State and local · OpenGov
CMAR for Morris K. Udall Park Expansion
Description
It is the City of Tucson’s intention to initiate an RFQ for a CMAR to provide pre-construction and construction-phase services for improvements at Udall Park, located at 7200 E. Tanque Verde Rd., Tucson, Arizona. The Morris K. Udall Park – Park Improvements project engages a diversity of departments and stakeholders, and the CMAR team will be required to work closely and collaboratively with all parties involved to ensure the success of the project. The design and construction teams will be responsible for defining, monitoring, and adhering to the project budget and schedule. The CMAR will make sure the team meets the project schedule and will provide repetitive cost and constructability alternatives throughout pre-construction and construction. The CMAR will provide pre-construction management services during the design phase of the project and may serve as the General Contractor for the construction phase of the project. At some point prior to construction, the CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. GMP means the sum of the maximum cost of the Work; the CMAR’s construction fee; general conditions fee; taxes, bonds, insurance costs; and bid contingency as proposed and approved pursuant to the CMAR Standard Terms & Conditions contained herein. The approved GMP will be made part of the contract by executing an amendment or additional amendments for phased construction. The CMAR will be responsible for construction means and methods and may be required to solicit bids from pre-qualified subcontractors to perform the work. It is recommended that submittals not exceed twenty (20) standard 8.5” by 11” pages. SCOPE OF WORK Pre-construction Phase Services Pre-construction Phase Services by the CMAR may include the following: • Team building/partnering • Management plans • Value analysis/engineering • Constructability reviews including identification of plan/specification conflicts, errors and omissions • Cost Modeling/Budgeting • Phasing Analysis/Sequencing/Construction Schedules • Estimating/Price/GMP • Building code/permitting analyses • Utility coordination with providers and existing infrastructure • Bid package strategy (subcontracting, SBE compliance) • Identification of specialized materials and ordering of long lead-time materials • Integration of means, methods and materials in relation to general, sustainable development Construction Services Construction Phase Services by the CMAR may include the following: • Team management/coordination • Underground utility location • Critical Path Scheduling • Submittal processes/coordination/management • Cost controls/change order management • Subcontract QC • Field management • Safety/QC programs • Special inspections and materials testing coordination • Project close out/warranty period services Introduction In 2018, Tucson voters approved Proposition 407, now known as the Tucson Delivers Parks and Connections Bond. The bond includes funding to expand access to enhanced recreational opportunities at Udall Park, as well as funding for the Pima Street Bicycle Boulevard that provides a connection through the park between neighborhoods east of the park to the Chuck Huckelberry Loop (The Loop). To complement the bond package, the City has applied for Outdoor Recreation Legacy Partnership (ORLP) funding through the Land and Water Conservation Fund (National Park Service). If awarded, the project will expand to include additional amenities requested by the community that are not covered by the bond. Background Morris K. Udall Park (referred to locally as “Udall Park”) is a 172.8-acre City of Tucson metro park located in Ward 2 at the southeast corner of Tanque Verde Road and Sabino Canyon Road. Before the site became a park it was the location of the United States Coast Guard and Geodetic Survey Magnetic Observatory. The park opened in 1982 and developed incrementally over the past four decades to include the Morris K. Udall Regional Center (indoor basketball and volleyball, fitness facilities, an indoor jogging track, and heated outdoor pool), Carol W. West Senior Center, and broader public park featuring multi-use athletic fields, batting cages, tennis courts, pickleball courts, a sand volleyball court, playground, ramadas, bocce courts, horseshoe pits, an amphitheater, splash pad, and paved walking path nestled into a Sonoran Desert landscape. The park facilities are extensively used by residents in northeast Tucson and regionally to recreate, connect with nature, and build community. In 2011, a master planning process was completed for Morris K. Udall Park to engage neighbors in the creation of a phased redevelopment plan informed by an assessment of existing conditions and community-prioritized needs. The master plan was adopted by the Tucson Mayor and Council by Resolution Number 21770 on June 7, 2011. The scope of the approved Udall Park master plan was reaffirmed in the 2016 Systemwide Parks Master Plan that identified a need for additional play areas, additional soccer fields, covered outdoor basketball courts, a multi-use trail connection to The Loop, a landscape buffer for surrounding neighborhoods, and requisite facilities (e.g. parking, restrooms, path connections) to support new amenities. The Master Plan also suggests eco-efficient techniques for implementation, such as rainwater harvesting, water efficient landscaping, and reclaimed water expansion. The approval of Proposition 407 in 2018 secured Tucson Parks and Connections Bond funding to advance a suite of park improvements identified in the master plans and build an east-west connection through Udall Park as part of the Pima Street Bicycle Boulevard. This project is part of Great Parks: Phase 3 and Strong Connections: Phase 2 of the bond which include: one (1) new, inclusive playground (combines the 2 playgrounds noted in the bond language into one destination playground); two (2) new, covered basketball courts; two (2) new, lighted soccer fields; parking and circulation enhancements; softball fencing renovation; baseball field light upgrades to LED lighting; soccer field light upgrades to LED lighting; 2 new restrooms; a relocated sand volleyball court; requisite infrastructure to support new amenities (e.g. safety lighting, path connections); and a new, multiuse, east-west path connection through Udall Park to form part of the Pima Street Bicycle Boulevard. During the community and operational engagement process for the bond package, the City learned that residents are also interested in: improvements to the outdoor amphitheater; a new and expanded dog park; a pump track; and poolside seating and shade at the aquatic center. If ORLP funding is secured, the expanded scope will be added to the overall project. Additional Coordination Public Art The Morris K. Udall Park Improvements project is fortunate to work with the Arts Foundation for Tucson and Southern Arizona (AFTSA) and the Percent for Art program to add public works of art to the park. AFTSA, the City, and Dig Studio have collaborated with the selected artist, Sasha Primo, to conduct background research and engage residents in a participatory design process to shape the new art. The artist is currently developing preliminary concepts based on findings and inspiration to date and will install their own work. The CMAR team will be expected to coordinate closely with Sasha Primo, AFTSA, and Dig Studio to meaningfully incorporate the art into the overall project and site. Green Stormwater Infrastructure Concurrently with this project, Tucson Water’s green stormwater infrastructure program, Storm to Shade, will enhance the existing landscape at Udall Park by incorporating stormwater harvesting basins at key locations throughout the park. The CMAR will be required to coordinate carefully with the Storm to Shade project to promote efficient use of City resources and minimize the duration of park disturbance for residents. Design The design of the Morris K. Udall Park Improvements project is led by Dig Studio with support from Dibble Engineering, Monrad Engineering, Novak Environmental, BDA Design, Ninyo & Moore, Rider Levett Bucknall, and SWCA. The design team has reached 60% construction documents for the park improvements and is pausing to bring the multiuse path and complementary green stormwater infrastructure improvements to 60% while the City completes CMAR procurement and onboarding. It is expected that the CMAR will participate in the design process from early 2027 through 100% completion in November 2027. Project Timeline The design and pre-construction phase of the project is underway. It commenced in September 2025 and is estimated to continue through November 2027. The construction duration for this project is anticipated to be 12 to 18 months after permits have been approved. Existing Facilities 1) Most existing facilities are to be fully retained as part of the project design. The CMAR shall ensure that all existing facilities, infrastructure, utilities, and plants/ landscape features are properly protected in place during project construction. 2) The project is adjacent to established residential neighborhoods and will be constructed while existing amenities and programs remain fully operational. The CMAR contractor shall coordinate carefully with City staff regarding potential closures, staging, and material hauling and will conduct construction operations in a manner designed to cause as little disruption to park users and neighbors as possible. Buildings 1) New buildings and structures will be built as part of this project. Refer to the list above. Utilities - New and Existing 1) The project will involve the upgrade and expansion of existing utility connections for electrical service, potable water, and reclaimed water. 2) There will be a strong need for contractor coordination with City staff from Parks and Recreation, Tucson Water, and Facilities Maintenance, as well as all applicable utility providers to upgrade, expand, or install new services. 3) Existing utilities and easements in or around the project are extensive. The CMAR will need to coordinate carefully to protect existing utilities and infrastructure in place. Areas of Specialized Construction 1) A variety of specialized construction methods are anticipated for this scope of work. Specialized work includes, but is not limited to: • Fully inclusive nature play/ adventure play area • LED sports lighting systems • Outdoor basketball court installation • Sand volleyball court installation • Pump Track • Large-scale tensile structures • Native plant installation and passive rainwater harvesting • Irrigation systems NOTICE CITY OF TUCSON NOTICE OF REQUEST FOR QUALIFICATIONS NO 270167 CMAR for Morris K. Udall Park Expansion Pursuant to ARS Title 34, the City of Tucson is conducting a competitive One-Step Process to select a qualified construction manager/general contractor to provide design phase assistance for complete construction service as the Construction Manager at Risk for construction improvements for CMAR for Morris K. Udall Park Expansion . The estimated construction cost for the entire project is fourteen million dollars ($14,000,000) . The City invites interested firms to submit written Statements of Qualifications (SOQs) relating to this solicitation. A Screening Committee will evaluate firms’ qualifications and experience with similar projects. The top ranked firm(s) will then be invited to enter into negotiations with the City of Tucson. SUBMITTAL DUE DATE: Friday, December 11, 2026 AT 2:00 pm LOCAL AZ TIME PRE-SUBMITTAL MEETING DATE: Monday, November 30, 2026 TIME: 11:00 am LOCAL AZ TIME LOCATION: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2546846819126328?p=a5wLZTd2uBqOPoLFUV Meeting ID: 254 684 681 912 632 8 Passcode: xo7Rr6Ev Dial in by phone +1 213-293-2303,,690199085# United States, Los Angeles Phone conference ID: 690 199 085# QUESTIONS SHALL BE DIRECTED TO: Sandra Alcorn (520) 837-4118 sandra.alcorn@tucsonaz.gov Publication Dates: Wednesday, November 18, 2026 and Wednesday, November 25, 2026 Posted Date: Wednesday, November 18, 2026 INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO OFFERORS DEFINITION OF KEY WORDS USED IN THE SOLICITATION: For purposes of this solicitation and subsequent contract, the following definitions shall apply: Agency of User Department: Used interchangeably to mean the City department or division responsible for managing the project. City (COT): The City of Tucson, Arizona Contract: The legal agreement executed between the City and the Contractor/Contractor. Contractor/Contractor: The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City. Contract Representative: The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract. Director of Business Services: The contracting authority for the City, authorized to sign contracts and addenda thereto on behalf of the City. May: Indicates something that is not mandatory but permissible. Offeror: The individual, partnership, or corporation who submits a proposal in response to a solicitation. Shall, Will, Must: Indicates a mandatory requirement. Failure to meet these mandatory requirements, if they constitute a substantive requirement, may, at the City’s sole discretion, result in the rejection of a proposal as non-responsive. Should: Indicates something that is recommended but not mandatory. If the Offeror fails to provide recommended information, the City may, at its sole option, ask the Offeror to provide the information or evaluate the proposal without the information. PRE-SUBMITTAL MEETING A Pre-Submittal Meeting will be held at the date and time stated on the cover page of this solicitation, if such a date and time is provided. Attendance at this meeting is not mandatory, but written minutes and/or notes regarding the meeting will NOT be provided, so attendance is encouraged. The purpose of this meeting will be to clarify the contents of this solicitation in order to prevent any misunderstanding of the City's position. INQUIRIES Any question related to the Request for Qualifications shall be directed to the Contract Officer whose name appears above. An offeror shall not contact or ask questions of the department for whom the requirement is being procured. The Contract Officer may require any and all questions be submitted in writing. Offerors are encouraged to submit written questions via electronic mail, at least nine days prior to the submittal due date. Any correspondence related to a solicitation should refer to the appropriate Request for Qualifications number, page and paragraph number. Oral interpretations or clarifications will be without legal effect. Only questions answered by a formal written addendum to the Request for Qualifications will be binding. ADDENDUM OF SOLICITATION Solicitation Addenda will be posted on the City’s link to the online bidding website. Offeror is responsible for checking the webpage regularly for new solicitation addenda and must acknowledge each addendum to this solicitation in its submittal. Please note that vendors who have registered with the Business Services Department at https://procurement.opengov.com/portal/tucson-az and follow the City of Tucson will receive email notifications of solicitation addenda. FAMILIARIZATION OF SCOPE OF WORK Before submitting a statement of qualifications, each Offeror shall familiarize itself with the Scope of Work, laws, regulations and other factors affecting contract performance. The Offeror shall be responsible for fully understanding the requirements of the subsequent Contract and otherwise satisfy itself as to the expense and difficulties accompanying the fulfillment of contract requirements. The submission of a statement of qualifications will constitute a representation of compliance by the Offeror. There will be no subsequent financial adjustment, other than that provided by the subsequent Contract, for lack of such familiarization. PREPARATION OF STATEMENT OF QUALIFICATIONS All submittals shall be on the forms provided in this Request for Qualifications package. It is permissible to copy these forms as required. Facsimiles or electronic mail proposals shall not be considered. At a minimum, your statement of qualifications should include the signed Offer form, signed copies of any solicitation addenda and your response to all evaluation criteria. The Offer page shall be signed by a person authorized to submit an offer. An authorized signature on the Offer Page, solicitation Addendum(s), or cover letter accompanying the submittal documents shall constitute an irrevocable offer to sell the good and/or service specified herein. Offeror shall submit any additional requested documentation, signifying intent to be bound by the terms of the agreement. The authorized person signing the submittal shall initial erasure, interlineations or other modifications on the submittal. It is the responsibility of all offerors to examine the entire Request for Qualification package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting a response. Negligence in preparing a submittal confers no right of withdrawal after due date and time. The City shall not reimburse the cost of developing, presenting, submitting or providing any response to this solicitation. Offeror must list any subcontractors to be utilized in the performance of the services specified herein. For each subcontractor, details on respective qualifications must be included. SUBMITTAL FORMAT A statement of qualifications should be submitted on the forms and in the format specified in the solicitation. Any information that the offeror requested to be held as confidential shall be clearly marked as such. The material should be in sequence and related to the solicitation. The sections of the submittal should be organized, clearly identifiable, and should include a minimum of the following sections: the completed Offer Form, all signed addenda and the offeror’s response to the Evaluation Criteria. Failure to include the requested information may have a negative impact on the evaluation of the offeror's submittal. EXCEPTIONS TO CONTRACT PROVISIONS A response to any Request for Qualifications is an offer to contract with the City based upon the contract provisions contained in the City's Request for Qualifications, including but not limited to, the specifications, scope of services and any terms and conditions. Offerors who wish to propose modifications to the contract provisions must clearly identify the proposed deviations and any proposed substitute language in their submittal. However, the provisions of the Request for Qualifications cannot be modified without the express written approval of the Director or his designee. Proposed modifications or exception to the indemnification language herein shall not be considered. If an offer is returned with modifications to the contract provisions that are not expressly approved in writing by the Director or his designee, the contract provisions contained in the City’s Request for Qualifications shall prevail. PUBLIC RECORD All statements of qualifications submitted in response to this Request for Qualifications shall become the property of the City and shall become a matter of public record available for review subsequent to the award notification. CONFIDENTIAL INFORMATION The City of Tucs
Published attachments
Addenda and notices
Addendum #1 · 1
SBE/DBE packet update is attached. Please use the See What Changed link to view all the changes made by this addendum.
OpenGov categories
- 65000 · Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 67017 · Irrigation Systems, Supplies, Parts, and Accessories
- 90672 · Recreation Facilities (Parks, Marinas, etc.) - Architectural Services
- 91223 · Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.)
- 91227 · Construction, Irrigation System
- 91233 · Construction, Swimming Pool
- 91240 · Demolition Services
- 91263 · Maintenance and Repair, Swimming Pool (Includes, Swimming Pool Water Treatment Services)
- 91319 · Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
- 91356 · Construction, Utility/Underground Projects
- 91389 · Maintenance and Repair, Utility/Underground Projects
- 91430 · Concrete
- 91438 · Electrical
- 91468 · Plumbing
- 93165 · Park, Playground, and Swimming Pool Equipment Maintenance and Repair
- 93437 · Irrigation Systems Maintenance and Repair
- 98863 · Park Area Construction/Renovation