Cloverdale Road, Victory Road to Overland Road
Description
Widening Cloverdale Road from Victory Road to Overland Road to a five (5)-lane configuration, including the construction of median islands, a multi-use pathway, and pedestrian ramps on both sides of the roadway. Additional improvements shall include epoxy coating repairs to three (3) bridge decks; replacement of the existing Eightmile Creek pipe with a forty-eight-inch (48-inch) reinforced concrete pipe (RCP); installation and modification of associated irrigation piping and slide gates; construction of a drainage basin; and installation of Pedestrian Hybrid Beacons (PHBs) at Muir Ridge Drive and Peppermint Drive. The project shall also include sanitary sewer improvements to be performed by the City of Boise. Special Provisions Special Provisions Please refer to the " Attachments " section for Special Provisions and other pertinent supporting documents. Legal Notice Ada County Highway District Invitation to Bid Cloverdale Road, Victory Road to Overland Road Contract Number: CT227-08 Project Number: 521021 GIS Number: RD207-11 Project Location: Ada County, Idaho Only electronically sealed bids will be received by Ada County Highway District (ACHD) until 3:00 pm , Friday, November 6, 2026 , at which time they will be publicly opened via Zoom. Be advised that ACHD may have more than one (1) bid opening scheduled for Friday, November 6, 2026 , at 3:00 pm . ACHD will conduct the bid openings scheduled for that date and time individually and in an order established solely by ACHD that best suits its business needs. All proposals must be electronically sealed and submitted via ACHD's eProcurement portal https://procurement.opengov.com/portal/achdidaho . Manual/Paper bids will be deemed non-responsive. All electronic bidders must first register on the ACHD eProcurement portal at https://procurement.opengov.com/portal/achdidaho . No fee will be incurred to bid electronically. Bidders will have the option to Subscribe to all ACHD solicitations and receive email notifications. Following the Bid Opening, the Bid Results will be available from the eProcurement Portal . In accordance with the plans and specifications, this work shall consist of widening Cloverdale Road from Victory Road to Overland Road to a five (5)-lane configuration, including the construction of median islands, a multi-use pathway, and pedestrian ramps on both sides of the roadway. Additional improvements shall include epoxy coating repairs to three (3) bridge decks; replacement of the existing Eightmile Creek pipe with a forty-eight-inch (48-inch) reinforced concrete pipe (RCP); installation and modification of associated irrigation piping and slide gates; construction of a drainage basin; and installation of Pedestrian Hybrid Beacons (PHBs) at Muir Ridge Drive and Peppermint Drive. The project shall also include sanitary sewer improvements to be performed by the City of Boise. . All work involving irrigation and/or bridge work shall be completed no later than March 15, 2027, unless otherwise approved by the irrigation district. All other work shall be completed in its entirety on or before October 29, 2027 . The completion dates are predicated on the intent of ACHD to issue a Notice to Proceed to the Contractor on or about January 5, 2027 . ACHD shall be entitled to Liquidated Damages of Three Thousand Dollars ($3,000.00) for each calendar day of delay in the completion of the work. A delay on one portion of the project does not justify delays on other portions of the project. The contractor shall be liable for any and all damage charges filed as a result of disruption of irrigation water delivery. Liquidated damage assessments shall be cumulative and concurrent. All questions or requests for clarification regarding this Invitation to Bid, including the content and requirements of the Bid and Contract Documents, must be submitted in writing through the "Question and Answer" section of the ACHD eProcurement Portal and must be submitted no later than 12:00 pm on Friday, October 30, 2026 . Questions submitted by any other method, including manual delivery or email, will not be accepted , nor will questions be accepted after the designated Question and Answer deadline. Bidders are strongly advised to observe the stated deadline for submitting inquiries. To ensure timely receipt of updates, bidders are encouraged to select "Follow" on this Bid within the eProcurement Portal to receive automated email notifications when responses are posted. Notwithstanding such notifications, it remains the sole responsibility of each bidder to monitor the eProcurement Portal for updates and responses regularly. Any interpretation, clarification, or modification of the ITB that may affect its substance will be issued only in writing in the form of an Addendum and will be made available through the eProcurement Portal. It is the bidder's responsibility to review and acknowledge all Addenda before submitting a Bid. A Plan Holders List will be posted on the eProcurement Portal . ACHD has prepared the Invitation to Bid (ITB) including the Plan Sets for the proposed project. These ITB and Plans are available for download at the eProcurement Portal . Except as modified herein, all construction shall conform to the currently adopted Edition of the IDAHO STANDARDS FOR PUBLIC WORKS CONSTRUCTION (ISPWC), and approved supplements, for use in the ACHD rights-of-way. Except as modified herein, any bridge construction shall conform to the currently adopted Edition of State of Idaho STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION including the current edition of the Supplements and Standard Drawings. Proposals must be accompanied by an original or photocopy or electronic version, e.g. PDF, FAX, etc. of certified check, cashier's check, or a bid bond (collectively referred to hereafter as “Bid Security”) issued by a surety authorized to issue such bonds in the State of Idaho, in an amount of ten percent (10%) of the total amount of the proposal submitted. If a photocopy or electronic version of a certified check, or cashier's check is provided with the proposal, an original certified check or cashier's check shall be submitted to ACHD within 48 hours of the bid opening. In addition, any Contractor submitting a Certified Check or Cashier's Check for Bid Security will be required to submit within 48 hours of the bid opening, a letter from their bonding company stating that it will guarantee bonding for the Bidder, in the event said Bidder is notified via a “Notice of Intent to Award Letter,” that it is the apparent low-cost Bidder and may be awarded the contract. Said letter is to be included with the Proposal Form, and shall name the Bidder, project number, and the amount of bonding value being guaranteed. The apparent low-cost responsive Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the contract Introduction Summary Background Contact Information Timeline Instructions to Bidders The following Instructions to Bidders are General Requirements that apply to Electronic Procurements. FORMAT The Contract Documents are divided into parts, divisions, and sections in keeping with Industry practice in order to separate categories of subject matter for convenient reference thereto. Generally, there has been no attempt to divide the specification sections into work performed by the various building trades, work by separate subcontractors, or work required for separate facilities in the project. GENERAL DESCRIPTION OF THE PROJECT A general description of the work to be done is contained in the Invitation to Bid (ITB). The scope is indicated on the accompanying drawings and specified in the applicable parts of these Contract Documents. DOCUMENT INTERPRETATION The Contract Documents governing the work proposed herein consist of the drawings and all material bound herewith. Said documents are intended to be compatible and to provide all details reasonably required for the execution of the proposed work. Anyone submitting a proposal shall have thoroughly examined all the Contract Documents. Should there be any doubt as to any meaning or intent of any Contract Document statement or provision, all questions or clarifications must be posted in the Q&A section of the solicitation located at the eProcurement Portal located at https://procurement.opengov.com/portal/achdidaho . All questions or clarifications must be submitted by noon on the Monday prior to the Bid Opening. Any interpretation that may alter or change the Contract Documents will be digitally published, in the form of Addenda, which will be furnished to officially listed Plan Holders via the eProcurement Portal . Bidders shall acknowledge receipt of Addenda as instructed. BIDDER'S UNDERSTANDING Each Bidder must inform their self of the conditions relating to the execution of the work, and it is assumed that the Bidder will adequately inspect the site and become thoroughly familiar with all site conditions and the Contract Documents. Failure to do so will not relieve the successful Bidder of their obligation to enter into a contract and complete the contemplated work in strict accordance with the Contract Documents. It shall be the Bidder's obligation to verify complete satisfaction to all information concerning all site conditions. Ada County Highway District (ACHD) will make available for inspection by prospective Bidders, upon request and prior to the final inquiry deadline, during regular business hours, any information that it may have as to the subsurface conditions and surface topography at the work site. Investigations, if any, conducted by ACHD of subsurface conditions were made for the purpose of study and design and the ACHD does not assume any responsibility whatever with respect to the sufficiency of borings or of the logs of test borings or of other investigations that have been made or of the interpretations made therefrom; and there is no warranty or guarantee, either expressed or implied, that the conditions indicated by such investigations are representative of those existing through-out such area, or any part thereof. Logs of test borings or topographic maps showing a record of the data obtained by ACHD investigations of surface and subsurface conditions that are made available or bound herewith shall not be considered a part of the contract documents; said logs represent only the opinion of the Engineer as to the character of the materials encountered by the Engineer in their investigations and is provided only for the convenience of the Bidders. Information derived from inspection of logs of test borings, or topographic maps, or from drawings showing location of utilities and structures will not in any way relieve the Bidder from any risk or the responsibility to properly examine the site and make such additional investigations as necessary or from properly fulfilling all the terms of the Contract Documents. Each Bidder shall inform their self of, and the Bidder awarded a contract shall comply with, all Federal, State, and local laws, statutes and ordinances relative to the execution of the work. This requirement includes, but is not limited to, applicable regulations concerning minimum wage rates; non-discrimination in the employment of labor; protection of public and employee safety and health; environmental protection; the protection of natural resources; fire protection; burning and non-burning requirements; permits, fees and similar requirements. The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has been given adequate opportunity to get acquainted with the scope of the Work, the conditions imposed upon execution of the Work and to the Bidder’s satisfaction, has resolved any questions regarding any perceived conflicts, ambiguities, errors, and discrepancies contained within the Contract Documents. ACHD has prepared and upon request will provide prospective Bidders with electronic versions of the Contract Documents and Proposal Documents for Submittal including the Design Plan Sets and Specifications for the proposed project in PDF format. The original digital copy of the electronic design data is retained on file at the ACHD. The electronic data is provided for Bidder convenience and information and will not become part of the Contract. No guarantee or warranty is made by ACHD that the electronic design data provided to the Bidder is compatible with any of the systems that are used by the Bidder, is complete, is representative of the actual conditions at the sight of work, or accurately reflects the quantities and character of the actual work required. The furnishing of electronic design data does not relieve the Bidder from risks or of duty to make examination and investigations of the site of work or of other responsibilities as outlined in the Contract Documents including, but not limited to, the General Conditions. DRAWINGS The number of drawings consists of Sixty-Three (63) Plan Sheets. TYPE OF PROPOSAL Unit Price: When the proposal for the work is to be submitted on a unit price basis, unit price bids will be required for all items of work set forth in the proposal, except those designated to be paid for as a lump sum. IN CASE OF DISCREPANCY BETWEEN UNIT PRICES AND TOTALS, UNIT PRICES WILL PREVAIL. The estimate of quantities of work to be done is tabulated in the Contract Documents and, although stated with as much accuracy as reasonably possible, is approximate only and is established solely for the basis of calculation upon which the award of contract shall be made. Payment to the Contractor will be made on the measurement of work actually performed by the Contractor as specified in the Contract Documents. ACHD reserves the right to increase or decrease the amount of any class of work as may be deemed necessary, unless otherwise specified in the Contract Documents. Lump Sum: When the proposal for the work is to be submitted on a lump sum basis, a single lump sum price shall be submitted in the appropriate place in the Proposal Documents For Submittal. The total amount to be paid the Contractor shall be the amount of the lump sum. PREPARATION OF PROPOSALS All bidders must submit their proposals as electronically sealed bids utilizing the eProcurement Portal located https://procurement.opengov.com/portal/achdidaho . All Contract Documents and Plans are available through the eProcurement Portal . All blanks on the Vendor Questionnaire and Bid Schedule(s) shall be completed, and the Authorized Signature Form electronically signed as provided. If the Bidder is a corporation, the legal name of the corporation shall be set forth, together with the signature of the officer or officers authorized to sign contracts, attested to by the Secretary of the Corporation, and affix corporate seal, on behalf of the corporation. If the Bidder is a partnership, the true name of the firm shall be set forth, together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership. If the signature is by an agent other than an officer of a corporation or a member of a partnership, a notarized power-of-attorney must be on file with the ACHD prior to opening of proposals or submitted with the proposal. Bidders may modify their electronic Proposals at any time prior to the scheduled closing date and time for the receipt of bids. If any document uploaded and submitted to the eProcurement Portal contains omissions, erasures, or alterations, they shall be initialed by an authorized representative of the Bidder. In addition, the Proposal submitted shall not contain additions of any kind, prices uncalled for, or fail to conform to the conditions of the published Invitation to Bid. Late Bids are not allowed through the eProcurement Portal website. ACHD will not accept a late Bid or Proposal, in any format, regardless of cause or circumstance. Bidders are solely responsible to ensure timely submission of their Proposals to ACHD via the eProcurement Portal . All electronic Bids shall be accompanied by the Bid Security and other required documents. If a Cashier’s Check or Certified Check is utilized as the Bid Security, then the Check shall be hand-delivered to or sent to and received by ACHD within 48 hours of the Bid Opening date and time stated in the ITB. The shipping envelope for the Check Bid Security shall be plainly marked with the Project Name, Contract Number, Bid Opening date and time, and state “Bid Security Enclosed”. ACHD assumes no responsibility for failure of any computer or other equipment to deliver all or a portion of the bid or proposal at the time or to the location required by the solicitation. Following the Bid Opening, the Bid Results will be available at the eProcurement Portal . Neither OpenGov nor ACHD warrant that access to and use of the eProcurement Portal will be free from interruptions or free from errors, nor shall OpenGov or ACHD be responsible for any inadvertent disclosure of bid repository information or any unauthorized access to bid repository information by third persons. In the case of known loss of services by OpenGov within two (2) hours prior to the deadline for submission of bids, ACHD will delay the deadline for bid submissions to ensure the ability of potential Bidders to submit bids. If this occurs, instructions will be communicated to known Plan Holders. “OR-EQUAL” ITEMS The Contract, if awarded, will be on the basis of material and equipment specified or described in the Proposal Documents for Submittal without consideration of possible “or- equal” items. Whenever it is specified or described in the Proposal Documents For Submittal that an “or-equal” item of material or equipment may be furnished or used by the Contractor if acceptable to the Resident Engineer, Application for Acceptance will not be considered by the Resident Engineer until after the execution of Contract. STATE AND LOCAL SALES AND USE TAXES State and local sales and use taxes, as required by the laws and statutes of the State and its political subdivisions, shall be paid by the Bidder. Prices quoted in the proposal shall include sales and/or use tax, unless provisions are made in the Contract Documents form to separately itemize such taxes. The Bidder is advised that in accordance with Idaho Code Chapter 15, Title 63, Collection of Taxes from Public Works Contractors, Section 63-1502; that as a condition precedent for the construction of any public works in this state, the Bidder will be required to show proof that they are authorized to do business in the State of Idaho and furnish evidence that they have paid or secured, to the satisfaction of the respective taxing unit, all taxes for which the Bidder and the Bidder property is liable then due or delinquent. Verification that all taxing requirements have been met may be obtained from the State of Idaho, Department of Revenue and Taxation, State Tax Commission, at 700 West State Street, Boise, Idaho 83722. NAMING OF STATUTORILY-REQUIRED SUBCONTRACTORS Pursuant to Idaho Code, Section 67-2310, the Bidder shall be required to include in their proposal the name and address or names and addresses of the subcontractor(s) who shall perform the plumbing, heating, ventilation, and/or air conditioning (HVAC); and/or electrical work under the construction contract in the event the Bidder secures said contract. If the Bidder intends to self-perform the plumbing, HVAC, and/or electrical work, then the Bidder must be licensed by the State of Idaho to perform such work. The Bidder shall demonstrate compliance with this requirement by listing on the Bid Proposal the Bidder’s valid license number for the plumbing, HVAC, and/or electrical work to be performed by the Bidder. Failure to name subcontractors as required shall render any bid submitted by a Bidder unresponsive and voi
Published attachments
- Vicinity Map
- Special Provisions
- Utility Information Sheet
- SWPPP
- Geotechnical Report
- Nationwide Permit 14
- City of Boise Approval Permit Letter
- Cross Sections
- Plan Sheets 1 - 59
- City of Boise Special Provisions - Plan Sheets 1-4
- Bid Bond
- Sample Agreement
- Cloverdale - Victory to Overland.dwg - CADD FILE - FOR VIEWING PURPOSES ONLY
- Cloverdale_Road,_Victory_Road_to_Overland_Road_(Addendum_#4_Revision).pdf
Addenda and notices
Addendum #1 · 1
Addendum One Please use the See What Changed link to view all the changes made by this addendum. Refer to the attached Addendum One for all applicable revisions. The Bid Schedule has been updated in accordance with Addendum One.
Addendum #2 · 2
ADDENDUM TWO Refer to the attached Addendum Two for all applicable revisions to Addendum One.
Addendum #3 · 3
ADDENDUM THREE Please use the See What Changed link to view all the changes made by this addendum. See the attached Addendum Three for the revised Bid Opening: The Bid Opening is rescheduled from November 4, 2026, at 3:00 p.m. to November 6, 2026, at 3:00 p.m. This is due to a forthcoming Bid Schedule Revision.
Addendum #4 · 4
ADDENDUM FOUR Please use the See What Changed link to view all the changes made by this addendum. Refer to the attached Addendum Four for all applicable revisions. The Bid Schedule has been updated in accordance with Addendum Four.
Public questions and answers
Can you please provide the design surface used to create the plans for this project with enough time for us to analyze the CAD surface and do a takeoff? Providing the CAD a day or two before the bid is not enough time.
CAD files have been provided in attachment M, any data contained is for information only. Contractor should bid per plan.
Recent ACHD projects have included “Contractor Furnished Construction Surveying & Staking” as a bid item; however, this item is not included in the bid schedule for this project. Please clarify whether ACHD survey crews will perform this work or whether a bid item will be added.
ACHD crews will be performing survey on this project.
The milestone for the GIRR work is 3 months after NTP, this work is not clearly defined in the bid schedule. Can the Agency please clarify what work is included in this milestone?
Irrigation work is indicated on the plans/profile sheets in the Plan Sheets
Can the Agency please clarify why a project of this complexity and magnitude is only given 2 weeks to bid?
ACHD standard practice is 2 weeks to bid on project.
The only groundwater elevation in the plans is 2660.9, shown on Sheet 14 for the retention basin The EightMile Creek structures south of the basin, are built at or below that elevation. • Sheet 17, east headwall (Item 703.4.1.A.1A): footing base 2660.03, on 16" of 6" minus rock, so excavation reaches about 2658.7. • Sheet 18, west CIP irrigation box (Item 703.4.1.A.1B): bottom of concrete 2660.83, next to the existing pump house. (with 12" of excavation below bottom of concrete) The bid schedule has no dewatering or creek bypass item, and neither the bid schedule nor the contract document mentions dewatering. Sheet 17 says shoring for the headwall is incidental to Item 703.4.1.A.1A. Sheet 14 Note 1 says that if groundwater is higher than shown, the contractor should contact the Engineer for possible design changes. Please provide guidance on where to put the dewatering cost on these line items.
See Addendum #1
Is Fiberglass Reinforced Polymer pipe an acceptable alternate to replace the 48" Eightmile Creek pipe with?
Contractor to bid per plan, substitutions may be considered during construction.
For SP 20110, I could not locate the retaining wall heights or specific wall details in the plans. Will those be provided?
Attachment H - Cross Sections in the Project Documents
Per the SP's the retaining wall engineering is to be completed by the contractor. Engineering is telling us that they will not be able to complete this prior to the bid date. Will ACHD extend the bid date to allow engineering to be completed as called out in the Special Provisions.
At this time no bid extension is warranted.
T14 Through T19 note 93 states to install street lighting wire, per section 1131 of ACHD supplemental provisions. Note 91 states to install lighting conduit with 1-#12 THWN green locate wire, per section 1131. T14 show installing a Davit -style streetlight at Peconic Dr. Note 93 is provided at the pole but is not duplicated through the rest of the lighting conduit run, only note 91. The same is true at all of the light poles locations on sheets T14 through T19. Is it ACHD's intent that the lighting wire continue through to the next closest service pedestal location?
Intent is to run lighting wire throughout entire project. See Addendum #1.
The provided design surface only contained contours, would you please provide the design surface CAD file?
Please note that ACHD CAD files, when provided, are for informational purposes only and should not be relied upon for bidding or construction. Contractors are responsible for preparing their bids based on the contract plans and specifications.
The provided Geotechnical Report does not contain any bores for the existing roadway. Can one be provided?
No additional roadway bores where taken.
Can you provide a detail for the removable bollards?
Contractor to provide detail.
I understand that a CAD surface is typically required to design the project and provide the cross sections that are provided. I do not understand why the surface file would not be available to issue with the bid documents when the projects are published for bid. Without the CAD surface we cannot accurately do a takeoff to capture the additional quantities of excavation/base course etc. required to perform the work and capture incidental items that are not paid for as they are not captured in the "plan quantities". In the past we have seen "plan quantities" be off by 30-50%. Please provide the CAD surface so we can provide competitive pricing while assuring we capture the work required to complete the project.
ACHD appreciates your interest in submitting a competitive bid and encourage all bidders to rely on the contract documents when developing their pricing. Any information provided outside of the contract documents is for reference only and should not be used as the basis for bidding or construction.