State and local · OpenGov
C26010 CMAR CAWCD Headquarters Building 2 HVAC Replacement
Description
The Central Arizona Water Conservation District (CAWCD), a municipal corporation organized and existing under and by virtue of the laws of the State of Arizona, is soliciting competitive sealed SOQs for a CMAR to perform preconstruction services for CAWCD Headquarters Building 2 HVAC Replacement Project. SOQs must be received no later than 2:00 pm on Thursday, December 17, 2026 . Response to the solicitation shall be submitted electronically on CAWCD’s OpenGov website: https://procurement.opengov.com/portal/centralarizonaproject SOQs must be in the actual possession of the CAWCD at the location indicated, on or prior to the exact time and date indicated above. Late SOQs will not be considered . No paper documents will be accepted. Responses to the solicitation shall be submitted electronically on OpenGov. Offers submitted different than specified may be rejected at the discretion of CAWCD. Submittal of an SOQ in response to this solicitation shall be construed as the intent to be bound by any resultant contract. In accordance with ARS 34-603, estimated costs to complete the work shall not be included in the SOQ. If estimated costs or hourly or daily rates are submitted, the SOQ will be rejected. The SOQ submittal (excluding Exhibit A, the Certificate of Good Standing, and corporate resolution) must be limited to 15 pages. Adherence to the maximum page criterion is critical. Pages that have project photos, charts, and/or graphs will be counted towards the number of pages. Front and back covers, table of contents pages, and divider (tab) pages will not be counted unless they include qualifications information that could be considered by the selection panel. SOQ preparation costs are the sole responsibility of the submitting entity, including any costs associated with any requested oral presentation/demonstration in response to this RFQ. SCOPE OF CMAR PRECONSTRUCTION SERVICES Project Description CAWCD is seeking a qualified CMAR to provide design phase assistance and complete construction services for the C26010 CMAR CAWCD Headquarters Building 2 HVAC Replacement . The estimated construction budget is $10M . The Central Arizona Project Headquarters is located at 23636 N 7th Street in Phoenix, AZ. HDQ2 consists of a combination of office space, conference rooms, and three large high bay areas serving the auto shop (North Quad), machine shop (West Quad), and warehouse (South Quad). The Central Core (two-story) of HDQ2 serves as the main office space for CAWCD’s Engineering and Maintenance organizations. The spaces affected by this project encompass a total area of approximately 127,400 SF. Most of the HVAC system serving the East Quad (17,000 SF) was replaced in 2017 and will not be included in this project. However, a 5-ton (TN) direct expansion (DX) unit, HP-16 (2011), should be evaluated for replacement. Refer to Figure 1 below for general layout information. The project will replace evaporative cooling serving the North, West, and South Quads and packaged direct-expansion (DX) equipment serving the Central Core with a chilled water HVAC system and associated electrical improvements. The estimated construction budget is $10M. Project Areas and Scope Limits Building 2 includes office and interior spaces, the North Quad light and heavy auto shops, the West Quad CNC machine and weld shops, and the South Quad warehouse. The work includes replacement of Central Core AAON units with variable air volume chilled water air handlers and new air handlers and fan coils for areas currently served by evaporative cooling. The concept layouts include energy recovery ventilation at the light and heavy auto shop air handlers. The majority of the East Quad is outside the concept scope; however, the layouts identify an East Quad woodshop fan coil with electric heat. The Titan unit and paint booth are identified as outside the concept scope. The CMAR shall verify scope boundaries and interfaces with CAWCD and the design engineer. Earlier solicitation area figures and exclusions shall not supersede the current design documents. Concept Alternatives Concept 1 Traditional Two Pipe Central Plant. A ground-mounted air-cooled chilled water plant in a concrete block mechanical yard would use three screw chillers, with two operating and one standby for building-level N+1 redundancy. Constant-speed primary and variable-speed secondary pumping would serve buried chilled water supply and return piping to Building 2. Air handlers and fan coils would use electric heat. Yard space and distribution provisions could support future expansion; future buildings are not included unless expressly authorized. Concept 2 Localized Chillers Per Quad. Three independent air-cooled plants would serve the North Quad, West Quad, and combined South Quad and Central Core. The concept layouts use roof-mounted chillers with new steel platforms and roof reinforcement, local two-pipe chilled water distribution, electric heat, and variable primary pumps with one duty and one standby pump per plant. Each area would depend on one chiller, with portable chiller connections for temporary cooling. North and West Quad change-over heat pump chillers are a possible alternative requiring further study and are not included in the stated concept estimate. Concept 3 Four Pipe Modular Heat Pump Central Plant. A ground-mounted plant in a concrete block mechanical yard would use modular heat pump chillers arranged in three banks, with N+2 redundancy at the module level. Buried chilled water piping would serve the building, and a separate heating hot water supply and return system would serve the North and West Quad shops. The Central Core and South Quad would retain electric heat. Primary and variable-speed secondary pumping would be provided for both water systems. This concept permits simultaneous heating and cooling and requires more piping and refrigeration components to maintain. Electrical Improvements Existing distribution includes two 3,000-amp, 480/277-volt, three-phase, four-wire switch sections, SS-1 and SS-2, and five ITE distribution boards, DSH-1 through DSH-5, apparently manufactured in 1986. Load recording indicates spare capacity; the report recommends replacing distribution boards where new load will be added because of equipment age. The CMAR shall review equipment condition, available capacity, replacement sequencing, utility coordination, and outage requirements with the design engineer. Concepts 1 and 3 anticipate a new 2,000-amp, 480/277-volt, three-phase, four-wire service for the central plant. Concept 1 also anticipates replacement distribution boards for building electric heat. Concept 2 anticipates replacement of SS-1 and SS-2 and distribution boards to serve chillers, pumps, and electric heat. Electrical ratings and quantities remain subject to engineering verification; the CMAR shall identify conflicts between preliminary loads, equipment selections, and proposed service capacity before procurement. Construction Phasing and Operational Continuity For Concepts 1 and 3, the mechanical yard, equipment pads, chillers, pumps, and buried piping can be constructed while existing HVAC remains in operation. The central plant is intended to be started, commissioned, and operational before replacement air handling equipment is connected area by area. The CMAR shall establish transition sequencing, testing prerequisites, contingency measures, and any temporary conditioning required to maintain operations. Concept 2 requires structural reinforcement, steel installation, and crane picks over occupied areas. The CMAR shall identify necessary vacancies, exclusion zones, roof protection, lifting plans, temporary cooling connections, and coordinated work windows. Assess the schedule and operational effects of performing this work around CAP occupancy and the Monday through Thursday work week. Anticipated Construction Schedule CAWCD anticipates a start date for construction activities by about September 2027 . CAWCD anticipates that the selected CMAR will assist in determining the optimal construction schedule that will best accommodate necessary construction activities and the needs of CAWCD. Project Schedule: 1. CMAR Preconstruction Contract February 2027 2. GMP 1 Due – Long Lead Equipment April 2027 3. Construction Contract Awarded August 2027 4. Construction Phase 1 – West Quad September 2027 5. Construction Phase 2 – North Quad February 2028 6. Construction Phase 3 – Central Quad July 2028 7. Construction Phase 4 – South Quad November 2028 8. Project Closeout December 2028 Preconstruction Phase Deliverables Once a CMAR selection has been made, the CMAR will provide a scope of preconstruction phase services that will be reviewed, changed as needed, and approved by CAWCD. The scope of preconstruction-phase services submitted by the CMAR will form the basis of the preconstruction phase contract. The CMAR will provide the agreed-upon services as applicable from the preconstruction phase through the end of the project design and guaranteed maximum price (GMP) process. The CMAR will begin the project as a CAWCD agency support role for preconstruction phase services and will (if successful) be awarded the construction phase of the project. Prior to construction, the CMAR will assume the risk of delivering the project through a GMP contract. The CMAR will be responsible for construction means and methods and may be required to solicit bids from prequalified subcontractors to perform the work using the CMAR-approved selection process. The CMAR may also compete to self-perform limited amounts of work. Services by the CMAR Provide project planning and scheduling. Provide for construction phasing and scheduling that will minimize interruption to CAWCD operations. Provide alternate systems evaluation and constructability reviews. Advise CAWCD on methods to gain efficiencies in project delivery. Provide a long-lead equipment procurement study, including chillers, air handlers, pumps, controls, switchgear, and distribution boards. Identify release dates, submittal and fabrication durations, delivery risks, storage needs, and warranty impacts. Initiate procurement only upon separate written CAWCD authorization. Protect CAWCD's interest in quality, safety, and environmental factors. Attend regular project meetings with CAWCD and designer. Provide detailed cost estimating, value engineering, and knowledge of market conditions. Develop a construction cost model from concept information and update it at the 30% and subsequent agreed design milestones, including final unreviewed and final design. Identify assumptions, exclusions, phasing costs, temporary systems, escalation, and unresolved scope. Provide complete GMP proposals with schedule-of-value breakouts and any assumptions or exclusions clearly stated. Deliverables Construct the selected HVAC and associated site, structural, electrical, and controls improvements in accordance with the approved construction documents. Arrange procurement, delivery, handling, storage, and installation of materials and equipment. Bid, award, and management of all construction-related subcontracts. Provide quality control, installation inspections, testing, balancing, startup, and commissioning support. Provide required bonds and insurance for the project. Coordinate owner issues, training, record documents, operation and maintenance manuals, and warranty obligations. Maintain a safe worksite and protect occupants, ongoing operations, existing facilities, and equipment. Design Document Reviews CMTA, Inc. prepared the 15% Design Concept Report. The CMAR will work with CAWCD and its design engineer to develop a project within the approved budget and operational requirements. Reviews will begin with the concept information and continue through the 30% and subsequent agreed design milestones, including final unreviewed and final design. Responsibility for engineering design remains with the design engineer. The CMAR will evaluate periodically the availability of labor, materials/equipment, building systems, cost-sensitive aspects of the design, and other factors that may impact the cost estimate, GMP proposals, and/or the project schedule. The CMAR will recommend, in conjunction with the project team, those additional surface and subsurface investigations that, in its professional opinion, are required to provide the necessary information for the CMAR to construct the project. The CMAR will meet with CAWCD as required to review designs during their development. The CMAR will familiarize itself with the evolving documents through the various design phases. The CMAR will proactively advise CAWCD and make recommendations on factors related to construction costs and concerns pertaining to the feasibility and practicality of any proposed means and methods, selected materials, equipment and building systems, and labor and material availability. The CMAR will address concerns that exist with respect to coordination of the drawings and specifications. The CMAR will recommend cost-effective alternatives. The CMAR will routinely conduct constructability and bidability reviews of the drawings and specifications, as necessary, to satisfy the needs of CAWCD. The reviews will attempt to identify all discrepancies and inconsistencies in the construction documents, especially those related to clarity, consistency, and coordination of the work of subcontractors and suppliers. Constructability Reviews The CMAR will evaluate the following: The drawings and specifications are configured to enable efficient construction. Design elements are standardized. Construction efficiency is properly considered in the drawings and specifications. The design promotes accessibility of personnel, material and equipment, and facilitates construction under adverse weather conditions. Sequences of work required by or inferable from the drawings and specifications are practicable. The design has taken into consideration efficiency issues concerning access and entrance to the site, laydown and storage of materials, staging of site facilities, construction parking, and other similar pertinent issues. Bidability Reviews The CMAR will check cross-references and complementary drawings and sections within the specifications and generally evaluate and satisfy themselves of the following: The drawings and specifications are sufficiently clear and detailed to minimize ambiguity and reduce scope interpretation discrepancies. Named materials and equipment are commercially available and are performing well or otherwise in similar installations. Specifications include alternatives in the event a requirement cannot be met in the field. In the CMAR's professional opinion, the project is likely to be subject to differing site conditions. The results of the reviews will be provided to CAWCD in formal, written reports clearly identifying all discovered discrepancies and inconsistencies in the drawings and specifications with notations and recommendations made on the drawings, specifications, and other documents. If requested by CAWCD, the CMAR will meet with CAWCD and Design Engineer to discuss any findings and review reports. The CMAR's reviews will be from a contractor's perspective, and though it will serve to reduce the number of requests for information (RFIs) and changes during the construction phase, responsibility for the drawings and specifications will remain with the design engineer and not the CMAR. Project Meetings The CMAR should anticipate submitting a scope of services that accounts for project reporting and adequate attendance at necessary project meetings associated with the preconstruction phase of the project. Cost Estimates Unless otherwise agreed to by CAWCD and the CMAR, within fourteen (14) days after receipt of the design documents for the interim and final unreviewed design stage, the CMAR shall provide a detailed cost estimate and written review of the documents. If any estimate submitted to CAWCD exceeds previously accepted estimates of the CAWCD project budget, the CMAR shall make appropriate recommendations on methods and materials to the CAWCD and design engineer that they believe will bring the project back into the project budget. In between these milestone estimates, the CMAR shall periodically provide a tracking report that identifies the upward or downward movements of costs due to value engineering or scope changes. It shall be the responsibility of the CMAR to keep CAWCD informed as to the major trend changes in costs relative to CAWCD's budget. If requested by CAWCD, the CMAR shall prepare a preliminary "cash flow" projection based upon historical records of similar projects to assist CAWCD in the financing process. Guaranteed Maximum Price (GMP) Proposals The proposed GMP for the construction phase (or portions thereof) will be presented in a format acceptable to CAWCD (see EXHIBIT B – GMP SUBMITTAL REQUIREMENTS ). In addition to Exhibit B, the contractor will be required to submit a detailed breakdown for the cost of the work that is reasonably tied to the anticipated progression of the work. The lump sum breakdown will also assist in estimating the progress towards completion of an item. CAWCD will provide its Division 00 standard contract language to the CMAR before the CMAR is required to submit a GMP. The GMP is comprised of the following not-to-exceed cost reimbursable and lump sum amounts, defined below. The cost of the work is a lump sum, not-to-exceed amount. The general conditions costs are a firm, fixed lump sum amount, which will include bonds and insurance based on the full contract price for construction. The construction fee is a firm, fixed lump sum. Taxes are considered to include all sales, use, consumer, and other taxes that are legally enacted when negotiations of the GMP are concluded. Taxes are actual costs and are a not-to-exceed reimbursable amount. The GMP shall be increased or decreased by the amount of any after-imposed tax, provided the contractor warrants in writing that no amount for such newly imposed excise tax or duty or rate increase or decrease was included in the GMP, as a contingency reserve or otherwise. No adjustment shall be made in the GMP under this section unless the amount of the adjustment exceeds $250. An updated/revised project schedule will be included with the GMP proposal(s) that reflects the GMP plans and specifications. Any such project schedule updates/revisions will continue to comply with the anticipated construction schedule. GMP proposal(s) review and approval: The CMAR will meet with CAWCD to review the GMP proposal(s) and the written statement of its basis. In the event CAWCD discovers inconsistencies or inaccuracies in the information presented, the CMAR will make adjustments as necessary to the GMP proposal, its basis, or both. The CMAR must provide CAWCD a detailed GMP within twenty-one (21) calendar days after receipt of the final design documents. Major Subcontractor and Major Supplier Selections The selection of major subcontractors and suppliers should occur prior to submission of the GMP proposal. Major subcontractors may be selected based on qualifications or a combination of qualifications and price. Subcontractors shall not be selected based on price alone. Except as noted below, the selection of major subcontractors/suppliers is the responsibility of the CMAR. In any case, the CMAR is solely responsible for the performance of the selected subcontractors/suppliers. The CMAR will prepare a subcontractor/supplier selection plan and submit the plan to CAWCD for approval. This subcontractor selection plan shall identify those subcontractor trades anticipated to be selected by qualifications only per this paragraph and those subcontractor trades anticipated to be selected by qualifications and competitive bid in accordance with the following paragraph. This plan wil
OpenGov categories
- 90638 · General Construction - Architectural
- 90921 · Building Construction, Industrial (Warehouse, etc.)
- 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
- 90930 · Building Construction (Not Otherwise Classified)