State and local · OpenGov
CLASS 2 LANDFILL PARTIAL CLOSURE
Description
The County of Greenville is seeking proposals for the Partial Closure Construction of the Class 2 Unit 2 Landfill at the Twin Chimneys Landfill, subject to the conditions and all provisions set forth herein and in the Drawings and Specifications (attachment C & D). A portion of the Class 2 Unit 2 Landfill has achieved final grades. The closure consists of constructing: A stormwater pond Subgrade preparation Structural fill of a perimeter berm Stone access road Erosion control measures (silt fence, erosion control blankets, seeding). The project is approximately 301,000 cy excavation and 120,000 cy of structural fill. The soil borrow area is within the Unit 2 Landfill footprint and has been cleared. The County desires the project to reach substantial completion within 210 calendar days. Scope of Work Class 2 Landfill Partial Closure The closure consists of installing erosion and sediment control measures, including silt fencing, a stormwater pond, erosion control blankets, seeding, and gabion baskets. Work will also include subgrade preparation, fine grading, excavation of approximately 301,000 cubic yards (CY) of soil, and placement of 120,000 CY of structural fill. Structural fill will be placed within the perimeter berm in accordance with the project plans and specifications. The remaining excavated material shall be stockpiled within the Unit 2 Landfill footprint at designated locations. The project area and designated soil borrow area are located within the Unit 2 Landfill footprint and have been cleared in advance of construction. The Contractor shall provide the services of a South Carolina-licensed land surveyor to establish survey control and perform as-built surveys to verify that required quantities, elevations, and grades have been achieved. The Contractor shall also engage a South Carolina-licensed firm to perform soil testing and provide the necessary testing and documentation to verify compliance with the project plans, specifications, and applicable requirements. Public Notice Greenville County is soliciting sealed proposals in response to CLASS 2 LANDFILL PARTIAL CLOSURE , subject to the conditions and all provisions set forth herein and attached. Sealed proposals will be received through the County’s online procurement portal located at https://procurement.opengov.com/portal/greenvillecounty until Wednesday, November 18, 2026 , 3:30 pm , then publicly opened. The goods and/or services must be furnished as described and specified herein and submitted to Greenville County. All inquiries regarding this proposal shall be submitted no later than Friday, October 30, 2026 , 5:00 pm via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this proposal to receive an email notification when answers are posted. It is the responsibility of the Offeror to check the website for answers to inquiries. Introduction Summary Background Contact Information Timeline Instructions to Offerors Pre-Proposal Meeting A Pre-Proposal meeting is not scheduled for this project. Pricing Pricing must be based upon payment in thirty (30) days. Discounts for payment in less than thirty (30) days will not be considered in making award. Discounts shall be stated in proposals as a percentage. Time in connection with discount offered will be computed from date of delivery of commodities to carrier, when inspecting and acceptance is at point of origin; or date of delivery at destination; or if laboratory inspection is made part of bid, from date of laboratory report. Unit pricing will govern over extended pricing, unless stated otherwise. Pricing shall include packing. Unless indicated by County, pricing must be firm. Vendors shall submit pricing using the Proposal Forms (pages 5-9) in the Project Manual. (See attachment C). Bonding Bonding will be required for this project. See Bonds section for the requirements. Statement of Qualifications Vendor shall include the following with their response: An Introduction Letter including the following: RFP subject and number. Name of the firm including mailing address, e-mail address(es), telephone number(s), and contact name(s). Overview of company background. Key contact including address, phone number, and email address for requesting additional information. Organization and Personnel including the following: List of present owner(s) and key management individuals. Location of corporate headquarters and divisional offices specifying the office(s) managing the Project. Include names, address and phone numbers. Resumes of key staff, project manager, and other key personnel including respective office locations. Resumes shall highlight qualifications, and relevant experience. List of proposed subcontractors and anticipated percentage of participation. Experience and Past Performance Description of at least five (5) projects including Greenville County completed within the past five (5) years that were similar in scope to include the following: Project Name Project duration and Location (City/State) Owner name and contact information Government or public-sector experience, if applicable Equipment Provide a list of all equipment proposed for this project, include make, model, and year. References Provide three (3) references; include name, role, telephone number, email and project name. Project Approach and Schedule Provide a written approach and a project schedule. Other Information Provide evidence of appropriate license in South Carolina to perform the work described in the specifications and drawings. Pricing and other Fees Submit pricing using the Proposal Form (pages 5 - 9) in the Project Manual. (See attachment C). Certificate of Insurance meeting specified requirements (upon award) Submission Procedures and Requirements All submissions must be received by Wednesday, November 18, 2026 at 3:30 pm . Submissions will not be accepted after the deadline. There will be no exceptions. Responders submitting proposals shall be responsible for all cost of preparing such proposals. Information requested and not received at the time of submission may disqualify the submitted proposal. Responders to this solicitation shall closely examine the specific requirements noted herein and the attached Terms and Conditions. Facsimile transmittals, hard copies, emails or offers communicated by telephone will not be accepted or considered. Proposals shall be organized in the following manner with the subject headings and sequence indicated. Introduction Organization and Personnel Experience and Past Performance Proposed Solution(s) References Pricing, Hourly Rates and Other Fees Other Information Requested License and Permits – The Contractor shall obtain all applicable licenses and permits, and promptly pay all taxes required by the State of South Carolina, and/or Greenville County. Inquiries and Addenda Offerors shall submit all inquiries regarding this RFP via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. The County will not be responsible for or bound by any oral instructions made by any employee(s) of the County in regard to this RFP. Addenda Notification: This RFP represents the most definite statement Greenville County will make concerning information upon which proposals are to be based. Offerors are required to register for an account via the County’s online procurement Portal hosted by OpenGov. Once you have completed the registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is sole responsibility of each proposer to periodically check the site for any addenda at https://procurement.opengov.com/portal/greenvillecounty . No addenda will be issued later than five (5) working days prior to the date for receipt for proposals except an addendum which, if necessary, postpones the date for receipt of proposals or cancels this RFP. Vendors shall acknowledge receipt of all addenda. General Information Proprietary Information – The County of Greenville is a public body and governed by the South Carolina Freedom of Information Act. Documents submitted to the County relating to this Solicitation are subject to requirements of the Freedom of Information Act and may be deemed public records. Errors and Omissions – The Responder will not be allowed to take advantage of any errors or omissions in the Request for Proposals. Where errors or omissions appear in the RFP, the Responder shall promptly notify the County of Greenville in writing of such error or omission it discovers. Any significant error, omission and/or inconsistency in the specifications are to be reported as soon as possible but no later than five (5) days before such time the response is to be submitted. Withdrawal of Proposal – An official representative of a Responder may withdraw a Responder’s response at any time prior to the proposal submission deadline. Acceptable proof establishing that he/she is the representative of the Responder must be provided. Non-Endorsement – If the County awards a contract, the successful Responder shall not issue any news release or other statement relating to the award or servicing of the agreement which state or imply the County of Greenville’s endorsement of the successful Responder’s services. Insurance Insurance Requirements The contractor is responsible for and must have all required insurance listed below and shall not commence work under the associated contract until it has obtained all insurance required, and the County has approved such insurance in writing, nor shall the Contractor allow any subcontractor to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained. All insurance policies shall be maintained for the life of the contract. THE COUNTY SHALL BE NAMED AS “ADDITIONAL INSURED” FOR ITS INTEREST on all policies of insurance except Worker’s Compensation, Automobile Liability, and Professional Errors and Omissions, as regards ongoing operations, products and completed operations, and this shall be noted on the face of the Certificate of Insurance. As a part of the certificate of insurance requirement the contractor shall also include acknowledgement and acceptance of the wavier of subrogation provision granted to Greenville County. This acknowledgement and acceptance should be included in the same section of the Certificate of Insurance that evidences the “Additional Insured” provision. Certificates for all such policies of insurance shall be provided by the Contractor's insurance agent or broker to the County within 10 working days from the date of Notice of Award. All Certificates of Insurance submitted shall provide on the face of the certificate reference to County's RFP # RFP #27027 . Contractor will provide County a minimum of 30 days advance notice in the event the insurance policies (or an insurance policy) are canceled. Subcontractors approved to perform work on this project are subject to all of the requirements in this Section. Contractor agrees to maintain and keep in force during the life of this Agreement, with a company or companies authorized to do business in South Carolina, the following insurance policies: Comprehensive General Liability: $1,000,000 per occurrence - combined single limit / $2,000,000 general aggregate, to include products and completed operations. Automobile Liability: $1,000,000 per occurrence - combined single limit (Coverage shall include bodily injury and property damage and cover all vehicles including owned, non-owned and hired) Statutory Worker's Compensation: Coverage A - State of SC Coverage B - Employers liability $1,000,000 Each Accident $1,000,000 Disease, Per Employee $1,000,000 Disease, Policy Limit Policies shall contain a waiver of subrogation in favor of and/or that applies to Greenville County, its departments, agencies, boards, employees, and commissions for losses from work performed by or on behalf of the contractor. No deviation from this coverage’s will be accepted unless, in the County’s sole discretion, it is more advantageous to the County, i.e., $1,000,000 - a $2,000,000 or $5,000,000 limit would be acceptable. Evaluation Phases The proposals will be evaluated on the following criteria. Greenville County reserves the right to interview responders or have demonstrations to this RFP at its discretion. Greenville County will not be responsible for any costs associated with interviews of responders or demonstrations. If interviews or demonstrations are needed, a second phase of the evaluation process may be implemented at the County's discretion. Point values are described below. 5 = High 4 = Medium High 3 = Average 2 = Medium Low 1 = Low 0 = Non-Responsive Bonds Bid Bond: This project requires a Bid Bond and a Performance/Payment Bond. Proposers shall submit with their proposal, a Bid Bond in the amount of 5% of the bid price. This bond may be in the form of Bid Bond from the American Institute of Architects (AIA), electronically through Surety 2000, Certified Check, Cashier’s or Bank Money Order of any national or state bank and shall be made payable to Greenville County. Proposals submitted without being accompanied by any of the foregoing as required, may be considered informal and may be rejected. Any proposal accompanied by a bid bond not properly executed in the opinion of the County Attorney, may be rejected. The bond will be forfeited to the County by the successful bidder as liquidated damages in case a proposal award is made to that bidder and the contract and bond are not promptly and properly executed. 1. Instructions for Bond through AIA or similar bond document: The Original (hard- copy) Signed-Bid Bond must be delivered to the Procurement Services Office by the Bid Due Date/Time specified . The Bid Bond must be submitted in a sealed-envelope to: Greenville County Procurement Services Division; 301 University Ridge, Suite N-2400; Greenville, SC, 29601. The following information must be included, on the outside of the envelope: A. “Bid Bond” (labeled) B. Bid Number C. Company Name 2. Instructions for Surety2000: The County has an account with an online Bid Security program called Surety2000. This is a fee-based program that bidders can use to obtain an electronically issued, verified and legal bid bond which can be used for bidding purposes. No bid bond can be created by the bonding agent on the site without the Surety being fully aware of that bond. Only agents appointed directly by the Surety can issue bid bonds on the site. If your company chooses to use Surety2000 to obtain the bid bond, please access Surety2000 at www.surety2000.com. Complete the necessary steps to log in to the site and obtain the bid bond. Bond Identifier: RFP #27027 USE THIS CODE WHEN ACCESSING SURETY2000 Once an official bid bond is issued, use the space below to input your company's E-Bond Serial Number. The number will look something like this: SNJ5185268 This number will then be used at the bid opening to verify your company's bid bond. If you are not using this method for Bid Security submission please write "N/A" in the field provided. Please note that the County is not responsible for late submissions and no consideration will be made for bid security received after the date and time stipulated in the Notice to Bidders even if you have electronically submitted your bid on time. If the original bid security is not able to be verified by the date and time stipulated in the Notice to Bidders, your submission will be rejected. If required per solicitation and after proposals are awarded, the Procurement Services Division will return immediately all checks, except that of the successful bidder. The check of the successful bidder will be returned upon compliance with the performance and payment bond requirements. If required per solicitation, the successful bidder, within fifteen (15) working days after acceptance of the bidder’s offer by the County, shall furnish a satisfactory performance and payment bonds in the amount of the total bid price. The performance and payment bonds must be received by the county prior to issuance of an executed contract and Notice to Proceed. The fifteen (15) working days may be extended upon written approval by the Procurement Director. A copy of the written approval shall be transmitted to the successful bidder stating the terms of any extension. In the event that the bidder fails to deliver to the County Procurement Services Division the performance and payment bonds in said period of fifteen (15) working days after acceptance of the bidder’s offer by the County, then the bid bond of the bidder shall be retained by the County in its entirety and the award will be withdrawn from the bidder. The successful bidder shall have as surety a corporate surety authorized to act as surety in South Carolina. The Performance and Payment Bonds will insure that the successful bidder will promptly make payments to all persons supplying labor or materials to the bidder; and shall guarantee to indemnify and save the County, its officers, divisions, and employees harmless from all costs, damages, and expenses growing out of or by reason of the successful bidder’s failure to comply and perform the work and complete the contract in accordance with the specifications in the matter of making, furnishing and/or delivering said work or supplies. The Performance and Payment Bonds will be in effect for one year after completion of the contract. If bonding is required per the solicitation, the bonding company must have an agent available to meet with County officials to clarify and explain the County’s responsibility in maintaining the integrity of the bond. Return of Bid Bond: After a contract is awarded, the Procurement Services Division will return immediately all checks, except that of the successful bidder. The check of the successful bidder will be returned upon compliance with the performance and payment bond requirements. Performance and Payment Bond: The successful bidder, within fifteen (15) working days after acceptance of the bidder’s offer by the County, shall furnish a satisfactory performance and payment bonds in the amount of the total bid price. The performance and payment bonds must be received by the county prior to issuance of an executed contract and Notice to Proceed. The fifteen (15) working days may be extended upon written approval by the Procurement Director. A copy of the written approval shall be transmitted to the successful bidder stating the terms of any extension. In the event that the bidder fails to deliver to the County Procurement Services Division the performance and payment bonds in said period of fifteen (15) working days after acceptance of the bidder’s offer by the County, then the bid bond of the bidder shall be retained by the County in its entirety and the award will be withdrawn from the bidder. The successful bidder shall have as surety a corporate surety authorized to act as surety in South Carolina. The Performance and Payment Bonds will insure that the successful bidder will promptly make payments to all persons supplying labor or materials to the bidder; and shall guarantee
Published attachments
- COG Sub W9
- Sample Services Agreement
- Specs_IFP_TCLF_CD_Unit_2_Landfill_Partial_Closure
- Dwgs_IFP_TCLF_CD_Unit_2_Landfill_Partial_Closure
- Revised Specs, proposal form, 31 23 00, Earthwork, 31 23 00 & Gabion Baskets, 31 37 10
- Dwgs_IFP_TCLF_CD_Unit_2_Landfill_Partial_Closure - Updated11-2-26
- CLASS_2_LANDFILL_PARTIAL_CLOSURE_(Addendum_#2_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum. Section 11 Attachments: New: " E - Revised Specs, proposal form, 31 23 00, Earthwork, 31 23 00 & Gabion Baskets, 31 37 10 " New: " F - Dwgs_IFP_TCLF_CD_Unit_2_Landfill_Partial_Closure - Updated11-2-26 "
Official Notice #1: Proposal Tabulation · 1
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum. Section 1 Public Notice: Changed: "Sealed proposals will be received through the County’s online procurement portal located at https://procurement.opengov.com/portal/greenvillecounty until Monday, November 16, 2026, 3:00 pm, then publicly opened." To: "Sealed proposals will be received through the County’s online procurement portal located at https://procurement.opengov.com/portal/greenvillecounty until Wednesday, November 18, 2026, 3:30 pm, then publicly opened." Section 2.3 Timeline: Changed: "Proposal Submission Deadline: November 16, , 2026, 3: 00pm " To: "Proposal Submission Deadline: November 18, , 2026, 3: 30pm " Changed: "Review of Proposals: November 16 - November 30, 2026" To: "Review of Proposals: November 18 - November 30, 2026" Section 4.5 Submission Procedures and Requirements: Changed: "All submissions must be received by Monday, November 16, , 2026 at 3:00 pm." To: "All submissions must be received by Wednesday, November 18, , 2026 at 3:30 pm." Section 13.1 Surety2000 Bid Bond Verification: Changed: "Project ID: RFP #2027 " To: "Project ID: RFP #27027 "
Public questions and answers
After NTP is provided on 12/18/26, what is the total duration for substantial completion?
The County desires the project to reach substantial completion within 210 calendar days.
Can a CAD file be provided for this RFP?
Please send an email to Philip.Westmoreland@hdrinc.com to request the CAD files.
Is all excavation to be considered usable soils?
There has not been any soil borings or test pits. Assume all soil excavated is suitable for structural fill. Any soil not suitable for structural fill will be stockpiled.
Can dimensions be provided for the sediment basin? Particularly the dimensions for the emergency spillway length and the length of the porous baffles.
This is included in the CAD files. Please send an email to Philip.Westmoreland@hdrinc.com to request the CAD files.
How will fluctuations in fuel prices be handled with this project?
Vendors may propose a fuel cost plan, which can be discussed and negotiated as part of the contract negotiations.
If the geotextile is 10,000 syds and the stone is 1' thick; I calculate 3,333 cyds of stone needed. 250 tons does not appear to be enough stone. Please advise.
See attachment E. The Proposal Form has been revised.
What is the dimension of the Skimmer pipe 4 or 6 inches?
The Owner is providing an 8” Marlee skimmer for the contractor to install.
With there being 301k cy of excavation and only 120k cy of structural fill, where is the remaining 181k going to be stockpiled?
Drawing 21G-01 has been revised to indicate the locations of the stockpiles. See attachment F.
OpenGov categories
- 98846 · Landfill Services