Skip to content
← Back to search

State and local · OpenGov

Opportunityevaluation

Concrete Pad Installation for Target System

Description

Greenville County Sheriff’s Office is installing a new target system at the Center for Advanced Training, located at 150 Thurston Road, Taylors, SC 29687. Greenville County is seeking a qualified contractor to construct the concrete pads required for installation of the new target system. Concrete Pad Installation - Base Bid Materials – Concrete pads and dirt swale Labor – Concrete pads and dirt swale Applicable Sales Tax Aggregate Installation – Add Alternate Aggregate Materials Labor and Installation Applicable Sales Tax Unit Pricing – Concrete Repairs Repair of existing damaged concrete, including removal, disposal, materials, labor, and installation Scope of Work PROJECT DETAILS Greenville County seeks a qualified contractor to construct two concrete pads at the Sheriff's Office Center for Advanced Training, 150 Thurston Road, Taylors, SC 29687. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following: Construct one concrete pad approximately 220' x 20'. Construct one concrete pad approximately 150' x 8'. Prepare, grade, and form the installation areas. Pour and finish the concrete pads. Provide concrete with a minimum compressive strength of 3,500 PSI at 28 days and containing fiber reinforcement. Concrete shall be 5 inches thick. Provide a broom finish. Provide saw-cut control joints as required. Grade the surrounding area to provide proper drainage. Construct an approximately 660-linear-foot dirt swale to convey water to existing drains. The dirt swale shall be included in the base bid. Provide separate alternate pricing to add aggregate to the swale. Excess dirt generated by the work may be relocated to another location at the Training Center as directed by the County. All other debris, including broken concrete, shall be removed from the site and properly disposed of by the Contractor. Provide a unit price per square foot for repair of damaged existing concrete. Repair work shall be performed only as authorized by the County. Third-party concrete testing will be required to verify compliance with the specified compressive strength of 3,500 PSI at 28 days. Greenville County will arrange for and pay for testing through an independent testing company. The Contractor shall coordinate with the County to allow sampling and testing during concrete placement. Leave the work area clean upon completion. CONTRACTOR LICENSING REQUIREMENTS The Contractor shall be properly licensed by the South Carolina Contractors Licensing Board to perform the work required under this solicitation. The Bidder shall provide with its bid a copy of its current South Carolina contractor's license. The documentation shall clearly identify: Contractor's license number; Applicable license classification and/or subclassification; and Group limitation sufficient for the total amount of the Bidder's bid. The license classification held by the Contractor must authorize the performance of the concrete work specified in this solicitation. The Contractor's applicable group limitation must be sufficient for the total bid amount. The required license shall be active at the time of bid submission and shall remain active throughout the performance of the work. The Contractor shall obtain and maintain all other licenses, permits, and approvals required by applicable federal, state, and local laws and regulations for performance of the work. WARRANTY The Contractor shall provide a one-year warranty on workmanship and materials from the date of final acceptance by the County. PROJECT COMPLETION The Contractor shall complete all work within thirty (30) days following issuance of the Notice to Proceed. In no event shall the project completion date extend beyond February 1, 2027. Public Notice Greenville County is soliciting sealed bids in response to Concrete Pad Installation for Target System , subject to the conditions and all provisions set forth herein and attached. Sealed bids will be received through the County’s online procurement Portal located at https://procurement.opengov.com/portal/greenvillecounty until Friday, November 20, 2026 , 3:00 pm , then publicly opened. The service must be furnished as described and specified herein and submitted to Greenville County. All inquiries regarding this bid shall be submitted no later than Thursday, November 12, 2026 , 3:00 pm via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this IFB to receive an email notification when answers are posted. It is the responsibility of the Offeror to check the website for answers to inquiries. Introduction Summary Background Contact Information Timeline Instructions to Offerors Pre-Bid Meeting A Mandatory Pre-Bid meeting will be held at the date and time specified in the Timeline. Pricing Pricing must be based upon payment in thirty (30) days. Unit pricing will govern over extended pricing, unless stated otherwise. Pricing shall include packing. Unless indicated by County, pricing must be firm. Pricing must be based upon payment in thirty (30) days. Unit pricing will govern over extended pricing, unless stated otherwise. Pricing shall include packing. Unless indicated by County, pricing must be firm. Bidders shall complete the Pricing Table provided in the solicitation, identifying separate costs for materials, labor, and applicable sales tax. Base bid pricing shall include all costs necessary to construct the concrete pads and dirt swale as specified. Alternate pricing for aggregate in the swale and unit pricing per square foot for repairs to existing damaged concrete shall be provided separately and shall not be included in the total base bid. Bonding Bonding will be required for this project. See Bonds section for the requirements. Submission Procedures and Requirements All submissions must be received by Friday, November 20, 2026 at 3:00 pm . Submissions will not be accepted after the deadline. There will be no exceptions. Responders submitting proposals shall be responsible for all cost of preparing such bids. Information requested and not received at time of submission may disqualify the bid. Responders to this solicitation shall closely examine the specific requirements noted herein and the attached Terms and Conditions. Facsimile transmittals, emails, hard copies or offers communicated by telephone will not be accepted or considered. Licenses and Permits – The Contractor shall obtain all applicable licenses and permits, and promptly pay all taxes required by the State of South Carolina, and/or Greenville County. Statement of Qualifications Vendor shall include the following with their response: Company Information - Basic company details, years in business, location Relevant Experience - Similar projects completed References - Contact information for recent clients Contractor License - Provide a copy of the Bidder's current South Carolina contractor's license as required in Section 3.2 including documentation showing the applicable license classification and/or subclassification and group limitation. Bid Bond Requirements: Submit ONE of the following prior to bid opening: Original hard copy delivered to Procurement Services, OR Surety 2000 electronic version submitted through the OpenGov system. Deviations from these requirements may result in bid rejection. Inquiries and Addenda Offerors shall submit all inquiries regarding this bid via the County’s online procurement portal, located at https:// procurement.opengov.com/portal/greenvillecounty . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement portal. Offerors may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. The County will not be responsible for or bound by any oral instructions made by any employee(s) of the County in regard to this IFB. Addenda Notification: This IFB represents the most definite statement Greenville County will make concerning information upon which proposals are to be based. Offerors are required to register for an account via the County’s online procurement portal hosted by OpenGov. Once you have completed the registration, you will receive addenda notifications to your email by clicking “Follow” on this project. Ultimately, it is sole responsibility of each proposer to periodically check the site for any addenda at https:// procurement.opengov.com/portal/greenvillecounty . No addenda will be issued later than five (5) working days prior to the date for receipt for proposals except an addendum which, if necessary, postpones the date for receipt of proposals or cancels this IFB. Vendors shall acknowledge receipt of all addenda General Information Proprietary Information – The County of Greenville is a public body and governed by the South Carolina Freedom of Information Act. Documents submitted to the County relating to this Solicitation are subject to requirements of the Freedom of Information Act and may be deemed public records. Errors and Omissions – The Responder will not be allowed to take advantage of any errors or omissions in the Invitation for Bids. Where errors or omissions appear in the IFB, the Responder shall promptly notify the County of Greenville in writing of such error or omission it discovers. Any significant error, omission and/or inconsistency in the specifications are to be reported as soon as possible but no later than five (5) days before such time the response is to be submitted. Withdrawal of Proposal – An official representative of a Responder may withdraw a Responder’s response at any time prior to the bid submission deadline. Acceptable proof establishing that he/she is the representative of the Responder must be provided. Non-Endorsement – If the County awards a contract, the successful Responder shall not issue any news release or other statement relating to the award or servicing of the agreement which state or imply the County of Greenville’s endorsement of the successful Responder’s services. Insurance Insurance Requirements The contractor is responsible for and must have all required insurance listed below and shall not commence work under the associated contract until it has obtained all insurance required, and the County has approved such insurance in writing, nor shall the Contractor allow any subcontractor to commence work on its subcontract until all similar insurance required of the subcontractor has been obtained. All insurance policies shall be maintained for the life of the contract. THE COUNTY SHALL BE NAMED AS “ADDITIONAL INSURED” FOR ITS INTEREST on all policies of insurance except Worker’s Compensation, Automobile Liability, and Professional Errors and Omissions, as regards ongoing operations, products and completed operations, and this shall be noted on the face of the Certificate of Insurance. As a part of the certificate of insurance requirement the contractor shall also include acknowledgement and acceptance of the wavier of subrogation provision granted to Greenville County. This acknowledgement and acceptance should be included in the same section of the Certificate of Insurance that evidences the “Additional Insured” provision. Certificates for all such policies of insurance shall be provided by the Contractor's insurance agent or broker to the County within 10 working days from the date of Notice of Award. All Certificates of Insurance submitted shall provide on the face of the certificate reference to County's IFB #27033 . Contractor will provide County a minimum of 30 days advance notice in the event the insurance policies (or an insurance policy) are canceled. Subcontractors approved to perform work on this project are subject to all of the requirements in this Section. Contractor agrees to maintain and keep in force during the life of this Agreement, with a company or companies authorized to do business in South Carolina, the following insurance policies: Comprehensive General Liability: $1,000,000 per occurrence - combined single limit / $2,000,000 general aggregate, to include products and completed operations. Automobile Liability: $1,000,000 per occurrence - combined single limit (Coverage shall include bodily injury and property damage and cover all vehicles including owned, non-owned and hired) Statutory Worker's Compensation: Coverage A - State of SC Coverage B - Employers liability $1,000,000 Each Accident $1,000,000 Disease, Per Employee $1,000,000 Disease, Policy Limit Policies shall contain a waiver of subrogation in favor of and/or that applies to Greenville County, its departments, agencies, boards, employees, and commissions for losses from work performed by or on behalf of the contractor. No deviation from this coverage’s will be accepted unless, in the County’s sole discretion, it is more advantageous to the County, i.e., $1,000,000 - a $2,000,000 or $5,000,000 limit would be acceptable. Evaluation Phases The bids will be evaluated on the following criteria. Greenville County reserves the right to interview responders or have demonstrations to this IFB at its discretion. Greenville County will not be responsible for any costs associated with interviews of responders or demonstrations. Bonds Bid Bond: This project requires a Bid Bond and a Performance/Payment Bond. Proposers shall submit with their proposal, a Bid Bond in the amount of 5% of the bid price. This bond may be in the form of Bid Bond from the American Institute of Architects (AIA), electronically through Surety 2000, Certified Check, Cashier’s or Bank Money Order of any national or state bank and shall be made payable to Greenville County. Proposals submitted without being accompanied by any of the foregoing as required, may be considered informal and may be rejected. Any proposal accompanied by a bid bond not properly executed in the opinion of the County Attorney, may be rejected. The bond will be forfeited to the County by the successful bidder as liquidated damages in case a proposal award is made to that bidder and the contract and bond are not promptly and properly executed. 1. Instructions for Bond through AIA: The Original (hard- copy) Signed-Bid Bond must be delivered to the Procurement Services Office by the Bid Due Date/Time specified . The Bid Bond must be submitted in a sealed-envelope to: Greenville County Procurement Services Division; 301 University Ridge, Suite N-2400; Greenville, SC, 29601. The following information must be included, on the outside of the envelope: A. “Bid Bond” (labeled) B. Bid Number C. Company Name 2. Instructions for Surety2000: The County has an account with an online Bid Security program called Surety2000. This is a fee-based program that bidders can use to obtain an electronically issued, verified and legal bid bond which can be used for bidding purposes. No bid bond can be created by the bonding agent on the site without the Surety being fully aware of that bond. Only agents appointed directly by the Surety can issue bid bonds on the site. If your company chooses to use Surety2000 to obtain the bid bond, please access Surety2000 at www.surety2000.com. Complete the necessary steps to log in to the site and obtain the bid bond. Bond Identifier: IFB #27033 USE THIS CODE WHEN ACCESSING SURETY2000 Once an official bid bond is issued, use the space below to input your company's E-Bond Serial Number. The number will look something like this: SNJ5185268 This number will then be used at the bid opening to verify your company's bid bond. If you are not using this method for Bid Security submission please write "N/A" in the field provided. Please note that the County is not responsible for late submissions and no consideration will be made for bid security received after the date and time stipulated in the Notice to Bidders even if you have electronically submitted your bid on time. If the original bid security is not able to be verified by the date and time stipulated in the Notice to Bidders, your submission will be rejected. If required per solicitation and after proposals are awarded, the Procurement Services Division will return immediately all checks, except that of the successful bidder. The check of the successful bidder will be returned upon compliance with the performance and payment bond requirements. If required per solicitation, the successful bidder, within fifteen (15) working days after acceptance of the bidder’s offer by the County, shall furnish a satisfactory performance and payment bonds in the amount of the total bid price. The performance and payment bonds must be received by the county prior to issuance of an executed contract and Notice to Proceed. The fifteen (15) working days may be extended upon written approval by the Procurement Director. A copy of the written approval shall be transmitted to the successful bidder stating the terms of any extension. In the event that the bidder fails to deliver to the County Procurement Services Division the performance and payment bonds in said period of fifteen (15) working days after acceptance of the bidder’s offer by the County, then the bid bond of the bidder shall be retained by the County in its entirety and the award will be withdrawn from the bidder. The successful bidder shall have as surety a corporate surety authorized to act as surety in South Carolina. The Performance and Payment Bonds will insure that the successful bidder will promptly make payments to all persons supplying labor or materials to the bidder; and shall guarantee to indemnify and save the County, its officers, divisions, and employees harmless from all costs, damages, and expenses growing out of or by reason of the successful bidder’s failure to comply and perform the work and complete the contract in accordance with the specifications in the matter of making, furnishing and/or delivering said work or supplies. The Performance and Payment Bonds will be in effect for one year after completion of the contract. If bonding is required per the solicitation, the bonding company must have an agent available to meet with County officials to clarify and explain the County’s responsibility in maintaining the integrity of the bond. Return of Bid Bond: After bids are awarded, the Procurement Services Division will return immediately all checks, except that of the successful bidder. The check of the successful bidder will be returned upon compliance with the performance and payment bond requirements. Performance and Payment Bond: The successful bidder, within fifteen (15) working days after acceptance of the bidder’s offer by the County, shall furnish a satisfactory performance and payment bonds in the amount of the total bid price. The performance and payment bonds must be received by the county prior to issuance of an executed contract and Notice to Proceed. The fifteen (15) working days may be extended upon written approval by the Procurement Director. A copy of the written approval shall be transmitted to the successful bidder stating the terms of any extension. In the event that the bidder fails to deliver to the County Procurement Services Division the performance and payment bonds in said period of fifteen (15) working days after acceptance of the bidder’s offer by the County, then the bid bond of the bidder shall be retained by the County in its entirety and the award will be withdrawn from the bidder. The successful bidder shall have as surety a corporate surety authorized to act as

Published attachments
Addenda and notices
  • Official Notice #1: Sign in sheet · 1

  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum. Section 3.1. PROJECT DETAILS: Changed: "Grade the surrounding area to provide proper drainage." To: "Grade the surrounding area to provide proper drainage. Construct an approximately 660-linear-foot dirt swale to convey water to existing drains. The dirt swale shall be included in the base bid. Provide separate alternate pricing to add aggregate to the swale." Changed: "Remove and dispose of excess and debris resulting from the work." To: " Excess dirt generated by the work may be relocated to another location at the Training Center as directed by the County. All other debris, including broken concrete, shall be removed from the site and properly disposed of by the Contractor." New: "Provide a unit price per square foot for repair of damaged existing concrete. Repair work shall be performed only as authorized by the County." New: " Third-party concrete testing will be required to verify compliance with the specified compressive strength of 3,500 PSI at 28 days. Greenville County will arrange for and pay for testing through an independent testing company. The Contractor shall coordinate with the County to allow sampling and testing during concrete placement." Section 4.2. Pricing: Changed: "pricing must be all inclusive ." To: "pricing must be firm ." Changed: (previous pricing instructions about bid sheet and breakdown uploads) "Base bid sheet is attached to this IFB, and there are other charges not listed on the bid sheet, those charges must be listed in a lump sum. A break down list of pricing can be uploaded with the response. The County reserves the right to ask for any breakdowns of the pricing." To: " Bidders shall complete the Pricing Table provided in the solicitation, identifying separate costs for materials, labor, and applicable sales tax. " Changed: "Vendors shall include" To: "shall include all costs necessary to construct the concrete pads and dirt swale as specified. " Changed: "Alternate pricing on the following." To: "Alternate pricing for aggregate in the swale and unit pricing per square foot for repairs to existing damaged concrete shall be provided separately and shall not be included in the total base bid." Section 13. Pricing Proposal: Changed: "CONCRETE PAD INSTALLATION" (title) To: "CONCRETE PAD INSTALLATION - BASE BID " Changed: "Provide lump-sum pricing for each item below. Pricing shall include all costs necessary to complete the project." To: "(

  • Official Notice #2: Bid Tabulation · 2

Public questions and answers
  • Per the scope of work, we are to provide 3500 PSI fiber reinforced concrete. Please confirm the type of fiber (Steel, Macro, Micro...) and the dosage (LBS/CY).

    The concrete shall contain synthetic macrofibers at a dosage rate of 3.0 pounds per cubic yard (lbs/CY).

Plain text

OpenGov categories

  • 91430 · Concrete