Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Coloma Road and Chase Drive Signal Upgrades Project

Description

The City of Rancho Cordova is seeking competitive bids for Coloma Road and Chase Drive Signal Upgrades Project . Estimated Construction Cost: $ 310,000 Contractor License Required: General Engineering Contractor, Class A Bids due before 1:00 pm on Wednesday, December 9, 2026 . Technical Construction Provisions Mobilization Mobilization is intended to compensate the contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to / from the project site; for the payment of premium cost and insurance for the project; for necessary costs of acquisition of equipment, including purchase and mobilization expense; and for any work and operations which must be performed or costs that must be incurred incident to the initiations of meaningful work at the site and for which payment is not otherwise provided in the contract. Mobilization shall include all costs associated with multiple mobilizations, remobilizations, and movement between work locations. Demobilization shall be considered incidental to mobilization and no separate payment will be made. Measurement and Payment: Full compensation for furnishing all labor, permits, right of entry, materials, tools, equipment and incidentals necessary for mobilization will be considered as included in the contract lump sum price for mobilization and no additional compensation will be allowed therefor. The contract price paid per LUMP SUM (LS) for Mobilization will be limited to ten percent (10%) of the total bid price. Partial payments will be made in accordance with the following provisions: The first payment of the lump sum price will be fifty percent of the contract lump sum price and will be paid with the first request provided that all submissions required are submitted by the contractor and to the satisfaction of the Engineer. The second payment will be twenty-five (25) percent of the contract lump sum price and shall be included in the second pay request. The third and final payment will be included in the final pay request. Traffic Control Plan GENERAL Provisions for public convenience and safety, construction area traffic control, and hours of work shall be in accordance with the Standard Construction Specifications. Specific requirements are provided in Sections 6-11, 6-12, 6-13, 6-14, 7-8, 12 of the County Standard Construction Specifications, and with the latest edition of California MUTCD Chapter 6 “Temporary Traffic Control”. The Contractor shall be responsible for public safety and traffic control within the Project limits and on the approaches to the Project. TRAFFIC CONTROL PLAN Prior to performing any work that requires a lane closure, a Traffic Control Plan, prepared by the Contractor, shall be reviewed and approved by the City of Rancho Cordova. A traffic control plan (or plans) shall be submitted for review for any work requiring modifications of existing traffic patterns. The traffic control plan shall include provisions for vehicular, pedestrian, and bicycle access. Additionally, the traffic control plan shall address traffic signal operation for any work performed within 200 feet of a signalized intersection. The Contractor shall maintain full signal operation at all times unless otherwise approved. Any required temporary signal modifications shall be included in the Traffic Control Plan. HOURS AND RESTRICTIONS All work shall be performed during nighttime hours as specified in Section 4.7, “Hours of Work”, of the General Provisions and Section 7-8, “Peak Hours of Darkness, Holidays, and Weekends”, of the Standard Specifications. Night work hours shall be as approved by the City. The Contractor may submit a written request to perform daytime work. Approval of daytime work shall be at the sole discretion of the Engineer and will be based on traffic impacts, safety considerations, and operational needs. If daytime work is approved, the work shall be performed in accordance with Section 4.31, "Work on/Around Private Property", of the General Provisions. No additional compensation will be allowed for night work, including but not limited to labor premiums, reduced productivity, lighting, or associated impacts. TRAFFIC CONTROL REQUIREMENTS At least one lane of 10-foot minimum pavement width shall be maintained for each direction of travel during construction operations. Lane closure shall not be allowed without an approved traffic control plan, proper advance warning devices, signing and flag person control. Unless otherwise approved by the City of Rancho Cordova construction shall not be permitted on weekends and holidays. The local Fire Department, Sheriff/Police Department, California Highway Patrol, and Regional Transit (if applicable) shall be notified 24 hours in advance of construction work. Minor deviations from the requirements of this section concerning hours of work which do not significantly change the cost of the work may be permitted upon the written request of the Contractor if in the opinion of the Engineer, public traffic will be better served and the work expedited. These deviations shall not be adopted by the Contractor until the Engineer has approved them in writing. All other modifications will be made by contract change order. PEDESTRIAN ACCESS Pedestrian access facilities that comply with ADA regulations shall be provided through construction areas within the right-of-way as shown on the Plans and as specified herein. Pedestrian walkways shall be provided with surfacing of asphalt concrete, Portland Cement Concrete or timber. Surface shall be skid resistant and free of irregularities. Full compensation for providing said pedestrian facilities shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. Any closure or detour of pedestrian access for contractor’s convenience shall be approved in writing by the Engineer prior to scheduling work in the area under question. Any request for temporary closure or detour of pedestrians shall be made in writing and include plans and information showing requested duration, days of the week, routes, signing and safety measures. Approval or rejection of requests will be at the sole discretion of the Engineer. Additional signing and safety measures for pedestrians approved as part of a pedestrian access modification shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation shall be allowed therefor. MEASUREMENT AND PAYMENT All costs for maintaining traffic control plan shall be included in the LUMP SUM (LS) price paid for the Traffic Control Plan and shall include full compensation for setup, removal, and relocation of traffic control devices throughout the project, furnishing all labor (including flagging costs), materials (including signs), tools, equipment and incidentals, and for doing all the work involved in placing, removing, storing, maintaining, replacing, and disposing of the components of the traffic control systems as shown on the Plans, required to maintain traffic as specified in the State Standard Specifications, in these Special Provisions, and as directed by the Engineer and no additional compensation shall be allowed therefor. No additional compensation will be allowed for delays, inefficiencies, or impacts resulting from traffic control requirements or restrictions Modifying Signal and Lighting Systems GENERAL The traffic signal work includes the modification of the traffic signal located at Coloma Road and Chase Drive. Removal of any concrete encountered that conflicts with the proposed signal, lighting, and electrical system shall be included in the prices paid for those items of work and no additional compensation will be allowed therefor. The Contractor’s attention is directed to the provisions of Section 49, “Signals, Lighting and Electrical Systems,” of the Standard Construction Specifications, the State Revised Standard Specifications and Plans, and these Special Provisions. All salvaged traffic signal heads and video detection equipment, shall be delivered to County of Sacramento corporation yard at 4135 Traffic Way, Sacramento, CA 95827. County and manufacturer’s representative will install contractor furnished Miovision Core DCM assembly in the existing signal cabinet. All salvaged traffic signal poles, pedestrian pushbuttons, and signs shall be delivered to City of Rancho Cordova corporation yard at 3303 Luyung Drive, Rancho Cordova, CA 95742. Project includes curb ramp modification and sidewalk restoration. MAINTAINING EXISTING AND TEMPORARY ELECTRICAL SYSTEMS The Contractor’s attention is directed to Section 49-1.06 "Maintaining Existing and Temporary Electrical Systems" of the Standard Construction Specifications and to these Special Provisions. TRENCH EXCAVATION AND BACKFILL The reference to Section 49-2.02, “Earth Saw Trenching,” in the last sentence of the first paragraph shall be revised to “Section 49-2.02, ‘Trenching and Boring.’” TRENCHING AND BORING Conduit for signals, lighting, and electrical systems may be installed by earth saw trenching or directional bore and shall conform to these Specifications. CONDUIT Conduit installed by earth saw trenching in existing pavement shall have conduit depth and backfill per Section 49-2.02.A, “Earth Saw Trenching,” in these Specifications. Conduit installed by trenching under proposed hardscape areas shall have 18” minimum cover from the top of the conduit to finished grade. Conduit installed by trenching in all other areas shall have 30” minimum cover from the top of the conduit to the finished grade. PULL BOXES The second paragraph of Section 49-2.07 of the Standard Construction Specifications is hereby revised to the following: Cover shall be factory marked per Section 86-1.02C, “Pull Boxes,” of the State Specifications to indicate the contents of the pull box. Do not mark “CALTRANS”. Metal covers shall be marked by the “bead weld” method as described in the State Specifications. The following paragraphs is herby added to the end of Section 49-2.07 of the Standard Construction Specifications: The pull box used for connecting conduits to the signal controller cabinet (home run box) shall be AASHTO HS20 rated 24” x 36” reinforced concrete box with steel frame. (Christ B2436 or approved equal). The cover shall be AASHTO HS20 rated two-piece galvanized steel checker plate with locking bolts. Locking hardware shall be brass, stainless steel, or other non-corroding material. Skid resistant 0.6 ASTM 1028. Each cover portion shall have inset lifting pull slots. Cover marking to be “Traffic Signal” per paragraph two of the Section. (Christy B2436 or approved equal). CONDUCTORS The third sentence of the first paragraph of Section 49-2.08, “Conductors,” of the Standard Construction Specifications is to be deleted and replaced with the following: The last paragraph of said Section 86-1.02F(1) is replaced with “All conductors must be copper. Conductors that are AWG 10-14 shall be solid copper. Conductors that are AWG 0-8 shall be stranded copper. Aluminum conductors are not allowed.” TRAFFIC SIGNAL INTERCONNECT The Contractor’s attention is directed to Section 49-2.08.A, “Traffic Signal Interconnect,” of the Standard Construction Specifications and to these Special Provisions. Each instance of “6E” in Section 49-2.08.A, “Traffic Signal Interconnect,” and all subsections of said section of the Standard Construction Specifications shall be replaced with “17”x30”x24”.” FIBER SPLICE BOXES AND PULL BOXES PULL BOXES The first paragraph of Section 49-2.08.A.(3), “Fiber Splice Boxes and Pull Boxes, Pull Boxes,” of the Standard Construction Specifications is hereby replaced with the following: Pull boxes shall be in accordance with Section 49-2.07, “Pull Boxes,” of these Specifications and this Section. Pull boxes which contain 96 strand fiber optic backbone cable shall be an AASHTO HS20 rated 17" x 30" x 24” reinforced concrete box with steel frame. (Christy B1730 with one extension or approved equal). The cover shall be AASHTO HS20 rated galvanized steel checker plate with locking bolts. Locking hardware shall be brass, stainless steel, or other non-corroding material. Skid resistant 0.6 ASTM 1028. Cover portion shall have inset lifting pull slots. Cover marking to be “TRAFFIC SIGNAL” per Section 49-2.07, “Pull Boxes,” of these Specifications. (Christy B1730 or approved equal).” Pull boxes which contain only 12 strand fiber optic drop cable shall be an AASHTO HS20 rated 13" x 24" x 24” reinforced concrete box with steel frame. (Christy B1324 with one extension or approved equal). The cover shall be AASHTO HS20 rated galvanized steel checker plate with locking bolts. Locking hardware shall be brass, stainless steel, or other non-corroding material. Skid resistant 0.6 ASTM 1028. Cover portion shall have inset lifting pull slots. Cover marking to be “TRAFFIC SIGNAL” per Section 49-2.07, “Pull Boxes,” of these Specifications. (Christy B1324 or approved equal).” The use of pull boxes in fiber optic signal inter Signature Page CITY OF RANCHO CORDOVA PUBLIC WORKS Coloma Road and Chase Drive Signal Upgrades Project City Project No. 80137 GENERAL TO BE SUPPLEMENTED WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION 2026 STANDARD PLANS AND SPECIFICATIONS AND THE COUNTY OF SACRAMENTO STANDARD CONSTRUCTION SPECIFICATIONS ADOPTED NOVEMBER 2024. THE SPECIAL PROVISIONS CONTAINED HEREIN HAVE BEEN PREPARED BY OR UNDER THE DIRECTION OF THE FOLLOWING REGISTERED PERSONS. Notice to Contractors CITY OF RANCHO CORDOVA Coloma Road and Chase Drive Signal Upgrades Project 80137 Notice is hereby given that the City of Rancho Cordova, California will receive sealed bids as follows: BID DATE: Wednesday, December 9, 2026 BEFORE 1:00 pm SUBMIT BIDS ONLINE AT: https://procurement.opengov.com/portal/cityofranchocordova ESTIMATED CONSTRUCTION COST: $ 310,000 CONTRACTOR LICENSE REQUIRE: General Engineering Contractor, Class A PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment and incidentals necessary to modify the existing traffic signal at Coloma Road and Chase Drive, including signal, lighting, and electrical system improvements, together with miscellaneous appurtenant work and details not mentioned above, and described in the Special Provisions or as shown on the Plans or as designated by the Engineer. No pre-bid conference or walk-through will be held for the purpose of reviewing and answering questions regarding this Project. Award of this contract requires a valid California contractor's license with the classification identified above. Contract Documents including Bid Proposal forms may be downloaded via the internet from the City's OpenGov portal at: https://procurement.opengov.com/portal/cityofranchocordova . Questions regarding this project are due online through OpenGov before 5:00 pm on Tuesday, December 1, 2026 . The County of Sacramento Standard Construction Specifications, which are incorporated by reference in the Contract Documents, are also on sale at the County of Sacramento Municipal Services Agency, Technical Resources Section, 827 7th Street, Room 105, Sacramento, CA 95814. Each bid must be submitted on the bid forms provided in the Contract Documents. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the City of Rancho Cordova, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the City of Rancho Cordova, each for not less than one hundred percent (100%) of the contract price. The contractor will be required to comply with the Equal Employment Opportunity Program outlined in the Contract Documents. This is a Public Works construction project in accordance with Section 1771.5 of the California Labor Code. Pursuant to California Labor Code Section 1720 and following, and Section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file in the office of the City Clerk of the City Council of the City of Rancho Cordova, 2729 Prospect Park Drive, Rancho Cordova, California 95670, and are available upon request. The prevailing wage determinations are also available on the internet at http://www.dir.ca.gov/DLSR/PWD . Pursuant to California Contract Code Section 22300, the contractor may, at its own expense, substitute securities for any money being withheld by the City of Rancho Cordova to ensure performance under this contract. The award of the contract, if it be awarded, will be to the lowest responsive, responsible bidder whose bid complies with all the requirements prescribed. The lowest bid will be determined based on base bid . The City of Rancho Cordova reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, are the lowest responsive bid of a responsible bidder. Time for completion of the work is Fifty (50) Working Days from the date of issuance as stated in the Notice to Proceed by the City. Within Fifteen (15) Working Days following execution of the contract, the Contractor shall submit all required material submittals for review and approval by the City Engineer. Upon approval of the required submittals, the Contractor shall proceed with procurement of the approved materials. Material lead times are anticipated to be approximately Twenty-Six (26) to Thirty (30) Weeks. A Notice to Proceed will be issued by the City following receipt of the required materials. Instructions to Bidders Inspection of Site Bidders are required to inspect the sites of the work to satisfy themselves by personal examination or by such other means, as they may prefer, of the locations of the proposed work and of the actual conditions at the project sites. Inspections shall be between the hours of 7:30 a.m. and 5:00 p.m. on weekdays only. Submission of a bid by the bidder shall constitute acknowledgement that, if awarded the contract, the bidder has relied and is relying on its own examination of (a) the sites of work, (b) access to the sites and (c) all other data and matters requisite to the fulfillment of the work and on its own knowledge of the facilities on and in the vicinity of the sites of the work to be constructed under the contract. Plans and Special Provisions Mutually Explanatory The Project Plans and Special Provisions are intended to be explanatory of each other. The work shall be performed and completed according to the true spirit, meaning, and intent of the Plans and Special Provisions. All work shown on the Plans shall be accurately followed to the scale to which the drawings are made, but figured dimensions are in all cases to be followed where given though they may differ from scaled measurements. Large-scale and / or full-size drawings shall be followed in preference to small-scale drawings. Any discrepancies found in the dimensions shall be brought to the immediate attention of the City Engineer. Preparing and Submitting Bids Bids shall be made on the blank Proposal forms prepared by the Public Works Department and provided here

Plain text

OpenGov categories

  • 55085 · Traffic Signal Poles, Standards, and Brackets
  • 55088 · Traffic Signals and Equipment, Electric Systems
  • 55089 · Traffic Signals and Equipment, Electric Parts
  • 96882 · Traffic Signal Installation