Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

CMAR for Waddell Road Improvements

Description

The City is accepting Statements of Qualifications (SOQ) from experienced and qualified firms to provide the Construction Manager at Risk (CMAR) services to construct roadway improvements to Waddell Road -- Waddell Road from Cotton Lane to 175th Avenue and Cotton Lane from Waddell Road to Woodrow Lane in Surprise, Arizona. The Waddell Road Improvements Project will include Roadway Design, Curb, Gutter and Sidewalks, two 12-foot travel lanes in each direction, Two-way left turn land/raised median and bike lanes, sewer, drainage, streetlights, traffic signals and conduits, irrigation relocation, dry utilities, wet utilities, and landscaping. Scope of Work PROJECT OVERVIEW The intent of the City is to award a single contract for the Construction Manager at Risk (“CMAR”) for the construction of Waddell Road Improvements, Waddell Road from Cotton Lane to 175th Avenue and Cotton Lane to Woodrow Lane located in Surprise, Arizona. The CMAR will be responsible for providing the pre-construction and complete construction services. The City has awarded Kimley-Horn under a separate contract to complete the preliminary design services. All construction services are pursuant to A.R.S. 34-601 et seq. SCOPE OF WORK The Construction Manager at Risk (“CMAR”) will provide pre-construction management services during the design phase of the project and may serve as the General Contractor for the construction of the project. The CMAR team will be required to closely work together with all involved parties. The design and construction teams will be responsible to define, monitor, and stay within the project budget and schedule. The budget is set for this project and additional funds are not available. The CMAR contractor for the project will ensure the team is adhering to the project schedule and will be responsible to provide repetitive cost and constructability alternatives throughout the pre-construction and construction process. The CMAR services will be performed in two phases as follows: PRECONSTRUCTION SERVICES (PHASE 1) The first phase of the project is the pre-construction services for the preparation, and submission of Guaranteed Maximum Price (GMP) including the procurement of any long lead items. Phase 1 may include the following preconstruction activities: Team Building/Partnering Management Plans Value Analysis/Engineering Constructability reviews including identification of plan/specification, conflicts, errors and omissions Cost Model/Budget Phasing Analysis/Sequencing/Construction Schedule Estimating Price/GMP Building Code/Permitting Analysis Utility coordination with providers and existing infrastructure Bid package strategy (subcontracting, SBE compliance) Identification of specialized material and ordering of long lead time materials Integration of means, methods and materials in relation to general, sustainable development. CONSTRUCTION SERVICES (PHASE 2) The second phase of the project is the completion of construction services and submission of Guaranteed Maximum Price (GMP 2). Phase 2 may include but not limited to the following project activities: Team Management/Coordination Underground Utility Location Critical Path Scheduling Submittal Processes/Coordination Management Cost Controls/Change Order Management Subcontract Quality Control Field Management Safety Quality Control Programs Special Inspections and Materials Testing Coordination Project Close Out/Warranty period services ESTIMATED PROJECT SCHEDULE The dates listed are an estimated project schedule and may be subject to change: Planned date of design: Currently in design Planned date of design completion: January 2027 Planned date of construction start: July 2027 Planned date of construction substantial completion: July 2029 Legal Notice Notice The City of Surprise is accepting Statement of Qualifications (SOQ) from qualified firms to provide Construction Manager at Risk ("CMAR") services for Waddell Road Improvements ("Project"). The CMAR will work with the City's project team, made up of City Staff and the Design Team to provide the Pre-Construction Services and Complete Construction Services. The CMAR will be evaluated through a qualifications-based selection process. In accordance with the City Procurement Code, competitive sealed SOQs will be received by the City Procurement Division via the City's e-Procurement Portal, OpenGov ( https://secure.procurenow.com/portal/surpriseaz ) until the date and time cited in this document. Proposals must be in the actual possession of the Procurement Division on or prior to the exact date and time indicated within this solicitation. Late responses will not be considered. Offerors must carefully read the entire RFQu package. Information regarding the requirements of this RFQu as well as the entire information package can be downloaded from the City’s e-Procurement Portal. The City shall not be held responsible for any oral instructions or formal documentation of any information exchange during a pre-proposal meeting. Any changes to this Request for Qualifications will be in the form of a published amendment. All technical questions regarding this Request for Qualifications must be submitted in writing via the City's e-Procurement Portal. Please reference 327129/P65020 , Procurement Officer in all your communications to the City. Anita Dandurand Procurement Officer Publication: AZ Business Gazette and City of Surprise website: https://www.surpriseaz.gov/bids.aspx Date(s): Thursday, November 5, 2026 and Thursday November 12, 2026 . Separate Contracts for Preconstruction Services, Construction Services, and/or Construction Pursuant to Arizona Revised Statutes, Title 34, the City of Surprise shall procure a single contract for construction-manager-at-risk construction services. However, the City may elect separate contracts for preconstruction services during the design phase, for construction during the construction phase and for any other construction services. The Offeror understands and acknowledges that the City may elect separate contracts for preconstruction services during the design phase, for construction during the construction phase and for any other construction services. The City makes no guarantees that an awarded entity for preconstruction services will be the same as the awarded entity for construction or construction services. The City reserves the right to terminate any Contract under which a single Contract was awarded for preconstruction services, construction services, and/or construction should the City elect separate contracts for preconstruction services during the design phase, for construction during the construction phase and for any other construction services. Under such circumstances, the Contractor awarded a Contract for preconstruction services during the design phase shall be paid for all undisputed services performed up to the termination date. Introduction Summary Background Contact Information Timeline Instructions to Offerors OFFER SUBMISSION, DUE DATE AND TIME SOQs in response to this solicitation shall be submitted via the City’s e-Procurement Portal, OpenGov to be received no later than Thursday, December 10, 2026 at 11:00 am . PREPARATION OF SOQ All SOQs must be on the forms provided in this Request for Qualifications package. It is permissible to copy these forms if required. Faxed or e-mailed responses will not be considered. The Offer Form must be submitted via the City's e-Procurement Portal with a signature by a person authorized to sign the offer. Periods of time, stated as a number of days, will be calendar days. It is the responsibility of all prospective offerors to examine the entire Request for Qualifications package and seek clarification of any item or requirement that may not be clear and to check all responses for accuracy before submitting a SOQ. Negligence in preparing a SOQ confers no right of withdrawal after SOQ due date and time. VENDOR RESPONSE The vendor's response shall be submitted via the City’s e-Procurement Portal. The SOQ is limited to a maximum of ten (10) pages in length, excluding the Offer page, Cover Letter, Past Performance Verification Exhibits, and any other required forms. Adherence to the maximum page criteria is critical; each page side with evaluation criteria information will be counted. Detailed written responses shall be on 8 ½” x 11” paper excluding any attached maps or schedules, using font no smaller than 11 point and printed on one side. Pages that have photos, charts, graphs or criteria information will be counted towards the maximum number of pages. Supplemental Resumes are not allowed and will be counted towards the page limit. The vendor response shall be submitted with the following sections: A. Offer Form The first section of the SOQ shall contain the Offer Form. The Offer Form shall be signed by an authorized representative of the company such as the owner, partner, or in the case of a corporation, the President, Vice President, Secretary, or other corporate officer(s) that is permitted to contract on behalf of the organization. B. Cover Letter Provide an identification of Offeror including name, address, telephone number, and email address. Submit a brief introduction of your interest in this project. C. SOQ Response ten (10) Maximum Pages The SOQ response should address the following evaluation criteria. 1. General Information: Provide a brief but narrative response to the following questions for the firm's information. a.) Provide a general description of the firm / team that is proposing to provide the pre-construction services and general construction services described herein. Explain the legal organization of the proposed firm or team. Provide an organization chart showing key personnel. List the names of the key persons who will be providing the services describing the services each will provide. b.) List the Arizona professional and Arizona Registrar of Contractors (ROC) licenses held by the firm and/or individuals who will be assigned to this project. Provide the license numbers and expiration dates, if applicable. The Offeror may not need to be licensed, but the person or firm actually performing construction services on behalf of the Offeror must be currently, and have been for at least one year immediately prior, a licensed general contractor in the State of Arizona or required to show proof from a different state. c.) Identify any contract or subcontract held by the firm or officers of the firm, which has been terminated within the last five years. Identify any claims arising from a contract which resulted in a formal claim being filed with a public entity pursuant to A.R.S. 12-821.01 or has resulted in litigation or arbitration within the last five years. Briefly describe the circumstances and the outcomes. 2. Experience of the Team: Identify at least three comparable projects in which the firm served as either Construction Manager at Risk, agency Construction Manager during design and construction phases (with or without providing construction services), and/or General Contractor. For each comparable project identified, provide: a.) Description of project. b.) Role of the firm (specify whether Construction Manager at Risk, Construction Manager or General Contractor). If CMAR or General Contractor, identify the percent of work self-performed. Also specify services provided during design phase, (cost of estimating, scheduling, value engineering, etc.) c.) Project’s original contracted construction cost and final construction cost; explain any over-runs. d.) Construction dates. e.) Project Owner. f.) Reference information (two names with telephone numbers per project). g.) Identify the location of the firm’s principal office, and percent of the work expected to be done locally for all three projects. List of all the City of Surprise projects where the firm provided either design services, agency construction management or general construction services in the last five years either completed or ongoing. Submit copies of a Critical Path Method (CPM) or Construction Progress Schedule (both the baseline schedule and the final completed schedule) for a single previous similar project. (CPM or Construction Progress Schedules will not be counted towards the page limit). 3. Key Personnel Experience: Provide a brief but narrative response to the following questions for each key person identified: a.) List at least two comparable projects in which they have played a primary role. If a project selected for a key person is the same as one selected for the firm, provide just the project name and role of the key person. b.) Reference information (two names with telephone numbers per project). c.) Identify the home office location of key staff on this project, their length of time with the firm, and the percent of their work expected to be done locally. d.) List any proposed consultants, including key staff names and the experience and qualifications of these individuals. For other projects provide: i.) Description of project. ii.) Role of the person and length of employment with the Firm. iii.) Project’s original contracted construction cost and final construction cost; explain any over-runs. iv.) Construction dates. v.) Project Owner. 4. Project Understanding & Approach: Provide a brief but detailed response to the following questions of your firm's project understanding and the approach to provide the Services resultant of a contract award. a.) Describe your firm’s project management approach and team organization during pre-construction and construction phase services. b.) Discuss the major issues your team has identified on this project and how you intend to address those issues. c.) Describe systems used for planning, scheduling, estimating and managing construction. Briefly describe the firm’s experience on quality control, dispute reso INQUIRIES Any question related to the Request for Qualifications must be submitted in writing through the OpenGov Question/Answer Section via the City's e-Procurement portal, on or before, Thursday, December 3, 2026 by 4:00 pm . Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to Offeror(s) following this solicitation on the City's e-Procurement Portal. PRESUBMITTAL MEETING A presubmittal meeting may be held. If scheduled, the date and time of this conference will be indicated on the cover page of this document. The purpose of this conference will be to clarify the contents of this Request for Qualifications in order to prevent any misunderstanding of the City’s position. Any doubt as to the requirements of this Request for Qualifications or any apparent omission or discrepancy should be presented to the City. The City will then determine if any action is necessary and may issue a written amendment to the Request for Qualifications. Oral statements or instructions will not constitute an amendment to this Request for Qualifications. LATE SOQs Late proposals will not be considered. WITHDRAWAL OF SOQ At any time prior to the specified SOQ due date and time, SOQs may be withdrawn through the City's e-Procurement Portal, the responding firm may withdraw their SOQ in OpenGov. After withdrawing a previously submitted SOQ, the responding firm may submit another SOQ at any time up to the deadline for submitting SOQs prior to the proposal opening. AMENDMENT OF RFQu Any addenda shall be posted on the City's e-Procurement Portal and must be acknowledged by the offeror. Addenda notifications will be emailed to all persons on record following this RFQu. Failure of any offeror to receive any such addenda or interpretation shall not relieve such offeror from any obligation under their SOQ as submitted. All addenda issued shall become part of the contract documents. RESPONSIVE OFFEROR An Offeror determined by the Procurement Manager to have submitted an SOQ that conforms in all material respects to the requirements of the RFQu documents. RESPONSIBLE OFFEROR An Offeror is determined by the Procurement Manager to have the following qualities: The ability, capacity, experience and skill to provide the Goods and/or Services in accordance with RFQu specifications; The ability to provide the Goods and/or Services promptly, or within the time specified, without delay or interference; The equipment, facilities and resources of such capacity and location to enable the Offeror to provide the Goods and/or Services; The ability to provide future maintenance, repair, parts and service for the use of the Goods and/or Services purchased, if applicable; The quality and adaptability of the Goods and/or Services required or necessary to the particular use; The financial resources to perform the Contract. SOQ EVALUATION Selection Committee: A Selection Committee will evaluate the Statements of Qualifications and may develop a short list of up to three (3) but no more than five (5) firms based on total average ranked scores. The criteria to be used to determine the order of firms on the final list are set forth in Evaluation Criteria. During the evaluation process and at the discretion of the City of Surprise, firms submitting SOQs may be requested to take part in interviews as part of the evaluation process. If interviews are conducted, the Evaluation Committee will determine the Offerors best suited to meet the needs of the City based on the average ranked scoring of the evaluation criteria. These Offerors will form the “Offeror Short List” that may be invited for interviews. Interviews would be conducted at City offices. Time limitations and presentation requirements will be provided with the “Offeror Short List” notification. Each Evaluation Committee member will score each interview. Average ranked interview scores will be the sole determining factor for selection. In the event of a tie of the average ranked interview scores, total points from the interviews will be utilized as a tie-breaker. If a tie still exists, total points for the interview and SOQ scores will be used as the tie breaker. The City may elect, at its sole option, not to conduct interviews with Offerors and will select the Final List based upon the average ranked scoring of the SOQs. KEY PERSONNEL The Firm shall ensure that Key Personnel identified in its SOQ shall be the Key Personnel assigned to the Project. Such Key Personnel shall not be replaced without prior written acceptance of City. Unauthorized replacements will result in disqualification of the proposal or breach of the Contract. EVALUATION CRITERIA The following evaluation factors are listed in descending order of importance. Topics should be addressed in the following order for ease of evaluator interpretation and evaluation. The committee will evaluate and rank the offers, based on the following criteria & points located in Section Evaluation Phases : General Information: 5 Points Proposed Team Experience: 20 Points Key Personnel Experience: 20 Points Project Understanding & Approach: 30 Points Subcontractor Selection Plan: 15 Points Past Performance Verification: 10 Points Total Points: 100 Points AWARD OF CONTRACT A response to a Request for Qualifications is an offer to contract with the City based upon the terms, conditions and specifications contained in the City’s Request for Qualifications and the written amendments thereto, if any. Upon completion of the final rankings, Surprise will enter into negotiations with the highest total average ranked firm for a contract for the Project. If a contract cannot be successfully negotiated with the highest total average ranked firm, then negotiations will be terminated with that firm and Surprise will enter into negotiations with the next highest t

Published attachments
Addenda and notices
Public questions and answers
  • What is the budget amount mentioned in the scope of work?

    The City will not be disclosing the project budget as part of this solicitation.

  • We are struggling to open the link to the Uyghur_Compliance.pdf. Can you please take a look to review to see if it needs to be revised?

    The City has reviewed all attachments, including Uyghur Compliance form, through the public solicitation portal and confirmed that all attachments opened successfully using both Google Chrome and Microsoft Edge.

  • Can the project scope and limits be clarified? Will there be any work completed on Cotton Lane North or South of Waddell Road? Or is this project strictly improvements on Waddell Road Only?

    The project location and limits are identified in Section 2.1 and Section 4.1 of the solicitation as Waddell Road from Cotton Lane to 175th Avenue. The anticipated roadway improvements are outlined in Section 2.1 and the CMAR scope of services is detailed in Section 4. No additional specifications/scope documents will be added under the attachment section.

  • Per the presubmittal meeting, please confirm that the improvements shown to the W side of Cotton Lane will be included in Phase 1 funding.

    Roadway improvements as of this time prior to further review and GMP costs are from Hearn north to Acoma, east and west, up to Woodrow east side only.

  • Per the presubmittal meeting, improvements were shown to Cotton Lane, with one slide showing W Acoma Dr as the northern limits and another slide showing W Woodrow Lane. Please confirm the northern limits of the project improvements along Cotton Lane.

    Roadway improvements are from Hearn both east and west, up to Acoma, east to Woodrow.

  • The RFQ sections 2.1 and 4.1, and Q&A #3 both state the scope of this solicitation as solely along Waddell Road, from 175th Ave to Cotton Lane. Can the City please confirm if Waddell Road is the sole scope of the improvements, or if the improvements shown to Cotton Lane in today’s presubmittal meeting will also be a part of this CMAR?

    Waddell from Cotton to 175th Ave west along with Cotton to Acoma/Woodrow are the full scope of the entire project. Phasing will be determined on further review, GMP costs and fiscal funding.

  • RFQ §2.1 says two 12-ft lanes in each direction, but the pre-submittal slides show three (ultimate 6-lane). Which will Phase 1 build?

    Both Waddell Road and Cotton Lane will be two 12-ft lanes in each direction.

  • The slides show both "Waddell Road to Woodrow Lane" and "Acoma Drive to Waddell Road." Which limits apply to this contract?

    The limits for the project are Waddell Road: 175th Avenue to Cotton lane and Cotton Lane: Waddell Road to Woodrow Lane.

  • RFQ §4.5 shows substantial completion in July 2029, but the slides show a 12-month build ending June 2028. Which should respondents plan around?

    The end date is correct in the RFQu July 2029.

  • Is a completed phase of an ongoing multi-phase City project (e.g. 163rd Avenue Phase 1) acceptable?

    This project is not a multi-phase project at this time. The limits of this project are set to those listed above. No other phase has been budgeted.

  • RFQ §4.5 shows design complete in January 2027, but the slides show final design in April 2027. Will the CMAR review the 90% plans?

    CMAR will review 90% plans and the final designs in April 2027.

  • What is the status of right-of-way acquisition? Are any County parcels or temporary easements still outstanding?

    Right-of-way acquisition is at 20% right now, but the legal descriptions are set and the City is in discussions with every property including those within the County.

  • Is APS's design for the 12kV conversion underway, and who manages its schedule? Will the MWD "protect in place or siphon" decision be made before the GMP?

    APS design for 12kV is underway, but in the early stages. MWD decision will be made before the GMP.

Plain text