Skip to content
← Back to search

State and local · OpenGov

Opportunityevaluation

Battery Electric Bus Maintenance Training & Apprenticeship Program

Description

TARTA seeks competitive proposals from qualified firms to develop and implement a comprehensive zero-emission workforce development, maintenance training, and apprenticeship framework. The engagement is intended to build internal capability as TARTA expands its zero-emission fleet and to move employees from foundational safety knowledge to progressively advanced electrical theory, diagnostics, troubleshooting, structured OJT, apprenticeship milestones, and internal instructor capability. Scope of Services Background The Toledo Area Regional Transit Authority (TARTA) is a public transit authority that operates public transportation bus and paratransit services across metropolitan Toledo, Ohio and Lucas County, Ohio. TARTA’s mission-critical employees, such as operators, are considered first responders because transit is designated as an essential service in times of crisis. TARTA’s service area includes all 596 square miles of Lucas County which includes the City of Toledo and into the City of Rossford in Wood County. Founded in 1971, TARTA has grown to provide service on 19 routes system-wide to 1.7 million riders. As the region’s public transportation provider, TARTA operates three facilities in its service area. Headquartered in Toledo at 1127 West Central Avenue, the Central Offices are home to the executive office, all administrative departments, and the bus storage facility, which houses TARTA’s directly operated fleet, micro-transit, maintenance, and operations departments. The TARTA Hub Station, located in downtown Toledo, is the central boarding hub and transfer point for 17 TARTA routes, the customer information center, and on-site security. TARTA also operates ADA Complementary paratransit operations through Toledo Area Regional Paratransit Services (TARPS) from a facility located at 130 Knapp Street just outside the downtown Toledo Area. The TARPS facility is home to administrative, operations, and maintenance departments for the ADA paratransit service. Project Objectives Develop a phased ZEB/BEB training roadmap aligned to fleet transition needs. Create role-based competency pathways for maintenance personnel and other employees who directly support zero-emission vehicle deployment. Develop a comprehensive, modular training curriculum and supporting instructional materials for ZEB/BEB, hybrid, and related vehicle technologies that can be delivered by TARTA staff and approved training partners. Align ZEB/BEB training curriculum with TARTA-approved industry standards, including applicable ASE and APTA objectives. Formalize ZEB/BEB training apprenticeship governance, OJT, related instruction (RI), mentoring, assessment, and progression. Build ZEB/BEB Train-the-Trainer capacity so TARTA can retain knowledge and reduce unnecessary reliance on outside instructors. Develop ZEB/BEB training instructor guides, lesson plans, student materials, assessments, hands-on exercises, and training documentation that can be maintained, updated, and delivered by TARTA after project completion. Integrate ZEB/BEB training diagnostic tools, PPE, training aids, practical exercises, recordkeeping, evaluation, and continuous improvement into one workforce system. Provide all ZEB/BEB curriculum and training materials in editable electronic formats with rights allowing TARTA to use, revise, reproduce, and deliver the program internally or through future training providers. Scope of Services 3.0. Important Instructions for Electronic Submittal The Toledo Area Regional Transit Authority is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. 3.1 Discovery, Skills-Gap Validation and Training Roadmap Review training records, prior skills-gap work, existing curriculum, certifications, relevant fleet plans, OEM training, and available grant documentation supplied by TARTA. Facilitate discovery with TARTA maintenance, workforce development, safety, facilities, operations, labor, and other designated stakeholders. Validate near-term and long-term skill requirements and prioritize competencies by role and deployment phase. Develop a sequenced roadmap from awareness and high-voltage safety through electrical theory, component-level knowledge, diagnostics, troubleshooting, and advanced maintenance. 3.2 ZEB/BEB Technical Curriculum and Standards Alignment Develop or curate curriculum addressing high- and low-voltage safety, electrical theory, zero-emission vehicle systems, safe isolation/lockout-tagout, diagnostic processes, troubleshooting, maintenance procedures, and related validated needs. Map curriculum to TARTA-approved technical standards and identify prerequisites, learning objectives, delivery methods, duration, assessment methods, and required tools for each module. Coordinate proposed training with relevant OEM and infrastructure supplier training to avoid unnecessary duplication. Include refresher and retraining strategies so employees can maintain competency as technology and the fleet evolve. Address first-responder, charging/infrastructure, operator, facilities, and safety training interfaces when applicable to the proposed program. 3.3 Role-Based ZEB/BEB Training Competency Pathways Develop role-based pathways that identify foundational, intermediate, and advanced competencies. Define prerequisites, competency milestones, practical demonstrations, knowledge checks, and criteria for progression. Recommend methods for reskilling incumbent personnel while retaining institutional maintenance knowledge during the technology transition. Identify mentor and internal instructor qualification criteria and continuing development expectations. 3.4 ZEB/BEB Training Apprenticeship and OJT Framework Build TARTA’s maintenance apprenticeship program by incorporating ZEB/BEB competencies into the apprenticeship standards. Develop a comprehensive apprenticeship framework integrating related supplemental instruction (RSI), on-the-job training (OJT), defined work processes and milestones, competency-based progression, mentoring, performance assessment, documentation, and pathways for existing employees. Develop curriculum maps and recommended course sequencing that align apprenticeship requirements with the ZEB/BEB training curriculum developed under this project. Develop apprentice and mentor tools including competency assessments, skills verification checklists, OJT logs, evaluation criteria, coaching guidance, mentor validation, progression standards, and trainee recordkeeping templates. Provide guidance for establishing a Joint Apprenticeship Training Committee (JATC) or comparable labor-management governance structure and support planning for state apprenticeship registration, as requested by TARTA. Provide draft apprenticeship standards, governance documents, policies, and program review procedures necessary to support ongoing program administration. Develop a comprehensive curriculum package including training modules, lesson plans, presentations, instructor guides, participant manuals, practical exercises, knowledge assessments, skills evaluations, competency checklists, and supporting instructional materials for identified training pathways. Provide all apprenticeship and training materials in editable electronic formats and develop a sustainability plan that enables TARTA to independently administer, maintain, update, and expand the programs as vehicle technologies, fleet composition, and workforce needs evolve. 3.5 Education, Labor and Industry Partnerships Identify, evaluate, and recommend qualified colleges, career-technical institutions, labor organizations, professional associations, OEMs, transit agencies, infrastructure vendors, and specialized trainers capable of supporting program implementation. Where appropriate, facilitate introductory discussions and provide recommended partnership structures, roles, and responsibilities. Evaluate opportunities for education partners to provide RSI or other complementary instruction. Identify opportunities for internships, work-based learning, recruitment, and succession planning relevant to the proposed workforce model. Ensure third-party resources complement TARTA’s internal Train-the-Trainer model and support intentional knowledge transfer. Workforce staffing, recruitment, retention, succession planning, and career progression strategy supporting TARTA's transition to zero-emission fleet operations. 3.6 ZEB/BEB Training Train-the-Trainer and Knowledge Transfer Design and deliver a Train-the-Trainer program for qualified TARTA personnel. Provide instructor guides, lesson plans, presentation materials, practical exercises, assessment tools, and supporting resources needed for repeatable internal delivery, subject to disclosed licensing terms. Include instructor observation, coaching, technical quality review, and recommended instructor qualification/recertification practices. Develop a handoff and sustainability plan identifying TARTA ownership, responsibilities, update cycles, and circumstances that warrant outside technical assistance. 3.7 ZEB/BEB Hands-On OJT and Practical Exercises Develop realistic hands-on exercises addressing high-voltage safety, safe energ Introduction Summary Background Contact Information Timeline Proposal Submission Provisions Postponement, Amendment, and/or Cancellation of the RFP TARTA reserves the right to revise or amend any portion of this RFP before the date and time for the proposal delivery. Such revisions and amendments, if any, shall be issued through an addendum to this RFP. Addenda shall be available on TARTA's OpenGov Procurement portal. TARTA reserves the right to cancel this RFP at any time or change the date and time for submitting proposals by announcing the same before the date and time established for proposal submission. Rejection of Proposals TARTA reserves the right to reject any or all proposals and/or waive any minor informalities or irregularities. Clarification of Proposals TARTA reserves the right to clarify any point in a proposal or obtain additional information to evaluate a particular proposal. Failure of a Proposer to respond to such a request for further information or clarification may result in that proposals’ rejection. Modification or Withdrawal of Proposals and Late Proposals At any time before the time and date set for submission of proposals, a Proposer may "Unsubmit" in order to withdraw or modify their proposal. In order for an updated or modified proposal to be be considered, Proposer shall resubmit prior to the due date and time submittals. Any proposal or modification of proposal received after the stated deadline for proposal receipt will not be considered. Errors and Administrative Corrections TARTA will not be responsible for any errors in proposals. Proposers will only be allowed to alter proposals after the submittal deadline in response to requests for clarifications by TARTA. TARTA reserves the right to request an extension of the proposal period from a Proposer or Proposers. TARTA reserves the right to allow corrections or amendments to be made that are due to minor administrative errors or irregularities, such as errors in typing, transposition, or similar administrative errors. Erasures or other changes or entries made by the proposer must be initialed by the person signing the proposal. Compliance with RFP Terms and Attachments TARTA intends to award a contract based on the terms, conditions, and attachments contained in this RFP. Proposers are strongly advised not to make any exceptions. Proposers shall submit proposals that respond to the requirements of the RFP. An exception is not a response to an RFP requirement. Proposers are cautioned that exceptions to the terms, conditions, and attachments may result in a rejection of the proposal. Collusion The proposer guarantees that the proposal submitted is not a product of collusion with any other proposer, and no effort has been made to fix the proposal price of any proposer or to fix any over-head, profit, or cost element of any proposal price. If TARTA determines that collusion has occurred among Proposers none of the proposals from the participants in such collusion shall be considered. TARTA’s determination shall be final. Taxes and Interest TARTA is exempt from Federal, Excise and Transportation Tax and the Ohio Sales, Excise and Use Tax. Proposers will not include these taxes in their proposed price(s). All other government taxes, duties, fees, licenses, permits, royalties, assessments, and charges shall be included in the proposed price. TARTA will not pay interest on unpaid or disputed invoices, whether due or overdue. Single Proposal Response If only one proposal is received, a detailed price/cost analysis may be requested of that Proposer. TARTA reserves the right to reject the single proposal and put the RFP out for bid again if necessary. Exclusionary of Discriminatory Specifications TARTA agrees that it will comply with the requirements of 49 U.S.C. Section 5323(h) (3) refraining from using any Federal assistance awarded by the FTA to support procurements using exclusionary or discriminatory specifications. Protest Procedure General Protests may be made by prospective Proposers, Vendors or Proposers whose direct economic interest may be affected by the award of the contract or by failure to award a contract. TARTA will consider all protests filed in a timely manner as described below. All protests are to be submitted in writing by one of the following: Send by regular United States mail to: Chief Financial Officer Toledo Area Regional Transit Authority 1127 W. Central Ave. Toledo, OH 43697 OR By electronic mail (E-mail) addressed as follows: info@tarta.com A protest submission should be concise, logically arranged, and clearly state the grounds for protest. A protest must include at least the following. Name, address, email address and telephone number of protester; Identification of contract solicitation number; A detailed statement of the legal and factual grounds for the protest, including copies of relevant documents; and A statement as to what relief is requested. Protests must be submitted to TARTA in accordance with these procedures and time requirements, must be complete and describe all issues that the protester believes relevant. Protests Before Proposal Opening/Pre-bid Protests: Protests alleging restrictive specifications or improprieties which are apparent prior to proposal or bid opening or receipt of bids or proposals must be submitted in writing as set forth above and must be received at least seven (7) business days prior to proposal or bid opening or the closing date for receipt of Proposals or bids. If the written protest is not received by the time specified, proposals may be received, and an award made in the normal manner, unless TARTA determines that remedial action is required. Oral protests not followed by a written protest will be disregarded. TARTA may request additional information from the protesting party and information or response from other bidders, which shall be submitted to TARTA not less than seven (7) business days after the date of TARTA’s request. So far as practicable, protest decisions will be made by the CFO, the project manager, and others as TARTA deems appropriate. So far as is practical, the decision will be based upon the written appeal, information and written responses submitted by the appealing party and other bidders. If any party fails to timely respond to a request for information, it may be determined by TARTA that such party does not desire to participate in the proceedings, does not contest the matter, or does not desire to submit a response and in such a case, the protest will proceed and will not be delayed due to the lack of a response. Upon receipt and review of written submissions and any independent evaluation that TARTA deems appropriate, TARTA shall render a final decision. Protests After Proposal Opening and Prior to Award Protests against the making of an award must be submitted in writing to TARTA and received within seven (7) business days of the award. Notice of the protest and the basis thereof will be given to all bidders or proposers. In addition, when a protest against the making of an award by TARTA is received and it is determined to withhold the award pending disposition of the protest, the bidders, or proposers whose proposals might become eligible for award shall be requested, before expiration of the time for acceptance, to extend or to withdraw the proposal. Where a written protest against the making of an award is received in the time period specified, the award will not be made prior to seven (7) business days after resolution of the protest unless TARTA determines that: The items to be purchased are urgently required; or Delivery or performance will be unduly delayed by failure to make award promptly; or Failure to make award will otherwise cause undue harm to TARTA or the federal government As far as practicable, protest decisions will be made by the CFO, the project manager, and others as TARTA deems appropriate. So far as practicable, the decision on the protest will be based upon a written appeal, information and written responses submitted by the protesting party and other bidders. If any party fails to timely respond to a request for information, it may be determined by TARTA that such party does not desire to participate in the proceedings, does not contest the matter, or does not desire to submit a response and in such case, the protest will proceed and will not be delayed due to a lack of a response. Upon receipt and review of written submissions and any independent evaluation that TARTA deems appropriate, TARTA shall render a final decision. Protest After Award/Post Award Protest Protests after an award (Post Award Protest) must be submitted in writing to TARTA and must be received no later than seven (7) business days after the award has been made. In instances where the award has been made, the contractor shall be furnished with the notice of protest and the basis thereof. If the contractor has not executed the contract as of the date the protest is received by TARTA, the execution of the contract will not be made prior to seven (7) business days after resolution of the protest unless TARTA determines that: The items to be purchased are urgently required; or Delivery or performance will be unduly delayed by failure to make award promptly; or Failure to make award will otherwise cause undue hardship to TARTA or the federal government. As far as practicable, protest decisions will be made by the CFO, the project manager, and others as TARTA deems appropriate. So far as practicable, the decision on the protest will be based upon a written appeal, information and written response submitted by the protesting party and other bidders. If any party fails to timely respond to a request for information, it may be determined by TARTA that such party does not desire to participate in proceedings, does not contest the matter, or does not desire to submit a response and in such case, the protest will proceed and will not Selection Process TARTA reserves the right to cancel or discontinue the proposal process and reject all proposals if it determines that there is no longer a requirement for the item(s), the funding is no longer available, or it is otherwise in TARTA’s best interest to cancel the proposal. Screening of responses will be based upon the following and on the responses to the RFP. The order does not necessarily indicate priority. TARTA will evaluate each proposal submitted in response to the RFP based upon the criteria stated below and

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Please provide the make, model, model year, quantity, and propulsion technology of TARTA’s current and planned high-voltage vehicles, including BEBs and hybrids.

    We have 11 2025 35' Gillig EV. Have procured 6 35' Hybrid and 6 more 35' Gillig EVs

  • Please provide the make, model, quantity, and power rating of TARTA’s charging equipment, including any depot and/or opportunity charging equipment.

    We have 6 Chargepoint Dual Chargers. Installed in Oct 2025

  • Does TARTA expect the selected consultant to personally deliver all technical training, or primarily develop the curriculum and establish TARTA’s internal Train-the-Trainer capability?

    TARTA is seeking a provider to deliver initial BEB maintenance training, develop the associated curriculum, and implement a train-the-trainer model that enables internal staff to sustain the program beyond the initial engagement.

  • What is the experience and technical background of the trainers if the plan is to conduct a Train-the-Trainer program?

    The ideal trainer would be our experinced A-Level mechanics. They are equipped with multiple ASE certs.

  • How many maintenance technicians are employed or contracted at present? Can TARTA provide the shift times?

    We currently have 15 mechanics. The only training shift offered would be first. M-F 7a-330p.

  • Does TARTA anticipate some training sessions are held outside of 8am – 5pm business hours?

    We anticipate training during first. 7a-330p.

  • Will training be held at both the West Central Avenue and Knapp Street locations, as required?

    The maintenance training program will be conducted at TARTA's Central Facility.

  • Will TARTA provide vehicles, chargers, training space, diagnostic equipment, PPE, tools, and de-energized components necessary for hands-on exercises?

    TARTA is seeking a partner to assist with the development and delivery of a comprehensive Battery Electric Bus (BEB) workforce training program. This includes assistance with procuring and recommending training-related hardware, diagnostic equipment, software, tools, and other resources necessary to support workforce development initiatives. The selected provider will be expected to support diagnostic software and laptop-based diagnostics training, charging operations and safety training, first responder training development and delivery, expanded OJT library development, additional train-the-trainer sessions, and ongoing coaching and program support. TARTA will provide access to training facilities, maintenance shop space, vehicles, fleet assets, subject matter experts, and any existing equipment, tools, training materials, curriculum, or resources currently available that can support project implementation. TARTA will collaborate with the selected provider to identify gaps and determine additional equipment, software, and training resources needed to successfully execute the program. The goal is to establish a sustainable, internally supported training and apprenticeship framework that enables TARTA to maintain and expand its BEB maintenance training capabilities over the long term.

  • Should proposers assume that OEM-specific vehicle and charger training will continue to be delivered directly by the applicable OEM/supplier, with the consultant responsible for integrating that training into the overall competency roadmap?

    Proposers should assume that OEM-specific vehicle and charger training will initially be provided by the applicable OEM or supplier. However, this training is limited in scope and duration, and OEM support may decrease as warranties and service agreements expire. The selected consultant will be responsible for integrating OEM-provided training into TARTA’s overall EV workforce development curriculum and competency roadmap while developing a sustainable, long-term training strategy that reduces reliance on OEMs.

  • Does TARTA anticipate training being conducted primarily onsite in Toledo, virtually, or through a hybrid delivery model?

    TARTA anticipates that the majority of training will be conducted on-site at TARTA facilities, with the flexibility to utilize a hybrid delivery model when appropriate. TARTA will provide access to training space, maintenance facilities, fleet vehicles, chargers, existing equipment, and subject matter experts to support hands-on instruction.

  • Does TARTA expect the contractor to develop all technical curriculum from the ground up, or may existing commercially developed/industry-standard curriculum be incorporated where appropriate?

    TARTA is willing to utilize an existing commercially developed/industry-standard, provided it can be customized to meet TARTA's operational environment, fleet requirements, and workforce development objectives.

  • Does TARTA require the contractor to train operators as part of coach awareness and efficient operation?

    TARTA does not require operator or driver training as part of this project. The scope of work is focused exclusively on maintenance personnel and the development of technical competencies related to Battery Electric Bus (BEB) maintenance, diagnostics, charging systems, safety procedures, troubleshooting, and apprenticeship-related training.

  • What is the warranty agreement for the ZEB and BEB vehicles? Does TARTA desire the contractor to train maintenance staff while vehicles are in warranty and/or after the warranty period?

    The battery component warranty is 8 years. The rest of the BEB warranty is 24 months or 100k miles.Training would be for post warranty work.

  • Given that the final contract may include the purchase of PPE, will PPE be available for hands-on training regardless of whether its purchase is included in the contract?

    Yes. PPE will be available for hands-on training regardless of whether the final contract includes the purchase of PPE. TARTA will provide appropriate PPE and other resources necessary to support safe hands-on training activities. However, TARTA is interested in ensuring that PPE and other consumable training materials can be replenished as the program continues and training activities expand. As such, proposals may include recommendations for the ongoing procurement and replacement of PPE to support the long-term sustainability of the training program.

  • Does TARTA require exclusive rights to all training content?

    TARTA will reserve the rights to share all material and curriculum. It is exclusive to TARTA.

  • Will we need to align with local Unions request?

    the development and implementation of this training program will need to align with TARTA's labor partnership commitments and applicable agreements with ATU Local 697. TARTA expects the selected provider to work collaboratively with TARTA leadership and labor representatives to support a sustainable maintenance workforce development program.

  • Does TARTA require the content to include components and systems outside of the BEB platform to include systems like brakes, steering suspension, axles, A/C, ADA/transit specific equipment, and others?

    TARTA currently provides diesel maintenance training that covers several foundational competencies applicable to EV maintenance.

  • Does TARTA have a designated individual or team who oversees the facility infrastructure for chargers and transfer switches?

    Yes, the manager of facility and infrastructure and senior manager of vehicle maintenance.

  • Will the TARTA facilities have the BEB charging and infrastructure in place prior to the training and apprenticeship program begins?

    Yes

  • What is the duration of the apprentice program? What is the skill level expected to achieve at each milestone?

    This could last anywhere from 1-2 years. Progressive milestones will be set during curriculum build.

  • Are we expecting backfill technical gaps like basic electrical fundamentals/ meter usage, other safety related items such as fall protection

    They will be required to pass all EV bus safety amd OHSA10 instructed by internal staff. Also if there are any skill gaps, the contractor will be required to assist in completing currriculum design.

  • Please clarify TARTA’s desired use of Trapeze EAM and/or ADP for training, competency, OJT, and apprenticeship tracking, and whether TARTA expects the consultant to configure these systems, develop tracking requirements/templates, or something else.

    We want to be able to track progress through EAM or other training platforms.

  • Is TARTA willing to provide a two-week extension to the RFP response submission date?

    No. This going to December board.

  • Please confirm the week in November when presentations/interviews, if required, will occur. The RFP currently states the week of November 9, 2026, while written questions are due November 5, responses are scheduled for November 10, and proposals are not due until November 19

    If needed interviews will be the week of November 23rd.

  • Please clarify the anticipated project start date and required completion date. The RFP references a grant spend-down window extending through the end of 2027/beginning of 2028 but states that the final solicitation will identify the controlling deadline.

    Upon awarding winning bid, a project schedule will be set post December Board Meeting.

  • Is there an established budget or not-to-exceed amount for the base scope and/or optional services?

    TARTA promotes fair and open competition, and all vendors are encouraged to submit their most competitive and best proposal.

  • Is there a page limit on the response to the RFP?

    No

  • Could TARTA please clarify whether proposers should price all optional services listed in Section 2.5, or only those they choose to offer?

    Yes. TARTA requests that proposers provide pricing for all optional services listed in Section 2.5, rather than only those they choose to offer.

  • Does TARTA have an anticipated scope in mind for the BEB/ZEB technical curriculum (number of modules or instructional hours)?

    No, we just need the curriculum to align with the state requirements for the BEB Apprenticeship Program, including a minimum of 2,000 hours of On-the-Job Training (OJT) and at least 144 hours of Related Supplemental Instruction (RSI).

  • For D3A, does ‘workforce staffing’ include quantitative headcount forecasting, or a qualitative staffing and succession strategy aligned to the training roadmap?

    No, this all for frontline staffing. Succesion planning is determined in house. Headcount, forecasting and workforce staffing is available.

  • Does TARTA currently have a maintenance apprenticeship program (registered or unregistered)? If so, would TARTA be willing to share its apprenticeship standards or OJT/RSI hour requirements before the proposal is due?

    TARTA does not currently have an apprenticeship program.

  • Is there a DBE participation goal for this contract?

    No

  • Could TARTA please confirm that the Section 4 deliverables table is the definitive list for contract and payment purposes? The following items are described elsewhere in the RFP. Please confirm whether they should be included in the proposal and, if so, under which deliverable: Mentor and internal instructor qualification criteria and continuing development expectations; and Instructor qualification/recertification practices; instructor observation and coaching

    Please provide all items in section 4 and include any addional sections. Please reference the RFP for how you should provide each diliverable.

  • Related to Section 4 deliverables table: Could TARTA please clarify whether D14 (Knowledge-transfer and sustainability plan) is intended as a single plan or as separate plans for the apprenticeship, Train-the-Trainer, and curriculum components?

    These are all considered conjoing not seperate.

  • Related to Section 4 deliverables table: For the Train-the-Trainer program (D7), how many TARTA personnel does TARTA anticipate training as internal instructors?

    Currently we have one, but numbers may grow based off of skill and adaptability.

  • Related to Section 4 deliverables table: Could TARTA please describe the expected content of the “rollout plan” (D13) and the “final implementation package” (D15), and how the two are intended to differ?

    The goal is to answers through the selected vendor based of their knowledge and application.

  • Related to Section 4 deliverables table: Could TARTA please confirm whether the materials in D8 (instructor guides, lesson plans, assessments and practical evaluation tools) apply to both the technical maintenance curriculum (D4A, Section 3.4) and the Train-the-Trainer program (D7, Section 3.6), or to only one of these.

    The goal is to be able to launch an apprenticeship program for internal linear growth. For the train the trainer we would need the same items included.

  • 1. Can TARTA share an estimated budget or not-to-exceed value for the required deliverables, and the grant program funding this work? 2. The RFP refers to a grant spend-down window through the end of 2027/beginning of 2028 and says the final solicitation will state the controlling grant deadline. Is this RFP the final solicitation? What is the controlling end date for performance and invoicing? 3. Please describe the current and planned zero-emission fleet: number of battery-electric and hybrid buses (and paratransit vehicles, if in scope), OEMs and models, charging equipment (depot and on-route, manufacturer, power levels), and the planned deployment schedule. 4. About how many employees are in scope by role (mechanics/technicians, apprentices, leads, facilities staff, operators, supervisors)? How many TARTA personnel do you expect in the Train-the-Trainer cohort and in the pilot delivery? 5. Does TARTA currently have a registered maintenance apprenticeship program? If so, will you share the current standards? Is registration itself in scope, or only planning support as requested? Please confirm the contractor develops the framework, tools, and draft standards, and that TARTA sponsors and operates the program. 6. Is the maintenance workforce represented by a labor organization, and does TARTA expect labor representatives to take part in discovery and in the JATC or comparable labor-management structure? 7. May the prime proposer meet the minimum qualifications as a team (e.g

    These are all answered in the RFQ and previous questions asked. Please refernce above.

Plain text