Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Concrete Improvements - City Wide Curb Ramps and Sidewalk Phase 1 (CDBG)

Description

In general, this project will consist of the removal of concrete and asphalt for the installation of new ADA Curb Ramps and Sidewalks . ADVERTISEMENT FOR BIDS (AS PUBLISHED) The City of Pueblo is soliciting bids for the following project: PROJECT NO.: 26-022 (CD2409) PROJECT NAME: Concrete Improvements - City Wide Curb Ramps and Sidewalk Phase 1 (CDBG) In general, this project will consist of the removal of concrete and asphalt for the installation of new ADA curb ramps and sidewalks, as detailed in the plans and specifications for this project. Complete solicitation information can be obtained on the City of Pueblo Purchasing Department website at www.pueblo.us/purchasing or the OpenGov portal at https://procurement.opengov.com/portal/pueblo This project is to be financed in whole by a grant from the U.S. Department of Housing and Urban Development and shall be referred to as Project 26-022 (CD2409) Concrete Improvements – City Wide Curb Ramps and Sidewalk Phase 1 (CDBG). Bidders shall comply with all applicable standards, orders, and regulations. It is the Bidder’s responsibility to determine and/or confirm the applicable and most current prevailing wages pursuant to the Davis-Bacon Act. Published: Tuesday, November 24, 2026 in The Pueblo Chieftain Newspaper INTRODUCTION Summary Background Contact Information Timeline SPECIAL PROVISIONS GENERAL INSTRUCTIONS All specifications included in the Special Provisions shall have precedence over and will govern in the event of a conflict with other sections contained in this document. Bidders are responsible for obtaining, reading, and carefully examining the entire Contract Documents package, including any Addenda, prior to submitting a bid. Failure to do so will not relieve a Bidder from any obligation or responsibility to understand and comply with all requirements and conditions for this project. Bidders shall inform themselves of the conditions of the project site and the requirements of the project's scope of work before submitting their bid. No allowances shall be made by reason of any matter or thing concerning which they might not have been fully informed prior to the bidding. No Bidder will be heard after the opening of bids to assert that there was any misunderstanding as to the nature of the operation expected in this solicitation. If a pre-bid meeting is held, Bidders should make every effort to attend. If the pre-bid meeting is mandatory and the Bidders cannot attend, it is imperative that someone else attend as a representative of the company, otherwise, their bid will not be accepted at the time of bid opening. Downloaded plans/drawings must be printed as “Actual Size”; scaling is NOT correct when printed using other options. It is the Bidder’s sole responsibility to ensure plans are printed correctly and to inform third-party printers of this information. The City is not responsible for bidding errors resulting from Bidder’s failure to follow this requirement. Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award. The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. Bidders must follow the submittal procedures outlined in the bid documents. The City reserves the right to reject any or all bids for any or all items covered in the Invitation for Bid, to waive informalities or defects in bids, or to accept such bids as it shall deem to be in its best interest. PROJECT FUNDING This project is to be financed in whole by a grant from the U.S. Department of Housing and Urban Development. RESPONSIBILITY AND CAPACITY TO PERFORM CONCURRENT WORK In determining responsibility, the City may review each Bidder’s capacity to perform multiple City projects concurrently, including staffing, equipment, bonding, financial resources, current workload, and performance history. Bidder’s failure to adequately demonstrate such capacity shall be grounds for determining bidder not responsible. STANDARD CONSTRUCTION SPECIFICATIONS AND STANDARD DETAILS The 2026 Standard Construction Specifications and Standard Details for City of Pueblo, Colorado , adopted January 12, 2026, and as most recently amended, shall control the construction and quality of materials for this project except where specifically modified by the Special Provisions. Unless specifically modified by the Special Provisions, the 2026 Standard Construction Specifications and Standard Details shall control with respect to any inconsistencies with the Plans. The 2026 Standard Construction Specifications and Standard Details are not included in this bid package but are available on the City of Pueblo’s website at 2026 Standard Construction Specifications and Standard Details . By submitting a bid, the Contractor acknowledges possession of a copy of said document. SPECIFICATION LANGUAGE Specifications may be written in abbreviated style with incomplete sentences. Omission of words such as “The General Contractor shall”, “Conforming to”, “shall be”, etc., are intentional; omitted words shall be supplied by inference. Where words “approved”, “satisfactory”, “directed”, “submitted”, etc., are used it shall be assumed that the words “Project Manager” follows, such as “approved by the Project Manager”. DEFINITION OF ENGINEER The term “Engineer” as used in Sections GENERAL PROVISIONS Authority of Engineer (a) and (b), of GENERAL PROVISIONS , shall mean the Director of Public Works with respect to all questions relating to the conformance of the work with the technical requirements of the plans and specifications, interpretation of the technical requirements of the plans and specifications, and with respect to the rejection of work and materials which do not conform. With respect to all other uses of the term “Engineer” in Section GENERAL PROVISIONS Authority of Engineer, the term shall mean the Director of Public Works. In Sections TERMINATION FOR CAUSE, FINAL ACCEPTANCE OF THE WORK, COMMENCEMENT AND COMPLETION OF WORK and UNCORRECTED WORK and TERMINATION FOR CONVENIENCE of GENERAL PROVISIONS , all references to Engineer shall mean the Director of Public Works. All other references to Engineer in GENERAL PROVISIONS not specifically addressed in this section shall mean the Consulting Engineer. APPROVED EQUAL An approved equal, where noted, may be considered by the City. For consideration as an approved equal, a Request for Substitution must be submitted through the OpenGov portal by Tuesday, December 8, 2026 at 4:00 pm (MT). Requests shall clearly describe the product for which approval is requested, including all data necessary to demonstrate acceptability. If approved, an addendum will be issued that lists all approved equal products or materials. No other products or materials will be considered. INCONSISTENCIES Any inquiries regarding seeming inconsistencies between the Plans and Specifications for this project must be made by Tuesday, December 8, 2026 at 4:00 pm (MT). PREPAYMENT OF CITY SALES AND USE TAX (This section applies to public improvement construction projects $100,000 and over.) The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded, including Base Bid plus those Alternates selected. Application and prepayment shall be made within fourteen (14) days of the date authorized to proceed with construction of the Project as set forth in the Notice to Proceed. All applications and prepayments shall be coordinated directly with City’s Division of Sales and Use Tax, Attention: Tax Audit Manager, 1 City Hall Place, Pueblo, Colorado 81003. Finance Department policy sets the threshold at $100,000. Any contractual obligations below this amount will not generally be required to make a pre-payment of Use Tax. PERA LIABILITY Contractor shall reimburse the City for the full amount of any employer contribution required to be paid by the City of Pueblo to the Public Employees’ Retirement Association (“PERA”) for salary or other compensation paid to a PERA retiree performing contracted services for the City under this Agreement. Awarded Contractor will be required to submit a completed Colorado PERA Questionnaire form. This form is available to view at Colorado PERA Questionnaire and is included by reference in this Contract. CONTRACTOR EVALUATION The performance of the awarded Contractor will be evaluated using the Contractor Evaluation Form. This form is available to view at Contractor Evaluation Form and is included by reference in this Invitation for Bid. The evaluation will be utilized to review Contractor’s performance, increase communication, and foster positive business relationships. The completed evaluation form will serve to document Contractor’s overall performance. Material failure to perform in accordance with the terms of one or more contracts, or materially unsatisfactory performance of one or more contracts, may be justification for disqualifying future bids by Contractor pursuant to Pueblo Municipal Code, Title 1, Chapter 10, Section 1-10-4(d). EQUAL OPPORTUNITY CLAUSE The following Equal Opportunity Clause shall be included in each government contract entered into by the City: During the performance of this contract, the contractor agrees as follows: The contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, national origin, creed or age. The contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, sexual orientation, gender identity. national origin, creed or age. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; lay-off or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places available to employees and applicants for employment, notices to be provided by the contracting officer setting forth the provisions of this nondiscrimination clause. The contractor will, in all solicitations or advertisements for employees placed by on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, creed or age. The contractor will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee’s essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the contractor’s legal duty to furnish information. The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer, advising the labor union or workers' representative of the contractor's commitments under Section 202 of Executive Order No. 11246 of September 24, 1965, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. The contractor will comply with all provisions of Executive Order No. 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. The contractor will furnish all information and reports required by Executive Order No. 11246 of September 24, 1965, and by the rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the contracting agency and the Secretary of Labor for purpose of investigation to ascertain compliance with such rules, regulations, and orders. In the event of the contractor's noncompliance with the non- discrimination clauses of this contract or with any of such rules, regulations, or orders, this contract may be cancelled, terminated, or suspended in whole or in part and the contractor may be declared ineligible for further Government contracts in accordance with procedures authorized in Executive Order No. 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order No.11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. The contractor will include the provisions of paragraphs (1) through (8) in every sub-contract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order No. 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The contractor will take such action with respect to any subcontract or purchase order as may be directed by the Secretary of Labor as a means of enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event the contractor becomes involved in or is threatened with, litigation with a subcontractor or vendor as a result of such direction, the contractor may request the United States to enter into such litigation to protect the interests of the United States. [Sec. 202 amended by EO11375 of Oct. 13, 1967, 32 FR 14303, 3 CFR, 1966-1970 Comp., p. 684, EO 12086 of Oct. 5, 1978, 43 FR46501, 3 CFR, 1978 Comp., p. 230, EO 13665 of April 8, 2014, 79 FR 20749, EO 13672 of July 21, 2014, 79 FR 42971] SECTION 3 PROGRAM REQUIREMENTS The applicable Section 3 project area for this contract is the City of Pueblo, Colorado. Bidder must submit a Section 3 Certification, Form S3a (Appendix C) for this project with the bid submittal. Statement shall include a commitment to employ to the greatest extent feasible, low-to-moderate income individuals and Section 3 business concerns. Consideration will be given to those contractors who will have training and employment opportunities for project area residents. Section 3 Utilization Plan is attached to this document as Attachment D. The intent of Section 3, a section contained within the Housing and Urban Development Act of 1968 is to provide job training and employment opportunities from programs that receive U. S. Department of Housing & Urban Development (HUD) funding to local low-income residents and the businesses they own or that employ them. The purpose of this Plan is to set forth procedures to be implemented by sub-recipients, developers, contractors, and subcontractors to ensure compliance with the City of Pueblo’s (City) Section 3 Program as administered by the Department of Housing and Citizen Services (DHCS) and the following Federal Implementing Act and Regulations: Housing and Urban Development Act of 1968 as ammended12 U.S.C. 1701u; 24 CFR 75 - Section 3 Regulations The City’s Section 3 Program is available for review from the Department of Housing & Citizen Services (DHCS), 2631 E. 4th Street, Pueblo, CO 81001. SECTION 3 PENALTIES Penalties for not meeting the Section 3 Employment Benchmarks or failure to meet additional reporting goals as outlined in Appendix A as follows: Contracts under $200,000 No penalty Contracts under $300,000 1% of contract value Contracts under $400,000 2% of contract value Contracts under $500,000 3% of contract value Contracts greater than or equal to $500,000 5% of contract value COMPLIANCE WITH AIR AND WATER ACTS This Contract Agreement is subject to the requirements of the Clean Air Act, as amended, 42 USC 1857 et seq., the Federal Water Pollution Control Act, as amended, 33 USC 1251 et seq., and the regulations of the Environmental Protection Agency with respect thereto, at 40 CFS Part 15, as amended from time to time. The contractor shall comply with the following requirements: A stipulation by the contractor or subcontractors that any facility to be utilized in the performance of any nonexempt contract or subcontract is not listed on the List of Violating Facilities issued by the Environmental Protection Agency (EPA) pursuant to 40 CFR 15.20. Agreement by the Contractor to comply with all the requirements of Section 114 of the Clean Air Act, as amended, (42 USC 1857c 8) and Section 308 of the Federal Water Pollution Control Act, as amended, (33 USC 1318) relating to inspection, monitoring, entry, reports, and information, as well as all other requirements specified in said Section 114 and Section 308, and all regulations and guidelines issued thereunder. A stipulation that as a condition for the award of the contract prompt notice will be given of any notification received from the Director, Office of Federal Activities, EPA, indicating that a facility utilized or to be utilized for the contract is under consideration to be listed on the EPA List of Violating Facilities. Agreement by the contractor that he will include or cause to be included the criteria and requirements in paragraphs (1) through (4) of this section in every nonexempt subcontract and requiring that the contractor will take such action as the Government may direct as a means of enforcing such provisions. INTEREST OF MEMBERS, OFFICERS, OR EMPLOYEES OF GRANTEE, MEMBERS OF LOCAL GOVERNING BODY, OR OTHER PUBLIC OFFICIALS No members, officers, or employee of the Grantee, or its designees or agents, no member of the governing body of the locality in which the program is situated, and no other public official of such locality or localities who exercises any functions or responsibilities with respect to the program during his tenure or for one year thereafter, shall have any interest, direct or indirect, in any contract or subcontract, or the proceeds thereof, for work to be performed in connection with the program assisted under the Agreement. Grantee's officers, employees, and agents shall never solicit nor accept gratuities, favors, or anything of monetary value from contractors or potential contractors, and, additionally, shall be governed in their actions by the standards of conduct described in Title VI of the 1971 Code of Ordinances of the City of Pueblo. WILLIAMS STEIGER OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 This contract is subject to the provisions of the Williams-Steiger Occupational Safety and Health Act of 1970. These construction documents and the joint and several phases of construction hereby contemplated are to be governed, at all times, by applicable provisions of the Federal Law(s), including but not limited to the latest amendments of the following: Williams-Steig

Plain text

OpenGov categories

  • 91319 · Construction, Curb and Gutter (Includes Maintenance, Repair, and Removal)
  • 91347 · Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps)
  • 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
  • 91382 · Maintenance and Repair, Sidewalk and Driveway (Including Removal)
  • 91384 · Maintenance and Repair, Street (Major and Residential)
  • 91430 · Concrete