State and local · OpenGov
Carlson Field Athletic Complex: Construction of new Pickleball Courts (REBID)
Description
The Town of Hingham, MA ("Town") is accepting sealed bids for the construction of eight (8) new pickleball courts located at the Carlson Field Athletic Complex at Bare Cove Park Drive. The general work will include but is not limited to the removal of existing trees and shrubs, including stump and root removal, re-grading the site and the installation of the eight (8) new pickleball courts, including posts, nets, walkways, benches, shade shelters, fencing, sound attenuation, new asphalt parking lot and ADA pathways. The Contractor will be responsible for installing and/or maintaining the construction fence and erosion control where needed prior to demolition and site prep and throughout the project. Erosion control and construction fence will be in place from the building demolition contractor, coordinate with contractor to either take over the rental of the construction fence or provide new construction fence as required. Erosion control shall remain in place, be repaired or replaced if needed and maintained throughout the project duration. The Contractor is required to coordinate with the Town and the demolition contractor prior to construction. The demolition contract of Building 12 has been officially awarded by the Town of Hingham Select Board to Pasquazzi Bros, Inc., on September 29, 2026. Estimated Pickleball Court Construction Cost, $1,300,000. Project Details Instructions for Electrical Submittal The Town of Hingham is exclusively accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. By responding to this Invitation for Bid, the bidder agrees that they have read and understand this document as well as any other applicable laws related to c. 30, 39M All bids that are not submitted through the OpenGov Portal will be deemed not acceptable by the Town. Scope of Work and Project Documents The bid documents available for this project are located in the Attachments Section. The Contractor shall furnish all labor, materials, equipment and insurance to perform all work required for said project in strict accordance with the Contract Documents and all related Drawings, Manuals and Specifications. The said Documents and any supplemental general conditions are incorporated herein by reference and are made part of this Agreement. Bid documents were prepared for Project by: CHA Consulting, Inc., 101 Accord Park Drive, Norwell, MA 02061, Michael Moonan, Phone 401-648-3860 Owner/Town/Awarding Authority Where the term Owner/Town/Awarding Authority is used in these Specifications, and other Contract Documents, same refers to the ("Town") Town of Hingham, Massachusetts. Site Information Not Guaranteed; Contractor's Investigation All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner. All such information is furnished only for the information and convenience of the Contractor and is not guaranteed. It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents. Contractor has familiarized himself or herself with the nature and extent of the Contract Documents, work, locality, and with all local conditions and federal, state, and local laws, rules, ordinances, and regulations that in any manner may affect costs, progress, or performance of the work. Contractor has made, or has caused to be made, examinations, investigations, and tests and studies of such reports and related data in addition to those referred to in the paragraph above as he deems necessary for the performance of the work at the Contract Price, within the Contract Time, and in accordance with the other Terms and Conditions of the Contract Documents; and no additional examinations, tests, investigations, reports, and similar data are or will be required by the Contractor for such purposes. Contractor has correlated the results of all such observations, examinations, investigations, tests, reports, and data with the Contract Documents. Contractor has given the Owner written notice of all conflicts, errors, or discrepancies that he has discovered in the Contract Documents, and the resolution thereof by the Owner is acceptable to the Contractor. It is further agreed and understood that the Contractor shall not use or be entitled to use any of the information made available to him/her or obtained in any examination made by him/her in anymanner as a basis of or ground for any claim or demand against the Owner, arising from or by reason of any variance which may exist between the information made available and the actual subsurface conditions or other conditions or structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents. Bidding Procedures Bids for the Work are subject to the provisions of General Laws Chapter 149, Sections 44A- 44J inclusive, as amended and Section 39M through 39R of Chapter 30 as amended. Regulations governing bidding procedure as set forth in above mentioned General Laws must be followed. In the event of any inconsistencies between any of the provisions of these Bidding Documents and of the cited statute, anything herein to the contrary notwithstanding, the provisions of the said statute shall control. No claims for immunity or exceptions predicated upon misunderstanding or failure to correctly interpret the “Invitation for Bid” or the contract Documents will be allowed. Bid Security A 5% bid security (bond or certified check) is required with each bid. For fully executed bid bonds, scan and upload them as part of your electronic bid submission. Also, treasurer's, cashier's or certified checks may be scanned and uploaded. The awarded Contractor must mail the original security or deliver to: Hingham Department of Public Works located at 25 Bare Cove Park Drive, Hingham, MA 02043, Attn: David Sequeira. If the scanned check is uploaded prior to bid due date and time, it will be considered as received. Town's Right Reserved The Awarding Authority reserves the right to reject any and/or all bids, waive minor informalities and award the contract in the best interest of the Town. Questions and Additional Information Bidders requiring additional information, or interpretation of the specification and bid documents, must make request for such information through the question section of the electronic bid portal. Should the bidder find discrepancies in, or omissions from, the plans, specifications, or other contract documents, or should the bidder be in doubt as to their meaning, it should be submitted through the OpenGov portal prior to the submission deadline. Answers to all requests will be published on the project portal and registered bidders will be notified when answers are published. No other explanation or interpretation will be considered official or binding. As a registered bidder, you will also receive addenda notifications to your email by clicking “Follow” on this project. No questions will be answered during the site visit Only questions from interested Contractors will be answered Addenda The Town may, during the bidding period, advise the Bidders by posted and published addenda of additions, omissions, or alterations in the Specifications and drawings. All such changes shall become a part of the contract and shall be included in the work covered by the bid. Failure to acknowledge any addenda may result in disqualification. Communication Related to this IFB All vendor communications concerning this Invitation for Bid shall be directed exclusively via the Questions and Answers Section. FURTHER EXPLANATION TO BIDDERS No oral interpretation will be made. Any interpretations made to bidders will be in the form of an addendum to the Specifications and Drawings posted. Discrepancies, omissions or doubts as to the meaning of Specifications and drawings should be communicated at once to the Owner’s Project Representative for interpretation. This request for clarification must be made in writing through the Question Section of the Portal. Bidders should act promptly and allow sufficient time for a reply to reach them before the submission of their bids and any interpretation made by the Town and/or Consultant prior to receipt of bids shall be posted on the project portal as an addendum and made a part of the Contract. Verbal explanations or instructions will not be binding during the bidding process. Only written addenda are binding. Written addenda resulting from requests for clarifications will be posted on the Project Portal and notification will be sent from the system to all registered bidders. All Bidders will be required to acknowledge all addenda before the system will allow bids to be submitted. In the absence of an interpretation by the Engineer/Architect should the Specifications disagree in themselves or with the drawings, the better quality or the greater quantity of work or materials shall be estimated upon and, unless otherwise ordered, shall be furnished. Requests for clarifications by a prospective Bidder regarding the specifications, or other bid documents must be presented in writing, through the Question section of the project portal. Contractor Where the term Contractor, Prime and/or General Contractor is used in the Specifications, shall mean the Contractor mentioned as such in the Agreement. Where reference is made to Subcontractors, such reference is intended for reasons of clarification and the relationship between the Contractor and said Subcontractors shall be in accordance with the General Conditions. Changes to the Scheduling Addenda A change may be made by the Procurement and Contracts Manager if, in the sole judgment of the Town, the change will not compromise the objectives of this procurement. A change to this schedule will be made by a formal addendum issued by David Sequeira, Procurement and Contracts manager . Addenda issued shall become part of this specification and will be included as part of the final Contract. It is the responsibility of the interested Bidder to assure that they have received any Addenda. All Addenda must be acknowledged via Town’s e-Procurement Portal . Changing Bids Bids may be changed at any time prior to the bid open date and time. To change a bid, log in to your vendor account: https://procurement.opengov.com/login , and go to your submitted proposal. Click on “Unsubmit Proposal”, make the required changes, and submit the proposal again. Withdrawing Bids Bids may be withdrawn any time before the bid open date and time. To withdraw a bid, login to your vendor account: https://procurement.opengov.com/login , go to your submitted proposal. Click on “Unsubmit Proposal." Bidders may withdraw a bid, without penalty, between the close of the bid due date up to the time of Award, and upon demonstrating, to the satisfaction of the Awarding Authority, that a bona fide clerical error was made during the preparation of the bid. Failure to conclusively demonstrate a bona fide clerical error may result in forfeiture of the bid deposit. In the event of a General Bid Withdrawal after Opening of Bids, the Awarding Authority shall consider the bid from the next lowest eligible and responsible bidder. Bid Response Submittal Completed bids must be received prior to the submission deadline via Town’s eProcurement Portal . Respond to the bid by clicking on “Draft Response” on the bid’s public page. LATE BIDS WILL NOT BE CONSIDERED. The Town of Hingham requires the bid to be submitted by a official authorized personnel to legally bind the Bidder. The official time will be the Eastern Time Zone as displayed on the bid open date. Bids must be submitted via Town’s e-Procurement Portal . No E-mail or Hard copies will be accepted. The Bidder has full responsibility to ensure the Bid is submitted at the Hingham Town’s e-Procurement Portal within the deadline. The Town of Hingham assumes no responsibility for any delays in bid submission. Bids will be opened automatically on the portal on the submission date. The Awarding Authority will review all submittals from each bidder. Bids will only be accepted through the OpenGov Portal Contract Award This contract shall be awarded to the lowest responsible and eligible bidder based upon the base bid amount. Such a bidder must possess the skill, ability and integrity necessary for the faithful performance of the work and shall establish his ability to comply with the schedule of work outlined in the Contract section. The term “lowest responsible and eligible bidder” as used herein shall mean the bidder whose bid is the lowest of those bidders possessing the skill, ability and integrity necessary for the faithful performance of the work within the time limit allowed. Action on the award will be taken within thirty (30) business days after the opening of the Bids. Bidder shall sign Agreement with the Town before commencement of construction Notice of Award Regardless of any notification of award to any prospective Contractor, all bids remain open and acceptable by the Town for sixty (60) business days from the bid opening date. Nothing in this paragraph is to be considered a waiver of the Town’s rights against a prospective Contractor who fails to execute a contract once it is awarded. The awarded contractor will be notified by the Procurement and Contracts Manager via OpenGov. The Awarded Bidder shall sign and acknowledge the Notice of Award before the commencement of construction Authorized Contract The c. 30 39M contract shall be signed by both parties (Contractor and Town) before the commencement of construction. Notice to Proceed (NTP) Once final authorization is granted by the Town, the Contractor will receive an official Notice to Proceed ("NTP"). This NTP will allow the awarded Contractor to begin the permitting process. The Awarded Bidder shall sign and acknowledge the Notice to Proceed before the commencement of construction Contract Documents and/or Exhibits The contract with the Town will consist of the following: Construction c. 30 39M Agreement "Exhibit A" Invitation For Bid Solicitation "Exhibit B" Contractor's Response including bid submission, certifications, provided references and all addendum or notices that were issued "Exhibit C" Current Prevailing Wage Sheets "Exhibit D" Certificate of Insurance with the Town of Hingham listed as additional insured Conditions of Work Each bidder shall carefully examine the Contract Documents, shall visit the site, and fully inform themselves as to all existing and controlling conditions and limitations. The submission of a bid shall be conclusive evidence that the Bidder is familiar with all such conditions, including the nature, amount, and location of the work, the type of facilities needed preliminary to and during the execution of the work, the general and local conditions, labor conditions, and all other matters which might in any way affect or have a bearing on the work or its cost. The Contractor shall include all charges for labor, work, material, tools, staging, equipment and supervision that Contractor deems necessary in order to complete, in a thoroughly professional and expeditious manner, all the work described hereafter. All work shall be according to code and approved by the proper authority. Material having salvage value shall become the property of the Town. All other material and debris accumulated as a result of this operation shall become the property of the contractor and shall be removed from the premises by the Contractor. Prior to the Contractor invoicing the Town, the premises must be cleaned from all debris to the satisfaction of the Town of Hingham Permits and Fees The successful bidder shall secure all permits and licenses necessary for the proper execution and completion of the work in accordance with all applicable laws. Anticipated Project Schedule The Prime Contractor shall start the work under this Contract on written notice from and on date set by the Town. The Contractor shall start the work at the location on the date set by the Town and shall continue, without interruption through completion. A. February 2027, Commencement of Construction B. August 31, 2027, Construction Completed C. December 15, 2027, Final Closeout Items Pre-Construction Conference; Designation of Authorized Representatives Before any Work at the Site is started, a conference attended by Town, Contractor and others as appropriate will be held to establish a working understanding among the parties as to the Work, and to discuss the schedule procedures for handling Shop Drawings, Samples, and other Submittals, processing Applications for Payment, electronic or digital transmittals, and maintaining required records. At this conference Town and Contractor each shall designate, in writing, a specific individual to act as its authorized representative with respect to the services and responsibilities under the Contract. Such individuals shall have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of each respective party. Facility Management and Operations Contractor parking, staging, dumpster placement and all other daily fundamental operations are to be coordinated through the Town and/or Consultant. Bare Cove Park, Side Road Access The Town of Hingham Municipal Light Plant as well as Department of Public Works utilizes a side road located off Bare Cove Park for daily operations that include deliveries as well as emergency mobilization. At no time, is the contractor permitted to close and/or partially close off the access point to the road. In the event that a road closure is needed, the Town must be informed at a minimum of seven (7) business days for official authorization by the Town. Notifications The Contractor shall notify the Town within at least 24 hours when/if the Contractor is in need of coordination with personnel, deliveries or other related work associated with the bid. Sales Tax The Town of Hingham and all of its departments are exempt from Massachusetts Sales Tax. A copy of the Certificate of Exemption is available upon request. Hours of Operation 7:00AM - 6:00PM Monday-Friday 8:00AM - 5:00PM Saturday No Work on Sundays This includes mobilization of all construction vehicles. Construction outside of the Hours of Operation must be approved by the Chief of Police, the Board of Health, the Building Department the Town Administrator and/or Select Board. Contractor's that do not adhere to the above hours may be penalized by the Town to the extent applicable Damage to Property The contractor is responsible and liable for any damages that is done to/on the property with machinery and/or related tools. All Town property must be handled with care. Prevailing Wage The contract requires Prevailing Wage, See updated sheets in the Attachments Section. Payment Bond Before Contract signing, the Contractor shall furnish the Town with a Payment Bond of 50% of the total project. All bonds shall be written in conformance with Massachusetts General Laws Contractor's Liability Insurance Each successful bidder will be required to present to the Town a Certificate of Insurance, which is to include coverage for General Liability, Automobile Liability, Property Damage, and Worker Compensation and Employer’s Liability. The Town of Hingham, Massachusetts shall be name
Published attachments
- 30 39M over $50k Sample Contract REVISED 4.16.25
- MA weekly certified payroll report form-fs (3)
- Owner-Operator Certification (PDF)
- Prevailing wage weekly statement of compliance-fs (1)
- _102399 Hingham Carlson Pickleball Complex - REBID Specifications 11.10.26
- 102399 Town of Hingham Carlson Pickleball Complex REBID Bid Drawings
- Pickleball PW Sheets (REBID)
- 102399- Drainage Report (Stacked); 05-07-26
- GEI Hingham Pickleball Courts Geotechnical Letter_2026-01-22
- Order of Conditions 25 Bare Cove Park Drive
- Carlson_Field_Athletic_Complex:_Construction_of_new_Pickleball_Courts_(REBID).pdf