Description
The objective of this project is to modify the interior of the existing building at 2727 Depot Road, Beaufort, South Carolina. The project will create a new interior space by installing a metal stud wall with insulation and gypsum board finishes. Work includes minor electrical and mechanical adjustments to support the new layout, installation of a new subpanel for mechanical systems, and reconfiguration of existing systems. Additional improvements include insulating existing walls, repairing and painting exterior wall panels, and painting the interior concrete floor. The project will maintain the building’s current use, with no changes to the roof or site. 01 | GENERAL CONDITIONS 02 | SITEWORK (Site Prep, Utilities, etc.) 03 | CONCRETE 05 | METALS (Structural Steel) 06 | WOOD AND PLASTIC 07 | THERMAL & MOISTURE PROTECTION 08 | OPENINGS 09 | FINISHES 10 | SPECIALTIES 11 | SPECIAL CONSTRUCTION 13 | FIRE SAFETY 15 | MECHANICAL 16 | ELECTRICAL Bonds, Permits SCOPE OF WORK Scope of Work The Contractor shall perform, at a minimum, the following work: A. Interior Construction Construct a new interior partition wall using cold-formed metal studs. Install batt insulation within the new partition wall. Install gypsum wallboard on both sides of the partition. Tape, finish, sand, and prepare gypsum board for paint. Install all required corner beads, trim, sealants, and accessories. Patch and repair adjacent surfaces disturbed during construction. B. Existing Wall Insulation Install insulation within existing exterior wall cavities where indicated on the construction drawings. Replace or repair interior finishes as required to accommodate installation. C. Mechanical Work Modify existing mechanical systems as necessary to serve the new room configuration. Relocate, extend, or reconfigure ductwork, diffusers, return air grilles, thermostats, and associated controls as required. Install a new dedicated electrical subpanel to serve mechanical equipment. Reconnect and test all mechanical systems to ensure proper operation. D. Electrical Work Perform minor electrical modifications necessary to accommodate the new interior layout. Relocate or install receptacles, switches, lighting, and associated wiring as required by the plans. Install a new electrical subpanel dedicated to mechanical equipment. Provide all conduit, conductors, breakers, grounding, labeling, and testing. Ensure all electrical work complies with the current edition of the National Electrical Code (NEC) and local code requirements. E. Exterior Repairs and Painting Repair damaged exterior wall panels as indicated or directed. Prepare exterior surfaces by cleaning, patching, sanding, and priming as necessary. Apply finish paint in accordance with manufacturer recommendations. F. Interior Floor Finishes Clean and prepare the existing concrete floor. Repair minor cracks or surface defects where required. Apply concrete floor coating/paint suitable for commercial or industrial use in accordance with manufacturer specifications. G. Painting Paint all new gypsum board walls. Touch up existing interior surfaces affected by construction. Paint repaired exterior wall panels. Hazardous Materials Prior to construction activities involving demolition or disturbance of existing building materials, an asbestos survey shall be completed by the Owner. The survey results shall be provided to the successful Contractor before work begins. If asbestos-containing materials (ACM) are identified within the project area, abatement work shall be completed by a licensed asbestos abatement contractor prior to commencement of affected construction activities unless otherwise specified in the contract documents. Contractor Responsibilities The Contractor shall: Verify existing field conditions prior to beginning work. Coordinate all work to minimize disruption to facility operations. Obtain all required permits and inspections unless otherwise noted in the contract documents. Protect existing building components from damage during construction. Maintain a clean and safe work site throughout the project. Remove all construction debris and dispose of it in accordance with applicable regulations. Restore any areas damaged as a result of construction activities. Coordinate utility interruptions with the Owner. Perform final testing and operational verification of all modified mechanical and electrical systems. The Contractor shall provide a complete list of all subcontractors that will perform work on this project prior to the commencement of any such subcontractor's work. Contractor to provide 5% of attic stock materials. Security & Background Requirements Due to the secure nature of the facility, all contractor and subcontractor personnel assigned to this project shall be subject to mandatory security screening requirements prior to receiving authorization for site access. Required security measures include: Criminal background checks Fingerprinting Approval by Beaufort County and/or designated security authorities No personnel shall be permitted access to the facility until all required clearances have been completed and approved. The Contractor shall be solely responsible for ensuring compliance by all subcontractors, suppliers, and associated personnel. Codes and Standards All work shall comply with the latest adopted editions of all applicable federal, state, and local codes and standards, including but not limited to: International Building Code (IBC) International Existing Building Code (IEBC) International Mechanical Code (IMC) International Energy Conservation Code (IECC) National Electrical Code (NFPA 70) OSHA safety requirements South Carolina building and construction regulations Local permitting authority requirements Project Constraints The building shall remain in its current occupancy classification and intended use. No work is included on the roof, building footprint, or site improvements. Existing utilities shall remain operational except during scheduled outages approved in advance by the Owner. The Contractor shall coordinate construction activities to minimize impacts to ongoing operations. Deliverables | Closeout Documents At project completion, the Contractor shall provide: Final inspections and approvals from the Authority Having Jurisdiction (AHJ). Manufacturer warranties for installed materials and equipment. Operation and maintenance manuals for new mechanical and electrical components. Record (as-built) drawings documenting field changes. Final cleanup and turnover of the facility in fully operational condition. Contractor to provide 5% of attic stock materials. Contractor will have 6 months to complete the work after issuance of Notice to Proceed Contractor Qualifications Bidders shall demonstrate the following minimum qualifications: Current and valid licensing applicable to the State of South Carolina Experience performing renovations within occupied public or government facilities Experience managing phased construction operations Ability to comply with Sheriff Department protocols and operational restrictions Compliance with all applicable federal, state, and local safety regulations, including OSHA standards IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS Response submittals for this Invitation For Bid will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Wednesday, December 16, 2026 . All responses must adhere to the following guidelines: Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason. All requested information and forms MUST be uploaded as indicated in the PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal. TITLE VI STATEMENT COUNTY COUNCIL OF BEAUFORT COUNTY Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as “Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (Title VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language regardless of whether those programs and activities are Federally funded or not. The County is also committed to assuring every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort County will not retaliate against any person who complains of discrimination or who participates in an investigation of discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination requirements into appropriate documents, directives, and regulations. Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT) and/or the Federal Highway Administration (FHWA). In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability, religion, or language by providing such a statement in its bidding and contract documents. Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may determine to be appropriate, including, but not limited to: Withholding of payments to the Contractor under the contract until the Contractor complies, and/or Cancellation, termination, or suspension of the contract, in whole or in part. In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the Contractor may request the United States to enter into such litigation to protect the interests of the United States. Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action. Any such complaint must be filed in writing or in person: Beaufort County Government Post Office Drawer 1228 | Beaufort, SC 29901-1228 843-255-2304 Telephone | E-mail: dthomas@bcgov.net INVITATION FOR BID Dates Advertised: November 10, 2026 This is a Formal Sealed Bid We require Bids to be Electronically submitted through the Procurement Portal. Please go to https://procurement.opengov.com/portal/bcgov and sign up to submit your bid. BIDS WILL BE RECEIVED UNTIL 3:00 pm LOCAL TIME ON Wednesday, December 16, 2026 . Bid Title: Beaufort County | Sheriff's Office Warehouse Upfit | Phase 1 Bid No: IFB 121626 PREBID CONFERENCE: A Pre-Bid conference will be held on Tuesday, December 8, 2026 at 2:00 pm p.m. virtually through Teams. This is a Non-Mandatory meeting; all interested bidders and subcontractors are encouraged to attend. Teams: This is a virtual meeting. Email victoria.moyer@bcgov.net for the invite. . All questions must be submitted through the Procurement Portal no later than 5:00 pm on Monday, December 14, 2026 . A Bid Tabulation Will Be Posted On The Procurement Portal After Bid Opening. BID ACCEPTANCE AND DELIVERY (Prices bid must be firm for a minimum of 90 ). In compliance with the Invitation, and subject to all conditions thereof, the Offeror agrees, if this bid is accepted within (90) days from date of opening, to furnish any or all items quoted on at prices as set forth after the item and to make delivery within N/A after receipt of order with transportation cost included and prepaid. Unless otherwise stated and accepted herein, the Offeror agrees to complete this proposed contract in less than thirty (30) calendar days after issue date of purchase order. I M P O R T A N T IF YOU CONSIDER THESE SPECIFICATIONS AS RESTRICTIVE, SEE GENERAL PROVISIONS, PARAGRAPH #20, DISCREPANCIES. Bids received after the time specified for opening cannot be considered. BID INVITATION Beaufort County | Sheriff's Office Warehouse Upfit | Phase 1 IFB 121626 Sealed bids submitted through the Procurement Portal will be received electronically until 3:00 pm on Wednesday, December 16, 2026 at which time responses to this request will be recorded in the presence of one or more witnesses in the Procurement Services Department. A Bid Tab will be posted on the Procurement Portal for: Beaufort County | Sheriff's Office Warehouse Upfit | Phase 1 A PRE-BID conference will be held on Tuesday, December 8, 2026 at 2:00 pm p.m. virtually through Teams. This is a Non-Mandatory meeting; all interested bidders are encouraged to attend. WebEx: This is a virtual meeting. Email victoria.moyer@bcgov.net for the invite. . Bid documents are available through the Procurement Portal at https://procurement.opengov.com/portal/bcgov . Beaufort County reserves the right to reject all proposals and to waive minor informalities and irregularities. All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract amount. A copy of the Bid Bond or Certified Check must be electronically sent with your bid documents through the Procurement Portal, as indicated in the Vendor Questionnaire Section. The original Bid Bond or Certified Check must be received by the Procurement Services Department within 10 days after the bid due date. Failure on the bidder’s part to provide a copy of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive bid and rejected by the County. The Bid Bond shall be forfeited to the County Council of Beaufort County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within fourteen (14) days after being notified that he has been awarded the Contract. The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes required for the construction and installation of this project as required by local, state, and federal regulations. County permits shall be required as applicable, but the fee shall be waived. This waiver shall apply to the Beaufort County permit fee only and not to any "City or Town" permit fee and/or licenses, when applicable. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of 1970. Bidders must certify that they do not and will not maintain or provide for their employees any facilities, which are segregated on the basis of race, color, creed, or national origin. The Beaufort County Council reserves the right to reject all Bids and waive any formalities. Any claims for cost incurred by any bidders in preparation of any part of, or total package for this project will not be handled for reimbursement by Beaufort County or their representatives. The Bidding Documents consist of the following, including all addenda issued there with and forms referenced therein, in addition to the drawings: Bid Documents Contract General Conditions Supplemental Conditions General Provisions Special Provisions Specifications Bid opening will be held at the Procurement Services Department. There will be no Public Bid Opening. A Bid Tabulation will be posted on the Procurement Portal. SMALL AND MINORITY BUSINESS PARTICIPATION PLEASE REVIEW THIS SECTION CAREFULLY, PAYING PARTICULAR ATTENTION TO “PRE-AWARD DOCUMENTS” DUE WITH THE BID/PROPOSAL, THE “GOOD FAITH EFFORTS CHECKLIST”, AND EXHIBITS 1-3. FAILURE TO FOLLOW THE PROGRAM REQUIREMENTS AND/OR FURNISH THE REQUESTED DOCUMENTS MAY RESULT IN THE REJECTION OF YOUR BID/PROPOSAL. PRE-AWARD DOCUMENTS Item/Form Submission Requirements 1 Program Overview n/a 2 Self-Performance Affidavit Indicates intention to perform work and/or provide services with own current workforce. Due with bid/proposal only if self-performing 100%. 3 Good Faith Efforts Checklist Indicates the actions undertook to recruit and solicit small and minority businesses for this project. Due with bid/proposal. 4 Good Faith Agencies Distribution List Indicates agencies that should receive notice of solicitation to small and minority businesses for this project. Copy of notice sent to good faith agencies due with bid/proposal. 5 Outreach Written Notice Example Sample of notice to be sent to small and minority businesses soliciting their participation for this project. Copy of notice sent to small and minority businesses due with bid/proposal. 6 Non-Discrimination Statement – Exhibit 1 Certification that this project is open to all businesses and persons and that no business or person shall be excluded from participating in the Beaufort County procurement process. Due with bid/proposal. 7 Outreach Documentation Log – Exhibit 2 Documents solicitation efforts to
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. Typo on time was corrected.
Public questions and answers
For this renovation work will Commissioning be required?
Third party commissioning is not required.
Scope and Quantities 1. West Wall Metal Panels (G-101; A-101 Note 16; EC-101 Note 14): The drawings require new full-height panels at the removed louvers, ductwork and equipment, "plus an allowance for replacement of (12) additional damaged panels," but the number of panels at the removed openings is not identified, and the existing panel profile, gauge, manufacturer and color are not given. Please (a) state the number of panels to be replaced at the openings; (b) confirm the 12 additional panels are a quantity to be included in the base bid, and whether unused panels will be credited and at what unit price; and (c) provide the existing panel manufacturer, profile and color if known. 2. Exterior Painting (Scope of Work E and G; A-101 Note 16): Scope of Work E and G call for preparing, priming and painting exterior wall panels, while the drawings require new panels to match the existing color and sheen and show no exterior painting. Please confirm whether (a) the entire west elevation is to be painted; (b) only new or repaired panels are to be painted; or (c) no exterior painting is required. Please also confirm the coating system. 3. Floor Coating (A-101 Note 10; G-107 A5; Scope of Work F): The basis of design is H&C Shield-Crete water-based epoxy garage floor coating, while Scope of Work F calls for a coating "suitable for commercial or industrial use." Please confirm (a) Shield-Crete is acceptable, or provide the required commercial system (for example, 100%-solids epoxy wi
The number of panels required to cover the removed equipment is to be determined. The contractor shall field-verify conditions to adhere to the Contract Documents. The existing panel profile, gauge, manufacturer, and color are to match the existing. The 12 additional panels are a quantity to be included in the base bid, and unused panels will not be credited. H&C Shield-Crete water-based epoxy garage floor coating is acceptable. Floor surface preparation and crack filling should follow the manufacturer's specifications. The floor area north of the proposed wall is the only area requiring coating.
OpenGov categories
- 90638 · General Construction - Architectural
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 90921 · Building Construction, Industrial (Warehouse, etc.)
- 90977 · Special Construction: Observatory, Security, Special Rooms, etc.
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91220 · Construction, Fire Protection (Includes Fire Escapes, Fire and Smoke Barriers, Firestops)
- 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering