State and local · OpenGov
Cerone Security Enhancements
Description
VTA seeks bids (each a " Bid ") from responsive and responsible qualified firms (each a " Bidder ") to provide all labor, materials, tools, equipment, services, supervision, and incidentals necessary to construct security related upgrades at the Cerone main entrance to the including but not limited to 10 feet tall chain link fencing, installation of vehicular swing gates, manual swing gate, pedestrian gates. Additional upgrades include the installation of card readers, an intercom system, and CCTV cameras at the entrance in front of the new security gates. The scope of work also includes the electrical infrastructure to support security upgrades and communications integration. for the project titled below and further described in the Scope of Work (the " Project "): Contractors State License Board (CSLB) Number Please enter your License Number here. This will be verified against the state database California Department of Industrial Relations Registration Please enter your Public Works Contractor Registration Number. This will be verified against the state database. Project Details C26102-CERONE SECURITY ENHANCEMENTS Please see attachment solicitation package for the Invitation for Bids for Contract C26102-Cerone Security Enhancements. Documents included are: 1) C26102-IFB Cerone Security Enhancements 2) C26102-Cerone Security Enhancements Contract Form Volume 1 (Contract Sample) 3) C26102-Technical Specifications Volume 2 4) C26102-Drawings Volume 3 Important Instructions for Electronic Submittal Santa Clara VTA is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Introduction Summary Background Contact Information Timeline Attachments Vendor Submissions
Published attachments
Addenda and notices
Official Notice #1: Pre-Bid Presentation and Attendance · 1
Addendum #1 · 1
Adjustment to the Procurement Schedule. Please note, additional addendum will be posted regarding changes to the project scope soon.
Official Notice #2: Site Tour Attendance · 2
Addendum #2 · 2
Adjustment to Procurement Schedule
Addendum #3 · 3
Adjustment to the Procurement Schedule. Please note, additional addendum will be posted regarding changes to the project scope .
Public questions and answers
Can VTA extend the bid due date. i need extra 2 weeks to get bid bonds.
Refer to addendum 1 regarding new procurement schedule
if bidding with B license is a C8 (concrete license) and c12(asphalt license and trenching) required since this is in the scope of work
Please refer to Section 1.9 of the IFB document for licensing requirements.
Please provide clearer closeup photos of the existing building L electrical panel & breaker labels.
Will provide clear photos in future addendum
CAT6 vs CAT6A. 28 23 00 §2.02D and 26 50 00 §2.01E call for CAT6 (23 AWG, 4-pair). Please confirm CAT6 is acceptable and that outdoor/water-blocked cable is required in underground and fence-mounted conduit.
Yes, CAT 6A is preferred for outdoor and fence mounted conduit.
28 23 00 §3.01E says to install an IDF when a camera is more than "one hundred (150) feet" from the IDF. Is the limit 100 ft or 150 ft? North gate devices are roughly 190–220 ft from the new network cabinet (E011). Is an IDF, switch or PoE extender required at the north gate? Where do the 2 network switches (Bid Item 30) go?
The limit for CAT6 ethernet cable is 100 meters (328 feet)? One network switch is in Building B and one network switch in new network cabinet near north gate.
The plans (E001–E011) show (2) 24-strand multimode cables, 0.25" OD. Spec 27 15 23 §2.01 calls for one 12-strand cable; the text says multimode but the fiber table is single-mode G.652.D. Spec 28 23 00 §2.02B calls for 12-strand OM3 tight-buffered. Please confirm the fiber type, strand count and cable construction.
12 strands Single mode and 24 strands multimode from Bldg B to Bldg L 12 strands multimode from Bldg L to the new network cabinet.
Please confirm that one 24-strand cable terminates in the Building L comm room (E009 N3/N4) and the other at the new network cabinet. Also confirm the patch panel locations in the Building B and Building L comm rooms (E001 N5).
All 48 strands (both MM and SM) can be terminated into just 1 panel at bldg. L
CD003 Detail 10 shows a "180° security camera" on each light pole. Spec 28 23 00 lists the Axis P5654-E Mk II PTZ and P3265-LVE dome. Please confirm the model at each of the 4 camera locations.
Axis P5654-E Mk II PTZ
East of Building L, notes on E001–E008 say "Provide (1) 3#4/0, 1#1G in 2.5" … conduit shall remain empty for future use." Should the conductors be installed, or should the conduit be left empty with a pull string?
Yes, the conductors need to be installed.
The existing Building L panel is 120/240V 1-phase 3-wire, but the new panel A1 schedule shows 120/208V 3-phase 4-wire (E013). Please confirm the system voltage, the feeder conductors (3#4/0 + #1G on an 80A breaker) and the conduit.
Proceed with the 4/0 feeder conductors as indicated. Final feeder /Conduit Configuration may be field adjusted as required, subject to Electrical Engineer approval
Spec 26 05 43 §3.01 calls for PVC-coated GRS in slurry backfill "unless otherwise indicated." The plans show Sch 40 PVC in controlled density fill (E013 Details 2A/2B). Please confirm Sch 40 PVC is acceptable.
Schedule 40 PVC is ok underground.
Bid Item 29 calls for 4 card readers. The plans show a card reader with intercom at each of the 2 vehicle islands and a reader at the north pedestrian gate (CD001). Please identify the location of the 4th card reader.
There will be a card reader for each pedestrian gate. Two pedestrian gates are located at north and south entrance. In addition to that, 2 card readers are designated for the vehicular gates bringing the total to 4. Will reflect proper call outs in plans for future addendum.
The plans call for 12"×24"×12" pull boxes. Spec 27 15 23 references No. 7 pull boxes and Christy boxes with 12" extensions, traffic-rated, with "VTA COMMUNICATION" lids. Please confirm the box type, size and load rating for communication boxes vs. electrical boxes.
Please use Christy (Pull box)- 12"×24"×12" and load rating H20 and use 12" extensions where needed for both communication and electrical
Does VTA currently have sufficient camera licenses available to support the new cameras? The VMS is currently unknown.
VTA will acquire the license.
If the security contractor is expected to configure and commission the new readers and cameras within the existing enterprise systems, please provide: Access control system version (CCURE) Video management system manufacturer and version Any integration requirements or compatibility considerations
Access control system version (CCURE) -CCURE 9000 Version 3.0. Video management system - Exacqvision, VTA will support the integration
Are the new meetings (pre-bid conference and site tour) mandatory? Please provide meeting information such as addresses, etc.
No
Can you please clarify in detail the process for requesting a product substitution and appropriate points of contact?
All questions or requests before bids are due need to be submitted via this section to preserved the integrity of the procurement process.
VTA has confirmed that the existing access control platform is C•CURE 9000 Version 3.0. The manufacturer currently lists Version 3.0 as reaching End of Support in January 2027. Given the timing of this project and the long-term lifecycle, cybersecurity support, and total cost of ownership considerations, would VTA consider an approved-equal substitution using an alternate access control platform/manufacturer rather than limiting approved equals to controllers that operate within the existing C•CURE 9000 environment? If so, please confirm whether an alternate platform may be proposed provided it meets or exceeds the functional and UL requirements of Section 28 10 01, supports VTA's existing credentials/readers as applicable, integrates with the existing ExacqVision VMS, and includes all software, licensing, programming, and interfaces necessary for a complete operational system. Please also confirm what technical documentation VTA would require to evaluate such an approved-equal substitution.
VTA has decided to continue using C•CURE 9000 V3.0 at this time due to compatibility requirements with other critical systems currently in operation. No alternative solutions or replacement platforms will be accepted at this time. All proposed solutions must remain compatible with the existing C•CURE 9000 V3.0 environment.
OpenGov categories
- 238210 · Electrical Contractors and Other Wiring Installation Contractors
- 238990 · All Other Specialty Trade Contractors
- 332311 · Prefabricated Metal Building and Component Manufacturing
- 56162 · Security Systems Services
- 561621 · Security Systems Services (except Locksmiths)