B027- 23 Oregon Road Bridge Replacement
Description
The City of Meriden seeks the services of a contractor to furnish labor and materials to replace the Oregon Road Bridge. B027-23 OREGON ROAD BRIDGE REPLACEMENT LOTCIP PROJECT NO. L079-0004 REPLACEMENT OF BRIDGE NO. 04184 CARRYING OREGON ROAD OVER QUINNIPIAC RIVER, MERIDEN, CT CONSTRUCTION ACCESS CLEARING AND GRUBBING REMOVE AND RESET WOOD FENCE EARTH EXCAVATION ROCK EXCAVATION EXCAVATION AND REUSE OF EXISTING CHANNEL BOTTOM MATERIAL CUT CONCRETE SIDEWALK CUT BITUMINOUS CONCRETE PAVEMENT STRUCTURE EXCAVATION-EARTH (EXCLUDING COFFERDAM AND DEWATERING) COFFERDAM AND DEWATERING COFFERDAM MATERIAL LEFT IN PLACE HANDLING WATER DITCH EXCAVATION FORMATION OF SUBGRADE GRANULAR FILL PERVIOUS STRUCTURE BACKFILL SEDIMENTATION CONTROL SYSTEM SEDIMENT CONTROL SYSTEM AT CATCH BASIN PROCESSED AGGREGATE BASE PROCESSED AGGREGATE HMA S1 HMA S0.5 HMA S0.5 HMA S0.375 HMA S0.25 HMA S0.25 JOINT AND CRACK SEALING OF BITUMINOUS CONCRETE PAVEMENT MATERIAL FOR TACK COAT MATERIAL FOR TACK COAT GUTTER LINE SEALING FOR BRIDGES FINE MILLING OF BITUMINOUS CONCRETE (0" TO 4") REMOVAL OF EXISTING WEARING SURFACE REMOVAL OF SUPERSTRUCTURE (SITE NO. 1) STRAIGHT ENDWALL SHEAR CONNECTORS 1-1/2'' POLYVINYL CHLORIDE PLASTIC PIPE ASPHALTIC PLUG EXPANSION JOINT SYSTEM PREFORMED JOINT SEAL STEEL-LAMINATED ELASTOMERIC BEARINGS TYPE 'C' CATCH BASIN DOUBLE GRATE TYPE 1 - 0' - 10' DEEP SCOPE OF WORK PROJECT DETAILS - PROJECT INFORMATION Specifications & Scope of Work PLEASE REFER TO ATTACHMENT G - L079-0004 Special Provisions for specifications & scope. LEGAL NOTICE INVITATION TO BID The City of Meriden is accepting electronic bids for: B027-23 Oregon Road Bridge Replacement The City of Meriden is seeking the services of a contractor to furnish labor and materials to replace the Oregon Road Bridge. Bids shall be submitted as electronic bids per specifications obtained via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct and on the State of Connecticut Department of Administrative Services website ( https://webprocure.proactiscloud.com ). Bids may be received up to but not later than 11:00 am , Thursday, December 10, 2026 via the City eProcurement Portal located at https://procurement.opengov.com/portal/meridenct . The City eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct by way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. A Pre-Bid Meeting will be held on Thursday, November 12, 2026 @ 10:00 am in the Engineering Conference Room (Rm 30) - Meriden City Hall, 142 East Main Street, Meriden, CT. Each bid shall be accompanied by a Bid Bond in the amount of Ten (10%) percent of the amount bid. The right is reserved to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive informality or technical defects, if it is deemed to be in the best interest of the City of Meriden. No bidder may withdraw its bid within ninety (90) days of the date of the bid opening. Labor and Material Payment Bond and a Performance Bond for One Hundred Percent (100%) of the contract price, with a corporate surety approved by the City of Meriden, will be required of the lowest responsible bidder. The attention of bidders is call to the requirement for minimum wage rates to be paid under this contract. This bid/contract is subject to state contract compliance requirements, including setaside (25% SBE and 6.25% M/W/DisBE) and non-discrimination requirements enforced by the CHRO. The City of Meriden is an Affirmative Action/Equal Opportunity Employer. Disadvantaged, minority, small, and women business enterprises are encouraged to respond. Rawle Dummett Purchasing Officer City of Meriden, CT 06450-8022 Dated: October 30, 2026 INFORMATION TO BIDDERS SUMMARY The City of Meriden seeks the services of a contractor to furnish labor and materials to replace the Oregon Road Bridge. TIMELINE Project Release Date: October 30, 2026 Pre-Bid Meeting (Non-Mandatory): November 12, 2026, 10:00am 142 East Main Street-Rm 30 Meriden, CT 06450 Question Submission Deadline: December 3, 2026, 4:00pm Submission Deadline: December 10, 2026, 11:00am BIDDING PROCEDURES The City will only be accepting electronic submissions of bids and proposals. Please submit electronic responses via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct. By way of the eProcurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. Bids are due for submission no later than 11:00 am , Thursday, December 10, 2026 . BIDS Bids are to be submitted as follows:. a. Bids must be made out and signed in the corporate, or other, name of Bidder, and must be fully and properly executed by an authorized person. b. The City of Meriden, CT will only be accepting electronic submissions of the enclosed bid sheet via the City eProcurement portal partner, OpenGov: https://procurement.opengov.com/portal/meridenct. c. Bids received later than the time and date specified will not be considered. d. Amendments to or withdrawal of bids received later than the date and time set forth in the bid opening will not be considered. EXAMINATION OF BIDDING DOCUMENTS Bidders are to examine all documents and visit the site in order to make a thorough examination of the conditions so that the bidder may familiarize itself with all of the existing requirements, conditions, and difficulties that will affect the execution of the work in order to determine the amount of work necessary to carry out the true intent of the specifications and work shown on the drawings. The City of Meriden and its agents do not have any responsibility for the accuracy, completeness, or sufficiency of any bid document obtained from any other source other than from the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct. Obtaining documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining documents from any other source may also result in failure to receive any addenda, corrections, or other revisions to the documents that may be issued. No request shall be honored if such request is made less than seven (7) calendar days prior to the date fixed for the opening of bids. Any and all such interpretations, and any supplementary instructions, will be in the form of a written addenda to the specifications which, if issued, will be made available via the City eProcurement Portal, located at https://procurement.opengov.com/portal/meridenct for addenda. Failure of any bidder to receive any such addenda shall not relieve any bidder from any obligations under its bid as submitted. Bidders shall submit all inquiries regarding this bid via the City eProcurement Portal, located at https://procurement.opengov.com/portal/meridenct. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. BIDS TO REMAIN OPEN No bidder may withdraw its bid within ninety (90) days of the date of the bid opening. Should there be reason why the contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the City of Meriden and the successful bidder. CHRO The contractor who is selected to perform this State project must comply with CONN. GEN. STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f. State law requires a minimum spending allocation goal of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services (“DAS”) under the provisions of CONN. GEN. STAT. § 4a-60g. (25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses.) The contractor must demonstrate good faith effort to meet the spending allocation goals. PREVAILING WAGES State and Federal wage rates apply to this project. The Wage Determinations are included with these specifications. It is the responsibility of the Contractor, before bid opening, to request, if necessary, any additional information on wage rates for those trades people who are not covered by the applicable Wage Decision, but who may be employed for the proposed work under this contract. In the event of a conflict between the State and Federal wage rates, the higher rate for a given labor category shall apply. The Contractor is cautioned that wage rates are continually changing and he shall insure himself that the enclosed schedules and modifications are the latest issue, this being his responsibility. In accordance with state regulations the wage rates used for the project are the rates and modifications that are in affect up to ten days prior to the bid opening. TIME Inasmuch as the contract concerns a public improvement, the provisions of the contract relating to the time of performance and completion of the work are of the essence of the contract. Accordingly, the successful bidder/contractor (“Contractor”) shall begin work on the day specified in paragraph 2.04 of the General Conditions and shall perform the work diligently so as to permit full use not later than the first day following the construction period established in the Contract. (See paragraph 10 entitled “Liquidated Damages” of the Construction Contract between City of Meriden, as owner, and the Contractor). TAXES The City of Meriden is exempt under Connecticut General Statutes from the payment of the excise taxes imposed by the federal government and the Sales and Use Tax of the State of Connecticut; such taxes should not be included in the bid price. Upon request, exemption certificates will be furnished to the successful bidder. FAIR EMPLOYMENT PRACTICES The Contractor shall agree that neither it or its subcontractors, except in the case of a bona fide occupational qualification or need, to refuse to hire or employ or to bar or to discharge from employment any individual or to discriminate against such individual in compensation or in terms, conditions or privileges of employment because of the individual's race, color, religious creed, age, sex, gender identity or expression, marital status, national origin, ancestry, present or past history of mental disability, intellectual disability, learning disability, physical disability, including, but not limited to, blindness or status as a veteran. The aforementioned terms are obtained from Connecticut General Statutes Section 46a-60, et seq., entitled “Discriminatory employment practices prohibited,” as amended. FORM OF AGREEMENT BETWEEN CITY OF MERIDEN AND CONTRACTOR The Agreement for the work will be via Purchase Order and Standard Construction Agreement including EJCDC . LIQUIDATED DAMAGES The Contractor recognizes that time is of the essence with this project and the City of Meriden will suffer financial loss if the Work is not completed within the anticipated times specified therefore, the Contractor agrees that as liquidated damages for any delay the Contractor will pay the City of Meriden Twenty-five Hundred Dollars ($2500.00) for each day that expires after the time specified in for Substantial Completion until the Work is substantially complete. In addition, after Substantial Completion, if Contractor shall neglect, refuse or fail to complete the remaining Work within the time specified for completion and readiness for final payment or any proper extension thereof granted by the City of Meriden, the Contractor shall pay the City of Meriden Twenty-five Hundred Dollars ($2500.00) for each day that expires after the time specified for completion and readiness for final payment. BUILD AMERICA BUY AMERICA This bid is subject to: The Build America Buy America Act , enacted as part of the Infrastructure Investment and Jobs Act on November 15, 2021, established a domestic content procurement preference for all Federal financial assistance obligated for infrastructure projects after May 14, 2022. The domestic content procurement preference requires that all iron, steel, manufactured products, and construction materials used in covered infrastructure projects are produced in the United States. CITY OF MERIDEN CODE OF ETHICS The City of Meriden has adopted a Code of Ethics located in Chapter 21 of the Code of the City of Meriden, sections 21-1 through 21-15, inclusive, which are expressly incorporated herein by reference. The terms of the Code of Ethics shall constitute a part of any contract or agreement entered into by the City of Meriden as a result of this bid as if those terms were fully set forth in such contract or agreement. Bidders are specifically advised that the Code of Ethics prohibits public officers and employees, as well as their immediate families and businesses, with which they are associated from participating in any transaction which is incompatible with the proper discharge of official duties or responsibilities. Bidders are also advised that the Code of Ethics contain provisions with respect to paid contractors and former employees and officials. BIDDERS SHOULD NOTE THAT BIDS, CONTRACTS, AND AGREEMENTS ENTERED INTO OR AWARDED IN VIOLATION OF THE CODE OF ETHICS ARE VOIDABLE BY RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MERIDEN. Copies of the Code of Ethics may be obtained from the office of the City Clerk or may be found online on the City of Meriden’s website. NON-COLLUSION STATEMENT Each bidder submitting a bid to the City of Meriden for any portion of the work contemplated by the documents on which bidding is based shall execute and attach thereto the sworn Non-Collusive Bid Statement, to the effect that the bidder has not colluded with any other person, firm, or corporation in the submission of the bid. AWARD IN CASE OF A TIE In the event there are two or more responsive bidders, the decision to award will be based by the following criteria and in the following order: a. The bidder located in the State of Connecticut will be awarded the bid over that of another bidder. b. The winner of a coin toss will be awarded the bid over that of another bidder. The above-referenced provisions do not apply to those situations in which more than one City-based business responsible bidder has submitted bids not more than ten (10) percent higher than the lowest bid and has agreed to accept the award of the bid at the amount of the lowest bid. Under such circumstances, the provisions of the Code of the City of Meriden, section 3-14, are controlling, as set forth under Section 8 of this ‘Information to Bidders.’ AWARD OF CONTRACT The Purchasing Officer reserves the right to make an award on the bid which, by the Purchasing Officer’s judgment and recommendation from the Public Works following bid evaluations, best meets the specifications and is deemed to be in the best interest of the City of Meriden. The contract will not be awarded to any corporation, firm, or individual which/who is in arrears to the City of Meriden by debt or contract, or who is in default as security or otherwise by any obligation to the City of Meriden. The right is reserved to reject any or all bids, in whole or in part, to award any item, group of items, or total bid, and to waive informality or technical defects, if it is deemed to be in the best interest of the City of Meriden. BID PROTEST PROCEDURE In the event that any bidder wishes to protest the potential award of a bid, or any procedure of act in the advertising or soliciting of the bids, said bidder must make said protest in writing, which shall state the reason therefore and request a conference with respect thereto. Said protest must be received in the City Purchasing Office within FIVE (5) business days after the delivery of bid results or decisions. A conference with respect to said protest shall be scheduled by the Purchasing Officer forthwith and shall be attended by him or his designee and such other persons as the Purchasing Officer and the City Manager shall require to attend. The subject matter of said conference shall be limited to the reasons for the protest specified in the written request for said conference. Said conference shall also include a discussion of all possibilities for a resolution of dispute. The City shall make a decision in writing within three (3) business days after said conference and forward the same to the protesting bidder forthwith. In the event that any protesting bidder wishes to take legal action against the City, they must fully comply with all of these instructions to bidders. ASSIGNMENT OF CONTRACT No contract may be assigned without the written consent of the Purchasing Officer or designee. PERMITS The Contractor shall be responsible for obtaining any and all necessary permits required by the City of Meriden prior to the commencement of work. The Contractor may contact the City of Meriden Building Department for permit information at (203) 630-4091. For all other required permits, contact the City of Meriden Engineering Department at (203) 630-4018. Please note-This is a City of Meriden project therefore City permit fees will be waived BUT the State Training and Education Fund Fees/Permit will NOT be waived. BID PRICE AND PAYMENT The City of Meriden is exempt from the payment of the excise taxes imposed by the Federal government and the Sales and Use Tax of the State of Connecticut under Connecticut General Statutes; accordingly, such taxes shall not be included in the bid price. The City of Meriden, unless stated otherwise in the bidding documents or Contract, will make payment to the Contractor not less than thirty (30) days following completion of services. QUALITY All materials, equipment, supplies, and services shall be subject to rigid inspection. If defective material, equipment, supplies, or services are discovered, the Contractor shall remove or make good such material, equipment, or supplies without extra compensation. It is expressly understood and agreed that any inspection by the City of Meriden will in no way lessen the responsibility of the Contractor or release Contractor from the obligation to perform and deliver to the City sound and satisfactory materials, equipment, supplies, or allow the cost to be deducted from any monies due it from the City of Meriden. All services will be performed in a workmanlike manner. LICENSES AND CERTIFICATIONS The successful firm(s) shall ensure that any appropriate licenses or certifications required by the State of Connecticut are maintained for the duration of the project. The firm must meet all municipal, state and federal affirmative action and equal employment opportunity practices. INSURANCE The successful bidder shall be required to provide a Certificate of Insurance denoting general liability, automobile liability, workers compensation liability, and other coverage required by the City’s Risk Manager. The State (ConnDOT) must be named as an additional insured party for the Commercial General Liability and Automobile Liability insurance policies required by this Article and the Special Provisions to the Contract, and any Umbrella Liability Insurance, as applicable, obtained in accordance with this Article. Each policy shall waive right of recovery (waiver of subrogation) against the State of Connecticut. (SEE ATTACHMENT O) BID FORM
Published attachments
- Construction Contract Bridges
- EJCDC General & Supplemental
- Construction Contracts Boilerplate Language - State Funded
- Floodplain Application & Approval
- Oregon Road Bridge USACE Approval
- L079-0004 Special Provisions
- 01 General Drawings
- 02 - Roadway Drawings
- 03 - Structure
- 04 - Traffic
- 05 - FIO
- 06 - CTDOT_HIGHWAY_STD_Individual
- 07 - CTDOT_TRAFFIC_STD_Individual
- CHRO NotificationtoBidderspdf
- Insurance Requirements
- B027-23 Prevailing Wages - Oregon Rd Bridge Replacement
- Prevailing Wage Info Packet
- Sample Performance Bond
- Sample Payment Bond
- B027-23_Oregon_Road_Bridge_Replacement_(Addendum_#7_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Scope is Attachment G
Addendum #3 · 3
Geo Data Report
Addendum #4 · 4
Geotechnical Engineering Report
Addendum #5 · 5
As-Built and Rehab Drawings
Addendum #6 · 6
Pre-Bid Sign in Sheet
Addendum #7 · 7
Permanent Casting Specification (Question 38 Re: Painting)
Public questions and answers
Per contract, this job will be completed in two seasons. Please confirm there would be no work this year. It would stat the following April of 2027 carrying through 2028, correct?
Correct- Actual Construction to begin Spring 2027-Contract will be awarded timely after the bids are received.
Trafficpersons. Item 0970006 provides for municipal police officers. Will certified uniformed flaggers (ATSSA/NSC) be permitted for alternating one-way operations and short-term lane closures, either in place of police or when Meriden Police are unavailable to staff a detail?
Meriden Police are required to be hired whenever there is a restriction of traffic. If PD cannot provide an officer, uniformed flaggers can be substituted.
Route 70. Will work on or adjacent to Route 70 require a CTDOT encroachment permit, and does that permit allow uniformed flaggers, or does it require police?
Yes. Work on or adjacent to Route 70 will require a CTDOT encroachment permit. The permit allows certified uniformed flaggers if Town Police cannot provide an officer.
Maintenance and Protection of Traffic scope. Does Item 0971001 (Maintenance and Protection of Traffic, lump sum) include relocating the pinned temporary traffic barrier between Stages 1, 2 and 3, or is that work paid under a separate item?
Relocation of temporary traffic barriers paid under contract items 0822101.01 and 0822101.02.
Small business goal. For the 25% DAS-certified small business goal, will a subcontractor whose DAS SBE certification is approved after bid opening but before contract award count toward the goal?
ConnDOT will review the bids before giving us Authorization to Award. DOT policies will govern.
Plan holders. Will the City publish a plan holders list or the attendee list from the November 12 pre-bid meeting?
Pre-Bid sign in sheet will be posted on/by November 13 @ 4 pm. It has been posted as Addendum #6.
Schedule. What is the anticipated notice-to-proceed date, the contract duration (calendar days to substantial completion), and the approximate duration of each construction stage?
Anticipated NTP is April 1, 2027. We anticipate 488 calendar days for substantial completion with approximately 203, 210, and 75 calendar days for stages 1, 2, and 3, respectively.
The documents reference appendix G - special provisions for specifications and scope of work. There are no sections for Drilled Shafts in the special provisions. Please confirm is this is correct, provide clarity, or if Form 819 is solely used as the specification for this section.
Yes. Form 819 Section 7.01 solely governs for Drilled Shafts.
Please provide the geotechnical report for the project.
It will be forthcoming in a day or two.
Has any laboratory testing of the bedrock been performed? Please provide laboratory testing of the bedrock samples.
Yes. Results are provided in the attached Geotechnical Data Report.
Please confirm that there are no trial drilled shafts required.
Trial drilled shafts are not required.
The cofferdam, primarily for the middle pier does not seem to be large enough to fit a full-size drill rig. Please confirm how the contractor will be compensated for additional length of cofferdam.
The drill rig will have to be placed on the east span to install drilled shafts at the Pier after the removal of the west span at each stage. Look in Drawing S-12 in Structure subset for suggested construction approach.
How is the top of rock elevation evaluated? Is it when the permeant casing first hits rock? Or is it once the whole circumference/diameter of the permeant casing is hitting rock? then additional plunge length beyond that?
The entire circumference of the permanent casing needs to be embedded in rock a minimum of 6".
What size (wall thickness) permeant steel casing is required.
Permanent casings are not structural. Contractor to design the casing to meet his means and methods of shaft installation. Contractor to provide submittals for permanent casing and submit it to the engineer for review and approval.
Please confirm that the reinforcing steel within the drilled shaft required to be galvanized per note on S-03?
Yes. Reinforcing steel within the drilled shaft to be galvanized per Note in S-03.
Please confirm that the contractor is not required to perform exploration test borings as indicated in Drilled Shaft section of form 819. If required, please provide a line item in the bid form this these explorations.
Yes. Exploration test borings are not required.
Will the use of temporary casing be allowed? Form 819 requires the contractor to have permission from the Engineer. Please let us know if this will be allowed.
The use of temporary casing is not allowed.
Will cross hole seismic testing be performed in the drilled shafts? If so, who is responsible for hiring the testing?
Yes, cross-hole-sonic testing is required at each drilled shaft. The Contractor is responsible for hiring the qualified testing firm.
Please share the design loads for the drilled shafts, axial compression, axial tension, and lateral loading.
Please refer to the Geotechnical Engineering Report for Drilled Shaft Loads. (Addendum 4)
Can the contractor VE the drilled shafts to micropiles?
The contractor shall bid as per contract plans.
Is this Bridge Replacement a DOT Group 8 (Minor Bridge) or a different DOT grouping. If so do we need to submit a prequalification letter with the bid submission?
This project does not fall under CTDOT Group 8 or other. However, the contractor shall show past performance on similar bridge replacement projects.
We understand this is a state project, and that the state will be involved in bid award's decisions. Is this project going to be managed and inspected by the state or would it be by a private engineering firm that City of Meriden would contract? Please advise.
Construction Engineering & Inspection will be completed by a consulting firm under the direction and oversight of the City of Meriden.
Can a complete set of as-built drawings for the existing bridge be provided to bidders?
Attached are the plans that we have for the bridge. Both as-built and Rehab. Please see Addendum 5
Will a plan holders list be posted?
Yes, after the pre-bid meeting the sign in sheet will be posted as an addendum
Please reconsider the answer to this question, as the way it's currently stated the contractor can install a nearly incidental wall thickness (tin foil) as "permanent casing". Please provide a performance specification for the permanent casing.
As indicated in response to question #14, permanent casings for drilled shafts are not being provided for structural reasons. The material requirements for the casing shall follow Form 819 article 7.01.02. The actual casing thickness shall be determined based on the installation methods of the contractor but shall not be less than 0.5”. The details of the casing shall be submitted as part of the drilled shaft installation plan submittal as outlined in Form 819 article 7.01.03.
Please clarify the use of temporary casing. Will the use of temporary casing be allowed if the annular space between the permanent casing and temporary casing is backfilled with a neat cement as the permanent casing is withdrawn?
Assuming, the bidder meant temporary casing rather than permanent casing in the last portion of the question, the use of temporary casing outside the permanent casing is allowed if needed for constructability reasons. Any changes to already approved permits, if needed, will have to be obtained by the Contractor at his own expense in a timely manner to avoid schedule delay.
If the shafts are to be inspected by the Engineer, what is the typical duration that Contractor should anticipate for such inspections?
Anticipated to be less than 30 minutes, assuming the Engineers representative is on-site.
Will the shafts be visually inspected by the Engineer prior to filling with concrete?
Yes. The bottom of the shaft is cleaned with “muck bucket” tooling and water is removed just before the Engineer’s visual inspection followed quickly by concrete placement. If water flow cannot be controlled during the inspection, concrete placement by tremie will be necessary.
Form 819 indicates that "the Contractor shall provide equipment and access to the Engineer for confirming dimension, alignment, and bottom cleanliness". Please indicate the equipment required to be provided.
The Contractor will need to provide proper bottom cleaning tool such as a “muck bucket” as well as adequate methods to remove water. Dimension will be confirmed looking down the shaft for continuity of the casing. A less accurate sense of dimension will be based on the volume of concrete placed in the shaft, but ultimately shaft dimension and alignment will be based on Integrity testing. Construction tolerances shall follow Form 819.
Are there any restrictions on the means and methods of how the permanent casing is installed and advanced, such as it needs to be vibrated, spun, hammered, etc.?
Based on Form 819, twisting, driving or vibration is allowed.
Will a submittal stamped by a professional engineer be required for the drilled shafts if the contractor uses the design shown on the plans?
No.
If the engineering for the drilled shafts is to be done by the contractor’s hired engineer, can end bearing of the drilled shafts be accounted for if in the contractor's hired engineer's opinion, it is proper to do so?
AASHTO does not agree with accounting for both end bearing and skin friction in the rock socket, unless very high capacity is trying to be achieved at a significant cost saving.
Who is the engineer of record for the Drilled Shafts? Is it GM2, or is it the engineer hired by the contractor?
GM2 is the Engineer of Record for the project. That does not absolve the contractor from the QA/QC requirements of the contract.
Will it be acceptable to detour Oregon Road or use alternating 1 way traffic to construct portions of the bridge due to access issues, particularly as it relates to the bridge pier and concrete bridge decks. Staging plans show long crane reaches to dismantle and erect the bridge superstructure. Must all the cofferdams and concrete work be done the same way?
Because of sight line issues on River Road and school traffic to the 3 schools on Oregon Road, alternating one-way traffic on the bridge will not be practical.
Please confirm the 819 qualification requirements for drilled shafts apply to this job.
Yes. Form 819 requirements apply for drilled shafts.
Please provide the approval permits for the project.
Permit approvals are in Attachments E (City) and F (USACE).
Can the contractor install falsework within the river to assist with access to the center pier?
As indicated in the suggested construction approach in Sheet S-12, the contractor can install floating docks or similar from Habershon Field (or Dossin Beach) to access the pier both of which are City owned. Contractor shall notify City at least two weeks ahead of time.
S-20, Note 4 indicate that the permanent casing shall be field painted. Please provide a specification for this, or confirm that it is the same special provision specification "metallizing structural steel".
Please see Addendum 7 for response to above question.
Why is there a bid Item for Water Handling (#020415A)? The bid item Cofferdam and Dewatering (#0204001A) covers all the dewatering associated with the cofferdams. There is no temporary cofferdams or bypass pumping shown on the Water Handling Plan and presumably therefore is not needed. It shows the same cofferdams on Sheets S-08 and S-09.
The water-handling cofferdam noted in S-10 shall be paid for under the item “Handling Water”. Refer to Pay Item Notes in S-10.
Floating docks to support the drill rig required for these shafts seems impractical in this size waterway. Can the contractor install a temporary trestle within the waterway to facilitate the work at the center pier?
The floating docks were meant for access to the cofferdam for removing existing Pier to the limits indicated in the Plans. Temporary trestles are not allowed or permitted.
sheet S-12 suggests installing the drilled shafts from the existing bridge (s-12 note 5). Please indicate the maximum load rating for Span 2 of the bridge mentioned in this note.
Assuming the bidder meant minimum rating, the minimum load rating of the bridge is 1.29 for HL-93 Inventory.
Please review or add a bid item for 36" diameter rock excavation. It appears that soil excavation within the shaft, and 30" diameter rock (socket) excavation have bid items but there is no bid item to cover the 36" diameter rock excavation of the casing plunge length.
The 36” diameter rock excavation for the casing plunge is not measured for payment.
Please provide the state funded portion of the project needed to determine CHRO set-aside requirements.
State is funding 100% of the project.
Will the town consider galvanizing and painting or powder coating the bridge rail. Metallizing does not coat the interior of the tube rails and we are now seeing rust on the bridge parapets and in the mid rail and bottom rail block outs on projects installed last year (Case Road Winchester and Old Road Westport).
Bridge rail does not need to be metallized. Please refer to specification 0904051A 3 Tube Curb Mounted Bridge Rail for galvanizing details.
OpenGov categories
- 15507 · Bridge Accessories and Parts
- 55006 · Bridge and Railroad Crossing Gates
- 57065 · Steel Bridge Truss, Overhead
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91313 · Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)
- 91366 · Maintenance and Repair, Bridges
- 91367 · Maintenance, Repair, and Operation of Drawbridges
- 92513 · Bridge Engineering
- 96800 · Public Works And Related Services