Description

The Washington Suburban Sanitary Commission, MD (the "WSSC Water"), is soliciting sealed responses for Business Case Development . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Thursday, December 17, 2026 . Late responses will not be accepted. WSSC Water seeks to establish Multiple Award Basic Ordering Agreements (BOAs) with qualified consulting firms to provide on-call professional services to develop Business Case Evaluations (BCEs). Work will be authorized through individual Task Orders. The BCE will cover the following areas. Architecture and Engineering Facilities/Real Property Management Capital Improvement Program Controls Software Evaluation Services Non-asset solutions Public / Community outreach and/or Mandatory Referral Process Economic Analysis Software The Commission does not guarantee any minimum quantity of work under this BOA. SCOPE OF WORK Scope of Work Professional services are required to support WSSC Water in developing business case evaluations (BCE). Consultants shall support WSSC Water’s Smart One Water Utility vision by incorporating a holistic, systems-thinking approach into the performance of services, as applicable to each task order. The Contractor shall also consider the interrelationships among business processes, infrastructure, technology, assets, and organizational functions to support integrated decision-making, operational efficiency, risk management, and long-term value. The Contractor may be required to support a variety of business case development assignments on an as needed basis. The scope, complexity, methodologies, staffing requirements, and deliverables will be determined for each task order. Consultants are required to provide the following services for all BCE task orders, included, but not limited to the following: Project Management: A responsible project manager who is an accomplished expert in the field of asset management and business case evaluations within a utility will be required to report to the EAMD task order project manager. A detailed project schedule and budget will be prepared by the consultant for each task and must be provided to the EAMD's project manager in a timely fashion (within five (5) to ten (10) business days) after receipt of the draft scope of work for a task. The development and evaluation of alternatives to meet various water and wastewater utility needs will involve either a comprehensive multi-step Business Case Evaluation (BCE) process or a streamlined version as needed to achieve business objectives of WSSC. Preparation of Lifecycle Cost Assessment for feasible alternatives across the four core phases. Planning and Design Acquisition and Implementation Operation and Maintenance Disposal and Renewal Assessment of financial implications associated with risk in each alternative, including health and safety as well as public trust risk, quantified in financial terms. Estimation of asset replacement values. Estimation of useful life of project alternatives and calculations involving the time value of money. Development of required data to determine economic consequences of social and environmental impacts of project alternatives. Preparation of project cost estimates to a budget level of accuracy of -10% / +25%; Data research, collection, and provision. Community Outreach. Report preparation. The consultants should be able to provide professional services experience that includes, but is not limited to, the following. Architecture and Engineering Water infrastructure engineering and modeling Wastewater infrastructure engineering and modeling Civil engineering Geotechnical engineering Structural and other building-related engineering Mechanical engineering (water and wastewater treatment equipment, HVAC, garage, elevators, fire suppression equipment, etc.) Environmental engineering Industrial engineering Architecture, commercial and industrial Laboratory design and equipment Federal, State, and local regulations, codes, and permitting Energy management Planning-level capital and operations and maintenance cost estimating Building inspection services Testing laboratory services Facilities/Real Property Management Logistical consulting (site selection, drive-time analysis, etc.) Real estate consulting (land purchasing, lease vs. own, etc.) Facilities planning and management Non-asset Solutions Operations and Maintenance strategies/optimization Contracts Software Evaluation Services Breaks and Leaks Model Asset Management Decision Support System Project Management Information System Materials Inventory Management System Public / Community Outreach and/or Mandatory Referral Process Stakeholder engagement Public hearings Regional and local government meetings (planning boards, council meetings, etc.) Capital Improvement Program Design Phase Scenarios Evaluating Value-Engineering Options Alternative Technical Specifications Asset Life-Cycle Costs Acquisition Phase Scenarios Assessing Alternative Delivery Methods Contract Bundling Vendor Risk Mitigation Strategic Sourcing Implementation Phase Scenarios Market Capacity Risk Allocation Scenarios Phased Construction Pivot Monte Carlo Simulators Economic Analysis Consultant team support (issue conceptualization/framework, data research, data collection, data provision, etc.) Risk analysis (estimating consequences of failure elements, estimating mitigation, etc.) Accounting and financial analysis Optimum resource allocation Process mapping Data Governance Framework Software Microsoft Office Suites ArcGIS AutoCAD Optimatics Optimizer for Water and Wastewater Bio-Win Wastewater Process Simulator ICM Infoworks Hydraulic Modeling Tool for buried and facility assets Bentley WaterGEMS SKM Power Tools for Electrical Modeling Trace 3D Plus for HVAC Modeling GAMS for hydro-economic modeling Primavera P6 Project Management Information System Asset Management Decision Support System Some business case task orders might require a limited amount of preliminary design work. Thus, additional services might (or might not) be required during the contract period. These additional services may include, but are not limited to, the following: Review / Determine Capacity Requirements Constructability - Easement Requirements, Construction Access, Staging Areas, and Work Areas. Environmental Impacts (table exercise) - Geology, Groundwater / Surface water, tree Clearing, reforestation, wetlands / Mitigation, Critical Area Impacts, Floodplains, protected species/habitat. Community Impacts - Parks / Community Facilities, Historic Areas, Traffic. Permit Requirements. Screen site matching selected criteria (constructability, environmental, required space vs. usable space, topography, etc.) Gather Utility As-builts County Paving Schedule Develop / Prepare: Conceptual plans, alignments, profiles Performance Criteria Project Report. Note: Some tasks or deliverables Roles and Responsibilities: The Consultant's role and responsibility shall include the following: Principal Provides high-level oversight, corporate alignment, senior quality assurance, and macro-level strategy confidence to WSSC Water executives. Project Manager Manages the task order budget, maintains the detailed project schedule, acts as the primary point of contact, and delivers timely work plans. GIS Specialist Leads spatial data research, manages utility assets within ArcGIS, and maps geographic components across the 5 core utility networks. Sr. Engineering Manager Directs multidisciplinary engineering design teams and ensures technical compliance for complex linear and vertical asset alternatives. Engineering Manager Oversees daily engineering tasks, coordinates technical workflows, and manages process mapping across divisions. Project Engineer Develops conceptual plans, alignments, and performance criteria; handles deliverables requiring a signed and sealed Professional Engineer (PE) license in Maryland. Staff Engineer Evaluates physical asset capacities, reviews utility as-builts, and conducts technical screenings based on constructability and structural parameters. Junior Engineer Supports data collection, performs basic engineering calculations, and assists with desktop modeling exercises. Sr. Architect Directs the architectural design, master planning, and space optimization parameters for commercial and industrial vertical facilities. Staff Architect Develops conceptual structural layouts and facility plans, matching spatial configurations to selected engineering criteria. Junior Architect Prepares basic architectural drawings and supports facility site-matching assessments. Sr. Engineering Technician Leads field walks of alternative sites and supervises technical asset inspections and field condition assessments. Engineering Technician Performs basic building inspections, records technical field data, and supports geotechnical and utility test pit investigations. Sr. Software Analyst Evaluates specialized asset software and leads the technical integration of modeling applications into WSSC's Decision Support System. Software Analyst Tests and maintains operational data software tools, including the Breaks and Leaks Model and Project Management Information Systems. Sr. GIS Technician Builds complex spatial models and manages advanced spatial analytics pipelines within the central GIS framework. GIS Technician Digitizes physical infrastructure maps, updates coordinate points, and inputs localized geographic data assets. Sr. Economist Designs the overarching multi-step economic evaluation frameworks and establishes structural methodologies for complex financial risk analysis. Economic Analyst Performs calculations involving the time value of money, calculates asset replacement values, and evaluates the financial consequences of social and environmental impacts. Sr. Cost Estimator Directs risk-prioritized capital improvement cost structures and models acquisition scenario risk allocations. Cost Estimator Formulates detailed project lifecycle cost assessments and prepares budget-level estimates adhering to -10% / +25% accuracy standards. Clerical Manages document data governance, tracks billing milestones, and coordinates administrative tasks across workshop sessions. CADD Specialist Generates engineering profiles, layouts, and multi-dimensional system diagrams using AutoCAD. Construction Specialist Reviews design phases for easement requirements, construction access, and localized constructability constraints. Sr. Construction Manager Evaluates alternative project delivery methods, structures contract bundling opportunities, and reviews contractor mobilization frameworks. Change of Key Personnel The Contractor shall notify the Project Manager or designee in writing of any proposed changes or substitutions to personnel working on this contract. Any proposed replacement personnel shall possess qualifications, experience, and technical expertise equal to or greater than those of the personnel being replaced. The Contractor shall submit the proposed replacement’s resume and qualifications, as well as, the justification for the substitution. All changes or substitutions shall be submitted to WSSC Water’s Project Manager or designated staff for review and approval at the sole discretion of WSSC Water. The Contractor shall ensure continuity of services and minimize any disruption to the Contract performance resulting from personnel changes. Task Order Procedure Task Order Requests will be issued to all awarded Contractors on a Time and Materials (T&M) basis. Task Orders will be solicited, evaluated, and awarded on an as needed basis. Task Order requests shall be issued to all Consultants. The request will indicate when responses are due. Each task order may include. Scope of Services Deliverables Schedule Budget Staffing Performance requirements Acceptance criteria WSSC Water reserves the right to issue Task Orders to any BOA holder whose qualifications best meet the needs of a particular assignment. Selection for individual Task Orders will consider. Technical expertise Specialized experience Key personnel Past performance Current workload Schedule availability Cost reasonableness The Consultant shall submit a detailed work plan, schedule, staffing plan, and fee proposal. Task orders will be awarded based on the best value to the WSSC Water. Each individual task order will follow the WSSC BCE 12 step or modified BCE process attached. Business Case Evaluation Process Contract Term The base term of the Contract shall be for a period of three years. All prices shall remain firm for the duration of the contract. The contract may be extended for an additional one two-year option, or any portion thereof, at the sole option and discretion of the Commission. Requirements Contract Bidders acknowledge that the Contract that will be entered into because of this Solicitation will be a Requirements Contract. The WSSC will have no obligation to the Contractor if no material is required. The Contractor understands and agrees that the WSSC is under no obligation to the Contractor to buy any amount because of issuing this Contract. The quantities stated herein are given are as a general guide for bidding and are not guaranteed amounts, but do represent the best estimate of the WSSC, based on previous usage and projected needs. INTRODUCTION Summary The Washington Suburban Sanitary Commission, MD (the "WSSC Water"), is soliciting sealed responses for Business Case Development . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Thursday, December 17, 2026 . Late responses will not be accepted. WSSC Water seeks to establish Multiple Award Basic Ordering Agreements (BOAs) with qualified consulting firms to provide on-call professional services to develop Business Case Evaluations (BCEs). Work will be authorized through individual Task Orders. The BCE will cover the following areas. Architecture and Engineering Facilities/Real Property Management Capital Improvement Program Controls Software Evaluation Services Non-asset solutions Public / Community outreach and/or Mandatory Referral Process Economic Analysis Software The Commission does not guarantee any minimum quantity of work under this BOA. Timeline Release Project Date: October 30, 2026 Pre-Bid Meeting (Non-Mandatory): November 10, 2026, 10:00am Microsoft Teams meeting Join: https://teams.microsoft.com/meet/260221476381378?p=6s0pjqHhddaBRUWEGr Meeting ID: 260 221 476 381 378 Passcode: g9bv9pM2 Dial in by phone +1 240-800-7929,,915015984# United States, Bethesda Find a local number Phone conference ID: 915 015 984# For organizers: Meeting options | Reset dial-in PIN Question Submission Deadline: November 16, 2026, 12:00pm Response Submission Deadline: December 17, 2026, 2:00pm Vendor Discussions (Anticipated Date #1): January 26, 2027 Vendor Discussions (Anticipated Date #2): January 27, 2027 MINIMUM QUALIFICATIONS The Prime Consultant's team shall meet the following minimum qualifications to be considered for the Award: The Offeror shall demonstrate successful performance of services comparable in size, scope, complexity, and nature to those listed in the scope of work. 1. Provide references from three (3) of the Offeror’s customers for the past five (5) years for services that are similar in scope, size, and complexity to the services described in this RFP and provide the following information: Customer name and address, Contract name with email address and phone number, Time period in which work was performed, and Short description of work performed. INSTRUCTIONS TO BIDDERS/OFFERORS COMPLIANCE WITH COMMISSION PROCUREMENT REGULATIONS The Commission's Procurement Regulations, WSSC Code of Regulations, Title 6, Chapter 6.15, are incorporated into this Solicitation and made a part of this Solicitation by reference. The Procurement Regulations can be viewed online at https://wssc.district.codes/Code/6.15 . DEFINITIONS Whenever the following words occur in these Instructions to Bidders/Offerors, they shall have the following meanings. "Bidder" means any person submitting a bid in response to an invitation for bids ("IFB") or a request for quotations ("RFQ"). "Contract Documents" means all documents that are included, attached, or referenced in a Solicitation. "Invitation for bids" ("IFB") means all documents, whether attached or incorporated by reference, utilized for soliciting bids. "Invitation for prequalification" ("IFP") means all documents, whether attached or incorporated by reference, utilized for prequalifying potential bidders. "Offeror" means any person submitting a proposal to a request for proposals ("RFP") or invitation for prequalification ("IFP"). "Request for proposals" ("RFP") means all documents, whether attached or incorporated by reference, utilized for soliciting proposals. "Responsible" means a person who has the capability in all respects to perform fully the requirements stated in the invitation for bids and request for proposals, respectively, and the integrity and reliability that will assure good faith performance. "Responsive" means a person who has submitted a bid or a proposal that fully conforms to the invitation for bids or request for proposals. "Solicitation" means an invitation for bids, a request for proposals, a request for quotations, an invitation for pre-qualification, or any other document issued by WSSC for the purpose of soliciting bids or proposals to perform a WSSC contract. WSSC’S SUPPLIER PORTAL SYSTEM Bidders/Offerors are required to register in WSSC's Supplier Portal System in accordance with WSSC Code of Regulations, Title 6, Chapter 6.25, at the time of bid opening or proposal submission due dates. Failure to have an active supplier profile prior to this time may render the bid or proposal non-responsive. Information regarding the Supplier Portal System can be found online at https://wssc.district.codes/Code/6.25 and www.wsscwater.com . EXPLANATION OF CONTRACT DOCUMENTS TO PROSPECTIVE BIDDERS/OFFERORS Any prospective Bidder/Offeror must carefully examine the Solicitation. If a prospective Bidder/Offeror is unclear as to the meaning or intent of any of the Contract Documents included in the Solicitation, the prospective Bidder/Offeror shall request a clarification from the Procurement Office before its bid/proposal is submitted. All questions pertaining to the Solicitation or Contract Documents shall only be submitted by a Bidder/Offeror to the Procurement Officer identified in the Solicitation via the Online Discussion feature in the Supplier Portal. Questions submitted via email shall not be answered. Replies, where warranted, will be by addenda issued electronically to all parties who have downloaded the Solicitation. Questions received less than ten (10) days prior to the date for opening of bids or due date for receipt of proposals may not be answered. Only questions answered by formal written addenda will be binding. Questions received after this deadline may be addressed at the discretion of the Commission. Oral and other interpretations or clarifications will be without legal effect. Any information given to a prospective Bidder/Offeror by the Commission will be furnished to all prospective Bidders/Offerors via Online Discussion in the Supplier Portal. Any information given to a prospective Bidder/Offeror by the Commission will be furnished to all prospective Bidders/Offerors. SECURITY CLEARANCE REQUIRED FOR ACCESS TO PLANS AND DRAWINGS In order to receive plans and drawings related to the Solicitation, a prospective Bidder's/Offeror's representative must first be approved through a security background investigation. The Bidder's/Offeror's representative can obtain an application for a security clearance by contacting WSSC''s Procurement Office by phone, (301) 206-8288. Requests for pla

Published attachments
Addenda and notices
  • Official Notice #1: Business Case Development Pre-bid attendee list and slides · 1

    See attached documents for the Pre-bid attendee list and slides.

  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • For firms seeking to provide services specifically under the “Public / Community outreach and/or Mandatory Referral Process” category, will WSSC evaluate qualifications and make BOA awards on a category-specific basis, or must every Offeror independently demonstrate the full range of business case evaluation capabilities described in Section 8.1.A?

    Each offeror must address all services and disciplines identified in the scope of work and propose personnel who meet the solicitation's requirements. A proposal limited to Public/Community Outreach and/or Mandatory Referral Process services does not meet this requirement.

  • May an Offeror be awarded a BOA specifically for Public / Community outreach and/or Mandatory Referral Process services without proposing personnel for the engineering, economic analysis, software, and other technical disciplines identified elsewhere in the Scope of Work?

    No.

  • For the three customer references required under Section 2, may an Offeror pursuing the Public / Community outreach and/or Mandatory Referral Process category submit references demonstrating comparable stakeholder engagement, public outreach, public hearing, and governmental engagement work rather than references covering the broader business case evaluation scope?

    No. The three customer references required must demonstrate experience relevant to the broader business case development scope of work. Offerors may include Public or Community Outreach and/or Mandatory Referral Process experience as part of those references, but references limited to those services are insufficient.

  • Can WSSC provide additional detail regarding the anticipated “Mandatory Referral Process” services, including the types of proceedings, agencies, planning boards, councils, or other governmental bodies with which the selected consultant may be expected to engage?

    The consultant is encouraged to thoroughly examine the information available on the WSSC Water External Affairs page. This review should focus on past proceedings, as well as relevant agencies, planning boards, councils, and other governmental bodies that may be involved in potential engagements upon the issuance of a task order.

  • Section 10.5 (page 60) sets an MBE/SLBE Goal of 29% and states that a certified Asian American firm "may count partially and fulfill 11% of the Subcontracting Goal." Does this mean such a firm may count toward up to 11 of the 29 percentage points, or toward 11% of the 29% goal (about 3.2 percentage points)?

    Asian American Firms may count Up to 11 of the 29 percentage points. Unless they are Asian American/Female firms or also SLBE's.

  • Section 4.7.A (page 17) asks for "a price for proposed labor rates," and the Section 11 Pricing Proposal (pages 68 and 69) lists 25 labor classifications. Must an Offeror enter an hourly rate for all 25 classifications, or may it leave blank the classifications it does not propose to provide?

    Each offeror must complete the Pricing Proposal in its entirety by entering a proposed hourly rate for each of the 25 labor classifications. Every rate field is required.

  • In the Section 11 Pricing Proposal (pages 68 and 69), the "Base Term" column shows 1 for lines 1 to 24 and 4 for line 25, Sr. Construction Manager. Is the "Total" for each line the "Unit Cost" multiplied by the "Base Term," so that line 25 counts four times in the TOTAL?

    Section 11 was revised as part of Addendum No. 1. Please review the addendum for updated quantity.

  • Section 8.4 (page 47) provides for Task Orders on a Time and Materials (T&M) basis, Section 5.6.D (page 20) for payment of "allowable costs and fees as set forth in the pricing sheet," and Section 5.51 (page 34) for travel reimbursement "To the extent Consultant's compensation under this Agreement includes reimbursement of travel expenses." The Section 11 pricing table lists hourly labor rates only. Will non-labor costs under a task order, such as travel, the field investigations in Section 8.1.B.3 and laboratory testing, be reimbursed separately, or must they be included in the hourly rates?

    The pricing categories for task orders will generally consist of hourly labor cost, other direct costs, and sub-consultant cost to develop the proposed total cost for the task order by the prime consultant.

  • Section 8.7 (page 49) refers to "The quantities stated herein" as "the best estimate of the WSSC, based on previous usage and projected needs," and the RFP states no quantity or contract value. For the "Contract Value" and "Value of Subcontracted or Supplier Services/Commodities" fields of the Subcontracting and Supplier Certification Form (OSDI_Forms.pdf, page 3), will WSSC provide an estimated contract value, or should Offerors complete only the "Percentage of Contract Value" field?

    Offerors must list a percentage. The estimated contract value may be left blank.

  • Tab 2 (page 14) asks Offerors to show that "proposed key personnel" have the required qualifications, and Section 4.5 (page 13) counts resumes within the 80-page limit. Which of the roles in Section 8.2 (pages 45 to 47) should Offerors present as key personnel, with resumes, in the Technical Proposal?

    While the positions outlined in Section 8.2 may encompass Key Personnel, it is important to note that this should not be regarded as an exhaustive list for this purpose. The bidding team is encouraged to submit resumes for individuals they have identified and designated as Key Personnel, as this will help us assess their qualifications and fit for this BOA.

  • Tab 4 (page 16) refers to "the Contract in the form attached to the Solicitation," and Section 5.1.A (page 18) lists a "Contract Execution Page"; Section 13 of the project shows no attachments. Will WSSC post the form of Contract, including the Contract Execution Page, or are the contract terms those in Sections 5 through 8 and Appendices A, B and C of the RFP?

    Please review Vendor Questionnaire section to obtain and upload the required forms.

  • Section 10.13 (page 66) states that "The OSDI must review information provided on the Bidder Declaration" to determine Commercially Useful Function, and refers to the Good Faith Effort Guide, which does not include a form with that title. Is page 2 of 2 of the Subcontracting and Supplier Certification Form (OSDI_Forms.pdf, page 4, "Detailed Description and Plan of Subcontracted or Supplier, Services or Commodities") the Bidder Declaration, or must Offerors submit another document?

    Each Bidder must submit the Subcontractor Supplier Certification Form for every subcontractor, and the Good Faith Efforts Affidavit and Non-Discrimination form with each proposal.

  • Section 10.14 (page 67) states that all forms must include two (2) authorized signatures, while the Good Faith Efforts Affidavit (OSDI_Forms.pdf, page 2) has one signature block. Is one authorized signature sufficient on the Good Faith Efforts Affidavit?

    They are two separate forms. The Good Faith Efforts Affidavit only requires the signature of the bidder/Prime.

  • Section 8.4 (page 47) states that Task Order Requests will be issued to all awarded Contractors. Is a BOA holder required to respond to every Task Order Request, or may it decline a request without affecting its consideration for later task orders?

    All awarded vendors are expected to provide a written response to each Task Order Request.

  • Section 4.2.A.2 (page 12) states that "The Technical and Price Proposal shall be submitted via the eProcurement Portal," and Section 12, item 2 (page 70) shows the heading "TECHNICAL PROPOSAL" with no upload field. Where in the OpenGov response should Offerors upload the Technical Proposal?

    The upload field is now available.

  • Please clarify the prompt payment discount requirement referenced in the vendor questionnaire: 1) Are subcontractors required to agree to the prompt payment discount? 2) Is the discount applied to the total contract fee, or only to the profit?

    This section has been removed.

  • Can a firm be a sub to more than one prime?

    Yes, a firm may subcontract to more than one prime.

  • In Section 2 of the RFP, Minimum Qualifications, A. it reads: “Provide references from three (3) of the Offeror’s customers…” 1. Can more than three references be provided? 2. Must the reference be for the Prime firm, or could it be for a subconsultant?

    Three is the minimum references required. References may be from the Prime's team (Prime and sub).

  • In Section 2 of the RFP, Minimum Qualifications, B. There is no content. Are there additional Minimum Qualifications?

    There are no additional minimum qualifications.

  • In Section 8, Scope of Work: Does WSSC Water anticipate that all task orders will be related to a business case evaluation, or is it anticipated that some task orders, such as Software Evaluation Services, might be unrelated to a specific business case?

    It is important to clarify that while many task orders may not focus specifically on Software Evaluation Services, some business case evaluations may indeed involve evaluating software options. Business case evaluations aim to identify the most effective solutions based on lifecycle costs, risks, and service levels. Software Evaluation Services play a vital role in this process by offering insights into various software alternatives.

  • In Section 8.2 Roles and Responsibilities, Are all 25 positions described in 8.2 and the Pricing Proposal considered Key Personnel, and is WSSC Water requesting resumes or other qualification information for each position?

    The pricing page reflects our understanding of the most relevant positions to executing specific business needs of task orders developed during this BOA contract. However, it is not exhaustive, and we may need additional roles to fulfill specific Task Orders. While it may include Key Personnel, it should not be interpreted as a definitive list of such personnel. The bidding Team should provide resumes from team members they have deemed and defined as Key Personnel.

  • The RFP states that the Technical Proposal is limited to 80 single-sided pages, inclusive of resumes, exhibits, appendices, and attachments required to be submitted with the Proposal. Please confirm whether the required Appendix A OSDI forms and Appendix C submission forms which are uploaded separately on Open Gov still count toward the 80-page Technical Proposal limit. And if they do, does WSSC also want them as part of the proposal as well?

    OSDI forms and submission forms should be uploaded separately and do not count toward the 80-page Technical Proposal limit.

  • In Section 8.1, Scope of Work, "Software Evaluation Services" is listed as one of the professional services. However, Section 8.2, Roles and Responsibilities, also mentions technical integration, testing, and maintenance of software systems under the Sr. Software Analyst and Software Analyst roles. Does WSSC Water anticipate that Software Evaluation Services may include these technical assignments?

    It is anticipated that the roles of Software Analyst and Software Analyst will possess the capability to assess software for integration into our existing technology stack. They should have a comprehensive understanding of the technical aspects related to integration, testing, and maintenance of software systems. This expertise will enable them to identify optimal alternatives in order to deliver the best solutions that align with our business needs.

  • In Section 8.1, Scope of Work, item 4, "Software Evaluation Services" lists four specific systems: Breaks and Leaks Model, Asset Management Decision Support System, Project Management Information System, and Materials Inventory Management System. Are these systems identified for potential evaluation or modernization under this BOA, or are they examples of software-related services that may be requested?

    The four software systems referenced herein serve as illustrative examples for potential modernization evaluations under this BOA. They highlight various possibilities without exhaustively covering all available options.

  • What is the anticipated annual and/or total value of the BOA

    This information is not provided during an active solicitation.

  • The pricing sheet identifies 25 labor classifications but does not appear to include specific data, digital, technology, or process-improvement roles. How should firms propose pricing for these capabilities? Can primes or subcontractors propose labor categories and rates that are not included in the pricing sheet after the award of the contract?

    To address the identified business requirements outlined in the Task Orders, it may be necessary for prime contractors and subcontractors to provide subject matter experts (SMEs) with the specialized skill sets needed to effectively fulfill these requirements.

  • Please provide additional information regarding the anticipated types, approximate number, typical duration, and expected dollar-value range of Business Case Evaluation Task Orders that WSSC Water anticipates issuing under this BOA.

    Each Business Case is tailored to address a specific business need, resulting in unique characteristics for each case, including variations in type, cost, and timeframe.

  • Please clarify the primary business and operational outcomes WSSC Water seeks to achieve through its Smart One Water Utility vision and how WSSC expects those objectives to be incorporated into Business Case Evaluations.

    Bidders shall clearly articulate a compelling narrative demonstrating how their proposed approach embeds WSSC Water’s Smart One Water vision into Business Case Evaluations (BCEs).

  • Please identify which positions listed in Section 8.2 WSSC Water considers “key personnel” for purposes of TAB 2 and Section 8.3, Change of Key Personnel.

    The pricing page outlines our insights into the key positions necessary to effectively meet the unique requirements of task orders under this BOA contract. While we've identified several critical roles, this list is not exhaustive, and additional positions may be required to successfully execute specific Task Orders. We encourage the bidding team to submit resumes for those individuals they identify and designate as Key Personnel.

  • Should Offerors propose enhancements to WSSC Water's existing 12-step Business Case Evaluation process, or does WSSC expect the successful consultants to apply the existing process without modification except when WSSC directs use of a streamlined BCE?

    Each task order is crafted to meet distinct business needs. Bidders should understand that the established process serves as the core framework. The WSSC maintains exclusive authority and ownership over any modifications to the comprehensive 12-step BCE process, ensuring that we uphold our commitment to quality and consistency.

  • What existing enterprise data sources, asset information, financial models, GIS data, planning models, decision-support tools, and prior Business Case Evaluations will WSSC Water generally make available to consultants performing Task Orders?

    Consultants assigned to task orders will receive the necessary access to WSSC's managed data and informational tools. They will adhere to our established security protocols to efficiently and effectively meet the specified business objectives.

  • Section 4.7 states that labor rates will remain firm for the duration of the contract. Please confirm whether the proposed hourly rates must remain unchanged through both the three-year base term and any exercised two-year option period.

    Labor rates will remain firm for the duration of the contract and remain unchanged through both the three-year base term and any exercised two-year option period.

  • Section 4.5 states that the 80-page Technical Proposal limit is inclusive of resumes, exhibits, appendices, and attachments required to be submitted with the Proposal. Please confirm whether the Appendix A OSDI Participation forms and Appendix C Submission Forms uploaded separately through the Vendor Questionnaire in the OpenGov Portal are included in the 80-page Technical Proposal limit.

    OSDI forms and submission forms should be uploaded separately and do not count toward the 80-page Technical Proposal limit.

  • Will WSSC Water be providing a copy of the slides presented at the Pre-Bid Meeting?

    Please see slides uploaded to the Addenda & Notices section.

  • If the Business Case Evaluation (BCE) uncovers non-IT or software gaps (such as those requiring updating hydraulic models or master plans) that lead to a follow-up RFP, would the firm performing the BCE be restricted from pursuing that new solicitation?

    Participation in the current initiative does not automatically disqualify your firm from participating in future phases, either as a Prime contractor or subcontractor. However, eligibility will depend on the scope of work performed and whether that involvement creates an organizational conflict of interest or an unfair competitive advantage. Any potential conflicts will be evaluated in accordance with WSSC Water's procurement requirements.

  • Section 8.2 identifies 25 consultant roles, while Tab 2 requests the qualifications and experience of key personnel. Please identify which Section 8.2 positions WSSC Water considers key personnel for proposal evaluation and confirm whether resumes are required for every listed role or only for the personnel designated by the Offeror as key personnel.

    The pricing page outlines our insights into the key positions necessary to effectively meet the unique requirements of task orders under this BOA contract. While we've identified several critical roles, this list is not exhaustive, and additional positions may be required to successfully execute specific Task Orders. We encourage the bidding team to submit resumes for those individuals they identify and designate as Key Personnel.

  • The RFP states that task orders will be issued on a Time and Materials basis and that proposed labor rates must remain firm for the contract duration. Please confirm whether the submitted labor rates must remain unchanged throughout the three-year base term and potential two-year option period, or whether WSSC Water will permit annual escalation or submission of revised rates when exercising the option period.

    Labor rates will remain firm for the duration of the contract and remain unchanged through both the three-year base term and any exercised two-year option period.

  • The Technical Proposal is limited to 80 single-sided pages inclusive of resumes, exhibits, appendices, and attachments required with the proposal. Please confirm whether Appendix C forms and Appendix A OSDI participation forms count toward the 80-page Technical Proposal limit or are submitted separately through the Vendor Questionnaire and excluded from that limit.

    OSDI forms and submission forms should be uploaded separately and do not count toward the 80-page Technical Proposal limit.

  • Section 8.4 states both that task-order requests will be issued to all awarded contractors and that WSSC Water may issue task orders to the BOA holder whose qualifications best meet the assignment. Please confirm whether every task order will be competed among all BOA holders, or whether WSSC Water may directly select a BOA holder based on qualifications, availability, past performance, and other stated factors.

    WSSC maintains the discretion to implement the most effective strategies for selecting the ideal team or combination of teams dedicated to achieving the desired outcomes, in alignment with the business objectives specified in the task order.

Plain text

OpenGov categories

  • 221310 · Water Supply and Irrigation Systems
  • 221320 · Sewage Treatment Facilities
  • 236220 · Commercial and Institutional Building Construction
  • 237110 · Water and Sewer Line and Related Structures Construction
  • 518210 · Data Processing, Hosting, and Related Services
  • 541330 · Engineering Services
  • 541350 · Building Inspection Services
  • 541380 · Testing Laboratories
  • 541511 · Custom Computer Programming Services
  • 541611 · Administrative Management and General Management Consulting Services
  • 541614 · Process, Physical Distribution, and Logistics Consulting Services
  • 541618 · Other Management Consulting Services
  • 541620 · Environmental Consulting Services
  • 541690 · Other Scientific and Technical Consulting Services
  • 561110 · Office Administrative Services
  • 562211 · Hazardous Waste Treatment and Disposal
  • 562219 · Other Nonhazardous Waste Treatment and Disposal