State and local · OpenGov
City Hall Second Floor Door Replacements
Description
The City of West Sacramento is accepting sealed responses for the following: Removal and replacement of two existing half-swing doors with two new full-height, lockable interior doors at the public permitting counter on the second floor of City Hall . Bids shall be submitted no later than Tuesday, November 24, 2026 at 3:00 pm . The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full Door Replacements (Base Bid) Replace two existing half-swing doors at the public permitting counter and replace them with two new full-height, lockable interior doors (frames and hardware included) Demolition - Remove and dispose of the two existing half-swing doors and related debris. Protect the counter, millwork, flooring, and wall finishes during demo and install. Door 1 (Main/Accessible) - Solid-core wood door with hap glass vision lite. Commercial-grade solid core finish (color/style subject to staff approval). Must meet specifications outlined in scope of work noted in project details. Door 2 (Secondary) - Solid-core wood door with hap glass vision lite. Commercial-grade solid core finish (color/style subject to staff approval). Must be same door type/glazing/finish as Door 1. Frames - Hollow metal (color/style subject to staff approval) Hardware - Both doors must lock; main door to work with access control Door Bottoms - undercut to clear carpet pile; doors must swing freely with no dragging or wear track. No sweeps over carpet Access Control Prep (Base Bid) Preperation of main door for badge access (control system installation not included in work) Electrified/electric strike prep Door position switch prep Power transfer path (electric hinge or transfer device) Conduit/raceway with pull string from door to device Coordinate exact prep with the access control vendor and City IT and Public Works Departments before fabrication Patch and Repair (Base Bid) Repair/refinish counter, flooring, and walls affected by the work, matching existing adjacent finishes. Leave everything clean and ready for use. Permits (Base Bid) Pull all necessary permits and coordinate all necessary inspections needed and complete scope of work (all work must meet California Building Code) Add Alternate Two (2) Solid-core wood doors with a full glass vision lite (safety glazing, laminated preferred for security). keep 10" of push side solid (glazing stops 10" up or add a 10" kick plate) New partition framing (studs, drywall, finish) to receive the frame Please upload a signed W-9 form Please download the IRS 2024 Form W-9 and upload a completed, signed copy. Acceptable signatures include either a handwritten (wet) signature or a valid electronic signature. Please enter Legal Company Name and related DBA Please state your company name and any related DBA's based on your California Secretary of State Filing. Cost Proposal using Electronic Pricing Table The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder. Response (without Cost Proposal) Please Upload Your Response Here, excluding your Cost Proposal. Statement of Offer Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date. Bid Bond Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs California Contractors State License Board Please enter your contractor license number for verification. City Contract The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract. Insurance Requirements The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the Insurance Checklist in Attachments . Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award. Project Details Important Instructions for Electronic Submittal The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full Project Scope 1. Overview Remove the two existing half-swing doors at the public permitting counter and replace them with two new full-height, lockable interior doors (frames and hardware included). Work must meet current California Building Code. Contractor must field-verify all existing conditions and dimensions before pricing or fabrication. 2. Demolition Remove and dispose of the two existing half-swing doors and related debris. Protect the counter, millwork, flooring, and wall finishes during demo and install. 3. Doors, Frames, and Hardware Base Bid: Solid-core wood doors with hap glass vision lite (both). Add Alternate: Solid-core wood doors with a full glass vision lite (safety glazing, laminated preferred for security). Applies to both doors. Finish: Commercial-grade solid core; color/style subject to staff approval. Frames: Hollow metal; color/style subject to staff approval. New partition framing (studs, drywall, finish) to receive the frame (if applicable) Hardware: Both doors must lock, main door to work with access control Door bottoms: Undercut to clear carpet pile, doors must swing freely with no dragging or wear track. No sweeps over carpet. Door 1 (Main/Accessible) – primary staff entrance; must meet accessible specs below. Door 2 (Secondary) – same door type/glazing/finish Accessible Door Specs (Door 1, minimum): 36" leaf, 32" clear opening at 90°. Lever handle, 34"–48" AFF, one-hand operable (no pinch/twist/grasp). No raised threshold where carpet is continuous; if a threshold exists at a material transition, ½" max, beveled. Verify maneuvering clearance at the door approach with plan check. Laminated and tempered for shatter resistance. Full-lite alternate: keep bottom 10" of push side solid (glazing stops 10" up or add a 10" kick plate). 4. Access Control (Installation by another vendor) Main door will get badge access (The access control system itself is not part of this sow) Contractor provides door/frame prep only: Electrified/electric strike prep Door position switch prep Power transfer path (electric hinge or transfer device) Conduit/raceway with pull string from door to device Supply electrified hardware for the door Coordinate exact prep with the access control vendor and City IT/PWOM before fabrication. Egress requirement: The access-controlled door must always allow free exit, no key, tool, or special knowledge required on the egress side. 5. Patch and Repair Repair/refinish counter, flooring, and walls affected by the work, matching existing adjacent finishes. Leave everything clean and ready for use. 6. Code and Permits All work must meet CBC. Contractor submits and pulls all permits needed and coordinate inspections. *Prevailing wage applies Project Estimate The City anticipates a project value of: 8,500 . Introduction Summary Background Contact Information Timeline Terms and Conditions Prevailing Wages Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this ITB is subject to compliance monitoring and enforcement by the DIR. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification. Statement of Offer Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date. Questions and/or Objections It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”). A Proposer may submit Questions related to this ITB to the City through the City’s e-Procurement Portal at or before: Tuesday, November 10, 2026 at 5:00 pm . Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all. Amendment and Cancellation The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications. Right of Rejection The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB. Prohibition of Respondent Terms and Conditions A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB. Joint Ventures and Partnering A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following: The Proposal shall respond to each section and subsection of this ITB. The Proposal shall clearly set forth the respective responsibilities and functions that each Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information. Proposal of Alternate Services A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected. Proposal of Additional Services A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the Contract before execution. Severability If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid. Licensure and Special Certification Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all Proposers to submit evidence of proper licensure and certifications. Disclosure of Proposal Contents All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals shall be open for review by the public to the extent required by the California Public Records Act, Government Code section 7920.000 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection. Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information. Conflict of Interest and Restrictions By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB. Proprietary Information A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law. Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection. Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information. If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver. Bid Submittal Cost Table Attachments Contract Award Opening & Award of Contract Bids will be opened publicly and read aloud at the time and date established in the invitation to Bidders. Bid Summaries may be made available to Bidders after the Bid Date. The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001 The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids. Before a Bid is considered for award, the City may, in addition to the Experience & Qualifications form included in the Bid documents, require a Bidder to submit a statement of facts and detail as to its business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the City may require evidence that the Bidder has performed other work of comparable magnitude and type. The City expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the bidder’s Subcontractors) is not sufficiently qualified for the work Bid upon and, therefore, justifies such rejection. Award of Contract The award of the Contract, if it is awarded, will be to the lowest responsive, responsible Bidder whose Bid complies with the requirements set forth herein. The City reserves the right to award the Contract based on the Base Bid alone or the Base Bid plus any combination of Additive Alternate Bid items, in any order, as determined to be in the best interest of the City. The issuance by the City of a notice to the successful Bidder of the award of the Contract (“Notice of Award”) shall be deemed the Award of Contract. Bid Protests The lack of a prompt procedure to resolve disputes regarding the bidding process would impair the City’s ability to carry out its purpose of constructing this project in a timely manner. Therefore, to the maximum extent authorized by law and notwithstanding any other procedures specified in documents referenced herein, all disputes and/or protests regarding the bidding process shall be subject to the following procedure. In submitting a Bid to the City for this project, the Bidder agrees to comply with and to be bound by this procedure. Any Bid protest must be submitted in writing to the Director of Capital Projects & Transportation of the City of West Sacramento before 5:00 p.m. on the fifth (5th) working day following Bid opening. (a) The initial protest document must
Published attachments
Addenda and notices
Addendum #1 · 1
The question response deadline was moved from 11/17/2026 to 11/23/2026 with the final response being issued on 11/23/2026. The revised timeline reflecting the change has been posted below. Release Project Date: November 3, 2026 Question Submission Deadline: November 10, 2026, 5:00pm Question Response Deadline: November 23, 2026, 5:00pm Proposal Submission Deadline: November 24, 2026, 3:00pm Public Bid Opening (Non-Mandatory): November 24, 2026, 3:00pm Join: https://teams.microsoft.com/meet/295405296142775?p=rG3Vac5BiDIKYgIwkW Meeting ID: 295 405 296 142 775 Passcode: Ae97BH9F Contract Award Date: November 25, 2026
Public questions and answers
Per Item 7 of the Bidder’s Checklist, a site visit is required. When can we schedule a site visit?
We could schedule a site visit after 11/30.
What access control system is currently installed on the existing doors? Please provide the manufacturer, model numbers, and voltage requirements (12VDC or 24VDC) for the electric strikes, door position switches, and related hardware.
Currently there is no access control to the doors installed there is two half doors with manual handles and no badge access. The system will be 24VAC.
What substrate will the new partition framing be anchored to (metal studs, wood studs, or concrete)?
The substrate will be metal studs around the framing.
Is the contractor responsible for furnishing the power supply/transformer box, or only the electrified hardware and raceway preparation?
Per Access Control Vendor ONLY Electrified hardware is what contractor needs to provide
Is temporary security or dust protection required while the counter area is under construction?
Temporary dust protection may be required/temporary encapsulation may be needed as it is an active floor for the public.
Can you confirm whether the project's maximum available budget is $8,500?
The $8,500 budget amount is an approximate project estimate but not a maximum not-to-exceed value. We encourage vendors to submit bids based on their assessment of project requirements and associated costs.
OpenGov categories
- 15020 · Door Openers and Parts, Electric
- 15021 · Doors, Aluminum and Glass, All Types
- 15022 · Doors and Components, Fiberglass
- 15023 · Doors and Parts, Automatic, Drive-Through Type, etc.
- 15024 · Doors and Parts, Swinging (Incl. Handicapped and Revolving Types)
- 15025 · Doors, Frames, and Jambs, Steel
- 15026 · Doors and Components, Plastic
- 15027 · Doors, Frames, and Jambs, Wood
- 55931 · Doors and Windows
- 90937 · Doors and Windows