Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Configurable Regulatory Program Information Management System

Description

OC San is issuing this Request for Information (RFI) to acquire information from qualified software vendors, platform providers, system integrators, and implementation partners regarding solutions and services to modernize the information systems used to administer its industrial pretreatment program. Project Details Important Instructions for Electronic Submittals The Orange County Sanitation District, CA will only accept electronic submissions via OpenGov. Interested Respondents shall submit their information in OpenGov by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments Section for the Information Requested Introduction Summary OC San is issuing this Request for Information (RFI) to acquire information from qualified software vendors, platform providers, system integrators, and implementation partners regarding solutions and services to modernize the information systems used to administer its industrial pretreatment program. Timeline Release Project Date: October 16, 2026 Question Submission Deadline: November 5, 2026, 2:00pm Proposal Submission Deadline: December 10, 2026, 2:00pm Procurement Contact Jeremey Arbiso Sr. Buyer 18480 Bandilier Circle Fountain Valley , CA 92708 Email: jarbiso@ocsan.gov Vendor Questionnaire Attachments

Published attachments
Public questions and answers
  • To size the budgetary pricing in Section 17, could OC San share rough volumes: the number of permitted industrial users by class and by local program, inspections and samples per year, internal staff users, and external users who would need accounts?

    Approximately: 1. 305 Class I users 2. 13 Class II users 3. 34 Special Purpose users 4. 46 Zero Discharge Certifications 5. 1,458 inspections FY 2025/26 6. 3,862 samples FY2025/26 7. Internal staff users - 50 8. External users - Between 1,000 and 10,000

  • Which system or systems would the new solution replace, and roughly how much historical data (years and record counts) would need to be migrated?

    The new system would replace iPACS by enfoTech and various paper/Excel-based processes. Data migration needs have not been determined yet.

  • Would a response that covers part of the scope (the core case and work management) and names third-party products for the remaining areas still be useful to OC San?

    Yes, a partial response is acceptable and useful.

  • For CROMERR-compliant electronic reporting, does OC San expect to use EPA's Shared CROMERR Services, a vendor-supplied component, or keep paper as the copy of record for now?

    OC San is open to all three of these options.

  • Number and types of users How many people are expected to use the solution at initial deployment and over the next three to five years? Please distinguish internal operational users, field inspectors, administrators/configurators, reporting or read-only users, and external users. For external access, please provide estimated registered users, monthly active users, and peak concurrent usage, if available.

    1. Internal users - 50 total 2. Field inspectors - 15 3. Config - 15 4. External - Between 1,000 and 10,000

  • Preferred platforms Does OC San have a preferred platform, technology standard, or strategic direction for this solution? Specifically, is ServiceNow a preferred option, or will purpose-built industrial pretreatment products and configurable enterprise platforms receive equal consideration?

    OC San does not have a preferred platform or vendor.

  • Budget range and funding Has OC San identified a target budget range or funding ceiling? If available, please distinguish one-time implementation and migration costs from annual software, hosting, support, and maintenance costs. Is funding approved, or will RFI responses establish the budget for a future procurement?

    OC San does not have a specific budget in mind at this time. RFI responses will be used as part of future planning.

  • Drivers for replacing iPACS What are the primary limitations of the current iPACS solution driving this initiative? Please identify the most important functional, usability, reporting, integration, support, cost, or customer-maintainability issues. Has OC San evaluated an upgrade or another purpose-built pretreatment product?

    Limitations 1. Limited access to modifying certain areas of software (black box) 2. Lack of customer support 3. Lack of customer-friendly portal 4. Lack of support for security updates in new OS

  • Operational scale Please provide approximate counts of regulated entities, facilities, active permits, and external organizations, together with annual volumes of applications, inspections, submissions, monitoring events, and laboratory results. What growth should respondents assume?

    Approximately: 1. 305 Class I users 2. 13 Class II users 3. 34 Special Purpose users 4. 46 Zero Discharge Certifications 5. 1,458 inspections FY 2025/26 6. 3,862 samples and lab results FY2025/26 7. 5,000 report submissions from users Assume 70% growth

  • Customer-maintainable configuration Which changes must trained OC San administrators be able to perform independently after go-live? Please identify representative examples involving compliance calculations, rule changes, permit templates, inspection forms, workflows, reports, and new program types, and describe the technical skills available within OC San.

    OC San is interested in learning about available systems and their level of configurability by staff, super users, and IT administrators.

  • Electronic reporting and CROMERR What electronic-reporting system and CROMERR approval arrangements are currently in place? Should respondents assume these capabilities will be retained and integrated, replaced, or modified? What responsibilities would OC San expect the selected supplier to undertake in supporting any required approval changes?

    OC San currently has a CROMERR-approved system (GovOnline by enfoTech). Full replacement Selected supplier to provide necessary info to support CROMERR approval process

  • Integration scope Which systems must be integrated at initial deployment, and which are optional or planned for later phases? Please identify the laboratory, financial, GIS, identity, document-management, payment, and regulatory-reporting systems, including available interfaces and expected data-exchange frequency.

    All systems must be integrated at initial deployment

  • Migration and historical records What data, documents, relationships, audit history, and historical compliance determinations must be migrated from iPACS and other sources? Please provide approximate volumes, retention requirements, known data-quality issues, and any records that may remain in an archive.

    OC San has not established which data, if any, must be migrated. Respondents should provide examples based on system capabilities or past work.

  • Deployment priorities and timing What capabilities are essential for the initial release, and would OC San consider phased deployment? Are there target implementation or go-live dates, current contract expiration dates, or regulatory deadlines that should shape the proposed approach?

    Essential 1. CROMERR compliant system (online portal) 2. Full complement of systems for permitting, inspection, sampling, documentation retention, and enforcement 3. Data exchange with lab (LIMS), finance, GIS No input regarding dates to shape proposal approach

  • Evaluation and future procurement How will OC San weigh functional coverage, customer configurability, implementation effort, total cost of ownership, and existing platform investment? Will software/platform selection and implementation services be evaluated together or separately, and what is the anticipated timing of a subsequent solicitation?

    OC San has not established a timeline for procurement or criteria for procurement evaluation.

  • 1. Section 12, REG-02 and REG-03 (CROMERR): Would OC San consider a solution that integrates a third-party CROMERR-compliant electronic signature and identity-proofing service, or does OC San expect CROMERR capability to be native to the proposed platform? Is CROMERR capability expected at initial go-live or in a later phase?

    OC San is open to a third-party CROMERR-compliant service. CROMERR capability is expected at initial go-live

  • 2. Section 5.1 (Capability classification): How will OC San weigh capabilities classified as CV (configured by vendor/partner) or CC (custom code) relative to CA (configurable by OC San), particularly where the respondent offers to train OC San staff to maintain those components after go-live?

    OC San has not established criteria for procurement evaluation.

  • 3. Section 5.2 and Appendix C (Response format): May respondents submit the Appendix C response matrix as an editable spreadsheet in addition to the narrative response? Are there page-count or file-size limits for the submission?

    Yes, spreadsheets are acceptable in addition to the narrative response. No page or file size limits.

  • 4. Section 17 (Budgetary pricing): To support consistent budgetary estimates, can OC San share approximate counts of internal staff users, regulated entities, active permits or authorizations, and annual inspections and submissions?

    Approximately: 1. 305 Class I users 2. 13 Class II users 3. 34 Special Purpose users 4. 46 Zero Discharge Certifications 5. 1,458 inspections FY 2025/26 6. 3,862 samples FY2025/26 7. 5,000 report submissions from users 8. Internal staff users - 50 9. External users - Between 1,000 and 10,000

  • There is no Vendor Questionnaire template in the Project Documents section. Is the Questionnaire we are to submit meant to be just a single pdf file of our response (ie any word or excel files combined into one doc)? If so, the web page says "Respondent Submittals (without Cost)" and "(Do not upload cost information in here)", but the Project Document ask for pricing in Section 17. Do we complete Section 17 and include it in our uploaded response?

    Please provide only rough estimates for Section 17, do not provide details for individual components from other sections.

  • 1. Approximately how many internal users and external portal users are anticipated for the proposed system? 2. How many regulatory programs and permit types does OC San anticipate implementing during the initial phase? 3. Does OC San have a preferred implementation timeline or anticipated go-live timeframe?

    Approximately: 1. 305 Class I users 2. 13 Class II users 3. 34 Special Purpose users 4. 46 Zero Discharge Certifications 5. 1,458 inspections FY 2025/26 6. 3,862 samples FY2025/26 7. 5,000 report submissions from users 8. Internal staff users - 50 9. External users - Between 1,000 and 10,000 OC San has not established a timeline for procurement or criteria for procurement evaluation.

  • 4. Could OC San identify the primary existing systems requiring integration or data migration, along with approximate historical data volumes? 5. Does OC San currently utilize a CROMERR-approved electronic reporting solution or shared service, or should vendors account for establishing a new compliance approach?

    The new system would replace iPACS by enfoTech and various paper/Excel-based processes. Data migration needs have not been determined yet. OC San currently has a CROMERR-approved system (GovOnline by enfoTech). Yes, vendors should account for a full replacement.

  • What are the primary challenges or limitations with OC San's existing regulatory information management systems that the proposed solution should prioritize addressing?

    Limitations 1. Limited access to modifying certain areas of software (black box) 2. Lack of customer support 3. Lack of customer-friendly portal 4. Lack of support for security updates in new OS

  • Does OC San prefer onsite, remote, or hybrid implementation services? Are vendors permitted to utilize offshore resources for configuration, development, and testing, subject to applicable security requirements?

    OC San expects to have this information available for a possible future RFP.

  • we have a few dozen questions to submit. do we need to submit each question individually through this box, or is there a way to submit a document with all our questions in one place?

    There is a way to upload a document to submit all your questions, but I see the questions were submitted below. OC San will respond to the questions below.

  • 1.) About how many regulated entities, facilities, permits and sampling points are in the program today? 2.) How many inspections, samples and monitoring reports are handled per year? 3.) What growth in regulated entities, permits or sampling volume does OC San expect over the next 3-5 years? 4.) Which business processes are in scope for the initial release, and which are expected in later phases? 5.) BC-63 lists local programs such as fats, oils and grease, dental amalgam, hauled waste, dry-weather runoff and radiator repair shops. Which of these are active today, roughly how many participants does each have, and which should be in the initial release? 6.) Should the system track grease interceptors, clarifiers and other pretreatment devices, including pump-out and maintenance records? Would haulers or food service establishments submit those records through the portal (BC-02, BC-63)? 7.) BC-29 mentions grouping inspections, monitoring events and field work into a case file "to support project and other pretreatment work." Can OC San give one or two examples of these projects (for example special studies or source investigations)?

    1. 305 Class I users, 13 Class II users, 34 Special Purpose users, 46 Zero Discharge Certifications. 2. 1,458 inspections FY 2025/26, 3,862 samples and lab results FY2025/26, 5,000 report submissions from users 3. OC San expects 70% growth in the next few years. 4. CROMERR compliant system (online portal), Full complement of systems for permitting, inspection, sampling, documentation retention, and enforcement, Data exchange with lab (LIMS), finance, GIS. 5. OC San has all of these programs and is interested in learning about available systems. FOG 36; Dental 1000; wastehaulers 47; DWUR 21; radiator 0. 6. OC San is interested in learning about how respondents’ systems handle these concepts. 7. Example would include conducting sampling events in the sewer lines downstream of a facility and conducting sampling events starting at either of the plants and working upstream to find source(s) of pollutants.

  • 1.) How many OC San staff would use the system (inspectors, permit writers, lab, finance, administrators)? 2.) Would anyone outside OC San need access under the new process, such as consultants, contract samplers or labs? Roughly how many regulated businesses would use the portal (BC-44, BC-45)? 3.) Do different user groups need different levels of access or data visibility (for example, limiting who can see enforcement records or confidential business information)? 4.) Do any member cities or sanitary districts run parts of the FOG or other local programs on OC San's behalf? Would they need their own access to the system, data sharing, or a separate portal experience (BC-45, BC-61)? 5.) SEC-02 names Microsoft Entra ID. 5-a.) Is Entra ID expected for staff only, or also for external users? 5-b.) Are there single sign-on or multi-factor authentication requirements for staff and for external portal users? 5-c.) What identity approach and level of identity proofing does OC San expect for regulated entities, labs and consultants (SEC-03)?

    1. Internal users - 50 total, Field inspectors - 15, Config - 15 2. OC San is interested in learning how permittees could allow consultants, contract samplers, or labs to submit data on their behalf. Approximately: 305 Class I users, 13 Class II users, 34 Special Purpose users, 46 Zero Discharge Certifications 3. OC San is interested in learning about how respondents’ systems handle these concepts. 4. No, these are not needed at this time. If a respondent’s system is capable of this, please describe. 5-a. OC San is interested in learning about how respondents’ systems may work with Entra ID or other similar technologies. 5-b. OC San is interested in learning about how respondents’ systems handle single sign-on or multi-factor authentication. 5-c. OC San is interested in learning about how respondents’ systems handle these concepts.

  • 1.) Does OC San have an established pretreatment process today, or is part of it new? 2.) Which systems are used to administer the program today (vendor product, database, spreadsheets), and are there plans to retire any of them? 3.) Are there process documents, forms or sample reports describing current processes that OC San can share? 4.) Will OC San share its records retention schedule and any legal-hold requirements for program records (REC-01)? 5.) Which document repository holds program records today (for example SharePoint or an enterprise content-management system), and should it remain the system of record for documents (REC-04)? 6.) What are the biggest pain points with the current process and tools? 7.) What would success look like 6 to 12 months after go-live? 8.) What share of submissions arrive on paper or by email today, and roughly how many outbound notices and letters are still mailed on paper each year? Will paper still be accepted and sent after go-live, which would require scanning, OCR intake or print and mail services (BC-15, BC-48, DAT-05)?

    1. OC San has an established pretreatment program and pretreatment software. 2. The new system would replace iPACS by enfoTech and various paper/Excel-based processes. 3. OC San expects to provide these during a possible future RFP. 4. OC San expects to provide these during a possible future RFP. 5. OC San is interested in learning about how respondents’ systems handle records and interactions with records management systems. 6. Limited access to modifying certain areas of software (black box), Lack of customer support, Lack of customer-friendly portal, Lack of support for security updates in new OS. 7. OC San has not established these criteria at this time. 8. Outbound notices on paper – 10,000, Paper will still be accepted after go-live.

  • 1.) Which pretreatment rules (limits, significant noncompliance criteria, sampling calculations, enforcement response) are expected to be configured by OC San staff, and how many such rules exist today? 2.) Which steps require review or approval (for example permit issuance, enforcement actions or report acceptance), and how many approval levels are involved? 3.) Are there separation-of-duties rules, such as the person who prepares a permit or enforcement action cannot also approve it? 4.) Which documents must the system generate (for example permits, fact sheets, notices of violation, orders, inspection reports, letters), and roughly how many templates exist today (BC-11, BC-40)? 5.) What notifications or reminders are required, for example permit renewals, report due dates, overdue responses, or overdue samples and lab results? 6.) BC-57 to BC-59 cover fees, invoices and payments. Which system should be the system of record for invoices and payments, the new solution or JD Edwards? Does OC San already use a payment processor for online payments? 7.) Are non-domestic user charges or other volume- or strength-based sewer charges (for example flow, BOD and TSS) in scope, or only permit and program fees (BC-57)? If charges are in scope, does JD Edwards or another system calculate them today? 8.) Are any industrial users subject to production-based categorical standards or the combined wastestream formula (CWF), or do all permits use fixed concentration and mass limits (BC-32)?

    1. The PIMS should be developed to accommodate any number of “pretreatment rule” or configurable areas by staff that include limits, SNC criteria, sampling calculations, enforcement responses, etc. 2. In any given process, there are at least 2 approval steps and two approval levels. Permit processing requires a minimum of 4 approval steps. Enforcement actions require a minimum of 2. 3. Yes, those that prepare drafts of permits and enforcement actions are not approving those items. Approvals require higher levels of authority. 4. The system must generate permits, permit renewal notices, permit fact sheets, notices of violation, orders, inspection reports, wastewater analysis reports, notices of self-monitoring and flow monitoring, failure to submit notices, SNC notices, and task reports. There are approximately 25 templates. 5. OC San is interested in learning about how respondents’ systems handle reminders, notifications, and configuration thereof. 6. OC San has not established criteria for system of record. OC does currently have online payments and is interested in learning about how respondents’ systems handle online payment processing. 7. OC San is interested in learning about how respondents’ systems handle these concepts. 8. Yes, there are industrial users subject to production-based categorical standards or the combined wastestream formula (CWF). Product data is reported on an annual basis and provided in the permit renewal application process. For production-based lim

  • 1.) Who performs the actual sample collection at the treatment facility sample points: OC San staff, consultants, or the regulated facilities themselves? Who delivers the samples to the lab? Do collectors have access to any system today? (This affects licensing.) 2.) How are collectors verified when they sign for a sample? Is a login enough, or is something stricter needed? 3.) How are sample bottles and kits supplied today? Who provides the containers? 4.) How are barcodes or QR labels created today? Are they pre-printed with the kit, made by OC San, or printed at the point of collection? What printers and devices are in use (BC-35)? 5.) Should the system track inventory (for example sample kits and containers), or only record a sample once a label is applied? 6.) What are the hold times between collection and delivery to the lab? 7.) Is sampling scheduled (monthly, quarterly, annual) or also event-driven, such as after a spill or wildfire? 8.) Where does the official copy of a sample record live today?

    1. For permitted industrial users, the industry contracts through their party labs to conduct sampling and analysis. For agency sampling, OC San has a staff of inspectors that conduct inspections, take samples, and deliver them to OC San’s internal laboratory for analysis. 2. For permitted industrial users, the industry contracts through their party labs to conduct sampling and analysis. The industry submits analytical results through the paper forms. OC San does not handle any samples taken by permitted industries. 3. OC San maintains an internal inventory of supplies to provide to inspection staff. 4. Sample labels are printed by inspection staff on a daily basis for sampling they plan to conduct at any number of facilities on that day 5. OC San is interested in learning about how respondents’ systems handle these concepts. 6. Holding time varies by method, generally from a few hours to many days. 7. OC San is interested in learning about how respondents’ systems handle both scheduled/recurring and ad hoc sampling events. 8. A sample record is the wastewater analysis report which is generated after analytical results are authorized and the wastewater analysis report is generated, printed, mailed to the permittee, and retained in the current database.

  • 1.) How many labs does OC San use, and are they in-house or third-party? 2.) Does OC San have a central group or process that receives sample requests and sends them to the labs, or must the new system decide which lab gets each sample? 3.) How do labs send results back today (HL7, FHIR, file transfer, API, email)? Is there a set message format, and do the labs share one interface agreement? 4.) What are the security requirements for result transmission? 5.) How should rejected samples or lab exceptions be handled, and how many samples move through the labs per day, week or year? 6.) BC-36 asks that third-party labs be ELAP certified for the required constituents. Should the system track certifications and accredited constituents and prevent assigning samples to a lab whose certification has lapsed, or only record certification status? 7.) Does OC San maintain a master list of parameters and analytes (with methods, CAS numbers, units and detection limits)? Should the new system own that list, or should it come from the LIMS (BC-30)? 8.) Do permittees submit self-monitoring reports as structured data (for example an electronic data deliverable from their contract lab) or as PDFs? Is OC San open to requiring a standard upload format for self-monitoring data (BC-15, BC-31)?

    1. OC San is interested in learning about how respondents’ systems handle both in-house and third-party laboratory data. 2. OC San manually determines if a sample should be analyzed in-house or with a third-party lab and is interested in learning about how respondents’ systems handle automated distribution. 3. OC San mostly uses file transfer and is interested in learning which options are available in respondents’ systems. 4. OC San has not established any result transmission requirements. 5. OC San is interested in learning about how respondents’ systems handle rejected samples or lab exceptions. 3,862 samples were analyzed in FY2025/26. 6. Yes, system should track certifications and accredited constituents and prevent assigning samples to a lab whose certification has lapsed. 7. OC San does have a master list and is interested in learning about how respondents’ systems handle both options. 8. OC San is interested in learning about how respondents’ systems handle paper/fax submissions, structured data, and PDFs.

  • 1.) Which integrations named in Section 10 are must-haves at go-live versus later phases (laboratory system, JD Edwards, Esri GIS, waste-hauler station, Microsoft 365, electronic signature, payment processor, Power BI, regulatory exchange)? Is the desired interface to each one file-based, database, or API? 2.) Which products and versions are in use for each integrated system (for example the LIMS product, JD Edwards EnterpriseOne or World, ArcGIS Enterprise or ArcGIS Online, the electronic-signature service and the payment processor)? Are the systems to be integrated on-premises, cloud-based, or a mix? 3.) INT-07 mentions waste-hauler station hardware or software. What equipment and software run the station today (for example scales, card readers, cameras), and is that integration needed in the initial release? 4.) For hauled waste, about how many hauler deliveries happen per day? Must the system decide in real time, at the station, whether a hauler may discharge (for example a valid permit, account in good standing, or a cleared manifest)? If so, what uptime and response time are required (INT-07)? 5.) Beyond laboratory results, is there a pre-defined message structure or data standard expected for the other integrations? 6.) Does OC San intend for integrations to run through its existing MuleSoft platform or other existing integration infrastructure, or may a respondent propose its own integration layer (INT-03, INT-11)? 7.) Is API or database documentation available for ea

    1. OC San is interested in learning about how respondents’ systems handle interfaces to other systems currently. 2. OC San is interested in learning about which other systems respondents’ systems are capable of interfacing with, both on-premises and cloud-based. 3. OC San is interested in learning which waste-hauler related options are available in respondents’ systems. 4. Daily not available, FY 25/26 annual total – 6583 loads. OC San is interested in learning how respondents’ systems handle discharge authorization, especially related to pH and account in good standing. 5. OC San is interested in learning which options are available in respondents’ systems. 6. OC San is interested in learning about how respondents’ systems handle integrations. 7. OC San expects to have this information available for a possible future RFP. 8. OC San expects to have this information available for a possible future RFP. OC San is interested in learning about how respondents’ systems handle data flow. 9. OC San is interested in learning about how respondents’ systems handle these concepts. 10. OC San expects to have test environments available to test integrations. 11. OC San is interested in learning about how respondents’ systems handle continuous data, but it is not expected at this time. 12. OC San is interested in learning about how respondents’ systems handle automatic and manual association of email.

  • 1.) Is the current vendor, if any, expected to take part in data migration? 2.) What data would need to move (databases, spreadsheets, scanned documents, attachments), in roughly what volumes, and how many years of history must come over (IMP-05)? 3.) Is a data dictionary or schema documentation available for the current data? 4.) Is the current data reasonably clean, or is cleanup expected before migration? Would OC San or the respondent own that cleanup? 5.) Will OC San staff who know the current data be available to support data mapping and validation? 6.) Does OC San have a preferred cutover approach (single cutover, parallel run for a period, or phased by user group) (IMP-08)? 7.) Significant noncompliance (SNC) is evaluated over 6-month periods. Must data migrated from the current system be complete enough to drive SNC and escalation rules on go-live day? If so, how many months or years of results and violations must be in structured form (IMP-05, BC-41)?

    1. OC San does not expect the current vendor to participate in any activities. 2. OC San has not established any data migration requirements. 3. OC San expects to have this information available for a possible future RFP. 4. OC San is interested in learning about respondents’ experience with data cleanup. 5. OC San expects to have staff with this knowledge available for a possible future project. 6. OC San is interested in learning about how respondents have performed cutovers in the past to use for a possible future RFP. 7. OC San has not established any data migration requirements. It is reasonable to assume that data must be complete for SNC and escalation rules on go-live day.

  • 1.) Beyond the Microsoft 365, Entra ID and Power BI tools the RFI mentions, does OC San already license an enterprise or low-code platform that respondents could build on, or should respondents include all platform licenses in their pricing? 2.) The RFI states that cloud-hosted SaaS is preferred but not required. Are there firm hosting requirements, such as US-only data residency, a government cloud, or specific frameworks (for example FedRAMP, StateRAMP or CJIS) (TA-02, SEC-01)? 3.) Are there OC San IT, enterprise architecture or security teams that a respondent should expect to work with during design? 4.) Must configuration releases go through an OC San IT change advisory board or other change-management process before they reach production? How long does that process usually take (LC-09, LC-13)?

    1. Respondents should include all platform licenses in their pricing. It would be acceptable to note separately costs that may not be needed if OC San already has licenses available. 2. OC San has not established hosting requirements. Assume that hosting must be at least US-only data residency. 3. OC San expects to have appropriate staff available for a possible future project. 4. OC San uses a change advisory board for change management as appropriate. OC San is interested in learning about how respondents’ systems handle test environments, change, and governance.

  • 1.) Which external submissions must the system send to regulators, to which agency systems, and in what formats (REG-04, INT-10)? 2.) Federal rules require OC San to publish, at least annually, a list of industrial users that were in significant noncompliance (SNC). Should the new system calculate SNC status and produce that list, or is it prepared outside the system today? 3.) Section 12 mentions electronic reporting. Must the system meet EPA CROMERR for electronic signatures and submissions, or is that handled by a separate process? 4.) REG-03 asks whether the approach would require a new or amended application to OC San's Approval Authority. 4-a.) Does OC San's current electronic reporting process already have CROMERR approval, and which Approval Authority granted it? 4-b.)Which electronic signature or identity-proofing tool, if any, is part of that approved process?

    1. At this time, there are no external submissions that need to be sent to regulators. OC San is interested in learning which options are available in respondents’ systems. 2. The system should evaluate SNC status and produce a list of SNC permittees. 3. OC San is interested in learning about how respondents’ systems are capable of meeting CROMERR compliance for both electronic signatures and submissions. 4-a. OC San currently has a CROMERR-approved system (GovOnline by enfoTech). Approval was granted by the EPA via Region 9 and the Santa Ana Regional Water Quality Control Board. 4-b. The approved tool is GovOnline by enfoTech.

  • 1.) Do inspectors need to work offline in the field? 2.) Which mobile devices and operating systems do field staff use? 3.) How often do they work without connectivity (BC-24, TA-06)?

    1. OC San is interested in learning about respondents’ systems offline capabilities. 2. OC San is interested in learning which options are available in respondents’ systems. 3. This information is not available, but inspection staff typically have connectivity.

  • 1.) REG-05 cites WCAG 2.2 Level AA, Section 508 and applicable California requirements. Which California requirements should respondents address? Do those requirements also apply to documents the system generates, or only to the portal? 2.) BC-50 mentions multilingual content. Which languages are required? Do they apply only to the portal screens, or also to generated notices and letters?

    1. OC San is interested in learning about how respondents’ systems handle accessibility in any electronic format. OC San expects to have specific requirements available for a possible future RFP. 2. OC San is interested in learning about how respondents’ systems handle multilingual content, especially as it applies to the Dymally-Alatorre Bilingual Services Act. Example languages that may be required are English, Spanish, Vietnamese, Chinese, and Korean.

  • 1.) What key metrics and reports does the program track today, and can OC San share examples? 2.) Who uses each report (staff, management, board, regulators), and how often? 3.) Does OC San use Power BI or another analytics tool today? If so, does it connect to a data warehouse or other reporting store, or should the solution feed it directly (INT-09, TA-11)?

    1. OC San is interested in learning which KPI and report options are available in respondents’ systems. 2. OC San expects to have this information available for a possible future RFP. 3. OC San is interested in learning about how respondents’ systems can make data available to cloud or on-premises data warehouses, and be used by various reporting and analytics tools either directly or via other data storage systems.

  • 1.) How many OC San administrators are expected to maintain the system, and what technical background should we assume (LC-08)? 2.) Which training formats does OC San prefer for staff and external users (for example train-the-trainer, live sessions, recorded content), and have users worked with similar systems before (TRN-01)? 3.) Is ongoing support expected after go-live and the warranty period? If so, what service levels are expected? 4.) Does OC San use a ticketing system for logging issues that a respondent's support process should align with?

    1. OC San is interested in learning about the number of administrators, and which skills are needed to effectively maintain respondents’ systems. 2. OC San has not established any preference for training and is interested in learning about respondents’ available formats. 3. OC San has not established any specific requirements related to support service levels and is interested in learning about respondents’ offerings. 4. OC San has not established any ticketing system requirements and is interested in learning about respondents’ ability to interface with ticketing systems.

  • 1.) Is there a target go-live date or a budget range OC San can share to help respondents size their estimates? 2.) For Section 17, would OC San like budgetary pricing for a single phase or a phased program? For how many years should recurring costs be shown? 3.) What quantities should pricing assume (internal users, external portal users, environments, storage)? 4.) Sections 5.2 and 5.3 ask for order-of-magnitude effort estimates and define Core and Additional priorities. Should estimates cover Core requirements only, or Core and Additional? 5.) How many OC San subject matter experts can take part in design workshops and user acceptance testing, and roughly how many hours per week can they give (IMP-01, IMP-07)?

    1. OC San does not have a specific budget or go-live date in mind at this time. RFI responses will be used as part of future planning. 2. OC San is interested in one-time costs for implementation, as well as annual recurring costs. 3. Internal users - 50 total; External - Between 1,000 and 10,000; at least 3 environments; storage unknown but at least 150GB. 4. OC San is interested in both Core and Additional, as applicable to respondents’ system. 5. OC San is interested in learning about the number of subject matter experts and hours are needed to effectively implement respondents’ systems.

  • 1.) Are there dependencies outside this project that could affect the timeline, such as planned upgrades to connected systems, security reviews or procurement steps? 2.) Will OC San invite selected respondents to demonstrate the Appendix B use cases, and if so, when?

    1. OC San expects to have this information available for a possible future RFP. 2. OC San is open to demonstrations of Appendix B use cases. If Respondents have demonstrations available, please include that information in Response.

  • Please identify the current systems and repositories expected to be replaced or integrated, together with estimated volumes for structured records, monitoring results, documents, attachments, communications, and historical audit data.

    The new system would replace iPACS by enfoTech and various paper/Excel-based processes. OC San has not established any data migration requirements.

  • For budgetary pricing, please provide estimated counts of internal users, field users, platform administrators, external organizations and users, annual submissions, peak concurrent users, storage, and expected transaction growth.

    Approximately: 1. 305 Class I users 2. 13 Class II users 3. 34 Special Purpose users 4. 46 Zero Discharge Certifications 5. 1,458 inspections FY 2025/26 6. 3,862 samples FY2025/26 7. 5,000 report submissions from users 8. Internal staff users - 50 9. External users - Between 1,000 and 10,000 70% growth estimated

  • Which laboratory, JD Edwards or other financial, Esri GIS, identity, document-management, payment, regulatory-reporting, and analytics interfaces are required for the initial deployment, and are current interface specifications and expected transaction volumes available?

    All systems must be integrated at initial deployment

  • Does OC San currently operate under an approved CROMERR implementation or shared service that the future solution may use, or should respondents assume that a new or amended CROMERR application and approval process will be required?

    OC San currently has a CROMERR-approved system and respondents should assume a new or amended CROMERR approval process.

  • Does OC San anticipate a phased implementation or minimum viable product, and if so, which programs, workflows, integrations, and data sets should be prioritized for the first production release?

    All systems must be integrated at initial deployment.

  • What devices do inspectors typically use in the field (for example, tablets, phones, laptops), and what are typical connectivity conditions at regulated facilities? Are there field activities beyond inspections, such as sampling or meter reading, that OC San expects to support on mobile devices?

    Inspection staff typically use laptops with connectivity, which includes sampling and meter reading with data entry into the laptops.

  • How does OC San currently perform compliance determinations and significant noncompliance (SNC) evaluations? Are these performed within the current system, or manually? What SNC time periods (rolling quarters, etc) are used for SNC determinations? Also, how is the annual report currently generated?

    The current PIMS performs compliance determinations by comparing results to concentration and mass limits for each permittee. SNC evaluations are conducted through an SSRS report and use a rolling 6 month evaluation period based on quarters. The annual pretreatment program report is generated in a word document, external to the current PIMS and using data from SQL queries.

  • Approximately how many regulated users submit reports electronically today, and what share of submissions arrive on paper or by email?

    Approximately 5,000 submissions are submitted annually by mail and fax. Email is not permissible.

  • For budgetary pricing (Section 17), what contract term should respondents assume (e.g., 5-year total cost of ownership)?

    OC San is interested in one-time costs for implementation, as well as annual recurring costs.

Plain text

OpenGov categories

  • 51 · Information
  • 5112 · Software Publishers
  • 51121 · Software Publishers
  • 511210 · Software Publishers
  • 518 · Data Processing, Hosting, and Related Services
  • 519 · Other Information Services
  • 54 · Professional, Scientific, and Technical Services