Avalon Road Reclaimed Water Storage and Repump Facility

Description

NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed bids for Avalon Road Reclaimed Water Storage and Repump Facility ( Y27-708 ) Sealed offers for furnishing the above will be accepted up to 4:00 pm EST on Thursday, December 10, 2026 . The Estimated Cost for this project is $19,500,000.00 NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers. Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected. Important Instructions for Electronic Submittal The County is ONLY accepting electronic bid submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. OpenGov Technical Support For Technical Support, respondent's can reach the OpenGov Service Desk: Chat (preferred): Click the button in the lower right hand corner of the portal Email: procurement-support@opengov.com Phone: 1 (650) 336-7167 Hours: Mon-Fri 7am - 10pm EST Timely Questions Regarding this Solicitation The question and answer module of OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, November 2, 2026 at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly. Any questions regarding Good Faith Effort or the SBE directory should be directed to the Business Development Division rather than Procurement. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division. Answers for timely questions will be addressed in the OpenGov question and answer module or as an addenda to this solicitation depending on volume, participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein. This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email julianne.foyil@ocfl.net . Critical clarifications may be made via addenda, however, untimely questions may not be considered. Scope of Services / Specifications Location of Solicitation Documents OVERVIEW: Project consists of installation a 6 million gallon (MG) reclaimed water storage tank. Installation of a 12,600 gallon per minute (GPM) high service reclaimed repumping (pressure boosting) station, including variable speed drives, electrical, instrumentation and controls (I&C), etc. Site will have a new pump/electrical building and installation of a 30-inch reclaimed water suction and discharge assembly. Please refer to the section titled #Solicitation Documents to access all necessary technical documentation and attachments related to this solicitation. Introduction & Submittal Instructions Summary Background Contact Information Orange County Procurement Point of Contact Timeline Solicitation Terms and Conditions Mobilization Mobilization is defined as construction start-up costs required for performance of preparatory work and operations in mobilizing for beginning work on the project. Such costs are necessary for the movement of personnel, equipment, supplies and incidentals to the project site and for the establishment of temporary offices, buildings, safety equipment, first aid supplies, sanitary and other facilities. Include the cost of bonds, insurance and any other preconstruction expense necessary for the start of work. Mobilization costs are not part of the physical construction. The Contractor shall retain adequate documentation to support all mobilization costs. The County may at its discretion verify reasonableness of actual mobilization costs and make an equitable adjustment to contract price if deemed necessary. The total cost of mobilization shall not exceed 5% of the Estimated Total Base Bid. For purposes of calculation of maximum allowable mobilization, the “Estimated Total Base Bid” is defined as the total of all line items specified to be included in the mobilization calculation, exclusive of any alternates or options, and exclusive of the Mobilization line item. Failure of the Respondent to comply with this limitation shall result in a reduction of the line item price for Mobilization; or, in the alternative, the bid may be found non-responsive, at the County’s option. References Each similar project listed should be listed with complete information as specifically provided on County’s provided reference form. The specific information on references must be provided on the reference form. Do not attach listings of reference information. All Respondents should submit the requisite number of similar projects. Each such project must be verified by the county in order to be deemed responsible under this “references” section. Failure to provide reference information as requested may result in the rejection of your bid. RESPONDENTS ARE ADVISED TO CONFIRM THAT: a. Each reference provided by the Respondent has up to date contact persons and contact information; b. The contact person provided for each reference is someone who has personal knowledge of the Respondent’s performance during the referenced project; and c. The contact person for each reference has been contacted by the Respondent regarding this specific bid submittal and such person confirmed their willingness to serve as a reference. THE COUNTY WILL CONTACT THE REFERENCES PROVIDED AND WILL REJECT ANY AND ALL REFERENCES FOR SIMILAR PROJECTS THAT IT IS UNABLE TO INDEPENDENTLY VERIFY. Notwithstanding anything to the contrary herein, without assuming any obligation to do so, the County reserves the right to follow up with – at minimum – the three (3) lowest Respondents for supplemental submission of references/similar projects. Any such opportunity to supplement or correct granted to a respondent by the County under this provision shall expire at 11:59pm county local time on the second full county business day after the day on which such respondent received the County’s request for supplementation. There will be no additional time or consideration granted by the County thereafter. Respondents found responsible under this “REFERENCES” section may still ultimately be deemed to be not responsible by the County due to other considerations including, but not limited to, other information provided in the Respondent’s bid submittal, as well as any history the Respondent may have of negative performance on previous County project(s). ULTIMATELY, THE DETERMINATION OF WHETHER A RESPONDENT IS DEEMED RESPONSIBLE SHALL BE AT THE SOLE DISCRETION OF THE COUNTY. Joint Venture Requirements Respondents submitting as a Joint Venture shall submit documentation as an attachment to their bid response. If applicable, failure to timely submit (1) the required Information for Determining Joint Venture Eligibility Form AND (2) a fully executed copy of your joint venture agreement may result in disqualification. The Information for Determining Joint Venture Eligibility form can be found at on the County's Forms and Resources website ( https://www.ocfl.net/vfr ). County paid Licenses / Permits and Fees Orange County will bear the cost of all permits, licenses, and fees imposed on the work/project by agencies of the Orange County Board of County Commissioners. This does not alleviate the selected Respondent from obtaining and procuring the permits, as required by the County. In compliance with the Public Bid Disclosure Act, Section 218.80, Florida Statutes, each permit, license, and/or fee applicable to this work/project (before and during construction) will be paid by the selected Respondent or may be furnished by the Orange County Board of County Commissioners, as specified below: The Orange County Government Fee Directory, incorporated herein by reference, contains a list of licenses, permits and fees that may apply to this project. The fee directory link “Fees” is available at: http://www.orangecountyfl.net/portals/0/resource%20library/open%20government/FeeDirectory.pdf Licenses, permits and fees which may be required by the State of Florida, State Agencies or by other local governmental entities or agencies other than Orange County Board of County Commissioners. Respondents shall review all applicable licenses, permits and fees and contact the applicable agency if there are any questions. The selected Respondent shall procure and pay for all permits and licenses, charges and fees and give all notices necessary and incidental to the due and lawful prosecution of the work. The cost of all permits, fees, etc. shall be included in the bid price except where noted otherwise in the specifications or other bid documents. Project Fee Schedule Unless the Bid Item Schedule specifies otherwise, unit prices shall include all incidental Project costs, including but not limited to, mobilization, maintenance of traffic, insurance, bonds, overhead and profit. The County reserves the right to itemize these expenses in the fee schedule. Trade Secret Information Orange County is subject to the State of Florida’s broad public records laws. Therefore, all documents, materials, records, data, or any other information submitted as part of a solicitation response are considered public records governed by the disclosure, exemption, and confidentiality provisions relating to public records in Florida law, including those found in Chapter 119, Florida Statutes. Section 815.045, Florida Statutes, makes trade secret information, as defined in Section 812.081, Florida Statutes, confidential and exempt from disclosure under Florida public records law. However, please note the following: A Respondent’s desire for privacy of particular information submitted to the County does not make such information trade secret information. Respondents cannot render public records exempt from disclosure as containing trade secret information merely by designating information it furnishes to the County as confidential. Only information that specifically meets the exemption in Section 815.045, Florida Statutes, should be designated as trade secret information by Respondents. Any Respondent who fails to designate information contained in its solicitation response as trade secret information at the time of solicitation response submittal has not taken the required measures or made reasonable efforts to maintain such information’s secrecy and has therefore waived any right to assert trade secret protections for such information. The County will therefore not consider any Respondent’s request to designate information in a solicitation response as trade secret information that is made after the time of solicitation submittal. The County is not soliciting, nor does it desire, the submission of any Respondent’s trade secret information as part of this solicitation response. Notwithstanding the foregoing, to the extent that a Respondent finds it necessary to designate certain information in its solicitation response as being trade secret information, the Respondent shall attach the following items to its solicitation response: Trade Secret Information Itemization Log . The Respondent shall create and attach to its solicitation response a “Trade Secret Information Itemization Log” that: Clearly itemizes any and all information that the Respondent designates as confidential trade secret information. Completes such itemization in the narrowest and least expansive manner (word, line, paragraph, page, etc.) necessary to protect the confidentiality of the Respondent’s trade secret information. Per item, provides the impacted submittal section/item number, a written explanation that comprehensively supports the Respondent’s classification of such information as trade secret information under state or federal law, and the legal citation under which such information is exempt and confidential from disclosure. Redacted Impacted Submittals. For each submittal that contains information designated by the Respondent as trade secret information, the Respondent shall attach a redacted copy of such impacted submittal. Such redactions must include notations containing cross-references to the itemized trade secret information as submitted in the Trade Secret Information Itemization Log. Redactions must be made in the narrowest and least expansive manner (word, line, paragraph, page, etc.) necessary to protect the confidentiality of the Respondent’s trade secret information. Each redacted submittal copy must have a cover page and page header that is clearly marked as “REDACTED COPY”. Respondents are advised that: They must only redact the specific information that they, using good faith, believe to be confidential and exempt under applicable state or federal law and should not submit documents that have been broadly marked “CONFIDENTIAL”. Exemptions to Florida’s broad public records law are narrowly construed and therefore, the County is unable to accept broad designations of confidentiality or exemption from disclosure. Consequently, any such broad classification of trade secret information made by a Respondent may lead to its solicitation response being deemed non-responsive. As a responsible steward of taxpayer funding and in the interest of transparency and accountability to the general public, the designation of the following information as trade secret information is not acceptable to the County and will therefore lead to a Respondent’s solicitation response being deemed non-responsive: Any proposed rates, fees, or prices; The total bid amount; The general nature of the services rendered or goods being provided; and Any information contained in the County’s solicitation documents, including the Respondent’s answers to any of the questions in the bid response form (not including any impacted submittals). Any Respondent that submits a solicitation response that in any manner asserts or suggests that information contained therein is the Respondent’s trade secret information hereby acknowledges and agrees to all of the following: To the extent the County deems necessary to effectively handle, process, review, evaluate, and maintain the Respondent’s solicitation response, the County and its officials, employees, agents, and representatives are hereby granted full rights to access, view, consider, and discuss any information designated by the Respondent as trade secret information. The County may make copies of, and distribute, the Respondent’s unredacted impacted submittals for the purposes of facilitating evaluation of such response. For auditing purposes, the County may disclose the Respondent’s unredacted impacted submittals to the Orange County Comptroller’s Office and the County’s internal and external auditors. Additionally, should funding for the award be in any part provided by the State of Florida or the Federal Government, the County may also disclos Bid Acceptance Period A bid shall constitute an irrevocable offer for a period of one hundred twenty (120) days from the public opening date or until the date of award. In the event that an award is not made by the County within one hundred twenty (120) days from the public opening date, the respondent may withdraw their offer or provide a written extension without modification. Proprietary/Restrictive Specifications If a prospective respondent considers the specification contained herein to be proprietary or restrictive in nature, thus potentially resulting in reduced competition, they are urged to contact the Procurement Division prior to submittal deadline. Specifications which are unrelated to performance will be considered for deletion via addendum to this solicitation. Debriefing of Respondents Not later than thirty (30) days after Board approval of an award, a Respondent may submit a written request to the applicable contracting agent for a debriefing on the evaluation of their submittal. The contracting agent will schedule a meeting with the Respondent for the debriefing. However, at the Respondent's request, the debriefing may be conducted virtually. The debriefing shall include the following minimum information: a. Key requirements of the solicitation. b. Deficiencies in the submittal in response to the requirements of the solicitation. c. If applicable, a summary of the rationale for award. d. Responses to any relevant questions of the proposer. Untimely debriefing requests will also be considered. Surety Requirements BID BOND A Bid, Payment and Performance Bond are a requirement when the offer/contract amount exceeds $200,000. Respondents shall attach an electronic copy of their bid bond for responsiveness. Submission of the bid bond, along with a certified and effectively dated copy of the power of attorney, shall be completed and signed by all required parties and submitted on the form provided in the solicitation. Submittal of a bid bond less than 10% of the total estimated contract amount for base period, shall result in the bid being deemed non-responsive. In order to be acceptable to the County, the Surety company issuing the Bid Bond shall meet and comply with the minimum standards described in #Bond Requirements , “Qualifications of Surety Companies”. Failure to submit a Bid Bond from a Surety Company meeting these minimum standards shall result in rejection of the offer. ALTERNATIVE SURETY In the alternative, a Certified Check, or a Cashier's Check shall be required to accompany each electronic offer in a stated dollar amount of not less than ten (10%) percent of the sum of the total estimated contract amount for the base period. Checks shall be submitted to the Procurement Division; Internal Operations Centre II, 400 E. South Street; 2nd Floor, Orlando, FL 32801 on or before the submission deadline of 4:00 pm EST, Thursday, December 10, 2026 . Respondent’s must indicate on the outermost sealed envelope the following: 1. Avalon Road Reclaimed Water Storage and Repump Facility ( Y27-708 ) 2. Deadline: Thursday, December 10, 2026 . 3. Name of Respondent 4. Return Address of the Respondent Submittal of a Cert

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Addendum No. 1 addresses the following changes: 1. Section 13216 – 1.06 A 2. Delete Paragraph 1.06 A 2 in its entirety and replace with the following: Construction: The entire tank, including all portions of the floor, sump structures, wall, and dome, shall be designed and built by the Tank Construction Company using its own trained personnel and equipment. The application of coatings may be performed by a subcontractor, however the Tank Construction Company shall be responsible for all the work including warranty items. 2. Section 13216 – 1.06 B Delete Paragraph 1.06 B in its entirety and replace with the following: Acceptable Tank Manufacturers: Subject to compliance with requirements, tank manufacturers offering products which may be incorporated in the work are limited to the following: 1. The Crom Corporation, Gainesville, Florida. 2. Precon Corporation, Newberry, Florida. Preload, LLC – Prestressed Concrete Tanks, Louisville, KY 3. Section 13326 Delete Specification Section 13326 in its entirety and replace with the attached revised Specification 13326. 4. Section 15117 Add Specification Section 15117 – Electronic Metering/Flow Control Valves to the Specification Documents, see attached Specification.

  • Addendum #2 · 2

    Addendum No. 2 to provide an answer in regards to Question and Answer #7 in the Q/A Portal: Question 7: Section 8 - Bid Response Form, Question 4.2 states a 25% SBE goal for this solicitation. Section 4 - Business Development Point 4.2 states the SBE goal for this solicitation is 30%. Please clarify which of those two it is. Answer: The SBE goal has been corrected to reflect the 30% Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Addendum No. 3 to provide an answer in regards to Question and Answer # 6 & 29 in the Q/A Portal: Question 6: Section 5, Insurance Requirements, indicates that Commercial General Liability, Business Automobile Liability, and Employer's Liability limits for contracts exceeding $20,000,000 shall be determined by the County. Given that the Engineer's Estimate is $19,500,000, please provide the required insurance limits for bids exceeding $20,000,000 so contractors can accurately account for insurance costs in their proposals. Answer: Verify profile: Construction 5 - Aboveground over $20M General Liability Each Occurrence Limit GL - $5,000,000 General Aggregate Limit - $10,000,000 Additional Insured Endorsement – Ongoing Operations (CG 20 10 or CG 20 26 or equivalent) Additional Insured Endorsement – Completed Operations (CG 20 37 or equivalent) Waiver of Subrogation Endorsement (with policy number) AM Best Rating for Insurance Carrier - A- (Excellent) Financial Size Category Minimum for Insurance Carrier VIII - $100-250 Million Auto Liability Combined Single Limit - $5,000,000 All Owned Autos Hired Autos Non-Owned Autos AM Best Rating for Insurance Carrier - A- (Excellent) Financial Size Category Minimum for Insurance Carrier VIII - $100-250 Million Worker's Compensation Workers Compensation applies per statute EL Each Accident Limit - $1,000,000 EL Each Employee Limit - $1,000,000 EL Disease – Policy Limit - $1,000,000 Waiver of Subrogation Endorsement AM Best Rating for Insurance Carrier - A- (Excellent) Financial Size Category Minimum for Insurance Carrier VIII - $100-250 Million Pollution Pollution Per Occurrence Limit - $5,000,000 AM Best Rating for Insurance Carrier A- (Excellent) Financial Size Category Minimum for Insurance Carrier VIII - $100-250 Million Builder's Risk AM Best Rating for Insurance Carrier - A- (Excellent) Financial Size Category Minimum for Insurance Carrier VIII - $100-250 Million Builders Risk Limit per Contract (project value) Orange County Florida must be named as named insured. Other COI requirements Cert Holder Name and Address: Orange County, Florida , Risk Management Division Additional Insured Entities: Orange County, Florida Question 29: Is Builders Risk Insurance required for this project? Answer: Yes, please see the insurance requirements answered in question #6 addendum 3.

  • Addendum #4 · 4

    Addendum No. 3 addresses the following changes: The Good Faith Effort submission is changed from Saturday, November 7, 2026 by 4:00PM EST to Monday, November 30, 2026 by 4:00PM EST. The bid submission is changed from Tuesday, November 17, 2026 by 4:00PM EST to Thursday, December 10, 2026 by 4:00PM EST. Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Section 5, Insurance Requirements, indicates that Commercial General Liability, Business Automobile Liability, and Employer's Liability limits for contracts exceeding $20,000,000 shall be determined by the County. Given that the Engineer's Estimate is $19,500,000, please provide the required insurance limits for bids exceeding $20,000,000 so contractors can accurately account for insurance costs in their proposals.

    Please see the insurance requirements in addendum 3 for projects over 20 million

  • Section 8 - Bid Response Form, Question 4.2 states a 25% SBE goal for this solicitation. Section 4 - Business Development Point 4.2 states the SBE goal for this solicitation is 30%. Please clarify which of those two it is.

    Please see addendum # 2

  • From the perspective of a Prime bidder, it is not uncommon for it to be impossible to determine if the SBE participation goal will or will not be able to be attained 10 days prior to the bid. Is it the intent of this due date to get an idea of SBE participation and adjust the goal accordingly prior to the bid deadline?

    No, the submission deadline is not intended to automatically adjust the established SBE participation goal based on preliminary respondent responses. Rather, it provides an opportunity for Business Development to review the submitted good faith effort log by the respondents. Respondents are encouraged to begin outreach to certified SBE firms as early as possible and submit the goof faith effort log prior to the deadline.

  • Please indicate if the partial or full waiver will be applied to the job as a whole or on a per contractor basis based on their submitted Good Faith Documentation. Is it possible for one bidder to have a 0% goal and another bidder to have the full participation goal required?

    Good Faith Effort documentation is evaluated based on the individual respondent's demonstrated efforts to meet the established SBE participation goal. Yes, it is possible for one respondent to have 0% goal and another respondent to have a full participation goal.

  • Please provide a copy of the Contract and Sub-Contract Goal Participation Schedule to the project documents or bid submittal page to avoid any mistakes or confusion on which document to submit with the bid package.

    Respondents should utilize the Contract and Subcontract Goal Participation Schedule form provided with the solicitation and complete all required information in accordance with the bid submission instructions. The Contract and Sub-Contract Goal Participation Schedule Form is located at https://www.orangecountyfl.net/Portals/0/Library/Vendor%20Services/docs/Contract%20and%20Sub-contract%20Goal%20Participation%20Schedule-revised%20VR-8.18.2026.xlsx

  • Please provide a copy of the Contract and Sub-Contract Goal Participation Schedule to the project documents or bid submittal page to avoid any mistakes or confusion on which document to submit with the bid package.

    Respondents should utilize the Contract and Subcontract Goal Participation Schedule form provided with the solicitation and complete all required information in accordance with the bid submission instructions. The Contract and Sub-Contract Goal Participation Schedule Form is located at https://www.orangecountyfl.net/Portals/0/Library/Vendor%20Services/docs/Contract%20and%20Sub-contract%20Goal%20Participation%20Schedule-revised%20VR-8.18.2026.xlsx

  • Is the good faith effort documentation a requirement to the bid? Will a bid be marked non-responsive or non-responsible if they meet the goal and did not submit good faith effort documentation?

    Good Faith Effort documentation is a requirement if the respondent is unable to meet the goal. No, if the goal is met Good Faith Effort documentation is not required.

  • Will the results of the good faith effort submissions be released prior to the bid due date or will the goal waiver be assessed after the bid due date in evaluation period?

    Yes, a notice will be sent to the respondent prior to the bid submission deadline via email.

  • The Good Faith Effort is due on 11/7/2026 which is a Saturday, is that correct? Also, is there a reason the Good Faith needs to be turned in a week prior to the bid being due? What if SBE contractors wait until the last few days to submit a quote how would we document that?

    Good Faith Effort submission is due 10 days prior to the submission deadline. The purpose of requiring Good Faith Effort documentation before the bid submission deadline is to provide Business Development with an opportunity to review the respondent's documented efforts to obtain certified SBE participation allowing respondents the opportunity to know in advance if their Good Faith Effort was sufficient. Prime Contractors are expected to conduct timely outreach and provide SBE subcontractors with a reasonable opportunity to review the solicitation requirements, evaluate the scope of work, and prepare and submit competitive quotes. Prime Contractors are to ensure they are communicating deadlines in order to meet the Good Faith Effort submission deadline. SBE subcontractors are responsible for responding within a reasonable and clearly communicated timeframe that allows the Prime Contractor to submit the Good Faith Effort log or incorporate their quotes into the bid submission to achieve participation. Prime Contractors should maintain documentation of their outreach activities, communications, quote requests, responses, and applicable deadlines as the dates and information is to be provided on the Good Faith Effort Log.

  • Is Builders Risk Insurance required for this project?

    Yes, please see the insurance requirements answered in question # 6 addendum 3.

  • Please confirm that the follow job description meets the Qualifications intent to demonstrate similar work to a 3,000 gpm high service pump station. For the outflow from a water reclamation facility, replaced with two new horizontal split case pumps (1,600 gpm duty flow each), the two existing reclaimed water high service vertical can pumps, along with associated piping, fittings, instrumentation, and controls. The work under this contract included removal and replacement consisting of, but not limited to, the following: two reclaimed water high service pumps, pump panel, MCC panel, piping, valves, duplex basket strainer, and fittings, concrete, flow meters and all other associated instrumentation. The work was sequenced such that the plant is 100% operational from start to finish.

    The County cannot make a determination regarding whether a specific project satisfies the similar project qualifications prior to the evaluation of submitted bids or proposals. Bidders are responsible for reviewing the similar project requirements outlined in the solicitation and submitting projects that demonstrate compliance with those requirements. All submitted projects will be evaluated in accordance with the criteria established in the solicitation. For clarification purposes the similar work requirement set for this project is a minimum of 3,000 GPM requirement refers to the total pumping capacity of the station rather than the capacity of an individual pump

  • Please confirm that the follow job description meets the Qualifications intent to demonstrate similar work to a 3,000 gpm high service pump station. The City operates an existing deep injection well (DIW) pump station. The OWNER has identified the need to replace outdated components of the pump station which have reached their respective service lives. The work under this contract included modifications of the piping and appurtenances at the DIW pump station, but not limited to, the following: 1. Removal and Replacement of three (3) vertical turbine pumps. The new vertical turbine pumps (National Pump K20MC 2-Stage) (Design points 3,500, 4,200, and 5,600 max gpm for each pump) will be furnished by the owner. 2. Removal and Replacement of three (3) sets of combination air valves, check valves, butterfly valves, expansion joints, pressure gauges, spool pieces, and miscellaneous ancillary equipment located between the vertical turbine pumps and the 36” discharge pipe. 3. Installation of three (3) variable frequency drives and one (1) air conditioning unit in the existing MCC enclosure. 4. Removal and Replacement of one (1) air compressor and (1) butterfly valve located between the hydropneumatic tank and 36” discharge piping. 5. Inspection services and rehabilitation of the existing hydropneumatic tank, including replacement of corroded air piping and valves, two (2) sight glasses, and cleaning of the interior of the tank. 6. Blasting and Painting of the existing DIW ductile iro

    The County cannot make a determination regarding whether a specific project satisfies the similar project qualifications prior to the evaluation of submitted bids or proposals. Bidders are responsible for reviewing the similar project requirements outlined in the solicitation and submitting projects that demonstrate compliance with those requirements. All submitted projects will be evaluated in accordance with the criteria established in the solicitation. For clarification purposes the similar work requirement set for this project is a minimum of 3,000 GPM requirement refers to the total pumping capacity of the station rather than the capacity of an individual pump

  • Please confirm that the follow job description meets the Qualifications intent to demonstrate similar work to a 3,000 gpm high service pump station. At a WRF, Effluent Transfer Pump Replacement - Work includes removing the existing pumps and providing new vertical turbine pumps with appropriate modifications for matching up with the existing piping. Work also includes construction and installation of variable frequency drives (VFDs) for the control of the effluent transfer pumps. All programming changes necessary for the replacement work is also included. There were 4 pumps with a primary design points of 1,650 gpm each. The contractor must maintain this capacity during replacement of the effluent transfer pumps. Any proposed bypass pumping equipment and ancillary provisions to maintain this flow shall be the responsibility of the Contractor.

    The County cannot make a determination regarding whether a specific project satisfies the similar project qualifications prior to the evaluation of submitted bids or proposals. Bidders are responsible for reviewing the similar project requirements outlined in the solicitation and submitting projects that demonstrate compliance with those requirements. All submitted projects will be evaluated in accordance with the criteria established in the solicitation. For clarification purposes the similar work requirement set for this project is a minimum of 3,000 GPM requirement refers to the total pumping capacity of the station rather than the capacity of an individual pump

  • Please confirm that the GFE Submission is Due on Saturday, November 7th, 2026 by 4:00 PM. How should this be submitted, Via Email, Open Gov., Mail?

    Yes, the current due date for the GFE Submission is set for November 7th, 2026. Please see section 4.2. Small Business Enterprise Program for the GFE form and how to submit.

Plain text

OpenGov categories

  • 90638 · General Construction - Architectural
  • 91100 · Construction And Utilities, Higher Education
  • 91356 · Construction, Utility/Underground Projects
  • 91389 · Maintenance and Repair, Utility/Underground Projects
  • 95895 · Utility Management Services
  • 96185 · Utility Services, Water