State and local · OpenGov
Cabling Services for E- Rate Funding Year 27- 28
Description
This Request for Proposal (RFP) is for Category 6 UTP ethernet compliant cabling materials and installation for twenty-six (26) District sites. TUSD seeks a 2-year contract for Internal Connections, and about half of the sites will be purchased in Funding Year 2027 and the remaining sites in Funding Year 2028. Pricing and quantities must be firm for both years of the contract, though a contingency amount may be included in the Offeror’s bid to accommodate possible site substitutions, in the event of school closure(s). Tucson Unified School District has dramatically increased network traffic in recent years. This project will support the expansion of current and future network traffic through installation of network wiring, and Outdoor Access Points (OAP), and related equipment. The proposal that is deemed to most cost-effectively meet the stated Applicant requirements and therefore is in the best interest of the Applicant, will be selected. A purchase order will be issued upon a favorable funding commitment decision, but no sooner than July 1, 2027 for contract year one (1) and July 1, 2028 for contract year two (2), in accordance with TUSD accounting procedures. In addition, the District reserves the right to limit or modify the scope of work based on budgetary limitations unrelated to the E-Rate program. To ensure funding availability, all contractor invoicing to TUSD must be issued no later than June 30, 2028 for contract year one (1) and June 30, 2029 for contract year two (2); in the event of delayed funding commitment or delivery delays, extensions may be allowed. Applicant – Tucson Unified School District Billed Entity Number – 143120 Establishing Form 470 – 270002130 Offerors must include their E-Rate SPIN (Service Provider Identification Number), FCC Registration Number, and evidence of green light status. Adhere and comply with all requirements of the product Manufacturer. Offeror shall include details of its extended product warranty and system assurance with proposal response Scope of Work Scope of Work This RFP is to install category 6 cabling at twenty-six (26) various locations within the school district over two (2) fiscal years. This cabling is to support outdoor wireless access points, to be mounted later within the same funding year. Vendors will be expected to install surface mount boxes (biscuits) and outdoor single-gang weatherproof boxes at the mount point for the outdoor access points. Offeror shall provide pre-discount pricing for: • E-Rate eligible items including taxes, shipping, and installation/configuration (if applicable) • Items not eligible for E-Rate support, including taxes, shipping, and installation (if applicable) • Other expenses as appropriate • Contingency pricing to accommodate possible site substitutions, in the event of school closure(s) All communication regarding this RFP, including questions and clarifications, must be conducted via email to Jacqueline.Posey@tusd1.org. No Phone calls or in-person inquiries will be accepted. Vendors are responsible for ensuring their email communications are successfully received by the designated contact listed in this RFP. Colors for these are as listed: • Category 6 Unshielded cables – Green • Category 6 QuickPort compatible Jacks – Orange • Surface Mount Boxes (biscuits) - Ivory • Outdoor Single-Gang Weatherproof Boxes - Gray Vendor Requirements Offerors must include their E-Rate SPIN (Service Provider Identification Number) and FCC Registration Number and evidence of green light status. Adhere and comply with all requirements of the product Manufacturer. Offeror shall include details of its extended product warranty and system assurance with proposal response. Submission of this proposal certifies all equipment and services are compliant with the FCC Order (FCC 19-121) prohibiting the sale, provision, maintenance, modification, or other support of equipment or services provided or manufactured by Huawei, ZTE, or any other “covered company” deemed a national security threat. REQIRED DOCUMENTS WITH RFP SUBMITTAL Appendix A - Signed Price Page Appendix B - Vendor Questionnaire Introduction In accordance with School District Procurement Rules in the Arizona Administrative Code (A.A.C.) promulgated by the State Board of Education pursuant to A. R. S. 15-213, bids for the material or services specified will be received by the Tucson Unified School District electronically through OpenGov. Proposals received by the correct time and date shall be opened and the vendor’s who submitted shall be publicly read. After the proposals submitted in response to a request for proposal are opened and the award is made the governing board shall make available for public inspection all information, all proposals and all findings and other information considered in determining whose bidproposal conforms to the request for proposals and will be the most advantageous with respect to price, conformity to the specifications and other factors to be selected for the award. Summary Background Contact Information Timeline Please note the Bid Submission Deadline time. Bids will not be accepted after this programmed time. For example: If the Bid Submission Deadline time is 10:00am the deadline is a hard cut-off. The system will not allow you to click "Submit" at 10:00:00:00:00 (and so on). A submission at 10:00:01 is late and will not be accepted. Also note the submission time is Local Arizona time. We do not observe Daylight Savings time. Documents Referenced DOCUMENTS REFERENCED: You may access a copy of the documents referenced within this proposal at the following web addresses: Arizona Revised Statutes (A.R.S.) is available at: www.azleg.state.az.us/ArizonaRevisedStatutes.asp. The Arizona School District Procurement Rules in the Arizona Administrative Code is available at: www.azsos.gov/rules/arizona-administrative-code I.R.S W-9 Form (Request for Taxpayer I.D. Number) is available at: www.irs.gov/pub/irs-pdf/fw9.pdf. Code of Federal Regulations is available at: http://www.ecfr.gov Uniform Instructions to Offerors Definition of Terms As used in these instructions, the terms listed below are defined as follows: “Attachment” means any item the Solicitation requires a Bidder or Offeror to submit as part of the Offer. “Award” means a determination by District that it is entering into a contract with one or more Bidders or Offerors. “Bid” means a response to an invitation for bids and includes an offer to contract with District. “Bidder” means a person submitting a Bid in response to an invitation for bids. "Contract" means a legally binding contractual agreement, regardless of what it may be called, for the purchase of materials, services, construction or construction services, or the disposal of materials by District. “Contract” includes the combination of the Solicitation, including the Uniform and Special Instructions, the General and Special Terms and Conditions, and the Specifications and Statement or Scope of Work; the Offer and any Best and Final Offers; and any Solicitation Addendums or Contract Amendments; and any terms applied by law. A Contract does not include a contract or agreement prepared and requested by Contractor unless it contains a provision that expressly states that it will be deemed part of the Contract, identifies what provisions of the Contract, if any, are superseded by the Contract or agreement, and is signed by the District Representative. “Contract Amendment” means a written document that is authorized by the District Representative and issued by District for the purpose of making changes to the Contract. “Contractor” means any person who has a contract with District. An Offeror or Bidder who has been awarded a Contract by District is a Contractor of District. “Days” means calendar days unless otherwise specified, and time measured in days in which an act is required to be done shall be computed according to A.R.S. §1-243. “District” means Tucson Unified School District . “District Representative” means Jacqueline Posey , Procurement Agent , or their designee. “Exhibit” means any item labeled as an Exhibit in the Solicitation or placed in the Exhibits section of the Solicitation. “Gratuity” means a payment, loan, subscription, advance, deposit of money, services, or anything of more than nominal value present or promised, unless consideration of substantially equal or greater value is received. “Offer” means Bid, Proposal, or quotation. “Offer Deadline” means the exact date and time when no Offer submitted thereafter may be considered or accepted by District. “Offeror” means a person submitting a Proposal in response to a request for proposals. “Proposal” means a response to a request for proposals and includes an Offer to contract with District. “Purchase Order” means a document issued by District, in writing or electronically, and identified as a Purchase Order that authorizes Contractor to proceed with fulfillment of all or part of an awarded Contract by delivery of materials or services in quantities and at times and locations specified in the Purchase Order. "Responsible Bidder or Offeror" means a person who at the time of Contract Award has the capability to perform the Contract requirements and the integrity and reliability which will assure good faith performance. “Responsive Bidder or Offeror" means a person who submits an Offer that reasonably and substantially conforms to all material requirements of the Solicitation. "Solicitation" means an invitation for bids, an invitation to submit technical offers, a request for proposals, a request for qualification, or any other invitation or request by which District invites a person to participate in a procurement. A Solicitation includes, in addition to the Invitation for Bid or Request for Proposal, the Uniform Instructions for Offers, General Terms and Conditions for Contract, Special Terms and Conditions for Contract, Statement of Scope of Work/Specifications, Solicitation Addendums, and Solicitation Exhibits and Attachments. “Solicitation Addendum” means a written document that is authorized by the District Representative and issued by District for the purpose of making changes, clarifications, or additions to the Solicitation. “The Solicitation Contact Person” for the Solicitation is the procurement agent. “Subcontract” means any Contract, express or implied, between Contractor and another party or between a subcontractor and another party delegating or assigning, in whole or in part, the making or furnishings of any material or any service required for the performance of the Contract. Pre-proposal Inquiries Duty to Examine. It is the responsibility of the Bidder or Offeror to examine the entire Solicitation, seek clarification in writing, and check its Offer for accuracy before submitting the Offer. Lack of care in preparing an Offer shall not be grounds for withdrawing the Offer after the Offer Deadline. Solicitation Contact Person. Any inquiry related to a Solicitation, including any requests for or inquiries regarding standards referenced in the Solicitation shall be directed solely to the Solicitation Contact Person. The Bidder or Offeror shall not contact or direct inquiries concerning the Solicitation to any other employee unless the Solicitation specifically identifies a person other than the Solicitation Contact Person as a contact. Submission of Inquiries. The Solicitation Contact Person may require that an inquiry be submitted in writing. Any inquiry related to a Solicitation shall refer to the appropriate Solicitation number, page, and paragraph. Do not place the Solicitation number on the outside of the envelope containing the inquiry since it may then be identified as an Offer and not be opened until after the Offer Deadline. Requests for Exceptions. A Bidder or Offeror may submit to the Solicitation Contact Person a written request for an unsubstantial, nonmaterial exception or deviation to a specific term, condition, or other provision in the Solicitation. Requests for an exception must identify the specific condition, term, or other provision to be excepted or modified and clearly state any proposed substitutions or modifications thereto. A requested exception that substantially or materially alters a term, condition, or other provision shall be rejected. The District Representative or designee shall determine, in his or her sole discretion, whether an exception is substantial or material and advise the Bidder or Offeror of the decision. Submission of the Bidder’s or Offeror’s preprinted contract in place of the General or Special Terms and Conditions of a Solicitation shall be rejected. A request for exceptions shall not be accepted, in whole or in part, unless accepted in writing by the Solicitation Contact Person or District Representative. A request for exceptions in the form will be considered by District when evaluating the Offer. If the request for exceptions is not acceptable, District will reject the Offer. Timeliness. Any inquiry shall be submitted as soon as possible and per Question Deadline. Failure to do so may result in the inquiry not being answered. No Reliance on Verbal Responses. Any inquiry that results in changes to the Solicitation shall be answered solely through a written Solicitation Addendum. A Bidder or Offeror may not rely on verbal responses from the Solicitation Contact Person to inquiries. Pre-proposal Conference. If a pre-proposal conference has been scheduled under the Solicitation, the date, time, and location shall appear on the Solicitation cover sheet or elsewhere in the Solicitation. A Bidder or Offeror should raise any questions it may have about the Solicitation at the conference, though written submission must follow to obtain a written response. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Solicitation Contact Person. Requests should be made as early as possible to allow time to arrange for the accommodation. Verbal responses to questions raised at the conference shall not amend the Solicitation. If an issue is raised at the conference that results in a decision by District to amend the Solicitation, the Solicitation may be amended only by issuance of a written Solicitation Addendum. A Bidder or Offeror may not rely on any verbal responses to questions at the conference. Proposal Preparation Forms. Only Electronic Proposals shall be submitted either on the forms provided in the Solicitation or their substantial equivalent. Any substitute document for the forms provided in the Solicitation must be legible and contain the same information requested on the form. An offer submitted via facsimile or by physical mail shall be rejected. Corrections, erasures, interlineations, or other modifications in the proposal must be initialed by the person signing the Offer. Modifications shall not be permitted after proposals have been opened except as otherwise provided under applicable law. Acknowledgement and Acceptance. The Acknowledgement and Acceptance of Terms and Conditions of Solicitation, within the Vendor Questionnaire, must be submitted with the Offer and acknowledged by a representative of the Bidder or Offeror. All exceptions or modifications requested by the Bidder or Offeror, regardless of whether District previously accepted the requested exceptions or modifications requested by the Bidder or Offeror, must be clearly set forth in the Acknowledgement and Acceptance of Terms and Conditions of Solicitation form. Any exceptions or modifications set forth in the form that have not been previously accepted by District, may be rejected if District determines, in its sole judgment, that the requested exception or modification would substantially or materially alter a term, condition, or other provision of the Solicitation. Unacceptable exceptions or modifications shall remove the Offer from consideration for award. Offer and Acceptance. The Offer and Acceptance form within the Solicitation must be submitted with the Offer and signature by authorized representative of the Bidder or Offeror. The signature shall signify the Bidder’s or Offeror’s intent to be bound by the Offer and the terms of the Solicitation and that the information provided is true, accurate, and complete. Failure to submit verifiable evidence of intent to be bound, such as an original signature, may result in rejection of the Offer. Subcontractors. A Bidder or Offeror shall clearly list any proposed subcontractors and the subcontractor’s proposed responsibilities in the Offer. Cost of Offer Preparation. District will not reimburse a Bidder or Offeror for the cost of responding to a Solicitation. Solicitation Addendum. Unless otherwise stated in the Solicitation, each Solicitation Addendum may be acknowledged electronically by the person signing the Offer, and may be submitted no later than the Offer Deadline. Failure to acknowledge a Solicitation Addendum may result in non consideration of the Offer. Tax Identification Numbers. A Bidder or Offeror must provide his or her Arizona Transaction Privilege Tax number and/or Federal Employer Identification number, if applicable, in the space provided on the Offer and Acceptance Form and provide the tax rate and amount, if applicable, on the Cost Form. Taxes. Prices stated in a Solicitation shall not include applicable state and local taxes. District is exempt from paying federal excise tax and state property taxes. District is not exempt from state and local transaction privilege (sales) taxes. The amount of any applicable transaction privilege or use tax of a political subdivision of the State is not a factor in determining the lowest Bidder. Shipping/Delivery. Terms and conditions relating to shipping and delivery are “FOB Destination, Freight Prepaid and Allowed.” The shipping and delivery terms are further described in the General Terms and Conditions of Contract and are subject to modification in the Special Requirements of this Solicitation. Order of Precedence. A Solicitation includes, in addition to the Request for Proposal, the following documents listed in their order of precedence: If applicable, Best and Final Offer (BAFO) Solicitation Addendums Special Requirements of Solicitation General Terms and Conditions of Contract Statement of Scope of Work/Specifications Solicitation Attachments and Exhibits Uniform Instructions for Offers In the event of a conflict between provisions in two or more of the foregoing Solicitation documents, the document having a higher order of precedence will prevail over the other document or documents with conflicting provisions. Submission of Proposal Each Offer shall be submitted electronically through OpenGov. Proposal Amendment or Withdrawal. The Bidder or Offeror may withdraw a proposal any time prior to the proposal deadline. The proposal may not be amended or withdrawn after the Offer Deadline, except as otherwise provided under applicable law. Confidential Information. 1. Request for Confidentiality. If a Bidder or Offeror believes that its Offer contains confidential trade secrets or other proprietary information that should not be disclosed, the Bidder or Offeror may submit to the District Representative and the Solicitation Contact Person a Request for Confidentiality of Proprietary Information form that identifies the specific information and explains why it should be protected from disclosure. All information proposed for protection from disclosure shall be so identified wherever it appears in the Offer. Th
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: Updated Site Walk Agenda and Pricing Attachment · 1
Please note there has been a new site walk agenda uploaded in the timeline section. -We will not be walking Borman K-5 on the base this year and it has been replaced with Bonillas Elementary School. Please note the pricing attachment has been updated to remove Borman and add Bonillas.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #2: MANDATORY Site Walks 11-4-2026 · 2
If your company plans to attend the mandatory site walks that begin tomorrow November 4th, 2026 please use the RSVP inside OpenGov and register at least one person from your company so that we know how many sets of maps to print. Thank you!
Public questions and answers
Appendix B, header: The Vendor Questionnaire is labeled RFP 25-077-TUSD1. Please confirm it is the correct questionnaire for RFP 27-029-TUSD1.
The questionnaire is correct, the header did not get updated but is updated now.
Section 7.1, p. 40: Will the outdoor access points be powered by PoE over the new Cat 6 cabling? Please confirm that no new 120V electrical work is included in the scope.
The access points are required to be PoE capable. No electrical work will be required.
Appendix A: The cable estimate is 330 ft per drop, which exceeds the TIA 100 m (328 ft) channel limit for Cat 6. Is this estimate for pricing purposes only, or does it reflect expected installed lengths?
This is the recommended cabling length estimate for pricing from our Erate consulting firm. The length expectations are reliant on the RFP winner's experience and cabling standards.
Appendix A / Section 7.1: Appendix A specifies plenum cable. For the exterior portions of the runs to the outdoor APs, is outdoor-rated or indoor/outdoor-rated cable expected?
The District will defer to the professional expertise and recommended best practices of the awarded vendor
Section 7.1: Can TUSD provide site drawings showing communications closet locations, proposed AP mounting locations, and preferred cable routes?
The winning bidder will receive updated maps upon award. Please make your best estimates based on the walk through and information already provided.
Section 7.1: Should pricing include new pathways (conduit, raceway), core drilling, exterior wall penetrations, firestopping, and patching/restoration?
All quotes must include all labor, materials, and associated costs necessary to complete the project in full.
Section 7.1: What testing standard and test documentation are required for the completed Cat 6 installations?
The District does not require bidders to be Leviton Certified Installers. However, the awarded vendor must adhere to equivalent installation standards and provide a comparable warranty.
Section 7.1: Is there a required labeling standard (e.g., TIA-606) or a TUSD-specific labeling scheme?
There is as TUSD-specific labeling scheme that we would prefer to be consistent with previous installs.
Section 7.1: The specified jacks are “QuickPort compatible.” Is a specific manufacturer or certified cabling system required for the extended warranty and system assurance, or are equivalent products acceptable?
The District uses the Leviton QuickPort system. We recommend using Leviton QuickPort products, though compatible equivalents are permitted.
Section 7.1: Will installations take place during school hours, after hours, weekends, or school breaks?
Installations must take place outside of regular school hours, such as after hours, on weekends, or during school breaks.
Appendix A: Please clarify the unit of measure for “Estimated Related Components” (100 per drop).
Row 3 reflects the total expected quantity of installation runs. Row 4 establishes the maximum cable footage, while Row 5 specifies the maximum number of additional items needed to complete the installation (as detailed in Row 6). Starting on Row 7, bidders are required to itemize all necessary materials and associated labor. Use Rows 4 and 5 to calculate the maximum not-to-exceed price
Section 9.3, p. 46: Can TUSD provide asbestos survey or AHERA management plan information for the 26 sites, and identify any areas along the expected cable routes known to contain ACBM?
This information will be provided/verified prior to start of work. If any issues, TUSD’s Risk Management Department will assess prior to work being performed and determine if mitigation needs to be done.
Section 5.17, p. 35: Is any trenching or excavation expected as part of this scope (e.g., underground pathways to outdoor AP locations)? If so, should it be included in pricing?
All quotes must include all labor, materials, and associated costs necessary to complete the project in full.
Section 3.3.I, p. 10, vs. Section 7.1, p. 40: Section 3.3.I states that prices shall not include taxes, while Section 7.1 and Appendix A include taxes (5.655%). Please confirm which approach to follow.
Your pricing will not be evaluated with taxes however, for e-rate we do have to included, so the spreadsheet will calculate it.
Sections 1.1 and 7.1: Contingency pricing for possible site substitutions is requested, but Appendix A does not include a line for it. How and where should contingency pricing be submitted?
Include Contingency info in column E, “Notes.”
Section 1.1, p. 3, vs. Section 5.1, p. 29: Section 1.1 requires firm pricing for both years, while Section 5.1 allows price increase requests after the initial year. Please confirm whether pricing must remain firm for the full two-year term
Pricing must remain firm for the full two years.
Section 6.1.R, pp. 38–39: Do the Davis-Bacon Act and related prevailing wage requirements apply to this project? If so, please provide the applicable wage determination and certified payroll requirements.
Consistent with section 6.1.R.2, "Davis-Bacon Act - The OFFEROR shall comply with the Davis-Bacon Act (40 U.S.C. 276a to 276a-7) as supplemented by Department of Labor regulations (29 CFR Part 5)."
Sections 6.1.H and 6.1.R, pp. 37–39: Please confirm whether the Copeland “Anti-Kickback” Act and the Contract Work Hours and Safety Standards Act apply to this project.
Consistent with section 6.1.R.1, "Copeland “Anti-Kickback” Act - All contracts and sub grants in excess of $2000 for construction or repair awarded by recipients and sub recipients shall include a provision for compliance with the Copeland “Anti-Kickback” Act."
Section 4.7.A, p. 21: Fingerprint clearance cards are required for personnel providing services “at least five (5) times during a month” at a District school. Does this threshold apply per school or across all District sites, and are cards required for installation crews working at a site for a limited number of days?
This is across district sites. Cards would be required for all employees who would be on site during school hours or who could possibly be on site during school hours.
Section 5.5, p. 30: Section 5.5 references forfeiture of a Bid Bond. Is a bid bond required from the prime contractor, and are performance or payment bonds required? If so, please provide the amounts and required forms.
No.
Section 4.8, p. 22, vs. Section 5.16, p. 33: Please confirm which insurance requirements apply to this project, specifically whether the Section 5.16 limits ($1M Employer’s Liability, Installation Floater) apply.
Yes, 5.16 $1M liability applies.
Will the pricing spreadsheet be updated to reflect the revised estimated footage for Cat6 cable drops and plenum cabling, along with the associated components, based on the updated WAP locations at most schools?
Row 3 indicates the total expected installation runs; use Rows 4 and 5 to calculate the maximum not-to-exceed price. Itemize all required materials and labor starting on Row 7.
OpenGov categories
- 28029 · Communications/Telecommunications Cable and Wire
- 28095 · Wire and Cable (Not Otherwise Classified)
- 72523 · Fiber Optics Cables, Interconnecting Components, and Accessories (Including Wiring Systems Tools and Supplies) (EFFECTIVE 3-1-07 THIS CLASS-ITEM INACTIVATED FOR NEW USE, REFER TO 838-29)
- 83828 · Cable, Copper (Cat. 5E 6 etc) Including Interconnecting Components and Accessories (See Class 280 for Other Communications Cable)
- 83829 · Cable, Fiber Optic w/Interconnecting Components and Accessories (See Class 280 for Other Communications Cable
- 83896 · Wire and Cable, Telecommunication (Not Otherwise Specified)
- 96218 · Cable Construction, Installation and Maintenance (Fiber Optic, Communication, Computer, etc.)