State and local · OpenGov
City Hall Roof Improvements
Description
The City of Dania Beach is soliciting bids for City Hall Roof Improvements . Bids are to be submitted via the City's e-Procurement Portal at https://procurement.opengov.com/portal/daniabeachfl . Bids will be received prior to 10:00 am on Friday, December 4, 2026 . Late bids will not be accepted. The City of Dania Beach is accepting sealed bids from qualified roofing contractors to furnish all labor, materials, equipment, supervision, permits, temporary protection, and incidentals required for the Dania Beach City Hall Roof Improvements in accordance with the contract documents. SCOPE OF WORK SCOPE The City of Dania Beach, Florida (the “City” or “Owner”), is actively seeking bids from qualified Contractors (the “Contractor”), for a project known as “ City Hall Roof Improvements ”. The Dania Beach City Hall Roof Improvements project aims to replace the existing roof system with a modern, high‑performance assembly that meets current building code, durability, and warranty standards. The work will address deteriorated roof components, improve weather resistance, and enhance long‑term protection of the facility. This project will ensure that City Hall remains safe, operational, and structurally sound by installing a complete SBS‑modified bituminous roofing system, updated insulation, sheet metal components, and roof specialties. This project is funded through the Hazard Mitigation Grant Program (HMGP) DR-4337-285-R, as approved by the Florida Division of Emergency Management (FDEM) and the Federal Emergency Management Agency (FEMA). The Contractor shall provide all labor, materials, equipment, and expertise necessary to perform the roofing improvements described below. Work must result in a complete, warrantable, and fully integrated roofing system. Work includes, but is not limited to, the following: 1. Selective Demolition The Contractor shall remove and properly dispose of all existing roofing systems, materials, and components required to prepare the roof for installation of the new roofing assembly. 2. Roof Deck Inspection and Preparation The Contractor shall inspect the existing roof deck and perform all necessary preparation, including minor incidental repairs. The scope includes replacement of deteriorated or damaged roof deck or substrate material up to 15% of the total roof area. 3. New Roofing System Installation The Contractor shall furnish and install a complete SBS‑modified bituminous roofing system, which includes: Insulation Tapered insulation Cover board Membrane Flashings All accessories required by the manufacturer and applicable codes The installed system must meet all performance, quality, and warranty requirements. 4. Fluid‑Applied Waterproofing The Contractor shall install fluid‑applied waterproofing at designated areas to ensure full watertight performance of the roofing system. 5. Sheet Metal & Roof Specialties The Contractor shall furnish and install all required sheet‑metal components, including flashings, trims, roof specialties, and joint sealants needed to complete the roofing installation. 6. Coordination with Existing Conditions The Contractor shall ensure proper integration of the new roofing system with all existing rooftop conditions and building components, including: Roof drains Gutters and downspouts Penetrations Rooftop equipment Equipment curbs Other appurtenances Coordination must ensure continuous drainage, proper tie‑ins, and compatibility with all existing building elements. City Hall will remain occupied and operational during construction. The Contractor shall: Coordinate demolition and roofing activities to maintain safe public and staff access and ensure uninterrupted building operations. Protect interior and exterior areas, including entrances, sidewalks, landscaping, vehicles, and equipment, from dust, debris, water intrusion, vibration, and damage. Provide all required barriers, signage, controlled access zones, and OSHA‑compliant safety protections. Prepare and implement temporary dry‑in plans, daily water‑protection measures, and emergency response procedures for any water intrusion. Promptly repair any damage caused by construction activities. Maintain exits and ADA‑accessible routes at all times, coordinating any temporary closures in advance. Vehicular and pedestrian access must be restored at the end of each business day. Perform all work during permitted hours: Monday through Saturday, 7:00 a.m. to 5:00 p.m. By submitting a bid, the Bidder acknowledges that he, she, or it is familiar with the scope of services prior to submitting a bid. Failure of a Bidder to be familiar with the requirements of the Project Work does not relieve the Contractor of the responsibility for completion of all required services for the Project. It shall also be the Bidder's responsibility to visit the proposed Project Site to become thoroughly familiar with the nature and extent of the Work to be performed and all local existing site conditions, and to make his or her own estimate of the facilities and difficulties attending the execution of the Work; no allowance shall be made by the Owner for the Bidder's failure to do so. Bids will be considered if submitted by qualified Contractors who or which have experience, including similar previous work in the provision of the requested services. Contractors offering full service will receive the highest consideration. Applicants should include the following items in the submitted Bid: Letter of Transmittal; Anticipated timeline to begin delivery of services; A breakdown of the costs for the delivery of services described above. Résumés of key personnel who will actually be assigned to the Project Work and a description of the role of each person within the company. NOTE: The City expects those personnel listed to be those who will be actually performing the Project Work. Substitutions (Contractors only) will be permitted only upon written approval of the City’s representative or designee who is in charge of the Project. A list of five (5) similar projects performed in South Florida (see the BIDDER SUBMISSIONS ) and it includes the following information: Name of each entity for which the work was performed; Brief description of the scope of work; Amount of initial contract award; and Name of contact person and contact information with the entity who can knowledgeably discuss your company’s performance. Indication that the Contractor can provide increased levels of service (additional hours) at the same cost per hour; and Any other infor NOTICE TO BIDDERS CITY OF DANIA BEACH, FLORIDA INVITATION TO BID FOR " City Hall Roof Improvements " 26-028 NOTICE IS GIVEN that the City of Dania Beach, Florida (the “City” or “Owner”) will be accepting sealed Bids for its “ City Hall Roof Improvements , 26-028 ”. Bids will be accepted on the City's e-Procurement Portal at https://procurement.opengov.com/portal/daniabeachfl until Friday, December 4, 2026 , at 10:00 am . Bids received after this time will be rejected. All submissions will remain confidential and exempt from public record disclosure requirements until the response opening is conducted. PROJECT DOCUMENTS Documents may be obtained from https://procurement.opengov.com/portal/daniabeachfl/projects/296990 . NON-MANDATORY PRE-BID CONFERENCE A NON-MANDATORY Pre-bid conference will be held on Tuesday, October 6, 2026 , at 10:00 am at City of Dania Beach (City Hall) 100 W Dania Beach Blvd Dania Beach FL, 33004 . All Bidders and interested persons are invited to attend the meeting, which will outline the Project as described in the Bid, and provide an opportunity for questions and answers for all interested persons. Any interpretations, clarifications or additional information not disclosed in this Bid and determined to be necessary by the Owner in response to questions, will be issued by means of addendum or addenda, which addendum or addenda will be posted to the Portal at https://procurement.opengov.com/portal/daniabeachfl/projects/296990 for all interested persons who are following the project. The Bidder will be notified of any addenda issued, if following the project, but it is recommended they check the portal to see if there has been any addendum or addenda posted for this Bid. Only questions answered and information supplied by means of such addendum or addenda will be considered as binding. Oral interpretations, clarifications or other information will have no legal and binding effect. BID DOCUMENTS Bids must be submitted electronically on the City's e-Procurement Portal at https://procurement.opengov.com/portal/daniabeachfl , the City’s designated electronic bidding system. All bid prices shall be guaranteed firm for a minimum of one hundred twenty (120) calendar days after the submission of the bid. No bidder may withdraw a bid within ninety (90) calendar days after the bid opening date. Pursuant to Florida law, all Bids are exempt public records until thirty (30) days after opening, or award of bid, whichever is sooner. In the event presentations are necessary, all non-presenting bidders will be required to exit the room during the presentations of each of the other bidders as portions of selection committee meetings at which presentations are made are exempt from Florida’s public meeting laws. A bid bond of 5% of the bid price is required for this project. This project is funded through the Hazard Mitigation Grant Program (HMGP) DR-4337-285-R, as approved by the Florida Division of Emergency Management (FDEM) and the Federal Emergency Management Agency (FEMA). All bidders are advised that the City has not authorized the use of the City seal or logo by individuals or entities responding to City bids. Bidders shall demonstrate successful performance of projects of a similar magnitude, scope and value as this project. The City Commission of the City of Dania Beach reserves the right to reject any and all bids, to waive any informality in a bid and to make an award in the best interests of the City, as Owner. CITY OF DANIA BEACH, FLORIDA Published on: Monday, September 28, 2026 GENERAL TERMS & CONDITIONS NO BIDS OR PROPOSALS If a Bidder or Offeror does not intend to bid or submit a proposal, please indicate the reason, such as insufficient time to respond, do not offer product or service, unable to meet specifications, schedule would not permit, or any other reason. CAUSES FOR REJECTION OF A BID OR PROPOSAL No bid or proposal will be considered or accepted that, in the opinion of the City, is informal or unbalanced, or contains inadequate or unreasonable prices for any items; each item must carry its own proportion of the cost as nearly as is practicable. However, the City shall be under no obligation to investigate the correctness of any bid or proposal, and the Bidder or Offeror by signing the bid or proposal shall be deemed to have verified that no errors appear in the bid or proposal as submitted. Any alterations, erasures, interlineations or failures of a bid or proposal to contain all items called for in the solicitation may result in rejection of the bid or proposal. If any Bidder or Offeror violates any provision in the solicitation, such Bidder or Offeror may be disqualified from performing the Project Work, or from furnishing the requested services for which the bid or proposal was submitted, and the Bidder or Offeror may be further disqualified from bidding or submitting proposals on any future bids or proposals for work, for goods, or for services for the City. GENERAL CONDITIONS Purpose : The purpose of the Invitation to Bid is to establish between the City and the Contractor an agreement to perform the project work. The successful Bidder shall provide a Performance Bond for One Hundred percent (100%) of the contract price made payable to the City of Dania Beach, Florida, within fourteen (14) days of notification of the award of the agreement. A copy of the Performance Bond form can be found in the attachments; it is made a part of and is incorporated into the ITB by this reference. Documentation : Bidder shall submit in its bid the following: Evidence that the Bidder is certified and licensed to perform the required services in the State of Florida. The successful Bidder must be in compliance with all applicable laws and regulations; A statement stating the number of years the Contractor has been a qualified provider of the requested services; and A complete Bidder’s Questionnaire; it is made a part of and is incorporated into the ITB by this reference. Bidder Expenses : Bidders are solely responsible for their own expenses in preparing and submitting Bids, and for any meetings, negotiations or discussions with the City or its representatives and consultants, relating to or arising from this ITB. The City and its representatives, agents, consultants and advisors shall not be liable to any Bidder for any claims, whether for costs, expenses, losses or damages, or loss of anticipated profits, or for any other matter whatsoever, incurred by any Bidder in preparing and submitting a Bid, or participating in negotiations for a contract, or any other activity related to or arising out of this ITB. No Contract : By submitting a Bid and participating in the process as outlined in this ITB, Bidders expressly agree that no contract of any kind is formed under or arises from this ITB prior to the complete signing by both parties of a formal written contract. Conflict of Interest : Bidders shall disclose any potential conflicts of interest and existing business relationships they may have with the City. If requested by the City, a Bidder should provide all pertinent information regarding ownership of the entity within forty-eight (48) hours of the City’s request. General Conditions : The agreement to be awarded will be subject to the provisions of the United States Constitution, Florida laws, statutes and ordinances of the United States of America, the State of Florida, Broward County and the City of Dania Beach. SPECIAL CONDITIONS Any and all Special Conditions contained in the solicitation that may be in variance or conflict with the General Conditions shall have precedence over the General Conditions. If no changes or deletions to General Conditions are made in the Special Conditions, then the General Conditions shall prevail in their entirety. The solicitation, Bidder Submissions, Specifications, Attachments, Addendum or Addenda, the legal advertisement of the solicitation and any other pertinent documents form a part of the solicitation, and ultimately, the agreement; all of the documents are made a part of and are incorporated into the solicitation and the awarded agreement. PUBLIC ENTITY CRIMES STATEMENT A person or affiliate who, or which has been placed on the State of Florida convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid or proposal on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids or proposals on leases of real property to a public entity, may not be awarded or perform work as a Contractor, supplier, subcontractor or consultant under an agreement with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017 F. S. for CATEGORY TWO, which is $35,000.00, for a period of thirty-six (36) months from the date of being placed on the convicted vendor list. A form to that effect, as mentioned above, must be submitted by the Bidder or Offeror. A copy of the Sworn Statement on Public Entities Crimes can be found in the attachments; a copy is made a part of and is incorporated into the solicitation by this reference. PRICES, TERMS ARE TO BE FIRM The Bidder or Offeror warrants by virtue of its Bid or proposal that the prices, terms and conditions contained in the solicitation shall be firm for a period of no less than one hundred twenty (120) calendar days from the date of the solicitation opening. The bid or proposal prices shall include all permit fees, royalties, license fees, taxes and other costs arising from the use of the materials and equipment in any way involved in the Project Work, as well as all costs of packaging, transporting and delivery of any materials and equipment to the designated location within the City, and the site cleanup. The City may require the addition or deletion of services from the Contractor if the requirements and needs of the City change, in City’s sole opinion. This may entail additional services and additional locations. The Contractor shall provide the City with costs for these additional services and additional locations or both, based upon the cost structure utilized in establishing the pricing for listed locations in initially contracted areas. Deletion of locations, services, or both shall be handled in the same manner as described above. If the costs offered are not acceptable to the City, the City reserves the right to procure the additional services from one or more other Contractors. UNIT PRICING; NOT-TO-EXCEED; NEGOTIATED DISCOUNTS Unit Pricing as Maximum Rates. The unit prices set forth in this Agreement, including any exhibits, rate sheets, or bid schedules (collectively, the “Unit Prices”), are established as maximum, not-to-exceed rates for the applicable goods and/or services. The Unit Prices shall not be construed as fixed or minimum charges, and Contractor expressly acknowledges that the City shall have the right to procure the same goods and/or services at rates lower than the Unit Prices without requiring a formal amendment to this Agreement. Acceptance of Discounted or Bundled Pricing The City may accept, and Contractor may offer, discounted, promotional, or bundled pricing (including volume discounts, package pricing, or reduced per-unit rates) for any goods or services within the scope of this Agreement, provided that such pricing does not exceed the applicable Unit Prices or the total compensation authorized under this Agreement. Acceptance of such discounted or bundled pricing shall not require a written amendment, so long as the scope of services remains unchanged. Authority to Negotiate Pricing Within Approved Limits. The City Manager, or designee, is authorized to negotiate and approve pricing for individual work orders, events, or service requests on a case-by-case basis, based on budgetary considerations and operational needs, provided that: the negotiated pricing does not exceed the Unit Prices; and the total compensation paid under this Agreement does not exceed any applicable not-to-exceed or budgeted amount approved by the City Commission, if required. No Increase Without Formal Amendment. Under no circumstances shall Contractor be entitled to compensation exceeding the Unit Prices or any authorized not-to-exceed amount unless approved by formal written amendment executed in accordance with City requirements. Documentation of Pricing. All negotiated pricing, including any discounts or bundled rates, shall be documented in the applicable work order, purchase order, or written authorization issued by the City. Such documentation shall reflect the agreed-upon pricing and demonstrate compliance with the limitations set forth herein MARKUP LIMITATION The Contractor shall not assess a markup greater than ten percent (10%) on any subcontracted labor, materials, equipment, or third-party services. All cost proposals, change orders, and invoices must clearly itemize any such markup to allow the City to verify compliance. Any markup exceeding this limit will be disallowed and removed from the Contractor's payment request. The Contractor shall ensure that all subcontractors and vendors adhere to this requireme
Published attachments
Addenda and notices
Addendum #1 · 1
Addendum 1- Questions and Answers
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
Addendum 4 - Questions and Answers
Addendum #5 · 5
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #6 · 6
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #7 · 7
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #8 · 8
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #9 · 9
Addendum 9
Public questions and answers
Kindly confirm Questions deadline
October 15, 2026, 3:00pm
do you have an established budget for this project?
Please see addendum 2
Please confirm whether a contractor may use its own crew when payroll and workers’ compensation insurance are provided through a PEO.
Please see addendum 2
Please identify the existing structural roof deck material and thickness for each roof section (Roofs 1–10), and clarify which sections have the wood decking referenced in the specifications
Please see addendum 2
Has a moisture survey been do already?
Please see addendum 2
Please confirm whether the required cover board is ¼-inch asphaltic board or ⅝-inch gypsum board, and identify where each applies.
Please see addendum 2
Please confirm the applicable daily liquidated damages amount, as the agreement and performance bond show different amounts.
Please see addendum 2
Please confirm the required number of field membrane plies, including the anchor/base sheet. Would a three-ply Polyglass SBS assembly meeting the specified wind uplift, fire rating, material performance, and 20-year NDL warranty requirements be accepted as a responsive base bid?
Please see addendum 2
will there be another day we can visit the property
Please see addendum 2
Could you clarify whether Core Tests 4, 5, 6, 8, and 9 show LWIC as the structural deck or as insulation over the structural deck?
Please see addendum 4
Could you confirm whether the TPO membrane in Core Tests 12, 13, 14, and 15 is adhered directly to the concrete deck?
Please see addendum 4
Could you confirm whether Core #9 on Roof #18 and Core #10 on Roof #3, shown on Sheet R-S-6, correspond to Roofs #18 and #3 on Sheet R-S-1?
Please see addendum 4
Can we use a stainless steel metal shop with a spring system instead of Metal-Era? Please confirm if this is acceptable.
Please see addendum 4
Could you confirm whether any of the existing roof assemblies have a structural metal deck?
Please see addendum 4
If we encounter corroded curbs during demolition or pipes, is there an allowance for unforeseen mechanical or electrical work?
Please see addendum 4
Please confirm that the existing roof drains will be replaced with new drain domes and clamping rings.
Please see addendum 4
Could you please clarify what you’re referring to as “Fluid-Applied Waterproofing” in Line Item 6 of your bid form? I couldn’t find that reference on the drawings.
Please see addendum 4
The drawings say REMOVE ABANDONED LIGHTNING PROTECTION SYSTEM - are we going back with a new LP system?
Please see addendum 4
For the roofs that have lightweight - are we removing the existing lightweight and installing a new system or tearing down to the existing lightweight?
Please see addendum 4
Per Drawing D-021, we are required to remove the abandoned lightning protection system. Are we also required to provide a new lightning protection system as part of our scope?
Please see addendum 4
For logistics, would it be possible to place a temporary dumpster truck on the east side of the building, between the library and City Hall, during the day to collect debris from the roof demolition?
Please see addendum 4
Is installation and certification of LP included in this solicitation?
Please see addendum 4
OpenGov categories
- 25174100 · Roof systems
- 72110000 · Residential building construction services
- 72111000 · Single family dwelling construction services
- 72111006 · Single family home new construction service
- 72111008 · Single family new town home or garden home construction service
- 72111101 · New apartment building construction service
- 72111102 · New cooperative construction service
- 72111103 · New condominium construction service
- 72111105 · New hotel or motel construction service
- 72111111 · General residential construction contractor service
- 72121100 · Commercial and office building construction services
- 72121101 · Commercial and office building new construction service
- 72152600 · Roofing and siding and sheet metal services
- 72152601 · Roofing service