Architectural and Engineering Design Services — Rec Center Locker Room Renovation
Description
STATEMENT OF PURPOSE The City of West Sacramento is soliciting proposals from qualified firms or individuals ("Proposer") to provide architectural and engineering design services for the renovation of the locker room facilities at the West Sacramento Recreation Center . More details on the City's needs for this work are provided in the Scope of Work . Each qualified Proposer is to submit a proposal in conformity with the terms of this Request for Proposal ("RFP") by the deadline below ("Proposal"). The Proposer selected by the City pursuant to the terms of this RFP and the City's contracting procedures, if any is selected, is referred to herein as "Contractor." SYNONYMOUS TERMS Unless the use indicates otherwise, as used throughout this bid and its attachments, the following terms are synonymous: a. Firm, Consultant, Supplier, Vendor, Contractor, Successful Bidder, Offeror b. Purchase Order, Contract, Agreement c. Services, Work, Scope, and Project d. Pricing proposal/sheet, Cost proposal/sheet, Rate table/sheet Cost Proposal — Design Services Proposers shall complete the pricing table below and shall submit an hourly rate schedule with their proposal. The rate schedule shall identify all classifications anticipated to work on this project, including subconsultant classifications, and shall be used as the basis for negotiating any additional services authorized by written amendment. Proposers shall state the period for which the submitted rates are held or provide a rate escalation schedule. Task 1 — Coordination and Project Support Task 2 — Existing Conditions Investigation and Assessment Task 3 — Programming and Accessibility Tasks 4 through 6 — Design and Final PS&E (30, 65, and 95 percent) Task 7 — Permitting and Regulatory Support Task 8 — Bid Phase Support Task 9 — Designer Construction Support Construction Phasing Plan — development and incorporation into the construction documents, maintaining continuous facility operation Hourly Rate Schedule Proposers shall complete the Hourly Rate Schedule below for each classification listed. Rates shall be fully burdened and inclusive of overhead and profit. If a classification listed will not be used on this project, enter $0. Any additional classification not listed above, including subconsultant classifications, shall be provided on a supplemental rate sheet submitted with the proposal. These rates will serve as the basis for negotiating any additional services authorized by written amendment. Principal / Principal Architect Project Manager Project Architect Lead Designer / Interior Designer Mechanical Engineer Electrical Engineer Plumbing Designer Lighting Designer Cost Estimator CASp / Accessibility Specialist CAD / BIM Technician Administrative / Clerical Clarifications All lump-sum prices shall include all labor, materials, equipment, travel, reimbursables, coordination, meetings, documentation, and subconsultant costs required to complete the associated task as described in the Scope of Work, inclusive of all clauses and requirements integrated into Sections 1 through 7. Construction Phasing Plan (Line Item 8) shall include all effort required to develop, coordinate, detail, and incorporate the phasing plan into the PS&E for all three phases, including continuous facility operations, temporary power, access routing, absorption of manufacturer requirements, and interdisciplinary sequencing provisions. The City will not accept supplemental lump-sum pricing for any portion of the Scope of Work identified in Tasks 1 through 9 or in Section 4 (Construction Phasing). All such work must be included in the lump-sum amounts above. Additional services will only be authorized through written amendment under the hourly rate schedule. Hourly rates submitted with the proposal will be used only for authorized amendments as defined in Section 5 (Terms & Conditions). No increase in hourly rates will be accepted after contract execution unless expressly authorized by the City. Scope of Work PROJECT BACKGROUND The City of West Sacramento (City) is seeking proposals from qualified firms to provide architectural and engineering design services for the renovation of the locker room facilities at the West Sacramento Recreation Center, located at 2801 Jefferson Blvd., West Sacramento, CA 95691. The Recreation Center locker rooms are original to the facility, which is now approximately 17 years old, and have experienced significant wear and deterioration. Grout in the shower and floor tile has eroded, creating sanitation concerns and increasing the potential for water intrusion beneath the flooring. The existing rubber flooring has begun to bubble and lift due to prolonged moisture exposure, presenting both a safety hazard and an ongoing maintenance issue. Ventilation in the locker rooms is inadequate, contributing to excess moisture. The existing lockers and benches are original to the facility and are at the end of their service life. The Recreation Center is the City's only recreation center and serves the entire community. The facility will remain in continuous public operation and is not expected to close during construction. Asteroom 3D tours of the locker room areas, with photographs numbered to correspond to room numbers on the record drawings and including a navigable floor plan: A) Design Expectations The City is seeking a firm with demonstrated architectural and interior design capability for public recreation, aquatic, or institutional locker room facilities. Beyond addressing the deteriorated conditions described above, the City is relying on the Consultant to propose a modern, cohesive, and functional design for the renovated locker room spaces. The City is relying on the Consultant to present a range of design alternatives, which may include resinous or epoxy systems, fiberglass-reinforced panel systems, tile, combinations of these, or any other modern, practical, and functional system suitable for the application. Final selection will be made by the City based on the recommendation of the Consultant. Proposers should demonstrate design capability through relevant completed projects, and not solely through technical or engineering qualifications. Proposers shall identify the individual who will serve as lead designer for this project and shall include that individual's relevant project portfolio. Design capability is necessary but not sufficient. The City is equally reliant on the Consultant to produce complete, coordinated, and constructible documents. Proposers should demonstrate both. B) Key Personnel Commitment The Consultant shall maintain continuity of all key personnel identified in its proposal, including the lead designer and discipline leads. Replacement of any key personnel shall not occur without prior written approval from the City. Unauthorized substitutions shall constitute a material breach of this contract. The Consultant is the design professional of record and is responsible for the adequacy and suitability of all materials, systems, and methods specified, subject to City review and approval. Reference information provided by the City under Task 4.2 is provided for information only and does not relieve the Consultant of that responsibility. The City's intent in defining this Scope comprehensively is to minimize change orders, requests for information, and miscommunication during design and construction. Proposers are encouraged to identify in their proposals any scope element they believe is missing, unclear, or likely to generate a change during construction. PROJECT AREA AND SCOPE BOUNDARY A) Areas Within Scope Design services shall address the three locker room suites identified below, totaling approximately 3,378 square feet. Women's Locker Room Suite - approximately 1,150 SF Room No. Description Approx. SF K126 Women's Toilet 135 K127 Women's Showers 140 K127A Drying Area 61 K128 Women's Toilet 108 K129 Women's Locker 612 K130 Alcove 94 Family Locker Room Suite - approximately 1,078 SF Room No. Description Approx. SF K119 Family 129 K120 Family 127 K121 Family 127 K122 Family Lockers 312 K123 Family 129 K124 Family 127 K125 Family 127 Men's Locker Room Suite - approximately 1,150 SF Room No. Description Approx. SF K114 Alcove 94 K115 Men's Locker 612 K116 Men's Toilet 135 K117 Men's Showers 140 K117A Drying Area 61 K118 Men's Toilet 108 Square footages are approximate and taken from record drawings. The Consultant shall field verify all dimensions and areas. B) Areas Outside Scope The following are not included in the renovation scope: Exterior showers located on the north side of the Men's and Women's suites Corridor K131 Storage K110, Electrical K111, Mechanical/Fire Riser K112, Janitor K113 Note regarding areas outside scope: Exclusion from the renovation scope does not preclude the Consultant from evaluating, or the eventual contractor from accessing, these areas where necessary. Specifically: The design shall detail all transitions, thresholds, door frame conditions, and terminations where new work meets Corridor K131 or other adjacent out-of-scope areas. These conditions shall be fully detailed in the construction documents and shall not be left to field determination. Ventilation improvements may require access to, routing through, or equipment modifications within Electrical K111, Mechanical/Fire Riser K112, or adjacent ceiling and roof areas. The Consultant shall evaluate these areas as necessary to develop a complete ventilation design. Temporary power for contractor equipment may require connection at Electrical K111 or another point of connection identified by the Consultant, as addressed under Temporary Power for Construction. Contractor access, material delivery, and debris removal will require use of Corridor K131. Protection of corridor finishes, dust and noise containment, and access routing shall be addressed in the construction phasing plan. PROJECT PHASING (FISCAL YEAR) Improvements are programmed across three fiscal years, subject to future appropriations: Phase Fiscal Year Scope Phase 1 FY 26/27 Floor and wall finish replacement, including associated plumbing fixtures, accessories, and lighting Phase 2 FY 27/28 Ventilation improvements Phase 3 FY 28/29 Locker and bench replacement Design for all three phases is included in this scope. The City intends to complete design for all three phases under a single contract in order to coordinate the work as an integrated whole, avoid conflicts between phases, and minimize rework. Plumbing fixtures and accessories. Removal of existing floor and wall finishes is included in the Phase 1 scope. Because wall mounted plumbing fixtures, trim, valves, carriers, accessories, and associated penetrations are disturbed by that removal, replacement of those components is included in Phase 1 and shall be designed and specified accordingly. Existing floor drains are not anticipated to be replaced; however, the Phase 1 documents shall detail the termination of the new floor system at each drain, including drain top assembly, clamping ring, and finish floor elevation relative to the existing drain body. A) Scope by Phase Services included in the base contract differ by phase, as follows: Phase Base Contract Scope Phase 1 (FY 26/27) Tasks 1 through 9 - design through construction support Phase 2 (FY 27/28) Tasks 1 through 6 - design through final PS&E Phase 3 (FY 28/29) Tasks 1 through 6 - design through final PS&E Permitting and regulatory support (Task 7), bid phase support (Task 8), and construction support (Task 9) for Phases 2 and 3 are not included in the base contract. Because construction of those phases is not anticipated until FY 27/28 and FY 28/29 respectively, the City does not intend to hold the selected firm to those obligations over that period. The City intends to authorize those services by written amendment at the time each phase is programmed for construction. B) Phasing Requirements and Advisories Proposers are advised that: Deliverables shall be organized as separate, bid-ready PS&E packages for each phase, permitting the City to advertise each phase independently as funding becomes available. Interdisciplinary sequencing is a critical requirement. Ventilation improvements in Phase 2 may involve ductwork, exhaust routing, ceiling penetrations, wall chases, or electrical work that would otherwise damage or require demolition of Phase 1 finishes. The selected firm shall investigate ventilation requirements early enough in the design process to identify all rough-in, blocking, sleeving, chases, and related provisions that must be incorporated into the Phase 1 documents. This requirement applies equally to Phase 3 locker and bench replacement, including any floor anchorage, blocking, or electrical provisions. Document currency. Phase 2 and Phase 3 documents may not be advertised for bid until FY 27/28 and FY 28/29 respectively. CONSTRUCTION PHASING AND FACILITY OPERATIONS The Recreation Center will remain open and in operation throughout construction. The construction phasing plan is a design deliverable and a contract requirement. It shall not be characterized as, or deferred to, the Contractor's means and methods. Design Responsibility. The Consultant shall fully develop all phasing requirements and shall not defer design or sequencing decisions to Contractor means and methods. Any condition reasonably foreseeable during design, including access, temporary protection, sequence constraints, ceiling removal, electrical routing, and ventilation access, shall be resolved in the design documents. The Consultant shall determine and document the sequence of work, the areas out of service at each stage, and the temporary provisions required to maintain facility operation, and shall incorporate these into the drawings and specifications as enforceable requirements. A) Minimum Service Requirements The Recreation Center has three locker room suites. The construction phasing plan shall maintain, at all times during construction: Not more than one locker room suite out of service at any time; the remaining two suites shall remain open and available to patrons Hot water and toilet facilities available to patrons at all times. Utility shutdowns affecting hot water or toilet service to the suites remaining in operation are not permitted during hours of public operation. The phasing plan shall minimize the total duration of facility impact. The Consultant shall sequence the work to complete construction and return each suite to full operation as quickly as practicable, consistent with the minimum service requirements above, the blackout periods identified by the City, and the installation and cure requirements of the selected systems. The Consultant shall identify the anticipated duration of each closure and the total duration of facility impact, and shall identify any sequencing that would reduce that duration. B) Coordination With Recreation Center Operations The phasing plan shall be developed in coordination with Recreation Center staff and shall account for: Programming schedules, class schedules, league play, aquatics programming, and blackout periods. Construction within the locker room suites shall not occur during June and July. The City prefers that construction be avoided from May through August. Anticipated duration of each closure and the total duration of facility impact Signage, wayfinding, and patron communication requirements Temporary barriers, dust and noise containment, and separation from occupied areas Contractor staging, access, and debris routing that does not conflict with public circulation Utility isolation strategies that do not require shutdown of the broader facility Power supply for contractor equipment, as addressed under Temporary Power for Construction below C) Temporary Power for Construction The phasing plan shall address the source of electrical power for contractor equipment during each phase of construction, including surface preparation equipment, dust collection, temporary lighting, dehumidification, and any temperature or humidity conditioning required for material installation and cure. The Consultant shall evaluate and recommend an approach, addressing at minimum: Available spare capacity in the existing building electrical service, including voltage, phase, and amperage available at Electrical K111 or other points of connection Whether use of the building service would affect power to the portions of the facility remaining in operation Point of connection, temporary distribution routing, and protection of that routing through occupied areas If a temporary generator is required: location, clearances, noise, exhaust, fuel storage and refueling, security, permitting, and separation from public circulation, building air intakes, and adjacent occupied areas Requirements to be carried in the construction documents, including which party furnishes temporary power and any associated bid schedule line items Load Calculation Requirement. The Consultant shall perform electrical load calculations to confirm existing service capacity and determine whether temporary generator power is required. The Consultant shall provide a written recommendation and incorporate the resulting requirements into the drawings and specifications. D) Phasing Plan Content and Format The construction phasing plan shall be prepared as drawn plan sheets within the construction document set, supported by specification requirements. A narrative description alone is not an acceptable deliverable. At minimum, the phasing plan shall include: Plan sheets for each construction stage, drawn at the same scale as the floor plans, graphically identifying areas out of service, areas remaining in operation, and the limits of the work at that stage Architectural impacts at each stage, including ceiling removal or disturbance, lighting displacement and temporary lighting, access requirements above ceilings and within walls, and temporary architectural protection measures Locations and construction of temporary barriers, dust and noise containment, and temporary partitions, with details Contractor access routes, material delivery routes, staging areas, and debris removal routes, shown on plan Patron circulation routes and required signage locations for each stage, shown on plan Locations of temporary power connections, distribution routing, and any generator siting, shown on plan Utility isolation points, including hot water and toilet service, identifying what remains in service at each stage A stage-by-stage schedule identifying the duration of each closure and the sequence of stages Specification requirements making the phasing plan binding, including any restrictions on hours of work, notification requirements prior to a closure, and the conditions required before a suite may be taken out of service Phasing plans shall be fully coordinated with mechanical and electrical routi SCOPE OF SERVICES The objective of these services is a complete, coordinated, and buildable set of construction documents for each phase. Design development and visual presentation materials support that objective; they do not substitute for it. Plans, specifications, details, and the construction phasing plan shall be developed to a level of completeness sufficient for competitive public bidding and for construction by a contractor without reliance on further design interpretation. Conditions that are foreseeable during design shall be resolved in the documents rather than deferred to requests for information or change orders during construction. TASK 1: COORDINATION AND PROJECT SUPPORT 1.1 Coordinate the work of all subconsultants and perform internal quality control review of all deliverables prior to submittal. Drawings and specifications shall be coordinated across all disciplines. The City's Project Manager will manage the overall project schedule, budget, and stakeholder coordination. 1.2 Attend a design kickoff meeting conve
Published attachments
- Contract for Services (West Sacramento) - Boilerplate for RFP 11.4.24
- Commercial_Tenant_Improvements_Permit_Requirements
- Pages from 02-118064_WELL_SPC VOL 1_A - Resinous flooring
- Submittal Package 72R1 RESINOUS FLOORING - URETHANE - Product Data (jp-sn-NET)-TM 4.1
- Insurance Checklist
- CIP-60022_Scope_of_Services
- Rec Center Layout
- Lockers Layout
- Architectural_and_Engineering_Design_Services_—_Rec_Center_Locker_Room_Renovation.pdf
Addenda and notices
Official Notice #1: Notice to Proposers — Record Drawings in CAD Format · 1
The City is providing AutoCAD (.dwg) record drawings for the Recreation Center as an attachment to this RFP. Proposers may use these files in preparing base drawings for the project. The City makes no representation as to the completeness, accuracy, or currency of these files. The requirements of Task 2.2 and Task 2.3 remain unchanged: the Consultant shall field verify existing conditions and shall develop base drawings as necessary to produce complete and accurate construction documents.
Official Notice #2: Official Notice #2: West Sacramento Recreation Center 3D Tour · 2
West Sacramento Recreation Center 3D Tour
Official Notice #3: Bid Walk Sign In Sheet · 3
Official Notice #4: Bid Walk Stops · 4
Official Notice #5: Construction Phasing Plan Examples · 5
Example construction phasing plan sheets distributed at the October 23 pre-proposal meeting are attached. They show the type of drawn phasing plan sheets required by the Scope of Services (page 6, Section 4.D). They are provided for information only, are not a City template or standard, and do not modify the RFP. The Scope of Services governs.