State and local · OpenGov
Airport Digital Twin Platform Implementation and Support Services
Description
The Sanford Airport Authority (Authority) is seeking qualified professional services from an experienced Solution Provider to implement an Airport Digital Twin Platform and associated Open, Standards-Based Digital Twin Ecosystem that improve airport asset management, maintenance operations, operational awareness, and long-term facility stewardship. The selected Solution Provider shall configure, integrate, deploy, and support a commercially available Digital Twin Platform using industry best practices and a scalable implementation approach utilizing commercially supported, configuration-based solutions. The Digital Twin Platform shall establish a common operational environment that integrates information from selected airport systems and provides enhanced visualization, analytics, dashboards, workflows, and decision-support capabilities. The Airport Digital Twin Platform is intended to complement—not replace—the Authority’s existing operational and business systems. Existing systems shall remain authoritative systems of record for their respective functions. The Digital Twin Platform shall leverage information from these systems to improve asset visibility, maintenance coordination, operational awareness, and informed decision-making. For a detailed breakdown of the Authority's Digital Twin Program scope, see Attachment C - Detailed Scope of Work. Introduction Established by the Florida Legislature in 1971, the Sanford Airport Authority ("Authority") owns and operates Orlando Sanford International Airport (SFB), a commercial service airport serving approximately three million passengers annually. SFB serves as a significant economic engine for Central Florida, supporting passenger travel, tourism, commerce, workforce development, and a diverse range of aviation and non-aviation business activities. Summary Background Contact Information Timeline Definitions Addendum/Addenda A written modification, clarification, or revision to the Solicitation issued by the Authority through its e-Procurement Portal prior to the Response Deadline. Airport Orlando Sanford International Airport (SFB), owned and operated by the Sanford Airport Authority. Airport Digital Twin Platform / Platform The commercially available software platform, associated products, modules, configurations, integrations, interfaces, and related technology proposed to provide the Digital Twin capabilities described in the Solicitation and Attachment C. Authority / SAA The Sanford Airport Authority, owner and operator of Orlando Sanford International Airport. Authority Business Days Monday through Friday, 8:00 a.m. to 5:00 p.m. Eastern Time, excluding Authority-observed holidays. Board The Sanford Airport Authority Board of Directors. Contract The written agreement executed between the Authority and the selected Respondent for the Services, including all incorporated exhibits, attachments, amendments, the applicable Solicitation Documents, and portions of the selected Respondent's Response accepted by the Authority. Digital Twin Ecosystem The Authority's long-term, open and standards-based Digital Twin environment consisting of the Platform, approved integrations, data sources, spatial information, dashboards, workflows, analytics, operational use cases, and other capabilities that may evolve over time. Implementation Plan The detailed post-award project plan developed by the selected Solution Provider in collaboration with the Authority that establishes the approved implementation approach, priorities, phases, schedule, milestones, integrations, responsibilities, testing, deployment, and other activities necessary to implement the Platform. Attachment A specifically requires an approved Project Implementation Plan as an implementation deliverable. Key Personnel Individuals identified by the Respondent whose experience, qualifications, responsibilities, or involvement are material to the Respondent's proposed approach and successful performance of the Services. OpenGov / e-Procurement Portal The Authority's electronic procurement system through which the Solicitation is administered and Responses, questions, Addenda, notices, and other solicitation information may be submitted or distributed. Respondent A person, firm, corporation, partnership, joint venture, or other legal entity submitting a Response to this Solicitation. Response The complete proposal submitted by a Respondent in response to this Solicitation, including technical information, proposed approach, qualifications, pricing, required forms, certifications, and other requested information. Response Deadline The date and time identified in the Solicitation Timeline by which a Response must be submitted through the Authority's e-Procurement Portal. Selected Respondent / Solution Provider The Respondent selected by the Authority to enter into a Contract. Upon Contract execution, the selected Respondent shall serve as the Solution Provider responsible for providing the Services required by the Contract and Attachment A. Services All software, licenses, configuration, integration, implementation, documentation, training, support, professional services, and other services required by the Solicitation, Attachment A, and resulting Contract to implement and support the Authority's Airport Digital Twin Platform. Solicitation Documents This Solicitation and all documents incorporated into or issued in connection with it, including attachments, exhibits, forms, the proposed Contract, Addenda, and other documents issued by the Authority. System of Record An existing Authority operational or business system that remains the authoritative source for information within its respective functional domain. The Digital Twin Platform is intended to integrate and present information from such systems and not replace their core operational functions. Work Collectively, the Services and contractual obligations to be performed by the selected Solution Provider under the resulting Contract. Scope of Services The Sanford Airport Authority (Authority) is seeking qualified professional services from an experienced Solution Provider to implement an Airport Digital Twin Platform and associated Open, Standards-Based Digital Twin Ecosystem that improve airport asset management, maintenance operations, operational awareness, and long-term facility stewardship. The selected Solution Provider shall configure, integrate, deploy, and support a commercially available Digital Twin Platform using industry best practices and a scalable implementation approach utilizing commercially supported, configuration-based solutions. The Digital Twin Platform shall establish a common operational environment that integrates information from selected airport systems and provides enhanced visualization, analytics, dashboards, workflows, and decision-support capabilities. The Airport Digital Twin Platform is intended to complement—not replace—the Authority’s existing operational and business systems. Existing systems shall remain authoritative systems of record for their respective functions. The Digital Twin Platform shall leverage information from these systems to improve asset visibility, maintenance coordination, operational awareness, and informed decision-making. For a detailed breakdown of the Authority's Digital Twin Program scope, see Attachment C - Detailed Scope of Work. Project Objectives The objectives of this project include: Establishing a scalable Airport Digital Twin Platform to support airport operations, maintenance, and asset management. Improving visibility into assets, equipment condition, operational status, maintenance activities, and lifecycle information. Enhancing preventive and corrective maintenance processes through improved access to asset, operational, and performance information. Integrating information from selected airport enterprise and operational systems into a common digital environment. Providing configurable dashboards, spatial visualizations, workflows, analytics, and reporting capabilities. Establishing a sustainable platform that can expand through future integrations, use cases, and technology enhancements. Ensuring the Digital Twin Platform remains open, standards-based and interoperable, and capable of evolving without proprietary customization. Creating a formal process repository for post project system operation and maintenance. Initial Implementation Scope The initial implementation will focus on asset management optimization and establishing the foundation for future airport-wide Digital Twin capabilities. Initial focus areas involve the terminal and airfield including: Vertical transportation systems (elevators, escalators, and moving walkways) Passenger Boarding Bridge systems Baggage Handling Systems Heating, Ventilation, and Air Conditioning (HVAC) systems Airfield infrastructure Other airport assets and facilities identified during implementation The selected Solution Provider shall provide professional services necessary to implement and support the Airport Digital Twin Platform, including: Implementation Planning and Platform Configuration Conduct project initiation activities and validate implementation priorities. Develop an implementation approach and deployment schedule. Configure the Digital Twin Platform using standard commercial product capabilities. Configure asset models, dashboards, workflows, reports, notifications, security, and user interfaces. Minimize custom software development through configuration-based solutions. Data Integration and Spatial Enablement Collect, refine, consolidate, and integrate information from selected airport systems, which may include: Computerized Maintenance Management System (CMMS) / Enterprise Asset Management (EAM) Building Automation Systems (BAS/BMS) HVAC systems Passenger Boarding Bridge systems Baggage Handling Systems Vertical Transportation systems Other airport operational and business systems Incorporate available spatial and engineering information, including GIS, CAD, BIM, LiDAR, imagery, floor plans, drawings, asset locations, and related facility information where applicable. Dashboards, Analytics, and Operational Use Cases Configure role-based dashboards and visualizations supporting Engineering, Facilities Management, Maintenance, Operations, IT, and executive users. Develop initial Digital Twin use cases focused on asset performance monitoring, maintenance optimization, equipment status visibility, and operational decision support. Provide analytics capabilities, including artificial intelligence (AI)-enabled capabilities where practical and beneficial. Training, Documentation, and Sustainment Provide formal operational and maintenance processes as well as training and knowledge transfer for system administrators and operational users. Provide implementation, configuration, integration, and user documentation. Provide ongoing professional services to support future enhancements, including additional integrations, dashboards, workflows, analytics, and operational use cases. Desired Solution Characteristics SAA seeks a Solution Provider that can deliver a practical, sustainable, and scalable Digital Twin solution based on the following principles: Commercially supported software platforms Configuration before customization Open, standards-based, and maintainable integration approaches Sustainable administration and long-term support Measurable operational value Ability to expand as airport needs evolve The selected Solution Provider will assist the Authority in establishing a long-term Digital Twin capability that improves airport operations, enhances asset management, supports data-driven decision-making, and provides a foundation for future Airport technology initiatives. Attachment C, Digital Twin Program Detailed Scope, establishes the Authority’s project objectives, guiding principles, scope of services, functional requirements, representative existing system interfaces, and imp Meeting Rooms Any person requiring a special accommodation to attend a public meeting because of a disability or physical impairment should contact the Procurement Department at least 48 hours prior to the scheduled public meeting. Vigilante Conference Room The Vigilante Conference Room is located @ 2001 Red Cleveland Blvd., Sanford, Florida which is located across from the Main Terminal. Enter the lobby through the sliding glass main doors, go past the rental car area and the conference room is located on your right. For parking information, visit the Authority website at: https://flysfb.com/ground-transportation-parking/parking/ . Park in any available lot and a parking voucher will be issued to cover the parking fee. Authority Boardroom The Authority Boardroom is located on the 2nd floor of the Main Terminal - 1200 Red Cleveland Boulevard, Sanford, FL. 32773. Take the elevator past Baggage Claim 3 to the second floor and check-in at the front desk. For parking information, visit the Authority website at: https://flysfb.com/ground-transportation-parking/parking/ . Park in any available lot and a parking voucher will be issued to cover the parking fee. Contract Award of Contract The Draft Contract will be included with a future Addendum. Solicitation General Terms and Conditions Binding Offer A Respondent may withdraw its Response at any time prior to the Response Deadline in accordance with the procedures established by the Authority. After the Response Deadline, Responses shall remain valid and binding for one hundred twenty (120) calendar days unless otherwise authorized by the Authority. Submission of a Response constitutes acknowledgement that the Respondent has reviewed the Solicitation Documents and agrees to be bound by its Response, except for exceptions expressly identified in accordance with the Solicitation requirements. Respondent Responsibility Each Respondent is responsible for examining the Solicitation Documents and determining that its Response addresses the Authority's requirements. Respondents shall identify material assumptions, exclusions, constraints, dependencies, third-party requirements, risks, and Authority resource requirements associated with their proposed solution. A Respondent shall not rely upon an omission or ambiguity as a basis for avoiding an obligation that is reasonably apparent from the Solicitation Documents. Questions, Clarifications, and Addenda All questions, requests for clarification, and identified discrepancies or omissions concerning the Solicitation Documents must be submitted through the Authority's e-Procurement Portal no later than the Deadline for Questions identified in the Solicitation Timeline. The Authority's responses to questions and any revisions to the Solicitation Documents will be issued through the e-Procurement Portal. Only a written Addendum issued by the Authority may modify the Solicitation. Oral interpretations or representations shall not modify the Solicitation. Respondents are responsible for monitoring the e-Procurement Portal for Addenda and other notices concerning the Solicitation. Response Modification or Withdrawal Responses may be modified or withdrawn prior to the Response Deadline in accordance with the procedures of the Authority's e-Procurement Portal. Responses may not be modified after the Response Deadline except in response to a clarification, negotiation, Best and Final Offer, or other request expressly initiated by the Authority. Consent to Inquiry and Verification By submitting a Response, the Respondent authorizes the Authority to verify information contained in its Response and agrees to cooperate with reasonable inquiries conducted as part of the evaluation. The Authority may verify references, experience, qualifications, certifications, financial responsibility, prior performance, proposed technology, partnerships, licensing arrangements, and other information relevant to determining the Respondent's ability to successfully perform the Services. Compliance with Laws Respondents shall comply with all applicable federal, State of Florida, local, and Authority requirements applicable to this Solicitation and, if awarded, performance of the Contract. The Solution Provider shall be responsible for obtaining and maintaining licenses, registrations, permits, certifications, and authorizations required to perform its contractual obligations. Public Entity Crimes Respondents shall comply with the restrictions applicable to public entity crimes under Florida law and shall make any certifications or disclosures required by the Solicitation. A Respondent that is prohibited from contracting with a public entity under applicable Florida law shall not be eligible for award. Scrutinized Companies Respondents shall comply with applicable Florida statutory requirements regarding prohibited or scrutinized companies and shall submit any certifications required by the Solicitation or applicable law. The Authority may reject a Response, terminate a resulting Contract, or exercise any other remedy authorized by law if a Respondent or Solution Provider is determined to be ineligible or submits a false certification. Suspension and Debarment Respondents must be eligible to contract with the Authority and shall not be suspended, debarred, or otherwise prohibited from contracting under applicable federal or State requirements or Authority policy. Submission of a Response constitutes acknowledgement of the Authority's applicable Suspension and Debarment requirements. Non-Discrimination The Authority will provide Respondent a full and fair opportunity to compete for this Contract without discrimination as required by applicable federal and State law and Authority policy. The selected Solution Provider shall comply with all nondiscrimination requirements applicable to performance of the resulting Contract. Insurance The Selected Respondent shall provide evidence of the insurance coverage required by the Contract within the time established by the Authority and prior to commencement of Services. The Solution Provider shall maintain the required insurance throughout the Contract term. Failure to provide or maintain required insurance may constitute grounds for withdrawal of award or Contract termination. Non-Exclusive Contract Any Contract resulting from this Solicitation shall be non-exclusive unless expressly stated otherwise in the executed Contract. The Authority reserves the right to obtain similar, related, supplemental, or additional products and services from other sources when determined to be in its best interest. This provision is particularly important here because Attachment A anticipates an evolving Digital Twin Ecosystem, additional integrations, future technologies, and additional operational use cases. Solicitation and Contract Order of Precedence Prior to Contract execution, the Solicitation Documents and Addenda issued by the Authority shall govern the procurement process. Following Contract execution, any conflict among documents incorporated into the Contract shall be resolved according to the order of precedence established in the executed Contract. Procurement Protests By submitting a Response, the Respondent acknowledges that this Solicitation and any protest arising from it are subject to the Authority's Procurement Protest Policy, as amended from time to time. A copy of the applicable policy may be obtained from the Authority's Procurement Department. Award Does Not Constitute Authorization to Proceed The Selected Respondent shall not commence Services prior to execution of the Contract and receipt of written authorization from the Authority, as applicable. No Guarantee of Work or Expenditures Unless expressly provided in the Contract, the Authority does not guarantee any minimum quantity of Services, level of expenditure, number of integrations, number of future enhancements, or amount of subsequent professional services. The
Published attachments
- 2027-006-RFP - Attachment A - Procurement Process
- 2027-006-RFP - Attachment B - Evaluation Criteria
- 2027-006-RFP - Attachment C - Detailed Scope of Work
- Attachment D - 2027-006-RFP - Digital Twin - Contract Draft - Final
- Airport_Digital_Twin_Platform_Implementation_and_Support_Services_(Addendum_#5_Revision).pdf
Addenda and notices
Official Notice #1: Notice of Change to Pre-Solicitation Meeting - 2027-006-RFP - Airport Digital Twin Platform Implementation and Support Services · 1
The site tour previously included as part of the pre-solicitation meeting has been cancelled . The non-mandatory pre-solicitation meeting will still be held as originally advertised on: Friday, November 6, 2026 2:00 p.m. All other information regarding the pre-solicitation meeting remains unchanged.
Addendum #1 · 1
The Sanford Airport Authority - 2027-006-RFP - Addendum 1
Official Notice #2: The Sanford Airport Authority - 2027-006-RFP - Pre-Solicitation Conference - Sign-In Sheet · 2
Addendum #2 · 2
The Sanford Airport Authority - 2027-006-RFP - Addendum 2
Addendum #3 · 3
The Sanford Airport Authority - 2027-006-RFP - Addendum 3
Addendum #4 · 4
The Sanford Airport Authority - 2027-006-RFP - Addendum 4
Addendum #5 · 5
The Sanford Airport Authority - Addendum 5
Public questions and answers
Is there a conference bridge such as Teams or Zoom available for this meeting?
No. A virtual option is not available. The pre-solicitation conference is non-mandatory. The attendee list will be posted in OpenGov immediately following the conference. Any questions and answers discussed during the meeting will be included in a public addendum posted to the project. If you would like a copy of the meeting recording, please email procurement@osaa.net with your request for the public record, and we will be happy to provide it.
Is price scored out of 15 points as shown in Attachment B, or 10 points as shown in the scoring table? What method will SAA use to score responses based on pricing?
The evaluation scoring is strictly points based. The scoring table has been corrected to reflect points based and pricing will be scored with 15 points.
Section 10.4.6 requires Respondents to "Complete the Cost Proposal/Pricing Form," but no form was included with the posted Solicitation Documents. Please provide the form, or confirm that Respondents may submit pricing in their own format (Excel and PDF) that includes all items listed in 10.4.6.
A form is not required and was included in the Request for Proposal in error. All pricing must be submitted in the Respondent Questionnaire with a three-page limit.
Are there requirements for page size, minimum font size, or margins? Will an 11 x 17 page (for example, a schedule) count as one page or two?
Page size must be no larger than 8.5" x 11". Minimum font size is 11. Margins - The verbiage on the page must fit so that when printed, all type is visible. 11" x 17" will not be accepted. A page counts as single sided. If you have a front and back on the page, that will count as 2 pages.
Respondents are bound to a price, "except for exceptions identified in accordance with the Solicitation requirements"- before contract terms are known. The RFP documents do not state where in the response an exception is placed, or whether an exception affects the score.
The Solicitation General Terms and Conditions, Binding Offer, will be revised to exclude/strike verbiage included in error: "except for exceptions expressly identified in accordance with the Solicitation requirements." This exclusion will be included with a future addendum.
May Respondents include hyperlinks to recorded product demonstration videos within the Response, and will evaluators consider that content?
No. A hyperlink will not be accepted.
The Draft Contract will be issued by a future Addendum. Please confirm the expected issue date, the intended contract term (initial term and renewal options), and how Respondents should submit any exceptions to contract terms.
The draft contract is expected to be released via an addendum no later than COB on Friday, November 13, 2026. It has not yet been determined if exceptions to the contract will be allowed. The specific information relating to the contract draft will be included in the addendum.
May the prime Respondent's insurance satisfy the requirements for the entire team, or must each subcontractor separately meet the listed limits? Will cyber liability or technology errors and omissions coverage be required, given that the platform may host Authority data?
All subcontractors must follow every requirement in the solicitation and contract documents. It is the responsibility of the prime contractor to ensure its subcontractors meet those requirements. SAA retains the right to audit the prime contractor's records to ensure compliance.
Does the Authority require separate sworn statements or forms (for example, Public Entity Crimes under Section 287.133, Scrutinized Companies certification under Section 287.135, E-Verify under Section 448.095, or foreign country of concern attestation under Section 287.138, Florida Statutes) with the Response, or will the 10.1 confirmations suffice until award?
The Authority retains the right to request sworn statements or forms at any time during the solicitation process, evaluation, and award. For the purpose of submitting a response, 10.1 confirmations will suffice.
For the January 11 and 12, 2027 interviews and demonstrations, may some team members participate virtually if the Project Manager and technical lead attend in person?
Yes.
Will this contract be funded in whole or in part with FAA Airport Improvement Program or other federal funds? If so, will federal contract provisions (for example, DBE participation) apply?
The project is not funded with FAA Airport Improvement Program or other federal funds. However, because the airport receives federally funding on other contracts/projects, certain federal provisions will apply. Those provisions will be included in the contract draft. DBE participation will NOT be one of those provisions.
Did SAA utilize a consultant or other third party to draft the RFP and associated attachments? If so, are they excluded from submitting a proposal?
SAA created the RFP and all attachments with the exception of Attachment C - Scope of Work. SAA worked with a consultant to create the Scope of Work. They are excluded from submitting a proposal.
Please confirm the expected format, duration, and content requirements for the January demonstration.
The expected format, duration, and content requirements will be provided after the shortlisted firms are established. As discussed in the pre-conference on November 6, 2026, ample time will be given to the shortlisted firms to prepare for the January interviews/presentations and/or demonstrations. Only the shortlisted firms will be participating in the January interviews/presentations and/or demonstrations.
Please confirm whether Cyber Liability or Technology Errors and Omissions insurance will be required for this engagement. If required, please identify the applicable coverage limits and confirm whether evidence of coverage is required with the proposal or only from the selected respondent before contract execution.
Insurance requirements will be included in the contract draft in a future addendum. As stated in the evaluation criteria, all firms shall submit confirmation of the ability to obtain the insurance at the time of contract execution.
Could SAA please clarify the Techincal Evaluation Meetings listed in the RFP Timeline? Are these internal meetings only or are they open to the public?
Technical Evaluation Meetings are open to the public, except for portions of meetings during which negotiations occur and the interview, presentation, or demonstration phase involving shortlisted firms.
OpenGov categories
- 20654 · Geographic Information Systems (GIS)
- 20882 · Scientific, Statistical, Engineering, Mathematical, and Mapping Software (Including Photogrammetry)
- 91829 · Computer Software Consulting
- 91871 · IT Consulting
- 92033 · Mapping Services, Digitized, Cartography (See 962-52 for Standard Mapping Services)
- 92045 · Software Maintenance/Support
- 92064 · System Implementation and Engineering Services