BEAUFORT COUNTY COURTHOUSE RENOVATION – PHASE I
Description
Beaufort County requests proposals from qualified general contractors to provide labor, supervision, materials, equipment, subcontractors, scheduling, protection, testing, cleanup, and closeout necessary to renovate the Family Courtroom area at the Beaufort County Courthouse. The project is limited to Family Courtrooms 1 and 2, their associated anterooms, the interior vestibule, and bullet-resistant improvements at the judges’ dais. The final contract scope shall be governed by the approved solicitation, drawings, specifications, addenda, and executed agreement. SCOPE OF WORK Scope of Work The Beaufort County Courthouse Renovation – Phase I project consists of interior renovations and associated building system improvements within Family Courtrooms 1 and 2, their respective anterooms, and the shared interior vestibule. The proposed scope includes: Family Courtrooms 1 and 2: Renovation of interior finishes, flooring, ceilings, millwork, judges' platforms, low walls, acoustical treatments, lighting, electrical/data infrastructure, and localized HVAC modifications. Anterooms 1 and 2: Interior improvements, including flooring, walls, ceilings, doors, hardware, lighting, and associated electrical modifications. Interior Vestibule: Renovation of architectural finishes, doors, hardware, ceilings, lighting, and associated electrical systems. Bullet-Resistant Panels: Furnishing and installation of approved bullet-resistant panels at the judges' dais in both Family Courtrooms, subject to County approval of applicable specifications and installation requirements. All construction activities shall be performed in accordance with the approved construction documents, applicable codes, and Beaufort County requirements, with appropriate coordination to minimize disruptions to ongoing courthouse operations. Designated Renovation Areas | Proposed Construction Staging The Beaufort County Courthouse shall remain operational throughout the construction period. Construction activities shall be scheduled primarily during after-hours and weekends to minimize disruptions to judicial proceedings, courthouse personnel, and daily operations. Work during normal business hours may be permitted for non-disruptive, low-noise activities, subject to prior approval by Beaufort County. The Contractor shall develop and submit a detailed Construction Staging and Sequencing Plan for County review and approval prior to commencing onsite construction activities. The plan shall identify proposed work schedules, construction sequences, anticipated courtroom closures, access restrictions, major construction milestones, and coordination requirements. All construction activities shall be coordinated with Beaufort County Facilities Management, the Clerk of Court, and the Beaufort County Sheriff's Office to maintain courthouse security, safe access, required emergency egress, and continuity of essential judicial operations. Beaufort County reserves the right to require adjustments to the proposed construction schedule, staging, or sequencing to accommodate judicial proceedings, security requirements, and operational needs. The proposed construction staging and sequencing shall be organized around the following designated renovation areas and associated improvements, with all activities scheduled to minimize disruptions to ongoing courthouse operations: STAGE 1 | Family Courtroom 1 Interior renovations, including flooring, wall finishes, ceilings, painting, and architectural finishes. Modifications to the existing judge's platform, courtroom millwork, low walls, and related architectural features as indicated in the construction documents. Installation or refinishing of designated acoustical wall panels and woodwork. Associated lighting, electrical, and HVAC modifications. Installation of bullet-resistant panels at the judge's dais. Bullet-resistant panel specifications: Confirm the required ballistic resistance rating, applicable testing standard, and installation details with the Beaufort County Project Manager, architect and courthouse security representatives. STAGE 2 | Anteroom 1 Renovation of existing interior finishes, flooring, walls, ceilings, and painting. Door and hardware adjustments, where indicated. Associated lighting, electrical, and HVAC modifications necessary to support the renovated space. STAGE 3 | Family Courtroom 2 Interior renovations consistent with the approved architectural scope. Modifications to the existing judge's platform, courtroom millwork, low walls, and related architectural features. Installation or refinishing of designated acoustical wall panels and woodwork. Associated lighting, electrical, and HVAC modifications. Installation of bullet-resistant panels at the judge's dais. Bullet-resistant panel specifications: Confirm the required ballistic resistance rating, applicable testing standard, and installation details with the Beaufort County Project Manager, architect and courthouse security representatives. STAGE 4 | Anteroom 2 Renovation of existing interior finishes, flooring, walls, ceilings, and painting. Door and hardware adjustments, where indicated. Associated lighting, electrical, and HVAC modifications necessary to support the renovated space. STAGE 5 | Interior Vestibule Renovation of the shared interior vestibule serving the Family Courtroom area. Improvements to designated flooring, walls, ceilings, painting, and architectural finishes. Associated lighting, electrical, and door modifications as identified in the approved construction documents. STAGE 6 | Courtroom Security Coordinate installation requirements with Beaufort County Facilities Management, the Clerk of Court, Broadcasting, and the Information Technology Department. Work Explicitly Excluded from Phase I The following improvements are expressly excluded from the Phase I construction scope and are anticipated to be addressed under the separately planned Beaufort County Courthouse Renovation – Phase II (FY2028) project: Alterations to Level 1 men's and women's public restrooms. Alterations to Level 2 men's and women's public restrooms. Level 1 public lobby renovations. Level 2 public lobby renovations. Installation of a handrail on the existing stair guard. Construction of the proposed unisex ADA restroom. Refinishing of stained wood at the existing lobby security desk. Plumbing infrastructure repairs associated with the proposed Phase II restroom renovations. Family Courtroom 1 & 2 Furniture Selections The Contractor shall not include the above improvements in the Phase I base proposal unless expressly authorized through a written amendment issued by Beaufort County Procurement. Design Documents, Field Verification and Scope Control Contractor to review the attached approved Phase I drawings, specifications, room boundaries, and schedules. Proposers shall field-verify existing conditions, dimensions, access, and interfaces. No alteration to excluded areas shall be assumed without written authorization. Discrepancies shall be raised through the formal question/addendum process. Courthouse Operations, Access and Security Maintain safe, secure courthouse operations and coordinate work hours, noise, dust, deliveries, temporary closures, and any utility interruptions with the Facilities Management Project Manager. Coordinate contractor/subcontractor access and background-check requirements with the Beaufort County Sheriff’s Office; no personnel may access controlled areas without required approvals. Provide a security staffing plan identifying anticipated deputy hours, shift assumptions, weekend/holiday needs, and proposed coordination. Sheriff’s Office contracted law enforcement rates are indicated as $48.00–$128.75 per hour per deputy, minimum two hours; county-paid holiday rates are indicated as $28.00–$100.00 per hour per deputy, minimum two hours. Actual rates and staffing must be verified with the Sheriff’s Office; County retains managerial control of deputies. Arrange special equipment or facilities in advance with the Sheriff’s Office. Include barricades, dust partitions, signage, protected egress, and daily housekeeping as appropriate. Owner-Furnished Technology and State Coordination Beaufort County Broadcasting and IT are to provide designated security/access-control, audio/video, and office equipment. Contractor shall coordinate rough-in, power/data pathways, mounting supports, schedules, and installation access, without assuming equipment supply unless expressly identified. Beaufort County Project Manager is to coordinate removal of State-owned electrical equipment with the State and provide advance notice to the Clerk of Court of required removal dates. No unauthorized disconnection is permitted. Upon completion of the project Beaufort County Project Manager will coordinate the reinstallation of the required equipment. Contractor Responsibilities and Deliverables Provide a dedicated project manager, superintendent, subcontractor list, site logistics plan, and baseline construction schedule with critical milestones. Prepare demolition and protection plans, including safe disposal and protection of adjacent occupied spaces. Submit product data, samples, shop drawings, bullet-resistant assembly documentation, and coordination drawings as applicable. Obtain applicable licenses, permits, inspections, and approvals as assigned in the final contract. Maintain required insurance, bonding, safety compliance, quality control, and manufacturer installation requirements. Coordinate inspections, testing, punch list, cleaning, owner training (if applicable), warranties, as-built documentation, record (as-built) drawings documenting field changes and closeout. Submit requests for information and change proposals in writing; do not proceed with extra work without County authorization. Provide Weekly progress reports. Verify existing field conditions prior to beginning work. Coordinate all work to minimize disruption to facility operations. Protect existing building components from damage during construction. Noise, Dust Mitigation, and Environmental Controls: Implement appropriate construction barriers, dust containment, noise mitigation, and housekeeping procedures to protect occupied courthouse areas. Establish dust barriers using poly sheeting, temporary walls, or other approved containment systems to fully isolate the construction area from occupied spaces. Ensure all barriers are sealed at edges, seams, and penetrations to prevent dust migration. Maintain negative air pressure within the construction zone through the use of HEPA-filtered air scrubbers or equivalent equipment. Protect HVAC systems by sealing supply and return vents in the construction area and ensuring no dust enters building mechanical systems. Conduct daily housekeeping to remove accumulated dust and debris, including vacuuming with HEPA-filtered equipment. Prevent dust from tracking into non-construction areas by installing walk-off mats and cleaning pathways regularly. Dust mitigation shall be monitored using a dust monitoring device throughout the project. Protective measures shall be adjusted as needed to maintain compliance with applicable safety, air quality, and cleanliness standards. Air filters shall also be inspected and changed out consistently throughout the duration of the project to maintain proper air quality and cleanliness. Remove dust-control materials only after all construction activities generating airborne particulates have been completed and the area has been cleaned. Maintain a clean and safe work site throughout the project. This includes DAILY cleanups. Remove all construction debris and dispose of it in accordance with applicable regulations. Restore any areas damaged as a result of construction activities. Coordinate utility interruptions / shut-downs with the Beaufort County Project Manager. Perform final testing and operational verification of all modified mechanical and electrical systems. The Contractor shall provide a complete list of all subcontractors that will perform work on this project prior to the commencement of any such subcontractor's work. Provide 5% of attic stock materials. Asbestos Testing Asbestos inspection reports dated May 2, 2026 confirm that no asbestos mineral fibers were identified within the project areas. Work Hours and Site Access The Beaufort County Courthouse maintains operational hours of: Monday through Friday 9:30 AM to 5:00 PM Eastern Standard Time (EST) Construction activities generating excessive noise, vibration, dust, or disruption shall be restricted to non-operational hours unless otherwise approved in writing by Beaufort County. During operational hours, only quiet and non-disruptive activities may occur, including but not limited to: Painting Cleaning Finish work Minor touch-up activities The Contractor may access the facility outside of normal courthouse operating hours for performance of all other construction activities, subject to coordination with County representatives and courthouse security personnel. The Contractor shall acknowledge that occasional court proceedings or jury deliberations may extend beyond standard operating hours. The Contractor will be required to be escorted by the Sheriff’s Office security detail throughout the duration of the project during all after-hours and weekend construction operations. The Contracting Party shall make full provision in their tender bid price for all security compensation costs associated with the execution of the works. Security & Background Requirements 1. Security Screening and Site Access Due to the secure and operational nature of the Beaufort County Courthouse, all designated Contractor and subcontractor personnel, including individuals responsible for onsite supervision and project management, shall be subject to mandatory security screening prior to receiving authorization for site access. All Contractor employees, subcontractors, suppliers, and associated personnel shall comply with applicable fingerprinting, background screening, and security clearance requirements established by Beaufort County, the Beaufort County Sheriff's Office (BCSO), and other designated security authorities. Required security screening measures shall include, as applicable: Criminal background checks. Fingerprinting. Security clearance and approval by Beaufort County and/or designated security authorities. No personnel subject to mandatory security screening shall be permitted access to restricted construction areas until all required clearances have been completed and approved. The Contractor shall be solely responsible for ensuring that all employees, subcontractors, suppliers, and associated personnel comply with established courthouse security protocols, access restrictions, and applicable screening requirements throughout the construction period. 2. Beaufort County Sheriff's Office – Contracted Law Enforcement Services & Compensation Due to ongoing courthouse operations and security requirements, the Contractor shall coordinate all construction-related law enforcement staffing needs with Beaufort County Facilities Management and the Beaufort County Sheriff's Office. Mandatory Monthly Submission: The Contractor shall submit an updated Sheriff's Office Contract for Law Enforcement Services (CALEA 3.1.1) on a monthly basis, reflecting anticipated construction activities and law enforcement staffing requirements. Applicable compensation rates are as follows: Standard Rates: $48.00–$128.75 per hour, per deputy, with a minimum assignment of two (2) hours per deputy. County-Paid Holidays: $28.00–$100.00 per hour, per deputy, with a minimum assignment of two (2) hours per deputy. All security staffing requirements, special equipment, and facility arrangements shall be coordinated in advance with the Beaufort County Sheriff's Office. The Sheriff's Office shall retain full managerial and operational control over assigned law enforcement personnel. 3. Contractor Security Responsibilities The Contractor shall: Designate responsible onsite representatives to coordinate security requirements and contractor access. Ensure all personnel requiring background screening, fingerprinting, or security clearance complete the applicable approval process before accessing restricted areas. Coordinate after-hours, weekend, and holiday construction activities with Beaufort County Facilities Management and BCSO. Submit the required monthly law enforcement services documentation and coordinate anticipated staffing needs in advance. Ensure all subcontractors, suppliers, and associated personnel comply with approved courthouse access procedures. Promptly report security concerns, unauthorized access, or proposed changes affecting established security arrangements. The Contractor shall not modify approved security procedures or law enforcement staffing arrangements without prior authorization from Beaufort County and the Beaufort County Sheriff's Office. Liquidated Damages Liquidated Damages are set at ( $1,000.00) per calendar day.* Contractor Qualifications Bidders shall demonstrate the following minimum qualifications: Current and valid licensing applicable to the State of South Carolina Experience performing renovations within occupied public or government facilities Experience managing phased construction operations Ability to comply with courthouse security protocols and operational restrictions Compliance with all applicable federal, state, and local safety regulations, including OSHA standards Anticipated Schedule The County currently anticipates procurement and award consideration in early 2027. The actual commencement date, contract duration, and required completion date shall be established in the executed contract, Purchase Order (PO) and Notice to Proceed (NTP). The Contractor shall provide a proposed construction schedule identifying the anticipated duration of each designated renovation area, procurement lead times, equipment coordination activities, inspections, and project closeout requirements. All proposed scheduling and phasing shall account for the operational requirements of the Beaufort County Courthouse and shall be subject to review and approval by Beaufort County Facilities Management. Contract Administration The final RFP and contract shall establish the required performance/payment bonds, insurance limits, indemnification, prevailing legal requirements, change-order process, payment application procedures, retainage, warranty period, liquidated damages (of $1,000.00 per day), and termination provisions. Any Notice to Proceed shall be issued only after completion of required approvals and contract execution. IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS Response submittals for this Invitation For Bid will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Tuesday, December 15, 2026 . All responses must adhere to the following guidelines: Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason. All requested information and forms MUST be uploaded as indicated in the PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal. TITLE VI STATEMENT COUNTY COUNCIL OF BEAUFORT COUNTY Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as “Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (
Published attachments
- Exhibit 4 - Monthly Compliance Status Report
- BC 1st floor ACM Report
- M0-1
- BC Family Court 1_ ACM Report
- PAGE 8 - VECTOR
- BC Family Court 2_ACM Report
- M1-1
- E0.1_07-13-2026
- P0-1
- 2026.06.09 - CD BID SET - PROJECT MANUAL
- G0-1
- P2-1
- DD Lighting Selections
- A0-1
- A4-1
- A4-4
- A2-2
- M1-2
- A2-1
- A4-2
- A4-3
- A3-1
- A1-2
- E1-1
- E2-1
- M2-2
- A9-1
- M2-1
- P1-1
- E0-1
- 2026.06.09 - CD BID SET - DRAWINGS
- 644481 - BEAUFORT COURTHOUSE_AD-01_2026-11-24
- BEAUFORT_COUNTY_COURTHOUSE_RENOVATION_–_PHASE_I_(Addendum_#1_Revision).pdf
Addenda and notices
Addendum #1 · 1
Additional requirements posted; please read attachment post on this addenda and also uploaded under attachments.
Public questions and answers
Is third-party Commissioning required for the renovation work?
Third party commissioning is not required for this project/phase.
OpenGov categories
- 15007 · Boxes, Shoring (For Construction Worker Protection)
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
- 90924 · Building Construction, Commercial and Institutional
- 90977 · Special Construction: Observatory, Security, Special Rooms, etc.
- 91220 · Construction, Fire Protection (Includes Fire Escapes, Fire and Smoke Barriers, Firestops)
- 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering