ARCHITECTURAL AND ENGINEERING DESIGN SERVICES

Description

The Stanislaus Council of Governments (StanCOG) is seeking proposals from qualified architectural firms for design services at 1407 I Street, Modesto. StanCOG is a council of city and county governments and the federally designated metropolitan planning organization for Stanislaus County. It is governed by a Policy Board of member-agency elected officials, which meets monthly in public session along with its standing committees. StanCOG acquired 1407 I Street in 2024 and its staff moved into the building in July of 2026. The building was built as a bank branch and has no room set up for public meetings, so the Policy Board and its committees continue to meet in the agency's former leased premises under a lease that expires in November 2026. The purpose of this project is to create a boardroom large enough to accommodate the 16-member board, agency staff, and members of the public. The former teller area will be converted into a meeting chamber, with associated improvements to the surrounding offices. The work will proceed through the full design process, from programming and schematic design through construction documents, bidding and construction administration. Scope of Work Scope of Work General StanCOG is seeking an architectural firm, as prime consultant, to design the conversion of the former teller area at 1407 I Street into a Policy Board meeting chamber, together with associated improvements to the surrounding building. The services run from programming through construction administration and closeout. Phases The work proceeds in the following order. Proposers may recommend a different sequence. Phase 1 Programming and existing conditions 2 Code analysis and City pre-application 3 Schematic design 4 Phasing plan 5 Design development 6 Construction documents 7 Permitting and bid support 8 Construction administration, closeout and warranty Programming and existing conditions. Establish what the building has to hold, room by room, working with StanCOG staff. Verify the existing building, including structure, roof, mechanical plant, electrical capacity and plumbing, and produce a base plan that can be designed against. Programming shall include at least two scoping meetings with the StanCOG executive team and at least one meeting with an ad hoc committee of the Policy Board. Code analysis and City pre-application. Establish with the City of Modesto, how the chamber will be classified for occupancy, whether fire sprinklers are required, and what else the proposed work triggers. Schematic design. Develop at least two design options for the chamber and carry the selected option forward. Establish the arrangement, the structure and the building systems well enough to price. Phasing plan. Set out how the work is divided into phases that can be permitted, bid and built separately, in what order, and at what cost each. Address how the work proceeds while StanCOG staff occupy the building and the advisory committees continue to meet in it. Identify what can be carried as a priced alternate, so a phase can be bid at more than one funding level. Design development. Develop the approved scheme to the point where its size, character and systems are fixed. Provide renderings of the chamber and the public entrance suitable for presentation to the Policy Board and for public use. Present the design and cost to the Policy Board for consideration and approval. Construction documents. Prepare drawings and specifications sufficient to permit, bid and build the work, organized so that each phase can be permitted and built on its own. Permitting and bid support. Submit for permit and carry the submittal through City plan check to permit issuance. Prepare the bid documents, answer bidder questions, prepare addenda, and assist StanCOG in evaluating bids. Construction administration, closeout and warranty. Respond to requests for information, review submittals, review payment applications, visit the site as the work requires, and prepare punch lists. On completion, provide record drawings and operation and maintenance material, and carry out a warranty walk before the end of the first year. Authorization of Work All of the phases above are within this procurement and shall be priced. The Agreement will be awarded with a not-to-exceed amount covering the whole of the project. Work will be authorized in writing, phase by phase, as funding is confirmed. No work shall be performed in advance of authorization, and StanCOG will be obligated only for work so authorized. StanCOG makes no guarantee that any particular phase will be authorized. Cost Estimating No total project budget has been established, so cost estimating is a central part of this procurement. Estimates are required at schematic design, design development and construction documents. Each shall be prepared by a professional estimator independent of the design team, on a California prevailing wage basis, broken down by phase, escalated to an assumed midpoint of construction for each phase, and reconciled against the preceding estimate. Estimates shall reflect the cost of construction while staff continue to occupy the building. The 2024 preliminary plans and conceptual estimate are provided within Attachment H, for information only. These plans were presented to but not approved by the Policy Board. The 2024 estimate assumed a vacant building and a single construction contract. Team The proposing firm shall be prime consultant and shall hold all subconsultant agreements. The team shall include architecture, structural, mechanical, plumbing, electrical, fire protection, civil, accessibility and cost estimating. Proposers should identify any other discipline they consider necessary. Audiovisual and information technology are handled under a separate StanCOG contract and are not within this scope. Coordination with that provider is required. Identify the principal-in-charge, project manager and project architect by name, and the individual leading each discipline. These individuals will be named in the Agreement and may be substituted only with StanCOG's written approval. Qualifications A proposal that does not demonstrate the following may be deemed non-responsive: The firm is licensed to practice architecture in California. The firm has completed a public meeting chamber, council chamber or board room for a public agency. The firm has completed a renovation of a building that remained occupied during construction. StanCOG is also interested in adaptive reuse of commercial buildings for public use, projects in which an occupancy or fire protection question shaped the design, projects delivered in phases against incremental funding, and Central Valley experience. Meetings Proposers should assume, at minimum, four on-site workshops with staff during programming, coordination meetings every two weeks, one pre-application meeting at the City, a review meeting at each design milestone, and two or more evening presentations to StanCOG committees and the Policy Board. Deliverables All deliverables shall be provided in electronic format. Drawings shall be provided as plan sheets in PDF and in the native editable format in which they were prepare Introduction Summary Background Contact Information Timeline Vendor Questionnaire Evaluation Criteria Attachments

Published attachments
Addenda and notices
Public questions and answers
  • The RFP requires the consultant to determine the proposed occupancy classification and whether fire sprinkler installation or other building upgrades will be required. If the City of Modesto determines that additional improvements are necessary beyond the anticipated renovation scope, will the associated architectural and engineering design services be considered additional services subject to separate authorization and compensation?

    Work in the proposed scope to be evaluated during selection of respondents is expected to be covered by the fee proposed. Any change in scope during the contract will be negotiated within the contract terms and against the final scope and fee of the agreed-upon contract.

  • The RFP indicates that services will be authorized individually as funding becomes available, with no guarantee that all phases will proceed. If a subsequent phase is delayed for an extended period after completion of an authorized phase, will the consultant be entitled to negotiate an adjustment to its fee and schedule to account for remobilization, staffing changes, escalation, and updated code requirements?

    See Section 6.7 for the assumptions to be provided in the Cost Proposal for both the base contract and any proposed or future additional services. Please see the sample agreement for any rights a respondent retains through the contract.

  • Does StanCOG have an anticipated construction duration and number of construction contracts or separately bid phases that proposers should assume when developing their construction administration fees? If construction extends beyond the anticipated duration or additional construction phases are authorized, will the consultant's construction administration compensation be adjusted accordingly?

    It is expected that the respondent will have a reasonable understanding of the work needed to execute the RFP goals and to minimize any changes in scope from the original selected proposal related to packaging changes. The proposer should state the assumed duration and number of packages in the proposed scope for evaluation under Section 7.3. Additional services needed beyond the assumptions of the original services in the RFP will be negotiated under the terms of the agreed-upon contract.

  • Given that the final scope, construction budget, code requirements, and construction phasing have not yet been established, will StanCOG permit proposers to identify specific assumptions, exclusions, anticipated durations, and limits of services within their Cost Proposals, with services exceeding those assumptions subject to additional compensation?

    The proposer should state them in Section V of the Proposal for evaluation by the Evaluation Committee. See Section 6.4.

  • The RFP identifies conversion of the former teller area into a Policy Board meeting chamber, together with improvements to surrounding office areas. Can StanCOG clarify the anticipated limits of renovation outside the former teller area, including whether improvements to existing restrooms, corridors, building entrances, mechanical systems, electrical systems, and other occupied areas are expected within the base scope?

    See Sections 2.2, 2.5 and 3.3.

  • The RFP states that firms may be deemed nonresponsive if they have not completed a public-agency meeting chamber and an occupied-building renovation. Will StanCOG consider comparable public-sector meeting facilities, council chambers, conference facilities, or similar assembly spaces as qualifying experience, provided the proposer demonstrates the relevant design and operational requirements?

    See Section 3.6, as amended by Addendum No. 3. A room designed by the proposer where a public agency holds public meetings satisfies that qualification, whatever the room is called; "chamber" is used generically. Addendum No. 3 now also clearly accepts comparable experience, so that a proposer is not excluded from evaluation based on a narrow reading of the qualification. The experience the proposer presents will be evaluated under the criteria in Section 7.3.

  • The RFP states that no total project budget has been established and requires the consultant to prepare independent construction cost estimates at multiple design milestones. Does StanCOG have an anticipated construction funding allocation, target construction cost, or maximum project expenditure that proposers should use when developing their scope and fee proposals?

    See Sections 2.5 and 3.4.

  • Can StanCOG confirm whether existing architectural, structural, mechanical, electrical, plumbing, fire protection, and accessibility documentation is available in an accurate, editable format? If existing drawings are incomplete or inaccurate, will additional investigation, field verification, destructive testing, or documentation beyond customary visual observation be treated as additional services?

    See Section 4 and Section 3.2. Our understanding was that the existing drawings were conceptual in nature, with limited investigation, for high-level concepts and budgeting. The proposer should include in its scope the investigation it needs.

  • If the Policy Board requests substantial revisions to an approved design or a previously completed phase due to changes in program, available funding, or project priorities, will those revisions be treated as additional services?

    Any change in scope during the contract will be negotiated within the contract terms and against the final scope and fee of the agreed-upon contract.

  • The RFP requires construction estimates prepared by an independent professional estimator. Can StanCOG clarify whether the estimator must be an independent subconsultant retained by the architect, or whether qualified cost-estimating personnel within the prime consultant's organization would satisfy this requirement?

    See Section 3.4, as amended by Addendum No. 3.

  • If the proposed occupancy classification or renovation scope requires a new fire sprinkler system, fire alarm upgrades, or substantial modifications to existing building systems, should proposers include complete design services for those improvements in the base fee, or would those services be authorized following the initial code analysis and City pre-application review?

    See Section 2.5.

  • The RFP requires construction documents organized so that individual phases may be permitted, bid, and constructed independently. Should proposers assume a specific number of separately permitted and bid construction packages? If the number of packages is not yet determined, may additional packages beyond an identified base assumption be compensated as additional services?

    See Section 3.2. Priority and budget will first be directed to the new Policy Board chamber.

  • Can StanCOG clarify whether record drawings are expected to be prepared from contractor-provided as-built information and whether the required warranty walk is limited to one site visit per completed construction phase? If additional closeout or warranty services are required, will those be compensated separately?

    See Section 3.2. The proposer should describe its approach in the proposed scope for evaluation.

  • Will StanCOG consider reasonable exceptions or clarifications to the sample Professional Services Agreement, particularly provisions concerning additional services, schedule extensions, ownership and reuse of instruments of service, and professional liability, when identified in Attachment E?

    Exceptions, the final scope, and the fee are negotiated with the selected respondent after the evaluation process. The process is identified in Section 7.5.

  • The revised RFP cover identifies November 6, 2026, as the deadline for questions, while Addendum No. 2 and the revised procurement schedule identify November 3, 2026, at 5:00 PM. Please confirm that November 3 is the controlling deadline for submitting written questions.

    StanCOG did not issue a revised RFP cover, and the cover as originally released did not list a question deadline. See Addendum No. 2, which identifies all revised dates. Questions were due November 3, 2026, 5:00 p.m.

  • Section 2.5 identifies Phase 0, adaptation of the rear conference room to host public committee meetings. Is any design, code analysis, or accessibility work for Phase 0 within the scope of this RFP?

    See Addendum No. 3. The room is already set up for public committee meetings and will be in use by the time the contract for this solicitation is executed. Addendum No. 3 adds a limited code review of the room to the scope to confirm public safety.

  • RFP Section 2.6 identifies a separate public DC fast charging project on the same site, including an upgrade to the site transformer, and states that switchgear location, trenching, loss of parking and sequencing require coordination. Please clarify the A/E’s responsibilities with respect to that project: (a) What is the anticipated schedule for the EV project’s design, start of construction, and installation of the transformer upgrade and switchgear? Does StanCOG anticipate that construction of the EV project and the Phase 1 Project will overlap on the site? (b) Is the A/E’s role limited to coordinating with the EV project’s designer, or is the A/E expected to design or document any part of the EV work, such as modifications to the existing electrical service, trenching and restoration, parking layout and restriping, accessible EV charging spaces, or the accessible route to those spaces?

    (a) See Section 2.6. Other dates have not been set, and construction may, and is even likely to, overlap based on the required funding timelines from the state funding source. (b) See Section 2.6. Coordination only. MID confirmed the building service cannot handle the EV charging load and the EV charging needs a separate transformer. The A/E may need to show the EV work on its plans for conceptual phasing, and depending on the final EV design and A/E design, limited coordination may need to be shown on construction documents to clarify project limits and interfaces. However, the A/E consultant is not expected to be involved with the design or manage any design components associated with the EV charging project. The contract manager for the EV charging project is expected to be the same contract manager for this solicitation and can coordinate between the two contracts. For example, the loss of parking may reduce the number of stalls available for any code analysis. The contract manager would inform the design team of the loss of parking, and the design team would then need to reflect those changes in any existing analysis that was required as part of its work. A preliminary concept drawing is included in Addendum No. 3.

Plain text

OpenGov categories

  • 90600 · Architectural Services, Professional
  • 90607 · Architect Services, Professional
  • 90610 · Buildings - Architectural Design
  • 90630 · Fire Protection - Architectural Services
  • 90638 · General Construction - Architectural
  • 91107 · C.I.P., Architectural/Engineering Services
  • 91815 · Architectural Consulting
  • 92537 · Facilities Design Services, Engineering
  • 96258 · Professional Services (Not Otherwise Classified)