State and local · OpenGov
Alamogordo Aquatic Center
Description
The City of Alamogordo will receive Sealed Bids at 1376 E. Ninth Street, Alamogordo, New Mexico, 88310, Attn: Engineering Department for the construction of the Project known as "Alamogordo Aquatic Center", Public Works Bid No. 2026-001, until 2:00 PM on December 15, 2026 , at which time the Bid Opening and reading of the Bids received will begin in the Community Development Conference Room at 1376 E. Ninth Street, Alamogordo, New Mexico. The City Commission of the City of Alamogordo will consider the tabulation of Bids at its next regular meeting or at a later meeting if required. 1. Advertisement ADVERTISEMENT FOR BIDS The City of Alamogordo (“City”) will receive Sealed Bids for the construction of the Project known as Alamogordo Aquatic Center , Public Works Bid No. PW Bid 2026-001 , until 2:00 pm on Tuesday, December 15, 2026 , at which time the bids will be publicly opened and read aloud at A Mandatory Pre-Bid Meeting will be held at 10:00 AM on October 13, 2026, in the Dudley School Community Center, 523 Maryland Ave, Alamogordo, New Mexico 88310 , Alamogordo, New Mexico. The City Commission of the City of Alamogordo will consider the tabulation of Bids at its next regular meeting or at a later meeting if required. The Work designated as Alamogordo Aquatic Center consists of, The City of Alamogordo will receive Sealed Bids at 1376 E. Ninth Street, Alamogordo, New Mexico, 88310, Attn: Engineering Department for the construction of the Project known as "Alamogordo Aquatic Center", Public Works Bid No. 2026-001, until 2:00 PM on December 15, 2026 , at which time the Bid Opening and reading of the Bids received will begin in the Community Development Conference Room at 1376 E. Ninth Street, Alamogordo, New Mexico. The City Commission of the City of Alamogordo will consider the tabulation of Bids at its next regular meeting or at a later meeting if required. , in accordance with the drawings, specifications, and other Contract Documents. Construction Industries Division (CID) Project Classification Determination: DESCRIPTION OF WORK: LICENSE REQUIRED: The City of Alamogordo will receive Sealed Bids at 1376 E. Ninth Street, Alamogordo, New Mexico, 88310, Attn: Engineering Department for the construction of the Project known as "Alamogordo Aquatic Center", Public Works Bid No. 2026-001, until 2:00 PM on December 15, 2026 , at which time the Bid Opening and reading of the Bids received will begin in the Community Development Conference Room at 1376 E. Ninth Street, Alamogordo, New Mexico. The City Commission of the City of Alamogordo will consider the tabulation of Bids at its next regular meeting or at a later meeting if required. General Construction GA-98 or GB98 Electrical EE98 Mechanical MM98 Fire Suppression MS-12 Specialty Licensing - GS-1, GS-2, GS-14, GS-16, GS-21, GS-24 and GS-25 In accordance with the provisions of the New Mexico Construction Industries Licensing Act, all project work must be performed by properly licensed contractors and subcontractors with active licenses in good standing as of the date and time specified for Bid Opening. The City has determined that the Contractor shall possess a valid license classification as specified above or other appropriate license classification under the Construction Industries Licensing Act at the time of bid submission. Any work outside the scope of the Prime Contractor's classification(s) must be subcontracted. Any work subcontracted by a Prime Contractor must be performed by an entity that is validly licensed in the classification(s) of the work that is to be subcontracted as of the date and time specified for Bid Opening. Bids that do not satisfy applicable licensing requirements will be considered non-responsive. Specifications and Drawings will be available to BIDDERS on the City’s Portal, located at https://procurement.opengov.com/portal/alamogordonm A Mandatory Pre-Bid Meeting will be held at 10:00 am on Tuesday, October 13, 2026 , in the A Mandatory Pre-Bid Meeting will be held at 10:00 AM on October 13, 2026, in the Dudley School Community Center, 523 Maryland Ave, Alamogordo, New Mexico 88310 , Alamogordo, New Mexico. Attendance is mandatory for all prospective bidders. Prospective BIDDERS are advised of a 10% Bid Evaluation Criterion for area businesses that will apply to this Project. The CONTRACTOR is advised to obtain specific information as to the qualifications and conditions of the Bid Evaluation Criterion before submitting a Bid. A Bid Security shall accompany each Bid in the amount of not less than five (5) percent of the total Bid amount. The successful BIDDER will be required to furnish a Performance Bond and a Payment Bond in the amount of one hundred (100) percent of the Bid amount to assure the performance of the Contract, as well as payment for all labor and materials of the Contract. No Bids may be withdrawn after the scheduled closing time for receipt of Bids, and the City of Alamogordo reserves the right to reject any or all Bids and waive all technicalities and formalities. No BIDDER may withdraw their Bid within sixty (60) days after the actual date of the Bid Opening thereof. Attention of BIDDERS is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the Contract. Vivian Pedone Chief Procurement Officer City of Alamogordo Advertised on Alamogordo Daily News September 24th and October 1st 2026 , and Albuquerque Journal September 27th and October 4th 2026 , in: Alamogordo Daily News Albuquerque Journal VENDOR SUBMITTALS VENDOR SUBMITTALS
Published attachments
- PW Bid 2026-001
- PW Bid 2026-001 Specifications
- PW Bid 2026-001 Plans
- Alamogordo Technical Standards
- SECTION 3 Bid Schedule
- SECTION 4 Subcontractor's listing
- SECTION 5 Bid Bond
- SECTION 6 - Bidder's Qualification Statement
- SECTION 12 - WAGE DECISION
- SECTION 15 - Public Disclosure
- SECTION 16 Disclosure of Subcontracting
- SECTION 17 - Contractor Code of Conduct
- Alamogordo_Aquatic_Center_(Addendum_#5_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
PW Bid 2026-001 Alamogordo Aquatic Center – Pre-Bid Meeting Sign-In Sheets
Addendum #4 · 4
Attached is an additional contractor who has been pre-approved for PW Bid 2026-001. Please update your records accordingly. Contact Information: grant@tpcipools.com (253) 392-2689
Addendum #5 · 5
Approved alternative product submittals, clarification as discussed on the intent and application of Local Preference, and updated Civil Construction Sheets.
Public questions and answers
I wanted to confirm the required bid submission method for the Alamogordo Aquatic Center, Public Works Bid No. 2026-001. Will all bid documents be submitted electronically through OpenGov, or will this project require an in-person sealed hard-copy bid submission to the City? We just want to make sure we are preparing and submitting our bid in the correct format and location.
All bid submissions have to be done electronically.
The floor plan identifies the fencing at the outdoor deck as “Aluminum Fencing,” while the associated exterior elevation and railing detail indicate steel railing/posts. Please clarify the required material for the outdoor deck fencing/railing system: aluminum or steel. Additionally, please provide or identify the applicable specification for the fence/railing system, including required material, finish/coating, and any manufacturer or performance requirements necessary for bidding.
Steel railing is associated with Bid Lots 1, 2, and 3; Refer to Sheet A-202 and “Metal Railings” Specification Section 055200. Where referenced, replace “Aluminum Fencing” with “Decorative Fencing” which is associated with Deductive Alternates 1 and 2; Reference Detail 1 / G-102. Decorative Fencing shall be ‘Master Halco’ Remington Plus pre-manufactured, pre-finished decorative fence panels.
Sheet A100 - The drawing runs off the top of the page. Sheet A100.1 - Most of the drawing is blocked out. Is this intended?
It is ok that the drawing A100 runs off the page because the missing portion is on Sheets A100.1 and A101. These sheets show Bid Lot 3 Details - the shade patio. On sheet A100.1 parts of the drawing are blocked out intentionally to highlight Bid Lot 3 details.
We are preparing our bid for the Alamogordo Aquatic Center, Public Works Bid No. 2026-001, and I wanted to confirm the documentation required to receive the 10% Bid Evaluation Criterion for area businesses referenced in the bid documents. Can you please confirm exactly what documentation or certification we need to include with our sealed bid to qualify for the 10% Area Business Bid Evaluation Criterion? If there is a specific City form or affidavit that needs to be completed, would you please provide it or direct me to where I can obtain it? We want to make sure the required documentation is included with our bid at the time of submission.
When submitting your proposal, attach your business license. That is how we verify local preference.
Section 4 – Subcontractor’s Fair Practice Act Compliance identifies the subcontractor listing threshold as $5,000.00 or the applicable percentage of the Engineer’s/Architect’s estimated total Project cost, whichever is greater. Please provide the Engineer’s/Architect’s estimated total Project cost and confirm the dollar amount that bidders shall use as the subcontractor listing threshold for this project.
The Listing Threshold is $74,214.00
Please confirm whether the Contractor is required to provide Builder’s Risk Insurance under Section 18, General Conditions, Paragraph 5.15. If required, please specify the coverage requirements and limits.
Builder’s Risk Insurance shall be required at the contract value.
Per Section 18, General Conditions, Paragraph 6.15, please provide the State of New Mexico building permit fee and identify any applicable City of Alamogordo permit, plan review, or inspection fees.
It is the General Contractor’s responsibility to include all applicable permits, permit fees, plan review fees and inspection fees within their bid price and to contact applicable authorities having jurisdiction to confirm the costs for applicable fees
Please confirm whether the water utility allowance includes the fire service line and associated connection fees. If excluded, please identify any separate allowance for this work.
The water utility allowance does include the associated connection fees for the fire service line. The fire service line is not a part to the allowance and shall be a part to the General Contractor’s bid price.
Section 18 – General Conditions, Articles 13.2 through 13.7, distinguishes between testing required by public authorities, Contractor Quality Control, and Owner Quality Assurance testing. Article 13.3 specifically states that the material testing laboratory shall be retained by the Owner for Quality Assurance testing, with the Contractor responsible for failed QA retesting, standby/trip charges, required material information, coordination, and its own Quality Control. However, Section 014000 – Quality Requirements, Paragraph 1.05 states that the Contractor shall make arrangements, bear costs, and employ an independent testing firm for inspections and compliance testing required by the Contract Documents. Please clarify which provision governs. Specifically, please confirm whether the Owner will retain and pay for the independent testing laboratory for all required Quality Assurance materials testing, with the Contractor responsible for its own Quality Control, public-authority-required testing/inspections, failed QA retesting, and standby/trip charges as described in Section 18.
Quality Assurance Testing will be accomplished on this project in accordance with Article 13 of the General Conditions (Section 18).
Section 05 12 00 – Structural Steel Framing, Paragraph 1.3 Quality Assurance, requires the structural steel fabricator to maintain current AISC certification under STD, SBD, or CBD and requires the structural steel erector to maintain current AISC certification under CSE or ACSE. Please confirm whether current AISC certification is mandatory for both the structural steel fabricator and erector for this project, or whether a qualified fabricator and/or erector with documented comparable experience, AWS-qualified welding procedures/personnel, and approval by the Architect/Engineer and Authority Having Jurisdiction will be acceptable in lieu of the specified AISC certifications.
The AISC Certification requirement that is specified in the Specifications shall remain in effect for this project.
Section 25 30 00 requires the temperature controls contractor to maintain a permanent, fully staffed local office and stock all repair and replacement parts locally. Please define “local” for this requirement and confirm whether an Albuquerque, El Paso, or other regional service office is acceptable.
“Local” shall mean an established office within a reasonable distance of the project, with qualified personnel and required repair and replacement parts readily available. An office located in Albuquerque, El Paso, or other regional location is acceptable, subject to approval, provided it meets the specified service and parts inventory requirements.
Section 25 10 00 requires tuition for at least one individual to attend a one-week factory training class, while the Owner is responsible for travel, lodging, and meals. Please confirm the Contractor is responsible only for the factory training tuition and the Owner will pay all associated travel, lodging, and meal expenses.
The Contractor shall be responsible for the tuition associated with the factory training class. The Owner shall be responsible for associated travel, lodging, and meal expenses, if applicable.
Section 27 08 00 requires third-party verification and an RCDD or equivalently qualified IT Commissioning Agent. Please confirm whether the Division 27 Contractor is required to hire and pay for an independent third-party commissioning agent, or whether this commissioning agent will be retained and paid directly by the Owner.
Div. 27 contractor to provide their own RCDD responsible for the structured cabling scope. The Owner is not providing or paying separately for this expert.
Section 27 08 00 references the “UNM IT Department,” Owner campuses, and an IT Commissioning Contractor approved by the Owner for work “on and off campus.” This project is for the City of Alamogordo. Please confirm these UNM-specific requirements are applicable to this project and, if so, identify the applicable Owner IT department and approval authority.
The two references to “UNM” are incorrect and are to be changed to “Owner”. The City of Alamogordo will identify the applicable Owner IT representative.
Section 28 30 00 requires bidders to provide maintenance, testing, repair, technician rates, and travel costs valid for five years following expiration of the one-year guarantee. Please confirm these five-year rates are required for informational purposes only and are not to be included in the Base Bid Contract Amount. Specifications(1)
Delete post contract maintenance (item 1.05) and post contract expansions (item 1.06) from this specification.
Section 28 30 00 requires pricing for a future 10% expansion of the fire alarm system, including devices, labor, testing, programming, and additional loop hardware as required. Please confirm this future expansion pricing is for informational purposes only and is not to be included in the Base Bid Contract Amount.
Delete post contract expansions (item 1.06) from this specification.
Section 27 10 05 requires the Contractor to provide a complete telecommunications cabling system, including cabling, terminations, patch panels, racks, cabinets, outlets, patch cords, testing, labeling, and associated infrastructure. The specifications also reference switches and other equipment within the MDF and IDF racks. Please clarify whether Division 27 is required to furnish and install active network equipment, including network switches, routers, wireless access points, controllers, servers, UPS equipment, and other network electronics, or if active network equipment will be furnished by the Owner. Please also confirm that the Division 27 Contractor's Base Bid shall include all specified structured cabling, terminations, racks, patch panels, patch cords, testing, labeling, and associated passive infrastructure required for a complete cabling system.
Any reference to the following items is deleted from the specification: patch cords, active network equipment, including network switches, routers, wireless access points, controllers, servers, UPS equipment, and other network electronics. These items are the responsibility of the owner as identified on the matrix on sheet E-501.
Three openings on the door schedule (122, 124 & 126) call out a 45 minute fire rating. Unfortunately the Listed manufacture - Cline does not carry any fire rated productions. How would you like me to handle those three openings?
Fire rated doors and frames for openings 122, 124, & 126 shall be as manufactured by “Special-Lite” and shall be AF-FR Series All-Fiberglass doors with smooth texture finish with fire ratings as indicated on the drawings. Fire rated doors shall be provided with manufacturer’s accompanying fire rated frames. Vision lites, where applicable, shall be manufacturer’s stainless steel vision lites.
The specs call out for both a clear anodize finish along with a painted finish. Which one would you like me to quote?
This question references no product or specification section and therefore cannot be provided with a response.
The manufacturer of the tensioned fabric structure specified in Section 13 31 23 requires a 50% deposit at the time of order to initiate engineering and fabrication. Will the Owner allow the Contractor to include this initial 50% deposit in an Application for Payment upon placement of the order, provided appropriate documentation of the purchase and payment is submitted?
The Contractor will be responsible for the deposit; partial payment for materials is only applicable when said materials are onsite.
I will not be able to attend the pre bid meeting in person. Would it be possible to attend via virtual?
The pre-bid meeting is mandatory and must be attended in person. Virtual attendance will not be permitted.
Please clarify the procedures for submitting substitution requests for this project, including who the requests should be directed to, where they must be uploaded or submitted, and the deadline for submitting substitutions for consideration prior to bid.
All substitution requests during bidding shall be accompanied by the “Substitution Request Form”, Section 016213 of the Project Manual. Requests should be submitted to the same location as other bid questions which is the City’s Bid Portal. The deadline for submitting substitutions for consideration prior to bid is the same as the deadline for questions.
Detail 3/A-703 identifies the ladder as steel; however, the railing and gate shown in the same detail are specified as FRP. Please confirm whether the ladder is also intended to be FRP in lieu of steel for consistency with the railing and gate requirements.
The ladder, railings, and gate at the Pump Pit shall be FRP. Omit the reference to ‘steel’ in Detail 3 / A-703 and replace with FRP.
Drawing S-600 indicates the scoreboard is attached to a CMU wall, while Drawing A-601 shows the majority of the scoreboard attached to a metal stud wall, with only the lower portion supported by CMU. Please clarify the intended wall construction at the scoreboard location and confirm the required structural support and attachment requirements. This discrepancy impacts the scoreboard mounting method and associated installation costs.
The scoreboard shall be mounted to cmu wall as indicated on Elevation A / S-600. Refer to Interior Elevation 1 / A-601 – Reference the note on the left hand side of this elevation “Videoboard, extend cmu wall behind videoboard, Refer to Aquatic Drawings, Refer to Structural Drawings”. The dashed line around the videoboard in Elevation 1 / A-601 mimics the cmu as shown in Elevation A / S-600. The stippled surface texture is representing the direct applied exterior finish system that is to be applied over the cmu and stud framed wall in this area. Refer to Aquatic Drawings for videoboard information and install per manufacturer’s written installation instructions for a secure mounting on a cmu wall.
Sheet E-105 shows eight access-control card readers. We have identified six readers; however, the remaining two appear to be located near the reception area and lobby, with no associated doors shown on the plans. Please clarify the intended locations and which doors or access points these two readers are to serve.
The access controls are set next to their associated doors. Refer to the Architect’s door schedule for the door numbers.
Please confirm which access control manufacturers and systems are approved for the Alamogordo Aquatic Center. Since the Owner will be handling the camera system separately, we want to ensure the access control system we provide is compatible with the Owner's equipment and preferred platform.
Electronic access control is to be provided by allowance. Refer to Section 01 21 00 Allowance No. 4. Coordination with other systems will be required by the Contractor during construction.
Sheet C300 Grading Plan scale seems to not align with other sheets and known dimensions on sheets. Further more, the scale on sheet C300 does not appear to match the known lengths on its own sheet. I believe it is off by about 0.46 feet. Please confirm the scale on sheet C300.
The only lengths listed on this sheet are for the retaining wall. These dimensions are approximate per the dimension text. The Scale for the grading plan is confirmed to be 1” = 30’ with the enlargements being 1” = 10’. Scales for enlargements have been added to Sheet C300. Revised Sheet C300 will be included in Addendum 04.
Additive Alternate No. 3 (Lockers) requires pricing for all lockers in the men's and women's locker rooms, family changing room, and lifeguard office, referencing Specification Section 10 51 13. However, the lockers are specified under Section 10 51 26. Please confirm that Section 10 51 26 governs Additive Alternate No. 3 and that all lockers in the identified rooms are to be excluded from the Base Bid and included only in Additive Alternate No. 3.
Yes, the lockers are specified in Section 105126 “Lockers”. Yes, all lockers in the identified rooms are to be excluded from the Base Bid and included only in Additive Alternate No. 3.
Additive Alternate No. 10 requires seal coating the existing parking lot. Please confirm whether this alternate shall also include crack sealing, new pavement striping, concrete parking bumpers, and parking signage and posts as shown on Sheet C700, with all associated work excluded from the Base Bid.
Additive Alternate No. 10 shall include seal coating the existing parking lot to match the new parking lot. Crack sealing, new pavement striping, concrete parking bumpers, and parking signage and posts shall be in included in Bid Lot 1 (Base Bid).
Sheets AS-100 and C200 indicate removal of existing light poles and bases within the existing parking lot. Please confirm whether removal of these poles and bases, including excavation, backfill, compaction, and asphalt patching, is included in the Base Bid or Additive Alternate No. 10.
Removal of the existing light poles and bases within the existing parking lot including excavation, backfill, compaction, and asphalt patching shall be included in Bid Lot 1 (Base Bid).
Sheet G-102 provides an aluminum fencing section for Deductive Alternates No. 1 and No. 2, including fence dimensions and member sizes, and references Detail 8/A-700 for the gates. However, we could not locate a corresponding specification section in the Project Manual. Please provide the aluminum fencing specifications, including material thicknesses, finish, manufacturer requirements, gate hardware, and footing requirements.
This questions was previously responded to as follows: Steel railing is associated with Bid Lots 1, 2, and 3; Refer to Sheet A-202 and “Metal Railings” Specification Section 055200. Where referenced, replace “Aluminum Fencing” with “Decorative Fencing” which is associated with Deductive Alternates 1 and 2; Reference Detail 1 / G-102. Decorative Fencing shall be ‘Master Halco’ Remington Plus pre-manufactured, pre-finished decorative fence panels.
Please clarify how the lowest responsive and responsible bidder will be determined. Will the evaluation be based on Bid Lot No. 1 (Base Bid) only, or will additional bid lots and additive/deductive alternates be considered? If bid lots and alternates are included in the evaluation, please confirm whether they will be considered in numerical order or in a predetermined order of priority, and whether that order will be established prior to bid opening.
the lowest responsive bid shall be the composite base bid with all additive and/or deductive alternatives. The base bid and the selected alternatives will be awarded at the City's discretion.
Sheet AS-100 indicates a sanitary sewer line running perpendicular to Washington Avenue. However, this sewer line does not appear on Sheet C400 – Utility Plan. Please confirm whether this sewer line is required as part of the project. If so, please provide the revised utility plan showing its location, pipe size, connection points, and installation requirements.
This sewer line was not included in the survey. Civil doesn’t need this line installed and it should be removed from Sheet AS-100. Sheet AS-100 note indicating “Sewer Line to be Installed”; this reference to this sewer line and note shall be removed.
Sheet A-701 indicates EIFS applied over 1/2" soffit sheathing supported by tube steel purlins. Please confirm that the sheathing is to be fastened directly to the tube steel purlins without additional framing or furring. If additional framing is required, please provide the applicable details and spacing requirements.
Utilize Drywall Suspension System to fasten and support ½” soffit / sheathing.
Detail 14/A-701 indicates standing seam metal roofing and underlayment at the unconditioned canopy. However, Specification Section 07 61 13 requires R-20 insulation at unconditioned spaces and glass-mat gypsum substrate board. Please confirm whether R-20 insulation and the specified substrate board are required at the canopy roof. If so, please provide the complete roof assembly detail.
R-20 insulation and glass-mat gypsum substrate board is not required at the canopy standing seam metal roofing.
Details 9 and 10/A-702 indicate a vapor barrier beneath the exterior concrete slabs at the Outdoor Deck and Shade Deck. However, Specification Section 03 30 00, Paragraph 3.3.A.3, requires vapor retarders beneath interior slabs on grade. Please confirm whether the vapor barrier is required beneath both exterior deck slabs or if it can be omitted.
Omit reference to the vapor barrier beneath the exterior concrete slabs at the Outdoor Deck and Shade Deck as indicated on Details 9 and 10 / A-702.
Sheet A-500 schedules Door 140 as a pair of 3'-0" doors. However, Sheet A-100 appears to indicate a single door between Lobby 100 and Reception. Please confirm whether Door 140 is to be a single 3'-0" door or a pair of 3'-0" doors, and revise the drawings accordingly.
Door 140 is a single 3’-0” door at Lobby 100 / Reception 100 A
Detail 8/A-702 indicates exterior sheathing over the CMU wall beneath the weather barrier and EIFS. However, Sheet A-701 shows the weather barrier and EIFS applied directly to CMU, and Specification Section 07 25 00 specifies a fluid-applied weather barrier for use over CMU. Please confirm that the exterior sheathing shown in Detail 8/A-702 is not required and that the weather barrier and EIFS are to be applied directly to the CMU
Omit reference to the exterior sheathing indicated in Detail 8 on Sheet A-702. Yes, the fluid applied weather barrier specified in Section 072500 is to be utilized over cmu as specified. EIFS, in the thickness indicated, is to be applied over the weather barrier and cmu.
Detail 4 on Sheet A-701 indicates 1" perimeter insulation, while Specification Section 07 21 00, Paragraph 2.02, Item 6(a), requires 2" insulation at the foundation perimeter unless otherwise noted on the drawings Please confirm whether 1" or 2" perimeter insulation is required and clarify the required thickness throughout the project
2 inch perimeter insulation is required at the entire foundation perimeter.
Additive Alternate No. 3 requires providing and installing the lockers. Please confirm whether the benches in the men's and women's locker rooms and other applicable areas are to be included in Additive Alternate No. 3 or the Base Bid.
Locker Room benches shall be included with the lockers in Additive Alternate No. 3.
Sheet A-602, Elevation 1, indicates a sanitary napkin disposal in the men's toilet room. Please confirm whether this accessory is required or if the callout should be deleted.
A sanitary napkin disposal is required at each toilet stall in the Women’s Locker Room and in the toilet stall in the Family Change Room. Sanitary napkin disposals are not required in the toilet stalls in the Men’s Locker Room.
Detail 5/A-703 refers to the aquatic drawings and geotechnical report for soils, waterproofing, and subsoil drainage beneath and around the surge tank, pump pits, and backwash pit. Please confirm the required backfill material against these below-grade structural walls, including whether engineered fill or free-draining granular material is required, the limits of each material, lift thicknesses, and compaction requirements.
Refer to Detail ‘A’ “Over Excavation Extents” and Foundation Notes on Sheet S100 for information related to the required backfill material and compaction requirements.
Detail 5/A-703 references subsoil drainage piping beneath and around the surge tank, pump pits, and backwash pit. The geotechnical report provides general underdrain requirements, while the plumbing drawings identify pool sub-grade sump pumps SP-4/SP-5 and separate backwash sump pumps SP-1/SP-2. Please confirm the complete subsoil drainage piping layout, including pipe sizes, locations, elevations, bedding, cleanouts, and discharge points. Specifically, confirm whether these underdrains are intended to connect to SP-4/SP-5 or discharge elsewhere, and provide the applicable piping and connection details.
The subsurface drainage system must be provided by the Pool Contractor’s structural engineer. Refer to Spec 131100 Paragraph 1.02.B.1.u. The under-drainage system must adhere to the description provided within the geotechnical report, and the outfall of the underdrainage system must connect to SP-4 and SP-5.
Sheet A-501 requires an independent testing laboratory to verify the minimum 8-mil coating thickness, inspect for pinholes, and document surface preparation with photographs. Please confirm whether the Owner or Contractor is responsible for hiring and paying for this testing laboratory. If the Contractor is responsible, please identify qualified testing laboratories within a reasonable distance of Alamogordo, NM, capable of performing these services.
The City will hire and pay for the testing services associated with the coating system.
Section 10 14 00 requires room identification signage and references the Finish Schedule for sign text. However, a room signage schedule identifying the required quantities, locations, and sign types was not found. Please provide a complete room signage schedule identifying all required signs, quantities, locations, and sign types for bidding purposes.
A room identification sign shall be provided for each room. Refer to the Finish Schedule for initial sign text which shall be confirmed with the Owner during shop drawings / submittals. The signage type shall be as specified in Section 101400 including international gender and handicapped symbols at locker rooms and restrooms. Quantities are the responsibility of the contractor.
The drawings identify fire extinguisher cabinets and extinguishers but do not indicate any wall-mounted fire extinguisher brackets. Please confirm whether additional fire extinguishers with mounting brackets are required in the mechanical rooms, pool storage, pump pit, acid room, chlorine room, or other equipment rooms. If required, please provide the locations, quantities, and extinguisher types for bidding purposes.
Provide a fire extinguisher and wall mounted bracket in the Electrical Room and Pool Mechanical Room field located as directed by the Architect during construction.
Please confirm whether the Alamogordo Aquatic Center project will require City of Alamogordo Planning and Zoning review and approval prior to submitting the plans to New Mexico CID for permitting.
the project will not require review and approval by Planning and Zoning prior to permit submittal through CID.
Sheet C100, General Note 5 and Grading Note 1, state that the Contractor is responsible for all site material testing. However, the City's response to Question 9, dated October 25, 2026, confirms that Quality Assurance testing shall be performed in accordance with Article 13 of the General Conditions (Section 18), which assigns the independent Quality Assurance testing laboratory to the Owner. Please confirm that the Owner will hire and pay for all required Quality Assurance site material testing, including soils, compaction, concrete, and asphalt testing, and that the Contractor is responsible only for its own Quality Control testing, failed QA retesting, and other applicable costs outlined in Article 13 of the General Conditions.
As provided in response to Question 9, the Quality Assurance Testing will be accomplished on this project in accordance with Article 13 of the General Conditions.
Sheet C200 identifies existing irrigation equipment to be removed and relocated but does not clarify which bid lot includes this work. Please confirm whether the existing irrigation removal and relocation will be performed by the Owner or if the Contractor is responsible. If by the Contractor, please confirm whether this work is to be included in the Base Bid (Bid Lot No. 1) or Bid Lot No. 6 – Landscaping & Irrigation.
The City has located the remaining reclaimed water irrigation lines and valves and will provide the GPS locations to the successful bidder to protect in place.
Sheet C200 identifies three existing bleacher sections to be removed but does not clarify who is responsible for the removal or whether the bleachers are to be salvaged. Please confirm whether the Owner will remove the existing bleachers or if removal is to be included in the Contractor's Base Bid (Bid Lot No. 1). If the Contractor is responsible, please confirm whether the bleachers are to be salvaged and turned over to the Owner, relocated to another location, or demolished and disposed of.
The existing bleachers have been removed by the owner. Bleachers are not to be re-used for this Project. The existing bleachers which are removed shall be salvages and turned over to the Owner.