Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

BOUSE HILLS PUMPING PLANT KX1A & KX3A TRANSFORMER LEAK REPAIRS

Description

CAWCD is soliciting competitive sealed Proposals for BOUSE HILLS PUMPING PLANT KX1A & KX3A TRANSFORMER LEAK REPAIRS as fully described in the specifications. Proposals will be received on or before the day and time stated on the cover sheet of this solicitation. BOUSE HILLS PUMPING PLANT KX1A & KX3A TRANSFORMER LEAK REPAIRS INTRODUCTION The Central Arizona Water Conservation District (CAWCD) is a multi-county water conservation district and political subdivision of the state of Arizona organized pursuant to A.R.S. §48-3701 et seq . for the purposes, among others, of contracting with the United States for the delivery of Central Arizona Project (CAP) water, repayment of CAP costs and operation and maintenance of the CAP aqueduct. The CAP is designed to bring about 1.5 million acre-feet of Colorado River water per year to Pima, Pinal and Maricopa counties. The CAP carries water from Lake Havasu to the southern boundary of the San Xavier Indian Reservation southwest of Tucson. It is a 336-mile-long system of aqueducts, tunnels, pumping plants and pipelines and is the largest single resource of renewable water supplies in the state of Arizona. PROJECT DESCRIPTION CAWCD is soliciting competitive sealed Proposals for BOUSE HILLS PUMPING PLANT KX1A & KX3A TRANSFORMER LEAK REPAIRS as fully described in the specifications. Proposals will be received on or before the day and time stated on the cover sheet of this solicitation. PROPOSAL PREPARATION INSTRUCTIONS DEFINITIONS The following terms have the meanings indicated, which are applicable to both the singular and plural. "Request for Proposal" shall mean the Solicitation, Proposal Preparation Instructions, Terms and Conditions, Specifications, the Proposal Form, and any Addenda issued prior to receipt of Proposal. "Addenda" shall mean the written or graphic Documents issued by CAWCD prior to the signing of the Contract, which modify or interpret the Contract Documents by additions, deletions, clarifications, or corrections. "Proposal" shall mean the complete and properly signed offer to do the work for the sum stipulated therein, submitted in accordance with the Request for Proposal. "Respondent" shall mean the person or entity that submits a Proposal. "Contract Documents” shall mean the combination of the Request for Proposal, including any Solicitation addenda; the Offer and any Best and Final Offers; and any Contract Amendments and all Purchase Orders and Purchase Order Revisions. All definitions set forth in the Terms and Conditions are applicable throughout the Contract Documents. GENERAL INSTRUCTIONS CAWCD is soliciting competitive sealed Proposals for BOUSE HILLS PUMPING PLANT KX1A & KX3A TRANSFORMER LEAK REPAIRS . Proposals will be received on or before the day and time stated on the cover sheet of this solicitation. Proposals must be in the actual possession of CAWCD’s Contract and Procurement Services Department on or prior to the exact time and date indicated above. Late Proposals will not be considered. No paper documents will be accepted. Response to this solicitation shall be submitted electronically on OpenGov Procurement at https://procurement.opengov.com/portal/centralarizonaproject . Offers submitted differently than specified may be rejected at the discretion of CAWCD. Submittal of an Offer in response to this solicitation shall be construed as the intent to be bound by any resultant contract. Contacting CAWCD staff or elected officials, either directly or indirectly, regarding this solicitation for the purpose of, or having the effect of, influencing the selection process is strictly prohibited and may result in disqualification from consideration. All questions shall be addressed to Kyle Talbert , (623) 869-2409 or by email to ktalbert@cap-az.com . Proposal preparation costs are the sole responsibility of the Respondent including any costs associated with any requested oral presentation/demonstration in response to this RFP. The Proposal shall be signed by the person or persons legally authorized to bind the Respondent to a Contract. A Proposal by a corporation shall have a certificate of good standing and a resolution authorizing the submittal of the Proposal affixed to the Request For Proposal. A Proposal submitted by an agent shall have a current power of attorney attached certifying the agent's authority to bind the Respondent. COPIES OF CONTRACT DOCUMENTS CAWCD assumes no responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. CAWCD in making Contract Documents available on the above terms does so only for the purpose of obtaining proposals on the Work and it does not constitute an offer for acceptance. EXAMINATION OF CONTRACT DOCUMENTS It is the responsibility of each entity before submitting a proposal to; (1) examine the Contract Documents thoroughly; (2) consider federal, state, and local laws and regulations or any other conditions that may affect cost or performance of the Work; and (3) notify CAWCD of conflicts, errors, or discrepancies in the Contract Documents. Upon submission of a Proposal, the Respondent attests; it (1) has complied with every requirement of the Proposal Preparation Instructions; (2) that the Proposal is premised upon performing the Work required by the Contract Documents without exception; and (3) that the Contract Documents are sufficient in scope and detail to convey an understanding of all terms and conditions for performing and furnishing the Work. INTERPRETATIONS AND ADDENDA All questions about the meaning or intent of the Contract Documents must be directed to Kyle Talbert , (623) 869-2409 or by email to ktalbert@cap-az.com . Interpretations or clarifications considered necessary by CAWCD will be delivered prior to the due date to all parties that have obtained or downloaded Contract Documents directly from CAWCD. Entities that have obtained Contract Documents from other sources are responsible for obtaining any addenda or updates. Questions received less than seven (7) days prior to the due date may not be answered. Only questions answered by formal written Addenda will be binding upon CAWCD. Oral and other interpretations or clarifications will be without legal effect. Addenda may also be issued to modify the Contract Documents as deemed advisable by CAWCD. The Proposal shall contain an acknowledgement of Addenda. MODIFICATION OR WITHDRAWAL OF PROPOSALS A Proposal may not be modified, withdrawn or canceled at any time after the time and date designated for the receipt of Proposals. A Proposal may be modified or withdrawn prior to the time and date designated for receipt of Proposals. A Proposal may be resubmitted up to the time designated for the receipt of Proposals. RIGHT OF ACTION OR CLAIM The successful Respondent shall not have any right of action or claim before a Contract has been signed by the Respondent and CAWCD. COST ANALYSIS In the event only one (1) Proposal is received, CAWCD may require the Respondent to submit a Proposal in sufficient detail to perform a cost analysis to determine if the Proposal is fair and reasonable. PRE-PROPOSAL CONFERENCE A Mandatory PRE-PROPOSAL CONFERENCE will be held at 11:30 am on Tuesday, November 17, 2026 , at Bouse Hill Pumping Plant . The purpose of this mandatory meeting will be to clarify the contents of this Request for Proposal in order to prevent any misunderstanding of CAWCD's intention and desires, and/or to give Respondents an opportunity to view the area. Any doubt as to the requirements of this Request for Proposal, or any apparent omission or discrepancy should be presented to CAWCD at this meeting. CAWCD will then determine the appropriate action. If necessary, CAWCD will issue a written addendum to this Request for Proposal. Oral statements or instructions shall not constitute an addendum to this Request for Proposal. RSVP with Kyle Talbert via email at ktalbert@cap-az.com no later than 11:30 am (AZ Time), on November 16, 2026. Upon RSVP, confirmation with further directions to the plant will be provided. PROJECT SCHEDULE Critical dates for this project are detailed below: Issue Date: November 5, 2026 Pre-Proposal Conference (Mandatory): November 17, 2026, 11:30am Bouse Hill Pumping Plant Questions Due: November 24, 2026, 11:30am Proposal Due: December 3, 2026, 3:00pm Estimated Date of Evaluation Completion: December 2026 Estimated Date of Contract Award: December 2026 Field Work Schedule: TBD Final Deliverables Due: January 24, 2027 EVALUATION CAWCD in its sole discretion may (1) reject for any reason any or all Proposals; (2) reject a Proposal not accompanied by data required by the Proposal Documents; (3) accept other than the lowest cost Proposal; (4) waive minor deviations in Proposals received; (5) multi-award and (6) reissue a Request for Proposal. The evaluation criteria are set forth below and are intended to be the basis by which each Proposal shall be evaluated. This is a two-step process. Following the evaluation of the technical Proposals, the price Proposals will be evaluated for the top-ranking technical Proposals (number at the discretion of CAWCD). The lowest price of the top-ranking technical Proposals will receive 100% of the available pricing points. The next lowest price of the top-ranking technical Proposals will receive percentage of the available pricing points in relation to the lowest price (i.e. if the next lowest price is within a 10% variance of the lowest price, they will receive 90% of the available pricing points. A short list will be prepared of the top (number at the discretion of CAWCD) highest ranking technical and price Proposals upon a combined score of technical and price. These firms may be invited to provide an oral presentation/interview and to negotiate best and final offers. Award of the Contract shall be made to the Respondent whose Proposal is determined, at the sole discretion of CAWCD, to be most advantageous to CAWCD, taking into consideration evaluation factors identified below. SPECIAL PROVISIONS Voluntary Protection Program Requirements CAWCD is an OSHA approved Voluntary Protection Program (VPP) worksite which promotes effective worksite-based safety and health. Contractor's and subcontractor's employees are required to comply with OSHA VPP requirements while providing Services for CAWCD. Prior to the start of Services, CAWCD will conduct VPP requirement orientation consisting of CAP safety rules, emergency procedures, Personal Protective Equipment (PPE), and chemicals or hazardous materials as applicable to the Services being performed. INSURANCE PROVISIONS REQUIREMENTS Consultant/Contractor and subcontractors shall procure and maintain insurance against claims for injury to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Consultant/Contractor, his agents, representatives, employees or subcontractors, until all their obligations have been discharged, including any warranty periods under this Contract are satisfied. The insurance requirements herein are minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract. The indemnity covenants contained in this contract in no way limit the required insurance provisions. CAWCD in no way warrants that the minimum limits contained herein are sufficient to protect the Consultant/Contractor from liabilities that might arise out of the performance of the work under this contract by the Consultant/Contractor, its agents, representatives, employees or subcontractors. Consultant/Contractor is free to purchase additional insurance. If the Consultant/Contractor maintains broader overage and /or higher limits than shown above as required, CAWCD shall be entitled to the broader coverage or higher limits maintained by the Consultant/Contractor to the extent permitted by law. NOTICE OF CANCELLATION The Consultant/Contractor will notify CAWCD, in writing, if any policy or coverage provision is suspended, voided, canceled, or reduced in coverage or in limits. Such notice to be, if possible, thirty (30) days prior to the scheduled change. Such notice shall be sent directly to (Central Arizona Water Conservation District, Risk and Insurance Administrator, P. O. Box 43020, Phoenix, AZ 85080-3020). ACCEPTABILITY OF INSURERS Insurance is to be placed with duly licensed or approved non-admitted insurers in the state of Arizona with an “A.M. Best” rating of not less than A- VII. The Central Arizona Water Conservation District in no way warrants that the above-required minimum insurer rating is sufficient to protect the Consultant/Contractor from potential insurer insolvency. VERIFICATION OF COVERAGE Consultant/Contractor shall furnish the Central Arizona Water Conservation District with certificates of insurance (ACORD form or equivalent) as required by this Contract. The certificates for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. All certificates and endorsements are to be received by the Central Arizona Water Conservation District before work commences. Each insurance policy required by this Contract must be in effect at or prior to commencement of work under this Contract and remain in effect for the duration of the project. CAWCD in no way warrants that acceptance of insurance documents relieves the Consultant/Contractor or Subcontractors from maintaining the insurance coverage required in this contract. Failure to identify deficiency does not waive insurance requirements. If commercial general liability for products and completed operations coverage is required, the policy shall remain in effect for 2 years past the project completion. Failure to maintain the insurance policies as required by this Contract, or to provide evidence of renewal, is a material breach of contract. All certificates required by this Contract shall be sent directly to (Central Arizona Water Conservation District, Risk & Insurance Administrator, P. O. Box 43020, Phoenix, AZ 85080-3020) . The Contract number and Contract description shall be noted on the certificate of insurance. The Central Arizona Water Conservation District reserves the right to require complete, certified copies of all insurance policies required by this Contract at any time. SUBCONTRACTORS Consultant/Contractor's certificate(s) shall include all subcontractors as insureds under their policies or Consultant/Contractor shall verify that all subcontractors maintain insurance meeting all requirements stated herein. Consultant/Contractor shall ensure that the above additional insureds are required on the subcontractor’s policies. For CGL additional insured coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13 and CG 20 40 12 19 to cover parties they do not directly contract with. All coverages for subcontractors shall be subject to the minimum requirements identified herein. APPROVAL Any modification or variation from the insurance requirements in this Contract shall be made in writing as a formal Contract amendment. EXCEPTIONS In the event the Consultant/Contractor or sub-contractor(s) is/are a government entity, then the Insurance Requirements shall be provided by a Certificate of Self-Insurance. MINIMUM SCOPE AND LIMITS OF INSURANCE Consultant/Contractor shall provide coverage with limits of liability not less than those stated below. Commercial General Liability – Occurrence Form Policy shall include bodily injury, property damage, personal injury and broad form contractual liability coverage. General Aggregate..............................................$2,000,000 Products – Completed Operations Aggregate.....$2,000,000 Personal and Advertising Injury...........................$1,000,000 Blanket Contractual Liability – Written and Oral..$1,000,000 Damage to Rented Premises...................................$50,000 Each Occurrence.................................................$2,000,000 Using form CG 2010 (10/01) and CG 2037 (10/01), or equivalent, the policy shall be endorsed to include to the fullest extent permitted by law the following Additional Insured language: “The United States Bureau of Reclamation and Central Arizona Water Conservation District, its officers, directors, employees, agents and consultants, and each and any of them shall be named as Additional Insured with respect to liability arising out of the activities performed by or on behalf of the Consultant/Contractor.” The policy s GENERAL TERMS AND CONDITIONS DEFINITIONS When used herein, unless otherwise distinctly expressed, the terms: "Addenda" shall mean written or graphic instruments issued by CAWCD prior to the execution of the Contract Documents which modify or interpret the Contract Documents by additions, deletions, clarifications or corrections. “Attachment” shall mean any item the Contract Documents require the Contractor to submit. "CAWCD" shall mean the Central Arizona Water Conservation District. "Contractor" shall mean the company that is awarded the Contract for the supply of the specified Goods or Services. "Contract" or "Contract Documents" shall mean and consist of the Invitation for Bids, Request for Proposals, Request for Quotations, Request for Statements of Qualifications, the Purchase Order or any other offer accepted by CAWCD, and all Addenda and all Modifications and if applicable, any notice to proceed . "Goods" shall mean any or all of the goods, products, materials, supplies, and equipment to be provided as a part of the Contract Documents whether or not specifically identified in the Contract Documents. "Modification" shall mean (1) a written amendment to the Contract or Contract Documents signed by both parties, or (2) a Change Order. "Services" shall mean all labor and equipment furnished or utilized in the performance of the Work required herein. "Subcontractor" means a person who contracts to perform work or render service to Contractor or to another subcontractor as a part of this Contract. “Work” shall mean all demolition and construction services, supervision, administration services, coordination of all subcontractors, tests, inspections, and other Goods that are necessary to and appropriate for the finishing, equipping and functioning of the facilities and structures required for completion of the Contract. "Uncontrollable Forces” shall mean any cause beyond the control of the party affected, including but not limited to the failure or threatened failure of facilities, flood, earthquake, storm, lightning, epidemic, war, act of terrorism, riot, civil disturbance or disobedience, labor dispute, labor or material shortage, sabotage, restraint by court order or public authority, and action or non-action by or failure to obtain the necessary authorizations or approvals from any governmental agency or authority not a party to this Contract, which by exercise of due diligence such party could not reasonably have been expected to avoid and which by exercise of due diligence it shall be unable to overcome. Nothing contained herein shall be construed so as to require a party to settle any strike or labor dispute in which it is involved. AMENDMENTS AND MODIFICATIONS CAWCD may, at any time, make changes in the drawings, designs, specifications, quantities, schedule, or the manner, method, or place of performance. All changes must be in writing and provided to Contractor prior to performance of Work or shipment of Goods. If such change increases or decreases the cost or the time required for performance under this Contract, an equitable adjustment shall be made in the price and delivery schedule, as applicable, by mutual agreement between the parties. Any claim for price or schedule adjustment under this section must be asserted within thirty (30) calendar days

Plain text

OpenGov categories

  • 93687 · Transformer (High Voltage) Maintenance and Repair