Architect-Engineer (A-E) Structural Engineering Services – Task Order Contract

Description

The County of Orange (County), consisting of 22 agencies and departments, and the Orange County Flood Control District (District) deliver a broad range of services to the residents of Orange County. Services provided include public protection, public health, infrastructure maintenance, and community and social services. As the District relies on County staff to carry out its duties, the District will also be included as a party to any contract(s) resulting from this solicitation. It is the primary responsibility of the County’s public works department (OC Public Works) to enrich the community through the efficient delivery and maintenance of public works infrastructure, planning, capital improvement, and development services. OC Public Works intends to pre-qualify firms to provide Architect-Engineer (A-E) and A-E related services Countywide and District-wide for various maintenance and capital improvement projects. Through this Request for Qualifications (RFQ), the County and District will evaluate responding firms based on the qualifications and requirements established in this solicitation and will establish a Qualified Vendor List (QVL) consisting of firms determined to be qualified to perform the applicable A-E disciplines and services. From the firms determined to be qualified and placed on the QVL, the County and District intend to select certain firms for initial contract awards, subject to approval by the Orange County Board of Supervisors, as applicable. Firms that are determined to be qualified but are not selected for an initial contract award will remain on the QVL and may be considered for future contracting opportunities during the effective period of the QVL, subject to County and/or District needs, available contracting capacity, applicable procurement requirements, and required approvals. Placement on the QVL does not guarantee the award of a contract, task order, minimum dollar amount, or any specific volume of work. Likewise, the award of a contract does not guarantee that any particular amount of work will be assigned. The County and District reserve the right, at their sole discretion and in accordance with applicable County policies and procedures, to make multiple contract awards and to utilize qualified firms from the QVL as future needs arise. Contracts awarded as a result of this RFQ process shall have a maximum term of three (3) years. At the conclusion of the applicable contract and/or QVL period, the County and/or District may issue a new solicitation to establish a new QVL and provide firms an opportunity to compete for future A-E services. SCOPE OF WORK INTRODUCTION OC Public Works , on behalf of the County of Orange (County) and Orange County Flood Control District (District), requires supplemental professional services to meet workload demands and project scheduling commitments in relation to Architect-Engineer (A-E) Design, Project Administration and Management Services for various projects. A-E is defined as an Architect or Engineer for design and/or engineering of a project. To supplement existing resources, County intends to issue Architect-Engineer (A-E) Structural Engineering Services – Task Order Contract for use by County and District on an "as-needed" basis. No specified amount of work is guaranteed to Respondent. GENERAL DESCRIPTION OF SERVICES The Respondent will be contacted by County Project Management staff on an “as-needed” basis as projects arise to provide A-E services for professional services. Requirements will be discussed by the Parties and Respondent shall prepare a written Scope Statement that will include the specific work to be performed, including the costs and time required to complete the project/task. County Project Management staff will then review the Respondents’ Scope Statement , proceed with negotiation of task costs and when satisfied, issue a Contract Task Order (CTO) against this Contract. The Respondent shall serve as lead of a design team that may include other construction design professionals working together to ensure that the original design is carried through to the finished product, with no alterations in materials or design that would lead to safety issues or compromise the quality of the building or building component. Other team members who may be retained by the lead to support a project as a consultant may include, but are not limited to, landscape architects, lighting designers, data consultants, security consultants, controls engineers, commissioning consultants, traffic engineers, surveyors, estimators, special inspection, etc. The Respondent shall be responsible for the preparation of comprehensive building assessments, designs, drawings, specifications, cost estimates, and reports within the scope of the Contract Task Order (CTO). In the preparation of construction drawings and specification, the Respondent shall also be responsible for: Obtaining data by reviewing record drawings, visiting the site of the construction and by conferences with the User/Client and facility maintenance staff or by other actions as necessary to develop the design; Checking of shop drawings, submittals, materials and other data submitted by the Construction Contractor for approval. Furnishing consultation and advice to County to clarify the intent of the drawings and specifications and on questions that may arise during the construction of the project. Space planning, programming and code compliance review and upgrades. The meeting of submittal dates included in the Scope Statement of the Contract Task Order, including the work of consultants. Coordination with various agencies having authority of jurisdiction for planning services, entitlement, fire life safety, CEQA, ADA, etc.. Construction administration services, testing and commissioning. Close out services, as-built plans, material lists, project acceptance, etc. The coordination of the various elements of the design to assure compatibility of architectural, structural, electrical, mechanical/plumbing, and other design features. Other services as specifically included in the Contract Task Order related to project Initiation, Planning/Design, Bid/Award, Construction and Closeout. The Respondent shall restrict themselves to the Scope Statement of the Contract Task Order. Any changes in the Scope Statement shall require prior written authorization by County. CONTRACT TASK ORDER Respondent shall be assigned work via a task order by County which shall subsequently be referred to as the “Contract Task Order” (hereinafter “CTO”). A CTO for each project shall be developed by Respondent in conjunction with County Project Management staff. The County Project Manager shall manage all Respondent’s work including monitoring the CTO work schedule, quality of deliverables, review of invoiced amounts, adherence to set budget, and internal review of submittal packages. Respondent shall follow all requirements as outlined in the CTO; this general Scope of Work, the project specific Scope Statement , and the Architect-Engineer Guide (Rev July 2018). The CTO shall include a detailed Scope Statement, describing tasks to be performed with a specific list of deliverables for each task, schedule of work and cost to complete the work. The schedule of work shall allow enough time for meetings with County Management staff to review the work progress, provide technical and policy direction, resolve problems and ensure adherence to the work completion schedule. The CTO shall include a cover sheet provided by County Project Management staff with the appropriate signature blocks and contract information. Once both Parties agree, and all Parties have signed the CTO, County Management staff shall provide Respondent with a Notice to Proceed (NTP) to begin work. Respondent shall submit all plans, reports and other documents produced under the CTO to the assigned County Project Manager within the timeframe indicated in the CTO or as directed by County Project Management staff. SCOPE OF WORK Respondent shall provide professional structural engineering and related consulting services on an as-needed basis for County facilities, structures, infrastructure, and improvement projects. Services may involve new construction, additions, renovations, alterations, repairs, rehabilitation, seismic improvements, adaptive reuse, deferred maintenance, damage assessments, and evaluation of existing structures. Projects may include facilities designated as essential or non-essential and may vary in size, complexity, construction type, occupancy, age, and condition. The specific services, tasks, deliverables, schedule, staffing, and compensation required for each project shall be identified in the applicable Contract Task Order (CTO). Respondent shall perform only those services authorized in writing by the County. Services may include, but are not limited to, the following: A. Existing Conditions Investigation and Structural Assessment Review available record drawings, calculations, reports, studies, specifications, maintenance records, and other available project information. Conduct site visits, field investigations, visual observations, and structural condition assessments. Document existing structural systems, materials, visible deterioration, damage, deficiencies, and potential unsafe conditions. Evaluate structural components and systems, including foundations, slabs, floors, roofs, walls, framing, columns, beams, connections, equipment supports, anchorage, and other structural or nonstructural components. Assess structures for corrosion, cracking, settlement, deflection, water intrusion, fire damage, impact damage, seismic damage, weather-related damage, or other deterioration. Recommend additional investigation, testing, surveying, material sampling, destructive or nondestructive testing, or specialty consultant services when necessary. Destructive testing shall not be performed without prior written authorization from the County. Prepare existing-condition reports, structural assessment reports, deficiency lists, photographs, sketches, repair recommendations, preliminary cost estimates, and prioritized corrective-action plans. B. Structural Analysis and Engineering Studies Perform structural analyses and calculations for existing and proposed buildings, structures, parking structures, and structural components. Evaluate gravity-load and lateral-force-resisting systems, including wind and seismic loading. Determine allowable structural loading and capacity for roofs, floors, walls, foundations, equipment supports, storage systems, photovoltaic systems, mechanical equipment, and other improvements. Perform foundation evaluations, settlement analyses, structural feasibility studies, and alternative structural-system analyses. Evaluate structural and nonstructural components for seismic performance and code compliance. Perform seismic assessments, evaluations, retrofit studies, and strengthening analyses when required by the CTO. Evaluate proposed penetrations, openings, attachments, modifications, equipment installations, and changes in use or occupancy that may affect the existing structural system. Prepare engineering studies, technical memoranda, calculations, recommendations, and opinions regarding structural feasibility, safety, repair, rehabilitation, or replacement. C. Structural Design and Construction Documents Develop structural concepts, design criteria, design narratives, calculations, drawings, details, specifications, and other construction documents. Provide structural design for new construction, additions, alterations, renovations, repairs, rehabilitation, seismic upgrades, and replacement projects. Design foundations, slabs, retaining walls, framing systems, equipment pads, equipment supports, anchorage systems, canopies, platforms, stairs, guardrails, site structures, and other structural elements. Prepare structural demolition plans, shoring concepts, temporary support requirements, sequencing requirements, and repair details when included in the CTO. Coordinate structural design with architectural, civil, geotechnical, mechanical, electrical, plumbing, fire protection, security, telecommunications, and other project disciplines. Identify design conflicts and coordinate resolutions before submission of construction documents. Prepare technical specifications and special structural inspection and testing requirements. Develop documents using AutoCAD, Revit, Building Information Modeling (BIM), or other County-approved software and file formats, as required by the CTO. Provide quality-control and quality-assurance reviews of calculations, drawings, specifications, reports, and other deliverables before submission to the County. D. Code, Regulatory, and Permitting Support Perform services in accordance with applicable federal, State, and local laws, regulations, ordinances, codes, standards, guidelines, and County requirements in effect for the applicable project. Identify applicable structural design criteria, loading requirements, seismic requirements, material standards, accessibility-related structural requirements, and special inspection requirements. Coordinate with the County and agencies having jurisdiction, as authorized by the County. Prepare and submit structural documents required for plan review, permitting, or regulatory approval. Respond to plan-check comments and revise calculations, drawings, specifications, and other documents as required to obtain approval. Participate in meetings with reviewing agencies, permitting authorities, County staff, and other project stakeholders when requested. E. Cost Estimating, Scheduling, and Alternatives Analysis Prepare opinions of probable construction cost at the project phases identified in the CTO. Evaluate alternative structural systems, materials, repair methods, and construction approaches. Provide recommendations based on structural performance, constructability, anticipated service life, operational impacts INTRODUCTION AND INSTRUCTIONS TO RESPONDENTS INTRODUCTION The County of Orange (County), consisting of 22 agencies and departments, and the Orange County Flood Control District (District) deliver a broad range of services to the residents of Orange County. Services provided include public protection, public health, infrastructure maintenance, and community and social services. As the District relies on County staff to carry out its duties, the District will also be included as a party to any contract(s) resulting from this solicitation. It is the primary responsibility of the County’s public works department (OC Public Works) to enrich the community through the efficient delivery and maintenance of public works infrastructure, planning, capital improvement, and development services. OC Public Works intends to pre-qualify firms to provide Architect-Engineer (A-E) and A-E related services Countywide and District-wide for various maintenance and capital improvement projects. Through this Request for Qualifications (RFQ), the County and District will evaluate responding firms based on the qualifications and requirements established in this solicitation and will establish a Qualified Vendor List (QVL) consisting of firms determined to be qualified to perform the applicable A-E disciplines and services. From the firms determined to be qualified and placed on the QVL, the County and District intend to select certain firms for initial contract awards, subject to approval by the Orange County Board of Supervisors, as applicable. Firms that are determined to be qualified but are not selected for an initial contract award will remain on the QVL and may be considered for future contracting opportunities during the effective period of the QVL, subject to County and/or District needs, available contracting capacity, applicable procurement requirements, and required approvals. Placement on the QVL does not guarantee the award of a contract, task order, minimum dollar amount, or any specific volume of work. Likewise, the award of a contract does not guarantee that any particular amount of work will be assigned. The County and District reserve the right, at their sole discretion and in accordance with applicable County policies and procedures, to make multiple contract awards and to utilize qualified firms from the QVL as future needs arise. Contracts awarded as a result of this RFQ process shall have a maximum term of three (3) years. At the conclusion of the applicable contract and/or QVL period, the County and/or District may issue a new solicitation to establish a new QVL and provide firms an opportunity to compete for future A-E services. PROPOSED TIME SCHEDULE (subject to change) Release of RFQ: October 16, 2026 Question Period Ends: November 2, 2026, 2:00pm RFQ Submittal Closing Date and Time: December 4, 2026, 2:00pm INSTRUCTIONS TO RESPONDENTS AND PROCEDURES FOR SUBMITTAL Responses are to be uploaded via the County's eProcurement Portal at https://procurement.opengov.com/portal/ocgov . For assistance on uploading Response via County’s eProcurement Portal, please contact procurement-support@opengov.com or https://help.procurement.opengov.com/en/ Examine the Contract Documents and the site of the proposed work carefully before submitting a Response for the work contemplated. Investigate the conditions to be encountered, including the character, quality, and quantities of work to be performed, the materials to be furnished, and the requirements of all Contract Documents. The County has attempted to provide all information available. It is the responsibility of each Respondent to review, evaluate, and, where necessary, request clarification prior to submitting a Response. If any person contemplating submitting a Response to this Request for Qualifications (RFQ) is in doubt as to the true meaning of any part of the solicitation documents or finds discrepancies or omissions in the specifications, they may submit a written request for clarification or interpretation to the County Deputy Procurement Agent (DPA) through the County's eProcurement Portal under the bid page for this solicitation. If the County determines that clarification or interpretation of this solicitation is necessary, an Addendum will be issued and posted through the County's eProcurement Portal. Any interpretation of, or correction to, this solicitation shall be made only by the DPA. It is the responsibility of each Respondent to periodically check the County's eProcurement Portal to ensure they have received and reviewed all Addenda issued for this solicitation. The County will not be responsible for any other explanations, corrections, or interpretations of the solicitation documents, including any oral information. If an Addendum is issued, Respondents must acknowledge receipt of the Addendum through the County's eProcurement Portal. All questions or requests for interpretations must be received within this solicitation by Monday, November 2, 2026 , before 2:00 pm . The DPA will provide all official communication concerning this solicitation. Any County response relevant to this solicitation other than through or approved by the DPA is unauthorized and will be considered invalid. Responses must be valid for a period of at least three hundred sixty-five (365) calendar days from the closing date and time of receipt. No Response may be withdrawn after the submission date. Each Respondent must submit their response electronically via the County’s eProcurement Portal. All pages must be submitted on standard 8.5 x 11-inch paper, numbered and identified sequentially by section. Responses must be organized and indexed as outlined in the Response Requirements Section. It is imperative that all Respondents comply, exactly and completely, with the instructions set forth herein. All responses to this solicitation shall be type written or wor

Published attachments
Public questions and answers
  • What is the anticipated overall capacity, in dollars, anticipated for the QVL as a whole?

    There is no anticipated aggregate dollar capacity associated with the QVL. The County does not guarantee any specific level of usage, spending, or award volume under this Qualified Vendor List.

  • Who should be listed as the Procurement Contact name on the reference forms? Is this the Orange County contact or the submitting firm contact?

    Please refer to 2.28. Reference for the instructions.

  • The Reference Questionnaire Template includes a line for Contract Start Date, Contract End Date, and Contract Amount, but no line for Contract Title or Description. Should proposers insert the appropriate information?

    Yes. Proposers may include the contract title and/or a brief description of the referenced project or contract within the Reference Questionnaire Template, either in an available field or as a supplemental notation, provided the information does not alter the form's content. Including this information is encouraged for identification and context purposes.

  • On the Key Personnel - Staffing Plan under Section II. Subcontractor(s), there is a column for Percentage of the Proposed Contract Award. Please verify we can leave this column blank as it is completely project dependent.

    Proposers should not leave the "Percentage of the Proposed Contract Award" column blank. Although actual utilization may vary by individual Contract Task Order (CTO), proposers should provide their anticipated percentage allocation of work between the prime consultant and each subcontractor for purposes of demonstrating compliance with the County's requirement that the aggregate value of subcontractor work not exceed forty-nine percent (49%) of the total contract work. Actual percentages may vary at the CTO level based on project-specific needs.

  • In Section 5.3.1.B it states, "If the discipline includes sub-discipline(s), include projects examples that demonstrate qualifications and experiences for each sub-discipline." Please elaborate what is meant by sub-disciplines of disciplines as it relates to project examples.

    The term "sub-discipline(s)" refers to specialized service areas that fall within the broader discipline for which the Respondent is seeking qualification. If a Respondent proposes to provide multiple specialty services within its discipline, the project examples should collectively demonstrate the firm's qualifications and experience in those specialty areas. For example, under Structural Engineering Services, relevant sub-disciplines may include structural assessments, seismic evaluations and retrofits, structural design for new construction, rehabilitation and repair design, forensic investigations, parking structure evaluations, retaining wall design, foundation engineering, construction support services, or other specialized structural engineering services offered by the Respondent. Respondents are not required to provide a separate project example for every possible sub-discipline. However, the project examples submitted should adequately demonstrate the firm's qualifications and experience in the primary service areas it proposes to provide under this RFQ.

  • Section 3.2 of the RFQ lists the following consultants that may be necessary to support the prime A-E on this contract: landscape architects, lighting designers, data consultants, security consultants, controls engineers, commissioning consultants, traffic engineers, surveyors, estimators, special inspection, etc. The services in Section 3.4 are focused on structural engineering services. The consultants listed in 3.2 aren't typical consultants supporting a structural engineer-led effort. Please confirm that the services required for this contract are structural engineering, and if so, please clarify the appropriate consultants expected.

    Yes. The required services under this RFQ are professional Structural Engineering Services as described in Section 3.4, Scope of Work. The consultant types listed in Section 3.2 are intended as examples of specialty consultants that may be retained, as needed, to support various projects and are not mandatory team members for this solicitation. Respondents should propose the consultant team they believe is appropriate to support the structural engineering services they intend to provide. Depending on the specific project and Contract Task Order (CTO), supporting consultants may include, but are not limited to, geotechnical engineers, special inspectors, materials testing laboratories, surveyors, architects, civil engineers, MEP engineers, code consultants, cost estimators, or other specialty consultants required to complete the authorized scope of work. The need for any supporting consultant will be determined by the requirements of the individual project and CTO.

  • Page 7 of the RFQ states “The Respondent must possess a valid Professional XXXXXXXX license(s) in the State of California.” Can you please clarify what the XXXXXXXX should be?

    The Respondent must possess a valid California Structural Engineer (SE) license.

  • Does qualifying for the Architectural on-call exclude us from a Structural on-call?

    No. Qualifying for the Architectural on-call would not automatically exclude a firm from qualifying for the Structural on-call, unless the County establishes a separate restriction elsewhere.

  • Page 33 Section 5.3.1 B States “Describe at least three (3) project examples completed in Southern California that demonstrate the Respondent’s qualifications and experience”. Can you please confirm that projects that are substantially complete, i.e. drawings are completed, or where the architect’s role on the project, i.e. criteria documents or master plans, is complete, are acceptable to use as project examples?

    Respondents should submit projects that are completed and can demonstrate the firm's qualifications and experience in accordance with the requirements of the RFQ. If a Respondent chooses to include project examples that are not fully completed, the County reserves the right to evaluate the responsiveness of those examples during the SOQ review process.

  • Is there an established contract value maximum limit for each on-call assignment as part of this?

    No specific maximum value for individual Contract Task Orders (CTOs) has been established in the RFQ. Task orders will be issued on an as-needed basis, and the scope, schedule, staffing requirements, and compensation for each assignment will be negotiated and documented in the applicable CTO. The total amount of work authorized under any resulting contract remains subject to the overall contract maximum compensation established in the final executed agreement

  • Since Section 5.2.36 Reference asks responders to submit reference questionnaires directly to OC Procurement assigned Buyer, what would you like us to upload to the procurement portal under section 5.2.36. Is this intended to be copies of the completed forms our references are sending to you?

    No. The completed Reference Questionnaire Templates should be submitted directly to OC Public Works Procurement by the reference contacts, as specified in the RFQ. Respondents are not required to upload copies of completed reference questionnaires to the procurement portal. For Section 5.2.36, Respondents may upload a reference list or a brief statement identifying the references that have been asked to submit questionnaires. It remains the Respondent's responsibility to ensure that all required reference questionnaires are submitted directly to the assigned Buyer by the solicitation deadline.

  • Section 1.5 lists the minimum qualification as "a valid Professional XXXXXXXXX license(s) in the state of California." Please confirm which license is required (CA PE-Civil, CA SE, or ...)

    Please refer to question 7 listed above; the response has been provided. The Respondent must possess a valid California Structural Engineer (SE) license.

  • Item 5.2.35 refers to "Section 2.28" for the required number of references. There is no Section 2.28 in the RFQ. Please confirm that the requirements in Item 5.2.36 apply (min. 5 references within the past 5 years)

    Thank you for your question. Upon review, there does not appear to be an Item 5.2.35 in the solicitation for which you mentioned in your question. Section 2.28 is included in the RFQ under the Vendor Response section of the solicitation.

  • The Model Contract (Attachment A) was not included in the RFQ. Please confirm where it is posted and confirm the required insurance types and limits.

    Please click on the Downloads tab next to the Project Documents tab. There, you will see A-E Structural Engineering Services-Final_Draft_Model Contract. Select and download the model contract.

  • The Draft Model Contract makes several references to "General Contractor" verbiage that does not apply to "Consultants." Will exceptions to this verbiage result in a "0" for the criteria?

    Yes. The RFQ states that Respondents submitting exceptions to the County Model Contract will receive a score of zero (0) for the Degree of Compliance with the County Model Contract evaluation criterion. Specifically, Section 5.3.5 where it states.

  • The reference questionnaire template appears to be specific to "contractors." Is the questionnaire applicable to an engineer?

    Yes. The Reference Questionnaire Template is applicable to firms providing professional Architect-Engineer (A-E) services under this solicitation. References should evaluate the Respondent's qualifications, performance, responsiveness, and ability to provide services comparable to those requested in this RFQ. Any references in the questionnaire to "contractor" should be interpreted as referring to the Respondent firm providing the professional services. The questionnaire is intended to be used for all Respondents to this solicitation, including engineering consultants.

  • For any given CTO, if projects require a broader consultant team (including Architect, MEP, etc., per Section 3.4.C.e), will other consultants be selected separately, or will they be subconsultants to the Engineer?

    CTOs that require additional disciplines beyond structural engineering, such as Architecture, MEP, or other specialty consulting services, the County anticipates that those disciplines will be provided through the prime Respondent's consultant team. The prime Respondent would be responsible for retaining, managing, and coordinating any required subconsultants necessary to complete the CTO scope.

  • Per section 5.2.36, do the public sector references need to have had a direct contract with the consultant for a specific project?

    Public sector references should be from entities for which the Respondent directly provided services under a contract for a specific project or assignment. References shall provide the Respondent's performance, quality of work, responsiveness, and ability to successfully deliver services comparable to those requested under this RFQ. Respondents demonstrate successful prior performance of comparable services and provide references from clients for whom similar services have been performed.

Plain text

OpenGov categories

  • 81000000 · Engineering and Research and Technology Based Services
  • 81101500 · Civil engineering
  • 81101600 · Mechanical engineering
  • 81101700 · Electrical and electronic engineering
  • 81101800 · Chemical engineering
  • 81101900 · Oil and gas engineering
  • 81102000 · Mining engineering
  • 81102100 · Ocean engineering
  • 81102200 · Transportation engineering
  • 81102300 · Aeronautical engineering
  • 81102400 · Electrical power transmission engineering
  • 81102500 · Permitting services