Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Bayou Chico Sediment Remediation (Final and Post-Design) - RESTORE

Description

Escambia County is requesting proposals from qualified professional firms to complete design, permitting, and post-design services for the Bayou Chico Sediment Remediation Project. The Project will remove and remediate contaminated sediments from the bayou to improve benthic habitat and water quality in Bayou Chico. Data collection, modeling, and design through 60% plans have been completed. Permit applications have been submitted to state and federal permitting agencies. The selected consultant will work with Escambia County to complete design and permitting and advance Implementation of Phase I of the Project through bid solicitation, implementation, and as-built certification. Scope of Work General Information The Project will remediate contaminated sediments to improve benthic habitat and water quality in Bayou Chico. An analysis of contaminant types, concentrations, and vertical and horizontal distribution has been completed and remediation methodologies and technologies have been evaluated to determine the most appropriate means of remediation. See the Basis of Design Report (AECOM, 2026). Historical sources of contamination, investigations, and dredging activities are summarized in the Conceptual Site Model/Risk Assessment (AECOM, 2024). Design has been developed through 60% plans. Permit applications have been submitted to the Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers (USACE). Implementation of the remediation project may occur in one or more phases, with Phase I consisting of dredge management units (DMUs) 1 and 2. Phase I implementation is estimated to take 9 months. The Project involves dredging contaminated sediment from Bayou Chico using a barge-mounted excavator equipped with an environmental bucket. The sediment will be placed into a hopper barge and transported to the barge processing area where overlying water will be pumped to the barge-mounted water treatment system (WTS) to be designed by the selected consultant. After completion of dewatering and stabilization, sediment will be transferred to haul trucks for transport and disposal at the Escambia County Perdido Landfill. After the water has been treated in the WTS and is in compliance with a temporary discharge permit, it will be discharged to the Bayou. General scope of services: Engineering services to be provided will include completion of design and permitting of the entire project area, as well as bid document preparation and bid support for Phase I of implementation. Optional services such as cultural resource assessment, NEPA review, sampling and testing, data analysis and modeling, surveying, and public outreach may be funded through the change order process if necessary. Optional engineering services are also requested throughout Phase I implementation, including limited construction support and as-built certification, and may be funded at a later date through the change order process when additional funding is secured. Project Area Bayou Chico is located within the Pensacola Bay watershed in south central Escambia County. The bayou has a surface water area of approximately 235 acres with a surrounding drainage basin of more than 6,600 acres. The total project area consists of seven DMUs comprising approximately 62.5 acres. The eastern half of the bayou and associated contributing basin is generally located within the City of Pensacola with the remaining western bayou and associated contributing basin located outside city limits in unincorporated Escambia County. Information regarding private submerged lands rights can be obtained through FDEP online portal Map Direct at https://ca.dep.state.fl.us/mapdirect/ . A federal navigational channel extends northwest through the mouth of the bayou terminating into an existing large vessel turning basin. The DMUs are outside of the navigation channel. Average water depth in the bayou is approximately eight feet, with deeper areas located within the navigational channel. Maximum water depth exceeds 20 feet. Two state owned/maintained bridges cross the bayou along Barrancas Avenue (SR292) and Navy Boulevard (Hwy 98). Additional project location information is provided in the attached project location map. Grant Funding The Deepwater Horizon oil spill led to passage of the RESTORE Act in 2012, dedicating 80 percent of all Clean Water Act administrative and civil penalties related to the spill to the Gulf Coast Restoration Trust Fund. The Gulf Coast Ecosystem Restoration Council (Council) was established by the RESTORE Act to administer 60 percent of the total Trust Fund. The Council approved the initial Funded Priorities List (FPL) in 2015, identifying the Bayou Chico Contaminated Sediment Remediation Project as a Tier One Project. The Council entered into an agreement with the State of Florida to oversee the project as part of the Comprehensive Plan Component (RESTORE Pot 2). The Florida Department of Environmental Protection (FDEP) entered into a subrecipient agreement (RES09 and amendments attached) with Escambia County to plan and design the project. In addition, the Escambia County Board of County Commissioners selected the Bayou Chico Contaminated Sediment Remediation Project for inclusion with the State Expenditure Plan (SEP) for Florida’s portion of the Spill Impact Component (RESTORE Pot 3) funds designated by the RESTORE Act. The SEP funds have been awarded for design (210025011.01 and amendments attached) and have been allocated for implementation of the project. The final design shall be consistent with the SEP, available at https://www.gulfconsortium.org/state-expenditure-plan . This Project shall comply with terms and conditions of the grants and with all applicable rules and laws including attached Federal Contact Provisions. Scope of Services: Tasks and Deliverables The following scope establishes minimum requirements. Respondents may recommend additional tasks or deliverables that they determine necessary to meet the project objectives. The Project scope, as stated, will include but is not limited to the following items: Base Services: Final Design, Permitting, and Phase I Bid Support Task 1: Administration Attend meetings with and coordinate with Escambia County Natural Resources Management Department, Escambia County Waste Services, City of Pensacola and Port of Pensacola. If necessary, attend meetings with and coordinate with other potential disposal sites, other potential offloading sites, and utilities. Routinely submit invoices, progress reports, and schedule updates. Submit change order requests as needed. Task 2: Permitting Respond to request for additional information (RAIs) from permitting agencies. Submit payment of permit fees. Identify and obtain all permits and regulatory approvals necessary for implementation of the project. Coordinate and attend meetings with permitting agencies as necessary. Task 3: Final Design Develop and submit 90% and 100% plan sets for all DMUs. Plans should be reproducible to 40 scale 11”x17” and 20 scale 24”x36” sheets size. Provide all required construction details and specifications for the project. Task 4: Phase I Bid Documents and Support Provide a cost estimate, estimated implementation schedule, and all required bid documents. Assist in preparing the solicitation for construction. Attend bid preparation meetings with County staff. Attend the pre-solicitation meeting. Respond to questions from vendors and all requests for information. Prepare any necessary addendums. Provide low bid verification. Optional Services: Additional Design & Permitting Services and Phase I Post-Design Services Task 5: Cultural Resources Perform cultural resource assessment survey (CRAS) fieldwork conforming to the Florida DHR standards and guidelines for Phase I archaeological assessments. In general, the terrestrial portion of this work will include systematic surface inspection of the project area and the excavation of shovel test pits. The potential underwater portion will consist of a marine geophysical survey to identify significant submerged cultural resources on the bay floor or partially buried near the bay floor surface that are located within the area of potential effects (APE) for direct effects. Submit a summary report assessing the potential for more detailed cultural resources investigation to Escambia County and to the Florida Division of Historic Resources. Task 6: NEPA Evaluation / Documentation Determine the project’s environmental impact and prepare all required National Environmental Policy Act (NEPA) documentation requirements. The evaluation shall include: Wetland delineation using both U.S. Army Corps of Engineers and FDEP methodology; Habitat assessment of dominant ecotypes within project boundaries; Biological assessment for potential threatened or endangered species and critical habitat; Evaluation of existing site conditions including water quality parameters (such as water clarity, color, salinity, total suspended solids, and dissolved oxygen); Grant compliant monitoring plan; and Environmental permitting including permit fees. Task 7: Sampling, Testing, and Analysis Extensive sampling, testing, and modeling have been completed. The County will rely on the expertise and experience of the firm, in consultation with state and federal permitting agencies and other entities, to determine the number of samples required to adequately quantify and qualify contaminated sediment and effluent and meet the requirements to successfully obtain all necessary permits and agreements. Sample sediment, water, and/or effluent. Test for contaminants of concern (COCs). Analyze results and report findings. Perform hydrologic modeling. Task 8: Surveying and Environmental Site Assessments Perform additional surveying of Bayou Chico (geographic, bathymetric, etc.). Survey other potential offloading sites. Perform Environmental Site Assessments of other potential offloading sites. Task 9: Public outreach Coordinate one or more public meetings to present the project design and collect public input. Prepare agendas, presentations, attendance log, and post-meeting notes. Attend public meetings and present information about the project. Task 10: Phase I Limited construction support Attend the pre-construction meeting. Attend biweekly construction progress meetings and monthly site visits. Attend substantial completion site visit and develop a punch list. Attend final completion site visit. Review shop drawings. Respond to requests for information (RFIs) from the contractor. Review change order requests related to design. Perform design modifications as needed. Task 11: Phase I As-built certification Review post-construction survey. Provide as-built certification upon substantial completion of construction. Complete construction completion documentation, including forms and documents required by grants, permits, and Escambia County. Submission Guidelines Proposals shall be limited to 20 pages. Tab 1 - Introduction Provide organization information and address, including point of contact name, phone, and email. Provide a brief narrative summarizing the firm’s understanding of the scope of work and project goals. Tab 2 - Project Approach and Work Plan Provide a project approach narrative detailing a draft workplan for permitting and final design of the project and post-design services for Phase 1 of implementation. Tab 3 - Project Experience Submit at least 2 projects of similar scope and complexity, with date completed, summary of services provided, organization/client for whom services were provided, and other relevant information. Relevant projects should include similar scale dredging and contaminated sediment remediation/removal engineering and design, permitting with the Corps of Engineers and the Florida Department of Environmental Protection, and limited construction support. Tab 4 - Qualifications & Availability Describe the ability of the firm to manage this project within the specified project time and within budget. Project team members should be readily accessible to avoid unnecessary delays in the project schedule. Firm should demonstrate how their team will be readily accessible and be able to quickly respond to the County. Provide a list of key personnel who will be working on this project, along with their availability within the specified project time. Show the current workload of key personnel and hours projected on this project. Key personnel should have experience with contaminated sediment remediation/removal design, engineering, analysis, and permitting with the Corps of Engineers and the Florida Department of Environmental Protection. Only team members who will have considerable involvement in this project should be considered for their experience and technical expertise. Include relevant certifications and licenses, roles and responsibilities, and any subcontractors to be utilized. Tab 5 - Escambia County Purchasing Documents (not included in page limits). Please upload all required documents from Vendor Submissions in Tab 5. Introduction Summary Background Contact Information Timeline Attachments Solicitation Terms & Conditions Submission of a proposal in accordance with these Terms and Conditions and the General Terms and Conditions provided in Section IV below constitutes a binding offer from the respondent. The Terms and Conditions incorporated herein will become a part of the written agreement between the parties. Pre-Proposal Inquiries All inquiries concerning the solicitation, including, but not limited to, the scope of work, specifications, additional requirements, attachments, general or supplemental terms and conditions, must be submitted to the Office of Purchasing through the e-procurement portal hosted by OpenGov. All questions or inquiries must be received no later than the last day for questions stated on the cover page of the solicitation. Any modification to the solicitation documents will be in the form of a written addendum issued by the County not less than five (5) days prior to the date and time of solicitation closing. Addenda will be provided to each respondent via email and will be posted to the Escambia County website at Escambia County Solicitations ( https://procurement.opengov.com/portal/escambiacountyfl ). Such written addenda or modification shall be part of the solicitation documents and shall be binding upon each respondent. Each respondent is required to submit with the proposal a written acknowledgment to confirm receipt of any and all addenda. No respondent may rely upon any verbal modification to or interpretation of the solicitation documents, and no interpretation shall be considered binding unless provided in writing by the Office of Purchasing as provided in this provision. Examination of Documents and Site Before submitting a proposal, the Respondents shall familiarize themselves with the nature and extent of the work and any local conditions that may in any manner affect the work to be done and the equipment, materials, and labor required. Respondent shall also examine all drawings, specifications, addenda, and other relevant documents to be thoroughly informed regarding any and all conditions and requirements that may in any manner affect the work to be performed under the contract. Preparation of Proposal The Proposal shall be based upon the completion of the Scope of Work according to the drawings and specifications, together with all addenda thereto. The proposal must be executed by an individual listed as an authorized representative with the records on file with the Florida Division of Corporations website (Sunbiz) with the principal address provided below the signature. The proposal shall include evidence of respondent’s authority and qualification to do business in the State of Florida. As applicable, a state contractor license # for the State of Florida shall also be included in the proposal, and Respondent shall be licensed in accordance with the requirements of Chapter 489, Florida Statutes. Recommended Proposal Preparation Guidelines All respondents shall provide a straightforward and concise description of their ability to meet the proposal requirements. The proposal shall clearly show the technical approach to include work tasks, estimated time phasing and the proposed approach. The County discourages overly lengthy or costly proposals, all proposals shall be submitted in one electronic file. Integrity of Documents Respondents shall use the original solicitation documents in the format provided by the Escambia County Office of Purchasing and enter information only in the spaces where a response is requested. Submittal of Proposal A proposal shall be submitted no later than the date and time prescribed in the Request for Proposal or Qualifications and shall be accompanied by all required documents. It is the respondent’s responsibility to ensure that its proposal is delivered at the proper time. Each submittal shall include all the items listed in the Vendor Submissions section. The Purchasing Department reserves the right to extend the solicitation due date within ten ( 10 ) minutes of the proposal opening when the required number of proposals has not been received. Any extension will be determined by the Purchasing Department and communicated prior to the scheduled proposal opening to prospective respondents through OpenGov. Identification of Subconsultants/Changes After the Fact After submitting a proposal in response to this solicitation, respondents are prohibited from substituting, modifying, or amending the sub-consultants identified in the submittal at any time during the course of the solicitation process up to the final award of contract and including question and answer sessions, presentations or technical clarifications and submittals as may be required by the Review/Selection Committee. A substitution or addition of sub-consultants or any other material changes to the submittal after the initial response will cause the submittal to be invalid for review and selection purposes. Withdrawal of Submittals Any respondent may withdraw its submittal, either personally or by written request, at any time prior to the scheduled time for opening submittals. Requests to alter or withdraw an offer must be submitted in writing to the Purchasing Director. Submittals may not be altered or unilaterally withdrawn by the respondent after the scheduled time for submittal opening. All offers not so withdrawn shall constitute an irrevocable offer and will remain subject to acceptance or rejection by the County for a period of 90 calendar days. Proposal to Remain Subject to Acceptance All proposals will remain subject to acceptance or rejection by Escambia County for ninety (90) calendar days after opening Submittals. Conditional or Incomplete Proposals Escambia County specifically reserves the right to reject any conditional or incomplete proposal. Addition/Deletion of Item(s) The County reserves the right to add or delete any item from this solicitation or resulting contract when deemed to be in the County’s best interest. Changes to Specification General Terms and Conditions Any and all Supplemental Terms and Conditions and specifications referenced within the solicitation that vary from these General Terms and Conditions shall have precedence. Submission of an offer in accordance with these General Terms and Conditions and Supplemental Terms and Conditions constitutes a binding offer from the offeror. The terms and conditions incorporated herein will become a part of the written agreement between the parties. Prospective offerors may utilize the Office of Purchasing Home Page to obtain Vendor Information and Solicitation Information, including Bid/Proposal Tabulations, Recommended Award(s), etc. In order to participate in a solicitation, offerors must establish an account via the e-p

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Removed Escambia County Contractor's License from Vendor Submissions since it is not required for this solicitation.

  • Official Notice #1: Non- Mandatory Pre-Solicitation meeting tomorrow 11/24 at 1pm CT · 1

    Pre-Solicitation Meeting (Non-Mandatory): November 24, 2026, 1:00pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2910919693259083?p=UyHU9CbCfVp3Dh1Ahv Meeting ID: 291 091 969 325 908 3 Passcode: XC2ZH6GQ ________________________________________ Dial in by phone +1 863-333-5817,,565744169# United States, Lakeland Phone conference ID: 565 744 169# OR Office of Purchasing 213 Palafox Pl 2nd Floor Pensacola, FL 32502

  • Addendum #2 · 2

    Changed Pre-Solicitation meeting to " non-mandatory. "

  • Addendum #3 · 3

    Changed verbiage in Scope 2.4 Task 4 to this: Task 4: Phase I Bid Documents and Support Provide a cost estimate, estimated implementation schedule, and all required bid documents. Assist in preparing the solicitation for construction. Attend bid preparation meetings with County staff. Attend the pre-solicitation meeting. Respond to questions from vendors and all requests for information. Prepare any necessary addendums. Provide low bid verification. Added 2 attachments: N - RAI____appl SAJ-2025-02496-TSH and O - RAI - Bayou Chico Sediment Rem - 0476268

  • Addendum #4 · 4

    Added DEI Certification Form to Vendor Submissions.

Plain text

OpenGov categories

  • 91842 · Engineering Consulting
  • 92500 · Engineering Services, Professional
  • 92535 · Environmental Engineering
  • 92536 · Engineering Services (Not Otherwise Classified)
  • 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering