State and local · OpenGov
Architectural and Engineering (A&E) Services for a Recreation Center Lighting Upgrade
Description
STATEMENT OF PURPOSE The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide architectural design services for the lighting upgrades of the recreation center. More details on the City's needs for this work are provided in the Scope of Work . Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor." SYNONYMOUS TERMS Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous: a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror b. Purchase Order, Contract, Agreement c. Services, Work, Scope, and Project d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet Phase 1 – Assessment and Basis of Design Phase 2 – Construction Documents Phase 3 – Permitting and DSA Phase 4 – Bid Support Phase 5 – Construction Administration Scope of Work PROJECT BACKGROUND 1. Purpose The Recreation Center is the City’s only recreation facility. Its lighting has been repaired and modified piece by piece for years, and parts for the existing fixtures are becoming hard to get. The lobby wall switches are worn out. The City Parks Department wants to modernize the lighting in Buildings KB and KA and address the controls. Modernization here means both performance and appearance: fixtures that meet current energy and lighting standards, and that update the look of the public spaces. This document describes the electrical engineering services needed to get from existing conditions to a permitted, biddable set of construction documents, and to support the City through bidding and construction. 2. Buildings and Rooms The work covers all rooms in Buildings KB and KA, whether or not they are explicitly listed below. Buildings JB and JA are maintained by others and are not part of this project. The four buildings share fire walls, including a rated separation between the City and school portions of the facility; the design must not call for disturbing a rated assembly without also detailing its repair. Building KB (34 rooms) Room Use Room Use K132 Cardiovascular Center K148 Office K133 Classroom K149 Office K134 Classroom K150 Conference Room K135 First Aid K151 Break Room K136 Party Room K152 Toilet K136A Storage K153 Laundry K137 Child Care K154 Open Office Area K138 Kitchenette K155 Climbing Wall K139 Toilet K156 Exercise Room K140 Isolation Area K157 Lounge K141 Storage K158 Public Lobby K142 Janitor K159 Reception K143 Alcove K160 Alcove K144 Special Systems K161 Corridor K145 Work Room K162 Corridor K146 Storage K164 Alcove K147 Office K165 Electrical Building KA (14 rooms) Room Use Room Use K101 Men's Restroom K108 Storage K102 Women's Restroom K109 Physical Therapy K104 Auxiliary Gymnasium K115 Men's Lockers K104A Alcove K122 Family Lockers K105 School Gym Storage K129 Women's Lockers K106 Rec Center Gym K130 Alcove K107 Dance / Aerobics / Exercise K131 Corridor One design contract covers all of it, fixtures, controls, and Title 24, leading to one permit submittal and one bid package. 3. Scope of Services 3.1 Existing Conditions Survey the conditions the new design has to work with in each room: ceiling type, height, and condition; how the space is switched; and the branch circuits and panels that serve the lighting. Look at the existing PCI lighting control panel, the switches, and the low-voltage cabling between them. Determine what cabling can be reused and how long the runs are, and whether the panel talks to any other panel. The City has observed degraded performance in portions of the existing PCI control system beyond the lobby switches. Assume additional failing components will be found, and include the effort for a full controls assessment. Confirm the voltage of every lighting circuit the controls will serve. 3.2 Lighting Keep the existing layout. Match the type, quantity, and general location of the existing fixtures rather than redesigning each room, except where a fixture type is obsolete or the City directs a change. Modernize the appearance of the fixtures in the public-facing spaces, not just their performance. Back-of-house rooms need a functional LED fixture, nothing more. The specific rooms will be worked out with the City during design. The lighting should make the public spaces feel welcoming and comfortable, not just meet light-level requirements. Consider the quality and warmth of the light, not only its quantity. The City prefers a contemporary, warm-white aesthetic in the public-facing areas. The Consultant may propose more than one fixture family or appearance concept for the City to choose from during design. Expect downlights, 2×4 troffers, high bays, track and accent fixtures, and wall-mounted, wrap, strip, and vandal-resistant types. Meet IES recommended practice for each kind of space and do not go below existing light levels. Keep color temperature and CRI consistent within a room and from room to room. Design track or adjustable spot lighting for the artwork on the lobby walls. Work out where and how with Parks and Recreation during the assessment. Keep the means of egress lit as the code requires, and coordinate with the exit signs already in place. Use wet- or damp-rated fixtures where the location calls for it, and impact-resistant lenses or guards where fixtures can be hit. Run point-by-point photometrics wherever the fixture type or layout changes, and at a minimum for the lobby artwork lighting, both the KA and KB gymnasiums, and every space where tunable white or multi-scene control is planned. Get the City’s acceptance of the results before locking in fixture selections. 3.3 How the Lighting Should Work Beyond meeting code, the new lighting should give staff practical control of the spaces. Design the following in, and work out which rooms get what with the City during design: Occupancy or vacancy sensing so lights turn off on their own in rooms that are used off and on, such as offices, restrooms, storage, and meeting rooms. Daylight dimming in the lobby and other spaces with windows, so the electric light backs off when there is enough daylight. Dimming and scene control in the multipurpose spaces, such as the party room, dance and aerobics room, conference room, and lounge, so staff can set the light for the activity. Tunable white, or color-temperature control, where the City wants to shift the light warmer or cooler by time of day or use. 3.4 Controls The lobby wall switches are deteriorated. Specify their replacement. The City has identified replacement switches with its lighting representative; the engineer is to verify their suitability and confirm them on the drawings. Evaluate the existing control panel and the rest of the switches. Recommend whether to keep, upgrade, or replace them, then design whatever the City agrees to. If new switches will not work with the existing panel, say so in the Term of Contract The initial term of the Contract is at the City's discretion and may be up to 3 years. The City also reserves the right to extend the Contract for up to 2 additional 1-year terms (individually, “Extension”) upon the same terms and conditions as parties agreed to in the Contract. Thus, parties agree the Contract may be for a total of 5 years upon the same terms and conditions as parties agreed in the Contract. Notwithstanding the foregoing, the City is not obligated to extend the Contract for any amount of time. If there is outstanding work within the Scope of Work at the end of the term of the Contract and the City requires time to solicit for and secure an alternative contractor, Contractor shall continue to provide the services within the Scope of Work on a month-to-month basis, not to exceed six (6) months, at the same cost, terms, and conditions in effect at the termination of the Contract. The City shall give Contractor at least thirty (30) days written notice of such a need and the anticipated timeline to secure an alternative contractor. Introduction Summary Please state the Statement of Purpose of this Solicitation, being as descriptive as possible. Background Contact Information Timeline Proposal Requirements Proposal Format & Content Proposer Questionnaire must include each of the following sections to be uploaded in the Proposer Questionnaire section. Proposal Transmittal Letter Proposer's Mandatory Qualifications and Experience Technical Project Approach Cost Proposal Specific content and format requirements for each section are detailed below. Each section shall be uploaded in the Proposer Questionnaire section of this RFP. Proposal Transmittal Letter A Proposer is required to provide a written transmittal letter and offer in the form of a standard business letter ("Proposal Transmittal Letter" or "Letter"). The Proposal Transmittal Letter shall reference and respond to the following subsections in sequence and have attached to it corresponding documentation, as required. A Proposal Transmittal Letter is mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected. Proposer's Name and Contact. The Letter shall state the complete name, or business name, of the Proposer making the Proposal. The Letter shall state the name, title, mailing address, email address, and telephone number of the person the City should contact regarding the Proposal. Statement of Offer. The Letter shall state that the Proposal is an offer to complete the Scope of Work and the offer, including the Cost Proposal rates and budget, remains valid for at least ninety (90) business days after the Proposal due date. Conflict of Interest. The Letter shall state whether the Proposer, or any individual who shall perform work under the Contract, has a possible conflict of interest and, if so, the nature of that conflict. The City reserves the right to terminate the Contract if its execution would or could create, or give the appearance of creating, a conflict of interest. The City, at its sole discretion, shall make all determinations on the existence or appearance of a conflict of interest. City Contract Terms. The Letter shall include a statement of acknowledgement that the City’s standard contract and insurance (Included in Attachments ) have been reviewed and accepted by the Proposer with or without qualification. If the Proposer has qualifications, the Proposer shall download a copy of the standard contract and re-upload a version of the document in the Proposer Questionnaire under Standard City Contract Qualifications identifying the contract language at issue and Proposer's suggested adjustment or modification. If no qualifications are identified, Proposer is presumed to have accepted the City' standard contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification. Subcontractors. The Letter shall state whether the Proposer intends to use subcontractors, subconsultants, or other contracting parties to complete the Scope of Work (collectively, "Subcontractors"). If so, the Letter shall clearly identify the name of each proposed Subcontractor, their mailing address, email address, and telephone number as well as the service related to the Scope of Work that the Subcontractor is anticipated to perform. NOTE: The Contractor must obtain written approval from the City prior to the use of any Subcontractor, even after a Contract is executed. Signature and Authority. The Letter shall be signed by a person empowered to bind the Proposer to the provisions of the RFP, and any contract awarded pursuant to it. Evidence demonstrating authority to bind the Proposer shall be included or attached to the Letter, such as a statement describing the signatory's role with or relationship to the Proposer. Proposer's Mandatory Qualifications and Experience A Proposal shall demonstrate that the Proposer holds the qualifications and experience required to complete the Scope of Work by referencing and responding to the following subsections in sequence and attaching corresponding documentation, as required ("Mandatory Qualifications and Experience"). The qualifications and experience listed below are mandatory and failure to provide the required information may result in the proposal being considered nonresponsive and rejected. Organization. A brief description of Proposer's background, years in business, organizational history, and client base. Briefly state Proposer's total number of employees and list all relevant licenses, specialties, and trainings held by Proposer and/or employees. List office location(s) and identify the office(s) from which services will be performed. Experience. A brief statement of how long Proposer has been performing the services required to complete the Scope of Work. Proposer shall have a minimum of five (5) years of experience providing the services required to complete the Scope of Work to public agencies in California. If the Proposer has been in business for less than five years, the experience of its principals may be used to meet this requirement. Public Agency Experience. A description of no more than ten (10) public sector projects completed within the last five (5) years that demonstrates Proposer's experience performing services to complete the Scope of Work, including a statement as to whether Proposer has experience working for the City of West Sacramento, or a public agency similar in size to the City. Note key personnel involved in each project and if they are proposed for this Proposal and if applicable, differentiate which work was performed by subcontractor. List any contractual relationships with the City existing now or within the past five (5) years. Personnel. A narrative description, resume, and organizational structure chart of personnel to be assigned to complete tasks within the Scope of Work, clearly indicating where Subcontractors will be used, if applicable. The narrative description or resume shall list, at least, each individual’s title, education, relevant experience and duration, professional licenses, and demonstrated accomplishments. Identify the individual who will lead the day-to-day work effort and serve as the primary contact to the City. References. A list of five (5) references for whom the services required to complete the Scope of Work have been performed by Proposer within the last three (3) years. The list of references shall include name, mailing address, email address, brief description of services completed relevant to this RFP, and point of contact who can attest to the quality and effectiveness of the services. Local Benefit. A statement describing any and all local benefit the Proposer would bring to the Contract. For example, local benefit may include but is not limited to local vendors, suppliers, labor or subcontractors used in support of the project as well as fees or taxes paid to the City. To the extent practical, the local benefit described with the Proposal should be measurable. At the end of the Contract, the Contractor shall be required to provide a report detailing the measures taken to enhance the local benefit and whether or not stated goals were met. For purposes of this section, a local vendor or service provider is one located within the City limits and in possession of a West Sacramento business license. If the solicitation has Federal funds, there will be no Local Benefit considered. History. A statement as to whether there have been any mergers, acquisitions, or sales related to Proposer's organizational structure within the last three (3) years. If so, attach an explanation providing relevant details. Legal Challenges .A statement as to whether there is any pending litigation against the Proposer. If such litigation exists, attach an opinion of counsel as to whether the pending litigation will impair the Proposer's ability to perform the Contract. Fiscal Viability . A statement as to whether, in the last ten (10) years, the Proposer has filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors. If so, attach an explanation providing relevant details. Business License. Registration with the Secretary of State to conduct business in the State of California. Attach a copy of a proof of registration. Technical Project Approach A document detailing the operational and/or organizational approach the Proposer will take to timely fulfill the Scope of Work shall be submitted with the Proposal ("Technical Project Approach"). The Technical Project Approach shall be a comprehensive narrative describing how the Proposer will complete the Scope of Work, communicate with the City throughout the work, advance the project objectives, and provide continuity on work efforts. Cost Proposal A document detailing all costs associated to complete the Scope of Work shall be submitted with the Proposal ("Cost Proposal"). For sealed bids, the Cost Proposal shall be opened after and separately from the rest of the Proposal. Cost Proposal shall include all applicable federal, state, and local taxes and must be all-inclusive of project expenses, as no additional charges shall be allowed, except for additional services as requested by the City, if any. There shall be no additional reimbursement for travel time or expenses, telephone costs, copying costs, etc. If applicable, the Cost Proposal shall separately delineate costs for optional term extensions and/or optional services. Proposer agrees to maintain pricing pursuant to the Cost Proposal for the duration of the Contract, and any optional extensions. Cost proposal using Electronic Pricing Table Proposers shall use the electronic Rate Sheet to provide pricing for services listed. Proposers shall use the "no bid" option to opt out of any services not offered. Costs shall include all applicable federal, state, and local taxes and must be all-inclusive of project expenses, as no additional charges shall be allowed, except for additional services as requested by the City, if any. The City will not be responsible for any errors. For sealed bids, the Cost Proposal shall be opened after and separately from the rest of the Proposal. If applicable, the Cost Proposal shall separately delineate costs for optional term extensions and/or optional services. Proposer agrees to maintain pricing for the duration of the Contract, and any optional extensions. General Information Proposal Submission All Proposals, including any attachments, exhibits, or amendments, shall be submitted through the City's E-Procurement Portal, which will deliver Proposals to the City of West Sacramento staff overseeing the solicitation. Proposals not submitted through the City's E-Procurement Portal shall be deemed nonresponsive and rejected. Proposals may not be delivered orally, by paper, by email, by facsimile transmission, or by any other means. All proposals shall be submitted through the City’s e-Procurement Portal no later than: Friday, December 11, 2026 at 2:00 pm . A Proposer shall respond to the RFP and any exhibits, attachments, or amendments. A Proposer's failure to submit a Proposal in compliance with the procedures and timelines set forth in the RFP shall cause the Proposal to be deemed nonresponsive and rejected. A late Proposal shall not be accepted. Additional time to respond shall not be granted to any Proposer. Questions and/or Objections It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the RFP
Published attachments
- Contract for Services (West Sacramento) - Boilerplate for RFP 11.4.24
- CIP-60021_Scope_of_Design_Services
- Fixture Schedule Building KA and KB
- Rec Center Layout
- Insurance Checklist
- WUSD Rec Center File Auto CAD File DWG
- Architectural_and_Engineering_(A&E)_Services_for_a_Recreation_Center_Lighting_Upgrade_(Addendum_#1_Revision).pdf
Addenda and notices
Official Notice #1: Sign-in Sheet from Site Walk · 1
The sign-in attendance sheet from the November 12, 2026, site-walk is attached.
Addendum #1 · 1
ADDENDUM NO. 1 Project: Rec Center Lighting Infrastructure Upgrades Project No.: CIP-60021 Date: November 19, 2026 This addendum is issued to modify the Request for Proposals for the above project. All other terms and conditions remain unchanged. Proposers shall acknowledge receipt of this addendum in their proposal. 1. Additive Alternate — Architectural Ceilings The following ceiling work is added to the solicitation as an additive alternate . It is not part of the base scope. The City may accept, reject, or defer the alternate, in whole or by individual room, at its discretion. In the rooms listed below, the Consultant shall remove the existing carpeted ceilings and design new suspended architectural ceilings: K133 — Classroom K134 — Classroom K136 — Party Room K107 — Dance / Aerobics / Exercise K109 — Physical Therapy The intent is a durable, easily maintained ceiling to replace the existing carpet. A suspended open ceiling system (open-cell/metal grid, linear baffle, or mesh panel) is acceptable where appropriate. The Consultant shall: Design each ceiling for the room’s use. Design the ceiling and lighting in each room together. Present ceiling and lighting options to the City during design. Coordinate the ceiling work with all other work in these rooms, including any code, accessibility, or DSA requirements triggered by the ceiling modifications. 2. Additive Alternate Pricing — Per Room Proposers shall provide the ceiling design fee for each room separately, in the proposal response to this addendum. The City may award any, all, or none of the rooms. Alternate Room Use Design Fee A-1 K133 Classroom $ A-2 K134 Classroom $ A-3 K136 Party Room $ A-4 K107 Dance / Aerobics / Exercise $ A-5 K109 Physical Therapy $ Total (all rooms) $ These fees are additive alternates, separate from and in addition to the base design fees in the Cost Proposal table. End of Addendum No. 1
Official Notice #2: Additional Drawings · 2
The following link provides the full set of existing facility drawings in the City’s possession (River City High School / Recreation Center prints), for all proposers’ reference. The set covers the entire complex, including the school buildings, not only Buildings KA and KB. RCHS Prints This is the complete set the City has. There are no separate panel schedules or PCI lighting control drawings. The drawings are for reference and have not been field-verified. Per the Scope of Work, the Consultant confirms all existing conditions. Some panels serving the auxiliary gymnasium and back office are on the shared/school-district side. Access to those areas in Phase 1 is coordinated through the City and Washington Unified School District. All other terms of the RFP remain unchanged.
Official Notice #3: Lighting rep background material · 3
The preliminary controls information and the preliminary gymnasium photometric from the City’s lighting representative are posted with this notice. This material is provided as background only and is not a basis of design. As stated in the Scope of Work, it has not been engineered; the selected Consultant is responsible for the design it stamps and shall specify all products on an “or approved equal” basis. The replacement lobby switches identified with the lighting representative are the Wattstopper LMSW-250 and LMSW-220, as shown in the attached controls information. These are provided for reference only and are not a basis of design. The selected Consultant will verify their suitability and confirm the final product on the drawings, on an “or approved equal” basis. Attachments: preliminary controls information and product cut sheets; preliminary gymnasium photometric. All other terms of the RFP remain unchanged.
Public questions and answers
Hi - We missed the pre-meeting, can we still bid for the project?
The pre-proposal meeting on November 12, 2026 was identified as mandatory in the RFP (Section 1.4, Timeline). Proposers who did not attend the mandatory meeting are not eligible to submit a proposal.
Please provide the DSA application number and approved drawings for the 2022 tennis lighting and accessibility project.
There is no DSA application or approved drawings for this project. The DSA submittal follows finalization of the project budget and completion of the design. Preparing and processing the DSA application is part of the scope of services being solicited, as described in the Scope of Work (Section 3.5 and Deliverables, Phase 3). Proposers are responsible for confirming DSA jurisdiction for this scope, as stated in the Scope. I do not have the approved lighting drawings in my possession, but I can look for them.
Please provide any existing lighting plans, panel schedules and PCI lighting control drawings for Buildings KA and KB, including the high school side panels that serve the auxiliary gymnasium and the back office, and confirm consultant access to those panels during Phase 1.
The existing drawings in the City’s possession for this facility have been posted to the solicitation as Notice. The City does not have separate verified panel schedules or PCI control drawings; as stated in the Scope, the drawings are not field-verified and the Consultant is responsible for confirming existing conditions. Access to panels on the shared/school-district side during Phase 1 will be coordinated through the City and Washington Unified School District; the Consultant should account for this coordination in its site-verification effort.
Please provide the lighting representative's preliminary controls information and gymnasium photometric referenced in the RFP, and identify the replacement lobby switch the City has selected.
The preliminary controls information and the preliminary gymnasium photometric from the City’s lighting representative are posted with this notice as background only. As stated in the Scope of Work, this material has not been engineered and is not a basis of design; the selected Consultant is responsible for the design it stamps and shall specify products with “or approved equal” provisions. Regarding the lobby switches: as stated in the Scope (Section 3.4), the City has identified replacement switches with its lighting representative, and the selected Consultant will verify their suitability and confirm them on the drawings. The specific product will be addressed during design.
Addendum No. 1 asks for the per-room ceiling alternate fees in the proposal response. Since the Cost Proposal is uploaded separately and opened only for the top-ranked firms, should alternates A-1 through A-5 be priced in the separate Cost Proposal document rather than in the proposal itself? Will the electronic pricing table be updated with lines for the alternates?
The ceiling alternate fees (A-1 through A-5) should be provided in the proposal itself, not in the separate sealed Cost Proposal. These fees are for the City’s information only and will not be used in the cost evaluation or price comparison. The electronic pricing table will not be updated with alternate lines.
Please confirm if AutoCad and/or REVIT drawings are available for existing buildings.
An AutoCAD (DWG) file is available. It was posted to the supporting attachments at the time of release (Attachment G). No Revit files are available.
Please confirm if Circuit Tracing will be required.
Identifying the circuits and panels serving the in-scope lighting is part of the existing-conditions survey (Scope Section 3.1), to the extent needed to support the design. Facility-wide circuit tracing beyond the lighting scope is not required.
Please confirm if power load readings will be required.
The Consultant shall confirm that the existing circuits and panels can serve the new lighting loads. Field load readings are at the Consultant's discretion, to the extent needed to support that determination; they are not a separately required deliverable.
Please confirm if separate photometrics for emergency lighting are required.
Emergency and egress lighting must meet code-required illumination levels. A separate emergency-lighting photometric is required only where needed to demonstrate code compliance. A standalone emergency photometric for every space is not required.
Please clarify if there will be a City permitting process in addition to DSA.
Proposers should assume DSA review applies to this project. Whether City permits are also required will be confirmed during design; the Scope includes permitting and DSA as a single phase (Section 3.5 and Deliverables, Phase 3), and the Consultant coordinates both.
Will the project be required to be submitted to the office of the State Fire Marshal?
As stated in the RFP (Section 3.5), the State has determined that DSA is the authority having jurisdiction for this facility, and proposers should assume DSA review applies. The selected Consultant is responsible for confirming the complete approval path, including whether a separate submittal to the Office of the State Fire Marshal is required.
Please confirm if any energy analysis or rebates are being requested.
Title 24 Part 6 energy compliance is required, including the NRCC, NRCI, and NRCA documentation described in the Scope. The City is not requesting a separate energy analysis or utility rebate application as part of this scope.