State and local · OpenGov
Centennial Park Restroom Upgrades
Description
NOTICE OF INVITATION FOR BIDS Centennial Park Restroom Upgrades 2026-IFB-018 The City of Kingman is soliciting sealed bids (Invitation for Bids or "IFB") from qualified vendors capable of providing Modernize existing restroom facilities at Centennial Park. . Criteria for selection will be overall cost (to include shipping and taxes) and the ability to meet delivery dates listed. The IFB may be obtained by visiting the City of Kingman’s procurement portal at https://procurement.opengov.com/portal/cityofkingman . Bids must be submitted through the OpenGov procurement portal. Bidders wishing to submit questions must do so through the procurement portal by no later than 12:00 pm , Arizona time, on Wednesday, November 18, 2026 . Bids are due by 12:00 pm , Arizona time, on Monday, November 30, 2026 . The City may reject any bid not in compliance with all of the prescribed solicitation procedures and requirements contained herein. The City also reserves the right to reject any bid when cancellation is in the best interest of the City. Bidder wishing to submit bid responses should register for a free OpenGov account at: https://procurement.opengov.com/signup . To receive notification of future solicitations, please subscribe to the City of Kingman OpenGov solicitations by clicking here: https://procurement.opengov.com/portal/cityofkingman?status=all . For detailed instructions on how to register and subscribe, you can also visit the City of Kingman's website at: https://www.cityofkingman.gov/government/advanced-components/list-detail-pages/rfp-posts-list . Mailed, faxed, hand-delivered, and e-mailed bids will not be accepted. Mailed bids will be disposed of, unopened, and will not be returned to the Bidder. Thank you for your interest in working with the City of Kingman. Michael Hubbell Parks Superintendent General Project Costs Mobilization Costs Public/Site Protection Costs Temporary Restroom Accomodations Project Clean-up/Disposal Costs 4-Plex Restroom Subtotal 3-Plex Restroom Subtotal Restroom Behind Office Subtotal Total Base Bid (tax included) 10% Owners Contingency Total Bid Including Contingency (tax included) 4-Plex Restrooms Demolition & Removal of existing fixtures, partitions, countertops, sinks, flooring/wall finishes (as required) Furnish & Install New Stainless Steel Toilets (2 Mens/ 4 Womens) Furnish & Install 2 New Stainless Steel Urinals Furnish & Install New Sinks/Faucets (3 Mens/3 Womens) Furnish & Install New Stainless Steel Countertops Furnish & Install New Stainless Steel Restroom Partitions Painting (walls, ceilings, & associated surfaces) Flooring (Repairs/Refinish) Plumbing Repairs/Modifications Lighting Fixture Replacement & Electrical Modifications Install Restroom Accessories (ADA Grab bars, Toilet Paper Holders (non-rolling), Waste Receptacle, & Hand Dryers) Miscellaneous Wall, Ceiling, and Structual Repairs Final Cleaning & Preparation for Occupancy 4-Plex Restroom Subtotal 3-Plex Restrooms Demolition & Removal of existing fixtures, partitions, countertops, sinks, flooring/wall finishes (as required) Furnish & Install New Stainless Steel Toilets (1 Mens/ 3 Womens) Furnish & Install 2 New Stainless Steel Urinals Furnish & Install New Sinks/Faucets (2 Mens/2 Womens) Furnish & Install New Stainless Steel Countertops Furnish & Install New Stainless Steel Restroom Partitions Painting (walls, ceilings, & associated surfaces) Flooring (Repairs/Refinish) Plumbing Repairs/Modifications Lighting Fixture Replacement & Electrical Modifications Install Restroom Accessories (ADA Grab bars, Toilet Paper Holders (non-rolling), Waste Receptacle, & Hand Dryers) Miscellaneous Wall, Ceiling, and Structual Repairs Final Cleaning & Preparation for Occupancy 3-Plex Restroom Subtotal Restrooms Behind Office Demolition & Removal of existing fixtures, partitions, countertops, sinks, flooring/wall finishes (as required) Furnish & Install New Stainless Steel Toilets (1 Mens/ 2 Womens) Furnish & Install New Stainless Steel Urinal Furnish & Install New Sinks/Faucets (1 Mens/1 Womens) Furnish & Install New Stainless Steel Countertops Furnish & Install New Stainless Steel Restroom Partitions Painting (walls, ceilings, & associated surfaces) Flooring (Repairs/Refinish) Plumbing Repairs/Modifications Lighting Fixture Replacement & Electrical Modifications Install Restroom Accessories (ADA Grab bars, Toilet Paper Holders (non-rolling), Waste Receptacle, & Hand Dryers) Miscellaneous Wall, Ceiling, and Structual Repairs Final Cleaning & Preparation for Occupancy Restroom Behind Office Subtotal Bidder Response (Bid Package) Vendors must upload their bid response package here. SPECIFICATIONS Centennial Park Restroom Upgrades : Modernize existing restroom facilities at Centennial Park. . The Bidder shall provide the goods requested. Centennial Park Restroom Upgrades The City of Kingman Parks & Recreation Department is requesting bids from qualified contractors for the renovation of three existing public restrooms located at Centennial Park. The selected contractor shall provide all labor, materials, equipment, supervision, permits, locates, disposal, and incidentals necessary to complete the restroom remodel project in accordance with the scope of work and specifications contained within this IFB. The goal of the project is to modernize the existing restroom facilities, improve durability, enhance user experience, and address accessibility, safety, and maintenance concerns. Demolition Demolition Remove existing restroom fixtures, accessories, and finishes as required Remove and dispose of demolition materials Protect surrounding park facilities and public areas Maintain a clean and safe work area Plumbing Remove and replace existing plumbing fixtures Install new commercial-grade stainless steel fixtures Replace faucets, valves, flush valves, and associated components Repair plumbing deficiencies discovered during construction (with City approval) Electrical Replace existing lighting with LED fixtures Replace switches, sensors, and electrical components as required Ensure all electrical work meets current code requirements Flooring Remove existing flooring where required Install new durable, slip-resistant flooring suitable for high-use public restrooms Walls & Ceilings Repair damaged surfaces Prepare and paint walls and ceilings Partitions & Accessories Provide and install: Stainless Steel Toilet Partitions Stainless Steel Countertops Privacy panels ADA Grab Bars Soap dispensers Toilet paper holders Waste receptacles Hand Dryers Other restroom accessories Doors & Hardware Repair or replace doors as needed Replace damaged hardware Ensure ADA accessibility requirements are met INTRODUCTION Summary The intent of this Invitation for Bid (IFB) is to Modernize existing restroom facilities at Centennial Park. . Unless otherwise noted herein, this IFB is for the purchase of items listed herein with the intent of receiving all items and quantities listed in the Pricing Worksheet by no later than October 14, 2026 . Bids should only be submitted for items that Bidders can affirmatively source to the City. Do not submit a bid if your company does not have current inventory stock or an affirmed delivery of stock within the timeframes specified herein. Contact Information Michael Hubbell Parks Superintendent 3333 Harrison St Kingman , AZ 86401 Email: mhubbell@cityofkingman.gov Phone: (928) 716-1764 Questions Questions regarding this solicitation must be submitted online through the OpenGov portal. Questions must be received by no later than the date and time specified in the timeline included in this IFB (Questions Due From Proposers). MINIMUM QUALIFICATIONS Bidders must demonstrate that they have the resources and capability to provide the materials and services as described herein. All Bidders must submit the documentation requested. Failure to provide any of the required documentation may cause the bid to be deemed non-responsive and/or non-responsible and rejected. TERMS AND CONDITIONS Firm Pricing Bid price must be firm for City acceptance for a minimum of 90 days from the bid opening date. Quantities The quantities specified in the Pricing Table are minimum quantities to be ordered. In the event that additional quantities are needed beyond those contained herein, the Bidder shall provide those additional quantities at the same prices and terms as stated in this IFB. Use of Brand Names Unless otherwise provided in this IFB, the name of a certain brand, make or manufacturer does not restrict bidders to the specific brand, make or manufacturer named; it conveys the general style, type, character, and quality of the article desired, and any article which the City, in its sole discretion , determines to be the equal of that specified, considering quality, workmanship, economy of operation, and suitability for the purpose intended, shall be accepted. Any catalog, brand name or manufacturer's reference used in the IFB is descriptive – NOT restrictive – it is provided to generally indicate the type and quality desired, unless otherwise notes. Bids on brands of like nature and quality will be considered for those items listed in the Scope of Work. If the bid is based on offering other than the referenced or specified items, the bid must show the name of the manufacturer, brand or trade name, catalog number, etc., of article offered. If other than the brand(s) specified is offered, descriptive literature must be submitted with bid. Samples may be required. Bidders must certify that item(s) offered meet and/or exceed specifications. If an item considered as being equal by the bidder is offered and not accepted, the bid shall be rejected. If a bidder makes no other offer and takes no exception to specifications or reference data, it will be required to furnish the brand names, numbers, etc., as specified. Substitutions No substitutions or alterations will be accepted. Defective Products All defective products shall be replaced and exchanged by the bidder. The cost for shipping, transporting, and other like expenses shall be paid by the bidder. Subcontractors Bidder must include in their submittal a list of any subcontractors that will be utilized in the performance of the work awarded under this procurement. Bidder must describe the subcontractors qualifications in detail in their response. Basis for Award The City intends to award the bid to the lowest responsible, responsive bidder (after applying any applicable preference under Section CC-249 of the Procurement Code which is referenced in Section 6), based on the total cost using the minimum quantities listed and the ability to provide the minimum quantities listed by the stated delivery date. Rejection of Bids The City reserves the right to waive technical defects, discrepancies and minor irregularities in a response. The City reserves the right to re-seal any response that was opened prematurely; the City has determined this event as a minor irregularity. The Deputy City Manager/Finance Director shall be notified and shall log the event and place it in the procurement file. The City reserves the right to award any alternatives set forth in the IFB documents at its sole discretion. Bids may be rejected if there are any alterations to the required forms, additions not called for, conditional bids, incomplete bids, or irregularities of any kind. The City reserves the right to reject any bid not in compliance with the IFB documents, or prescribed public bidding procedures and requirements. Written notice of rejection of all bids shall be sent to all Bidders. Reissuance of IFB The City reserves the right to re-issue a subsequent procurement for this service at any time if deemed to be in the best interest of the City. Protest of Award A protest of award must be physically delivered to the Purchasing Officer within seven (7) business days of the notice of award date. Our office is open Monday through Thursday from 7:00 am to 6:00pm (closed on holidays). Packages containing protests shall be marked as follows: RFB Award Protest - 2026-IFB-018 Attn: Tina D. Moline, Deputy City Manager/Finance Director 310 N. Fourth Street Kingman, AZ 86401 Disputes In the event any doubt or differences of opinions exist as to the items or service to be furnished hereunder, or from evaluation and/or testing of substitutes, or the interpretation of the provisions of this procurement, the decision of the City of Kingman shall be final and binding upon all parties. Collusion Upon evidence that collusion exists among Bidders, none of the bids of participants in such collusion will be considered. All involved bids shall be rejected. Conflicts of Interest A. Notify. Prior to taking an action in connection with a City contract, every employee shall, in writing, notify the employee's supervisor, the City Attorney, and Purchasing Officer of any actual or potential conflict of interest of such employee. City employees shall comply with A.R.S. Title 38 regarding conflicts of interest in the purchasing of and contracting for goods, services, and construction for the City. B. Review potential conflict of interest. Upon receiving notice of an actual or potential conflict of the interest, the City Attorney or designated representative shall review the purchasing procedures for compliance with applicable laws and regulations. C. Determination of conflict of interest. If the City Attorney determines that an employee has an actual or potential conflict of interest in connection with a purchase, no contract shall be awarded without City Council review and approval. Extension of Time Prior to proposal opening, the City shall have the authority to extend the deadline for the submittal of proposals when unforeseen circumstances arise. If this occurs, the City will post an addenda at a minimum of five (5) business days prior to the proposal’s original opening date. Confidentiality A. All documents, reports, proposals, submittals, responses, or other materials submitted to the City by frims shall become the sole and exclusive property of the City and become a public record. B. Responses shall be opened publicly at the time and place designated in the RFQ. The name of each Respondent and such other relevant information as is specified by rule shall be publicly read and recorded. The responses shall be open for public inspection after contract award, if any. C. To the extent the Respondent designates, trade secrets or other proprietary data contained in the response documents shall remain confidential. The City of Kingman is subject to the Arizona Revised Statutes, Title 39, Chapter 1, relating to public records. (ADA) The Americans with Disabilities Act The bidder shall comply with all applicable provisions of the Americans with Disabilities Act of 1990 and the Arizonans with Disabilities Act of 1992. Transaction Privilege Tax (TPT) The City is not exempt from Transaction Privilege Tax (TPT); Bidder must include tax in the pricing proposal, when applicable. Licenses Bidder will maintain, in current status, all Federal, State, and local licenses and permits required for the operation of the business. Pursuant to the Kingman Municipal Code, Chapter 8, Article 1.5, Business Licenses , Vendors conducting business within the City of Kingman with a permanent or temporary physical business location within the city limits must apply for a business license and pay the applicable license fee, unless exempted under section 8-13. The full municipal code can be found on the City's website or at the following link: https://www.codepublishing.com/AZ/Kingman/. For details regarding how to submit an application, pay the license fee, etc., please visit our website at: https://www.cityofkingman.gov/government/departments/city-clerk/business-licenses . INSURANCE REQUIREMENTS Required Insurance Policies All insurance, with the exception of Workers Compensation and Professional Liability, must name the City as additional insured before a final contract can be executed. The City reserves the right to request a copy of the full policy for review. A copy of additional insured endorsement will be required prior to contract execution. Insurance must be be primary and include a waiver of subrogation. Proposer agrees to obtain and maintain the following insurance coverage from insurers licensed to do business in the state of Arizona that have an "A.M. Best" rating of not less than "A-VII" with the following minimum insurance required: Commercial General Liability Policy must include Bodily Injury, Property Damage, Personal Injury and Broad Form Contractual Liability with coverage limits of not less than: Each Occurrence: $1,000,000 General Aggregate: $2,000,000 Commerical Automobile Liability $1,000,000 Commercial Auto (can be waived, depending on circumstances) Worker's Compensation Per Occurrence: statutory requirement Other and Professional Liability $1,000,000 - Applicable to design services (architects or engineers). Pollution, where necessary. Builders Risk (for new construction). Bid bonds may be required and if awarded, payment and performance bonds. All bonds must be verified before work can begin. Minimum Limits The City in no way warrants that the minimum limits contained herein are sufficient to protect the contractor from liabilities that might arise out of the performance of work under this contract/agreement. The contractor is free to purchase such additional insurance as may be determined necessary. INSTRUCTIONS TO BIDDERS Submission of Bids Bids must be received by 12:00 pm , Arizona time, on Monday, November 30, 2026 , submitted directly through the OpenGov procurement portal. Mailed, faxed, hand-delivered, and e-mailed responses will not be accepted. Mailed responses will be disposed of, unopened, and will not be returned to the Respondent. Bidders wishing to submit responses must register for a free OpenGov account at: https://procurement.opengov.com/signup . To receive notification of future solicitations, please subscribe to the City of Kingman OpenGov solicitations by clicking here: https://procurement.opengov.com/portal/cityofkingman . For detailed instructions on how to register and subscribe, you can also visit the City of Kingman's website at: https://www.cityofkingman.gov/government/advanced-components/list-detail-pages/rfp-posts-list. Requests for extensions of this time and date will not be granted, unless deemed to be in the City’s best interest. Bids or unsolicited amendments to Bids received by the City after the acceptance date and time will not be considered. Any bid may be withdrawn at any time prior to the specified date and time for IFB closing. Documents to be Included with Bid Bidder Signature Page (IFB Signature Page) Bid Guarantee (if required) Bid Response Subcontractor List (if applicable) Materials List (if applicable) New Vendor Application (if not already a registered vendor) W-9 Form Subcontractors and Materials List Bidders shall submit subcontractor and materials list with bid response. Mandatory Pre-Bid Meeting A Mandatory Pre-Bid Meeting will be held at 9:00 am , Arizona time, on Wednesday, November 4, 2026 at 3333 Harrison St Kingman, AZ 86409 . The purpose of this meeting is to clarify the contents of the solicitation. Statements made by City representatives during pre-selection meetings are not binding unless the City has confirmed through written addendum. Taxes The City is not exempt from Transaction Privilege Tax (TPT) or Sales Tax. All applicable taxes should be included in the Bidder's quote. Questions and Inquiries Questions and inquiries, will be accepted from any and all Bidders through the procurement portal. Unauthorized contact with other City staff regarding the IFB may result in the disqualification of the Bidder. Inquiries pertaining to the IFB must list the IFB number and title. Material questions will be answered in writing with an Addendum provided. All questions must be r
Published attachments
Public questions and answers
What is the enginners estimate for this project?
There is no engineer for this project. No estimate was conducted.
Will there be plans uploaded for this project?
No plans. There will be a mandatory pre-bid walkthrough.
In section 1.1 Summary states: Unless otherwise noted herein, this IFB is for the purchase of items listed herein with the intent of receiving all items and quantities listed in the pricing worksheet by no later than October 14th 2026. Assuming this is a typo?
Yes, a typo. Bid award will be on 12/15. 1/29/27 would be the receiving date.
Could the City confirm whether this project is subject to the prevailing wage rates?
This will not be prevailing wage.
With no plans being provided, how is the bid process going to be comparable from GC to GC on what is bid? Also, there is plumbing, structural, & electrical work to be done without plans?
No plans; There will be a mandatory pre-bid meeting and walk all locations.
Can you please confirm whether the restroom buildings will be worked on simultaneously or if each building will be completed individually before moving on to the next?
That will be left to contractor. Portable toilets will be required in either case.
Can you specify the brand and model number of plumbing fixtures water closet, urinals, lavatories etc.?
The City does not have a specified manufacturer or model number for the plumbing fixtures. Contractors shall include commercial-grade fixtures suitable for high-use public restroom facilities. Proposed fixtures shall comply with applicable building and plumbing codes, ADA accessibility requirements where applicable, and all project requirements. Contractors may propose manufacturers and models that meet these requirements. Product specifications and cut sheets shall be submitted to the City for review and approval prior to procurement and installation. Stainless steel and vandal resistant preferred.
Are the existing light fixtures to remain or do we replace.
Replace with new LED light fixtures.
Rest room signage, does it remain?
Exterior signage will remain.
What are the colors to be used within the spaces?
Like-kind colors except for replacement equipment that should be stainless steel. Partitions, sinks, counters.
Will there be a sign in sheet from the prebid meeting?
There is a sign-in sheet from the 11-4-26 meeting.
Are the sinks assumed to be stainless steel, or is porcelain acceptable?
Stainless is requested.
Please clarify the requirements for the temporary restroom accommodations.
Each restroom will need 2 standard & 1 ADA portable toilet during construction. 1 Hand wash station as well, per restroom.
Are Baby changing stations required in any of the restrooms?
No changing stations.
Are sanitary napkin disposals required in the women’s restrooms?
No.
OpenGov categories
- 91065 · Remodeling and Alterations