accordance with FAA Advisory Circular 150/5380-6C. Provide high-resolution imagery and geospatial data for all surveyed pavements. Pavement Management System (PMS) Develop a Pavement Management System (PMS) that integrates with the airport's existing Geographic Information System (GIS). Ensure the PMS is compliant with FAA Advisory Circular 150/5380-7B. Include modules for data entry, analysis, reporting, and forecasting. Provide training for airport staff on the use and maintenance of the PMS. Maintenance and Rehabilitation Planning Develop a 5-year maintenance and rehabilitation plan based on the pavement condition assessment and PMS analysis. Prioritize maintenance and rehabilitation activities based on pavement condition, usage, and criticality. Provide cost estimates for recommended maintenance and rehabilitation activities. Ensure all recommendations comply with FAA standards and guidelines. Reporting and Documentation Prepare a comprehensive final report summarizing the findings of the pavement condition assessment and the recommended maintenance and rehabilitation plan. Include detailed maps, charts, and tables to support the findings and recommendations. Provide digital copies of all data, reports, and documentation in a format compatible with the airport's systems. Access information from all data sets through a dashboard or common data environment. Minimum Qualifications Firms submitting a response must show evidence of qualifications and experience related to successfully performing the requested services on 3 similar projects in the last 5 years. Firms must be qualified to work in the State of Kentucky and must be able to stamp the plans by a licensed professional Architect, Engineer, and/or Surveyor registered in the State of Kentucky. AOA Safety And Security A. SAFETY A.1 Contractor and all subcontractors shall comply with their site-specific safety plan and Owner’s recommendations regarding employee safety. Owner may shut down the job site/project if it deems necessary for any single or recurrent safety violation by Contractor or any subcontractor. In the event the job site/project is shut down under this section, Contractor agrees it will not file or pursue any claim including but not limited to a claim for delay against the Owner, in relation to such shutdown; and, each day elapsing during shutdown is counted as a contract day for purposes of calculating liquidated damages. The Contractor shall acquaint his supervisors and employees with the activity and operations that are inherent to an active air carrier airport; and shall conduct his construction activities to conform to all routine and emergency air traffic requirements and guidelines on safety as specified in this section of the specification. The applicable safety provisions of the latest FAA Advisory Circular 150/5370 prevail throughout this construction contract. This information is used by the Contractor as guidance in implementing and administering its own safety program during the term of this Contract. These requirements are minimum. Not all of the specific references may pertain to this Contract. A.2 Construction Activity and Aircraft Movements During the time the Contractor is performing the work under this Contract, existing terminal aprons, taxiways, and runways at the Airport will remain in use by aircraft, except as provided herein. To the extent feasible and convenient, in the opinion of the Engineer and to the extent permitted by the Federal Aviation Administration, the access by aircraft of runways and use of taxiways adjacent to areas where the Contractor is working will be routed as to reduce disturbance to the Contractor's operations. Aircraft operations, unless otherwise specified in the Contract Specifications, shall always have priority over any and all of the Contractor's operations, and the Contractor shall not allow his employees, subcontractors, material suppliers, or any other persons over whom he has control to enter or remain upon or allow any plant or materials to be brought or to remain upon any part of the Airport which, in the opinion of the Engineer, would be a hazardous location. Should aprons, runways, or taxiways be required for use by aircraft, and should the Engineer deem the Contractor to be too close to the portion used by aircraft for safety, he may, in his sole discretion, order the Contractor to suspend his operations; remove his personnel, plant, equipment, and materials to a safe distance; and stand by until the runway and taxiways are no longer required for use by aircraft. The Contractor shall not allow his/her employees, subcontractors, material suppliers, or any other persons under the Contractor's control to cross any active runway or taxiway without an escort by authorized Airport personnel. The Contractor shall pay a fine of up to Ten Thousand Dollars ($10,000) per occurrence for any unauthorized crossing of an active runway or taxiway by any such person under the Contractor's control. Any breach of security requirements is subject to a fine of up to Ten Thousand Dollars ($10,000). If any portion of the work area under this Project is contained within the Aircraft Operations Area (“AOA”), then these areas of work are considered critical areas. Work will be performed in the proximity of and directly adjacent to active taxiways, therefore, the Contractor shall become familiar with the Obstacle Free Areas and Safety Areas associated with active areas of the Airport. A.3 Airfield Safety Requirements The Contractor shall adhere to the following requirements when working in close proximity to aircraft: Brief each equipment and vehicle operator to thoroughly acquaint him with the absolute necessity of exercising discretion and proper judgment while in the vicinity to aircraft operations. Assist the Engineer and the Airport Security Personnel in monitoring the conduct of each vehicle and equipment operator. Require all operators to maintain a safe and reasonable speed and to utilize equipment strictly in accordance with prevailing weather conditions. At the direction of the Engineer, dismiss from the project any person operating unauthorized vehicles or equipment in an unauthorized area, or operating vehicles or equipment in a reckless and unreasonable manner. Shall not allow trash or debris to accumulate in his work or operations area. Extreme caution will be taken to keep all trash and debris from taxiways, runways, and apron areas. Shall not allow his vehicles or equipment to be operated within 130 feet of the centerline of an active taxiway or within 250 feet of the centerline of an active runway, unless they are using a designated haul route or have the express consent of the Engineer. Immediately cease and remove his operations from any operations or work area at any time he is instructed to do so by the Engineer, the FAA Control Tower, or by the Airport Staff. These instructions will be issued by radio or other means, if appropriate. The Contractor will not allow his operations to return to the area until he has received permission to do so by the Engineer. Shall provide, erect, and maintain all necessary barricades, signs, danger signals, and lights for the protection of the work and the safety of the public for both land and air traffic. Obstructions shall be illuminated as required by the Engineer. Tall but relatively low visibility units such as cranes, drills and the like must have appropriate obstruction lighting mounted and operational in accordance with FAA Advisory Circular 70/7460-1. Booms are also required to have an orange checkered flag attached to the top of the boom when elevated. In the event of poor weather, visibility, emergency issue, the equipment operator may GENERAL INFORMATION & SUBMITTAL INSTRUCTIONS NOTICE TO BIDDERS The Kenton County Airport Board (“KCAB”) will receive proposals for Airfield Pavement Management Program at the Cincinnati/Northern Kentucky Int’l Airport (“CVG”). Proposals must be received by Thursday, December 3, 2026 at 2:00 pm . No proposals will be accepted after that time unless such date or time is extended pursuant to an addendum issued by KCAB. A pre-proposal meeting will be held on Thursday, November 12, 2026 at 11:30 am at Conference Center D, CVG Centre 77 Comair Blvd. Erlanger, KY 41018 . Please RSVP by November 11, 2026 through KCAB’s online bidding system https://procurement.opengov.com/portal/cvgairport . Select Invitation 26-054-RFQ and provide the name of the person(s) attending. See Attachments for RSVP instructions. KCAB reserves the right to waive any informality or irregularity in any proposal or bid guaranty, to reject any or all proposals, to award or refrain from awarding a contract for the work, and to negotiate with the apparent qualified responsible proposer to such extent as may be beneficial to KCAB. Further information and copies of the Request for Proposal (RFP) may be downloaded from our website www.cvgairport.com/bids - KCAB's e-Procurement Portal. Lawrence J. Krauter, Chief Executive Officer CINCINNATI /NORTHERN KENTUCKY INTERNATIONAL AIRPORT Hebron , Kentucky 41048 SCHEDULE OF EVENTS Release Project Date: November 4, 2026 Pre-Proposal Meeting (Non-Mandatory): November 12, 2026, 11:30am Conference Center D, CVG Centre 77 Comair Blvd. Erlanger, KY 41018 Deadline For Questions To Be Submitted: November 19, 2026, 11:59pm Answers To Questions Issued: November 25, 2026, 11:59pm Proposals Due: December 3, 2026, 2:00pm Interviews: December 10, 2026 - December 18, 2026 Anticipated Contract Implementation: March 1, 2027 KCAB reserves the right to modify or alter the schedule of events to such extent as may be beneficial to KCAB. PRE-SUBMITTAL MEETING To facilitate a comprehensive understanding of the scope of services and expectations for the Airfield Pavement Management Program , a pre-submittal meeting will be held on Thursday, November 12, 2026 at 11:30 am , at Conference Center D, CVG Centre 77 Comair Blvd. Erlanger, KY 41018 . During the pre-submittal meeting, KCAB staff will provide an overview of the scope of services and expectations of the project and will address questions. The meeting will also provide an opportunity for prospective prime and sub-consulting firms to network. Attendance at the meeting is STRONGLY encouraged. BACKGROUND The Kenton County Airport Board (“KCAB”) is a Kentucky Municipal corporation established pursuant to the provisions of KRS Chapter 183 and is the operator of the Cincinnati/Northern Kentucky International Airport ("CVG") located in Boone County, Kentucky. KCAB is soliciting an RFQ from qualified firms for the Airfield Pavement Management Program at CVG. KCAB intends to select one qualified consultant, or proposed team of consultants and engineers, to provide the requested services. The Project Overview and descriptions provided in this RFQ are intended to convey a general scope of services so that each respondent might address its experiences and present its expertise in dealing with the services requested in its RFQ. In compliance with Federal Aviation Administration (FAA) requirements, KCAB has implemented a Pavement Management System to inventory, inspect, and determine the Pavement Condition Index (PCI) for airport pavements. This system is used for reporting and programming recommendations for repair or reconstruction, generating budgetary cost estimates, design of construction documents for bidding, and establishing priorities for capital improvement and maintenance projects. The current PMS has a well-established pavement network, database, and GIS configuration. This RFQ is for airfield pavements only. The pavement conditions are assessed and tracked on a long-term basis, with construction and maintenance projects programmed and budgeted from the corresponding funding source. SUBMISSION OF RFQS Responses to this RFQ must be submitted electronically through KCAB’s online bidding system which can be accessed at https://procurement.opengov.com/portal/cvgairport . Select the project titled Airfield Pavement Management Program (Invitation # 26-054-RFQ ) and follow the instructions for submittal. The completed and signed proposal (together with all required attachments) must be transmitted and received through OpenGov no later than Thursday, December 3, 2026 at 2:00 pm Eastern Time (ET). Proposers should allow for sufficient time to upload and transmit all required information. Proposer is solely responsible to ensure its submission is transmitted prior to the due date and time. KCAB will not accept submissions after the due date and time and is not responsible for any error in transmission including but not limited to power outage, internet connectivity, unauthorized access, etc. Individual submittals will not be read in public or available for public inspection until afte

Published attachments
Addenda and notices
Public questions and answers
  • Can the requirement for a licensed PE registered in Kentucky be fulfilled by a sub-consultant?

    The prime should have at least 1 licensed PE in Kentucky.

  • No question - the virtual option is provided in the Agenda. Thank you!

    You're welcome.

  • When was the last APMS performed and by which firm?

    The APMS was historically performed in-house. An RFQ was released in 2021 and RS&H, Inc. was awarded the on-call.

  • Follow up on Question 1, does the proposed PM have to be licensed in KY or can any team member on Prime's team be licensed in KY? Thank you!

    Any team member on the Prime's team can be licensed in KY.

  • Given the upcoming Thanksgiving holiday and the associated impact on staff availability, teaming coordination, and subconsultant participation, would the Board consider extending the proposal submission deadline? An extension would allow proposing teams additional time to coordinate with key team members and develop the highest-quality response to the RFQ requirements.

    Responses are due December 3rd as of right now the schedule will remain the same.

  • Because each section of the proposal is submitted separately, how should the appendices be uploaded? Should they be attached to the document for the relevant sections or submitted separately elsewhere?

    Please attach documents to relevant sections.

  • Are certificates of insurance required both prime and subconsultants?

    Certificates of insurance are required for Prime. Yes, Subconsultants should have and provide COI’s to prime and upon request to KCAB.

  • The RFP notes that DBE requirements of 49 CRF Part 26 apply to this contract, while the Subconsultant form notes that the DBE goal is 0%. Are firms required to show any proof of DBE good faith efforts?

    Not required to show proof of DBE good faith.

  • During the pre-proposal meeting, Caleb noted that the prime needs to have a key staff member with a KY PE license, but the individual does not necessarily have to be the Project Manager. However, the RFQ indicates the Project Manager is required to have a KY PE license. Can this be formally clarified?

    Yes - the Project Manager does not necessarily need to be a licensed PE in KY, but the prime firm must have a licensed PE in KY.

  • The RFQ identifies December 10–18, 2026, as the interview period. Will shortlisted firms have an opportunity to select an interview date within this window based on availability, or will dates be assigned?

    Firms will have the opportunity to select within the window of time given based on the availability.

  • Vendor Questionnaire Item 2 requests descriptions of up to three APMP projects completed within the last five years and notes that comparative project information may be provided in Appendix A. Please clarify whether Appendix A should be limited to supplemental information for the three projects identified in the response or whether additional relevant project examples may also be included.

    Additional relevant project examples may also be included.

  • As a follow up to Q7 – are we to submit subconsultant COIs or just have them ready if KCAB requests after submission

    If requested have them ready.

  • Because this is a qualifications-based proposal and not a price-based selection, do the subcontract value and amount need to be included in the Subcontractor List? If they are required, could you please clarify the difference between the ‘Subcontractor Value’ and ‘Subcontractor Amount’ fields?

    Please do not include any amounts, amounts are project specific and will be requested during projects if Subcontractor/s are used. There is no difference in the fields.

  • The RFQ limits the Innovation and Value-Added Services narrative to one page, while assigning a significant evaluation weighting towards this category. Would CVG consider increasing the page limitation for this section to allow proposers to adequately describe their proposed innovations and implementation approach?

    Please include additional pages for Innovation as an appendix. You can also provide links to sites that show examples of proposed innovations if it helps with the page limit.

  • As a follow-on to Question 14, will features assessed as innovations, but described in Project Execution count towards the Innovation and Value-Added Services score?

    Innovations may naturally be described in Project Execution since they're related, but the scoring for these innovations will count toward the Innovation and Value-Added Services.

  • May proposers include hyperlinks to supplemental materials, and will evaluators review them as part of the evaluation?

    Yes, this is acceptable, and the evaluators will review them.

  • Section 1.7.2 references ASTM D5340-12. Please confirm whether proposers should utilize ASTM D5340-12, or the most current version of ASTM D5340 available at the time of contract execution?

    Proposers should utilize the most current version of ASTM D5340 available at the time of contract execution.

  • As there is no DBE requirement should we fill out N/A for the DBE boxes on the subcontractors form? And is TBD acceptable for the subcontract value and subcontract amount?

    No DBE information is required N/A is acceptable. Value and Amount is not required at this time either, TBD is acceptable.

Plain text

OpenGov categories

  • 23731 · Highway, Street, and Bridge Construction
  • 237310 · Highway, Street, and Bridge Construction
  • 541330 · Engineering Services
  • 541380 · Testing Laboratories