Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Club West HVAC Replacement

Description

The City of West Sacramento is accepting sealed responses for qualified mechanical/HVAC firms to replace four (4) wall mount HVAC units to be received no later than Thursday, December 17, 2026 at 2:00 pm . The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full Bid Schedule Communication (AT&T) Panel Relocation Mobilization, Staging, and Site Access Removal and Proper Disposal of Existing Wall-Mounted HVAC Units Install New Wall-Mounted HVAC Units Electrical Connections and Modifications Controls, Thermostats, and Equipment-Level Integration Manufacturer-Authorized Start-Up, Testing & Balancing (TAB), Calibration, and System Commissioning (including final commissioning report) Cleanup and Demobilization Building Permit, Plan Review, and Inspections (Contractor to Pull Permit) Please upload a signed W-9 form Please download the IRS 2024 Form W-9 and upload a completed, signed copy. Acceptable signatures include either a handwritten (wet) signature or a valid electronic signature. Please enter Legal Company Name and related DBA Please state your company name and any related DBA's based on your California Secretary of State Filing. Cost Proposal using Electronic Pricing Table The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder. Response (without Cost Proposal) Please Upload Your Response Here, excluding your Cost Proposal. Statement of Offer Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date. Bid Bond Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs California Contractors State License Board Please enter your contractor license number for verification. City Contract The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract. Insurance Requirements The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the Insurance Checklist in Attachments . Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award. Project Details Important Instructions for Electronic Submittal The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full Project Scope Summary The City of West Sacramento (“City”) is soliciting bids from qualified contractors to provide a like-for-like replacement of four (4) wall-mounted HVAC units at Club West, 1125 Riverbank Road. Work to include coordination with the responsible telecommunications agency (e.g., AT&T) for relocation of telecommunications panels on the north side of the building. Base Scope – Equipment Installation: The Contractor shall furnish and install new HVAC units in the designated areas as specified in the equipment schedule. Units shall be commissioned using their native, standalone manufacturer controls (e.g., standard wall-mounted thermostats). Work shall include services required to remove the existing HVAC units as specified in the equipment schedule. Additional Requirements: All disconnect boxes shall be sized and installed such that they fit entirely within the limits of the existing security cage, which shall remain in place and secured at all times. The City prefers that the existing thermostats, approximately three to four (3–4) years old, be replaced with newer models equipped with Wi‑Fi–enabled control capabilities. Work to include coordination with the responsible telecommunications agency (e.g., AT&T) for relocation of telecommunications panels on the north side of the building. Communication Panel Coordination: The Contractor shall coordinate with the responsible telecommunications agency (AT&T or other applicable provider) for the relocation of the existing AT&T panel boxes currently obstructing maintenance access to AC Unit 1. All physical relocation work shall be performed by the agency responsible. Contractor’s responsibilities include scheduling, site access facilitation, and ensuring relocation occurs prior to installation of the replacement HVAC unit. Work Hours The Contractor shall perform all work in a manner that minimizes disruption to Club West operations. All work shall take place between 7:30 AM and 5:00 PM, Monday through Friday. Preferred completion dates are February 12–15, 2027, or March 20–30, 2027; however, the schedule may be adjusted as needed in coordination with project contact to accommodate operational or project-related changes. Contractor Responsibilities The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, fees, and incidentals necessary to complete the Work, including but not limited to: Field verification of existing conditions Removal and lawful disposal of existing equipment and refrigerants Furnishing and installation of replacement HVAC units Electrical, mechanical, and controls connections. Manufacturer-authorized start-up Testing and Balancing (TAB) Calibration of controls and sensors Commissioning Documentation and project closeout Coordinate all site access, equipment removal, planned shutdowns, and work‑hour impacts with City staff to ensure minimal disruption to Club West operations. Provide at least 48‑hour notice for any activities impacting access or electrical service. Contractor License Requirement : C-20 - Warm-Air Heating, Ventilating and Air-Conditioning Contractor Unit Requirements Replacement units shall be equivalent in capacity and function to the existing units listed below and compliant with current codes and manufacturer requirements: AC-HP (Heat Pump) Unit 1 Kitchen Area Manufacturer : Bard Manufacturing Make : Wall Mount Model : WH361-B09 xx4xxx Serial : 133H072361102-02 AC- HP Unit 2 Dance Room Manufacturer : Bard Manufacturing Make : Wall Mount Model : WH421-509 Serial : 127B90766597-02 AC-HP Unit 3 Game Room Manufacturer : Bard Manufacturing Make : Wall Mount Model : W60H1-B09 VP4xxx Serial : 325K129936511-02 AC-HP Unit 4 Admin/Office Manufacturer : Bard Manufacturing Make : Wall Mount Model : WH361-B09 Serial : 133C930771762-02 Replacement units shall meet or exceed the following: Compliant with current Title 24 energy standards Compatible with existing electrical infrastructure Noise level not to exceed 75 dB Replacement units shall be Bard Manufacturing . Removal and Installation The Contractor shall: Verify dimensions and compatibility of existing wall sleeves and ensure replacement units fit appropriately. Any modifications required to accommodate new units shall be included in the base bid. Disconnect and remove existing wall-mounted units. Install new units in existing openings/wall sleeves. Connect to existing ductwork, electrical systems, and controls. Start-Up, Testing, Balancing, Calibration, and Commissioning Manufacturer-Authorized Start-Up The Contractor shall: Coordinate and obtain manufacturer-authorized start-up for all new units. Verify proper installation, refrigerant charge, airflow, and electrical connections. Activate all manufacturer warranties. Testing and Balancing (TAB) The Contractor shall: Provide independent Testing and Balancing for all replaced units. Verify airflow, temperatures, and system performance. Adjust dampers, fans, and controls as needed. Submit a stamped TAB report to the City. Calibration The Contractor shall: Calibrate all sensors, thermostats, and control devices. Provide written calibration records to the City. Commissioning The Contractor shall: Perform full system commissioning. Test operational sequences, alarms, and system performance. Correct any deficiencies prior to final acceptance. Final Commissioning Report and Closeout All manufacturer start‑up documentation, TAB reports, calibration records, and commissioning results must be completed, submitted, and accepted prior to final acceptance and shall be included in the closeout package. Prior to final payment, the Contractor shall submit: Manufacturer start-up documentation Final TAB report Calibration records Commissioning test results As-built documentation Equipment manuals Warranty certificates Permit closeout documentation Codes and Standards All work shall comply with the latest editions of: California Mechanic Introduction Summary Background Contact Information Timeline Terms and Conditions Prevailing Wages Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this ITB is subject to compliance monitoring and enforcement by the DIR. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification. Statement of Offer Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date. Project Management Documentation & Administration Virtual Project Manager (VPM) The City anticipates using an online cloud-based project management system to manage, assign, and coordinate specific tasks with the City's selected Contractor within the Scope of Work. By way of this section, the City reserves the right to utilize an online cloud-based project management system. By submitting a bid, bidder acknowledges and agrees that they are prepared to use the system, as may be required by the City. The City's specific system is Virtual Project Manager (VPM). VPM allows for paperless documentation and project administration. For more information on VPM, go to www.virtual-pm.com Submittal Procedures and Construction Progress Documentation for requirements for administering and using VPM. The Contractor shall submit the items associated with this section via Virtual Project Manager (VPM), an online cloud-based project management system, as specified below. Virtual Project Manager (VPM) allows for paperless documentation and project administration. All posted information is available to all personnel involved with the project at any time using the internet. The use of VPM by the Contractor is mandatory. Access to VPM will be provided at no cost to the contractor. In order to utilize VPM, the contractor needs a computer, internet access, a digital camera, and a scanner. For more information, go to www.virtual-pm.com. To Login, from the homepage, select LOGIN and enter the Username and Password that will be provided to you by the agency. The contractor shall use the following features: Daily Logs: Contractor’s daily reports shall be entered electronically via VPM. Change Order Manager: Contractor requests for change order shall be submitted electronically via VPM. Transmittals: Schedules, Pay applications, etc. shall be submitted electronically via VPM. Submittals: Submittals requiring approval shall be submitted electronically via VPM. RFIs: Requests for information (RFIs) shall be submitted electronically via VPM. Technical Submittals Submittal Procedure The Contractor shall utilize the agency’s online cloud-based project management system (Virtual Project Manager) for submittals. Questions and/or Objections It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”). A Proposer may submit Questions related to this ITB to the City through the City’s e-Procurement Portal at or before: Friday, December 11, 2026 at 5:00 pm . Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all. Amendment and Cancellation The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications. Right of Rejection The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB. Prohibition of Respondent Terms and Conditions A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB. Joint Ventures and Partnering A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following: The Proposal shall respond to each section and subsection of this ITB. The Proposal shall clearly set forth the respective responsibilities and functions that each Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information. Proposal of Alternate Services A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected. Proposal of Additional Services A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the Contract before execution. Severability If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid. Licensure and Special Certification Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all Proposers to submit evidence of proper licensure and certifications. Disclosure of Proposal Contents All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals shall be open for review by the public to the extent required by the California Public Records Act, Government Code section 7920.000 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection. Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information. Conflict of Interest and Restrictions By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB. Proprietary Information A copy of each Proposal shall be retained for official files an

Published attachments
Addenda and notices
  • Addendum #1 · 1

    ADDENDUM NO. 1 Invitation to Bid 26-088-ITB, Club West HVAC Replacement City of West Sacramento, Capital Projects Department Date issued: November 19, 2026 This addendum modifies the Invitation to Bid as described below and is part of the bid documents. The bid due date is unchanged: Thursday, December 17, 2026, 2:00 pm. Change: AT&T panel relocation removed from the scope The relocation of the existing AT&T and telephone equipment adjacent to AC Unit 1 (Kitchen) is removed from the scope of work. The equipment will remain in place. Section 2.2, Project Scope, Summary. Delete the sentence: “Work to include coordination with the responsible telecommunications agency (e.g., AT&T) for relocation of telecommunications panels on the north side of the building.” Section 2.2, Project Scope, third bullet. Delete the bullet beginning “Work to include coordination with the responsible telecommunications agency (e.g., AT&T)” and ending “ensuring relocation occurs prior to installation of the replacement HVAC unit” in its entirety. Section 5, Cost Table, Line Item 1. Line Item 1, “Communication (AT&T) Panel Relocation,” is no longer part of the work. The line remains in the electronic pricing table. Bidders shall enter $0.00 for Line Item 1 and shall not include any cost for relocation of telecommunications equipment in any line item. Line Items 2 through 9 are unchanged. Section 2.2, Project Scope, add: “The existing AT&T and telephone equipment mounted on the wall adjacent to AC Unit 1 shall remain in place. The Contractor shall remove the existing unit and install the replacement unit with this equipment in place and shall protect it from damage during the work.” Acknowledgment All other terms and conditions of the Invitation to Bid remain unchanged. Bidders must acknowledge this addendum in their bid. A bid that does not acknowledge every addendum may be rejected as non-responsive.

  • Official Notice #1: Pre-Bid Walk Sign In Sheet · 1

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum. The City's project contact for ITB 26-088-ITB, Club West HVAC Replacement, has changed. Section 1.3, Contact Information, is revised to read: Damir Arushanov Project Manager I 1110 West Capitol Avenue, 1st Floor West Sacramento, CA 95691 Email: damira@cityofwestsacramento.org Phone: (916) 617-4913 Department: Capital Projects - Construction All questions must still be submitted through the City's e-Procurement Portal by Friday, December 11, 2026, at 5:00 pm. All other terms and conditions of the Invitation to Bid remain unchanged.

Public questions and answers
  • Can Class B bid with C-20 subcontractor?

    Considering the scope of this project, the contractor is required to possess a C-20 license. This requirement is supported by the bid packet provision stating: "The Bidder is considered the Prime Contractor and shall perform at least fifty-one percent (51%) of the work, as determined by a percentage of the value of the work." Accordingly, the prime contractor must hold the appropriate C-20 license and perform a minimum of 51% of the total contract value.

Plain text