State and local · OpenGov
Construction Management Services for TRWQCF Primary Flotator Improvements Project
Description
The City of Turlock is requesting proposals from qualified firms to provide construction management services for City Project No. 25-058: Turlock Regional Water Quality Control Facility Primary Flotator Improvements Project. Proposals must be submitted before the deadline specified in the RFP. Qualified vendors should review the full RFP for submission requirements, scope of services, and evaluation criteria. SCOPE OF WORK The City invites you to submit a proposal for Construction Management Services for TRWQCF Primary Flotator Improvements Project services. All work must comply with applicable federal, state, and local laws and regulations. The scope of work includes, but is not limited to, the following: Scope of Services to be Provided by Construction Management Firm The scope of services outlined below represents the minimum to be provided by the CM consultant. Proposers are encouraged to suggest additions or modifications to the scope required in this section that will enhance and clarify the scope of work per the proposers experience, knowledge, and expertise. Consultants shall describe their approach to all tasks in the proposed scope of services. The scope of services provided by the CM consultant shall be provided beginning with the Notice to Proceed issued to the construction contractor through the Final Completion due date. It is estimated that the Notice to Proceed will be issued to the construction contractor in mid-January 2027 and Final Completion will be attained in July 2028. The scope of services to be provided by Construction Manager shall include the following: Agreement Documentation: Enter into and provide all required documentation specified in the sample agreement and provide said documentation within five (5) days of the approval of the agreement by the City Council. Internet Based Construction Document Management System: The Construction Manager shall provide an internet based construction document management system for use by the Engineer, Contractor, City Staff, and Construction Manager for the duration of the project. The internet based construction document management system shall be utilized for reviewing, approving, and viewing of all construction documentation for the duration of the construction contract and shall be utilized for project correspondence to the maximum extent possible. Consultant shall review the requirements of Section 01322 "Web-Based Construction Document Management System” of the attachment file for the construction project specifications. The Consultant shall use computer hardware and software that meets the requirements of the system. The system shall be the primary means of project document submission and management. At the conclusion of the project, the consultant shall provide all files saved to the system to City staff in the form of PDFs that are organized in a coherent file structure. Proposers are advised that City will allow access for the consultant to utilize Virtual Project Manager (VPM; www.new.virtual-pm.com ) at no cost to the consultant as the internet based construction management system, at consultant’s option. VPM is generally used by City for management of City’s capital improvement projects, though consultant will not be required to use VPM for this project if it would prefer to select another software platform in its place. At the conclusion of the project, the consultant shall provide all files saved to the system to City staff in the form of PDFs that are organized in a coherent file structure. Perform Duties of “Construction Manager” in the Construction Contract Documents: The successful consultant shall assume all responsibility for performing the work described to be performed by the “Construction Manager” in the construction project's bid documents. A copy of the construction contract bid documents are included as attachments to this RFP. Attention is directed to the construction project’s OpenGov landing page at https://procurement.opengov.com/portal/cityofturlock/projects/295270 . It is suggested that interested proposers perform a word search of “Construction Manager” of all construction contract specifications to assure that the submitted proposal captures all required work Contract Administration Manual : Prepare a contract administration manual which establishes procedures for administration of the construction contract. The manual must be consistent with the project specifications. Project Meetings : Participate in a meeting to establish a working understanding of a preliminary Progress Schedule, Schedule of Submittals, and Schedule of Values, and later a separate meeting to review these schedules for acceptability. Schedule, conduct, lead and document a pre-construction meeting, in coordination with the Design Engineer. Schedule, conduct, and document regularly scheduled construction progress meetings on a weekly basis. Provide a virtual option to participants for each meeting, such as Zoom, Microsoft Teams, Webex, or similar platform. Schedule, conduct, and document pre-installation meetings, pre-process start-up meetings, electrical and instrumentation coordination meetings, and close out meeting as required by project specifications. Meetings shall be held as per Section 01312 “Project Meetings” of construction document specifications in the attachment file. Construction Time Management: Construction Manager shall create and approve Weekly Statement of Working Days report (WSWD) in the web-based construction document management system on a weekly basis and include them in the regular progress meeting agenda packets. The statements shall include the working days and non-working days charged for the reporting week, any time adjustments, a work completion date with the remaining working days left in the contract and the controlling activities for the week. Escrow Bid Documents Review : Schedule the escrow bid document review meeting, lead the review of documents for conformance with specifications, and provide escrow services for storing the documents as described in the construction project specifications section “Escrow Bid Documents.” Review Photographic and Video Documentation : Contractor is required to provide photographic and video documentation per the contract specifications. CM consultant shall review contractor’s performance in pursuing this work and shall advise contractor of any deficiencies. Full-Time Inspection : Provide full-time field inspection of the work in progress on the site for conformance with the project plans and specifications with skilled and professional personnel. This task includes monitoring all construction work and documenting the work. Daily Scope of Services to be Provided by Others Carollo Engineers will provide Engineering Services During Construction (ESDC). ESDC services include, in general, the following items: Attend the pre-construction meeting Prepare conformed drawings and specifications and print hard copies for Contractor, City, and CM consultant use Attend construction progress meetings Provide submittal and shop drawing review Respond to Requests for Information (RFI), in coordination with the construction manager Provide supervisory control and data acquisition (SCADA) programming as needed Assist with startup of new facilities Conduct operations training Prepare record drawings in CAD using as-built drawings prepared by contractor and reviewed by the CM firm. City Staff shall perform the following functions for the project: If selected by the CM consultant, set up of the project in Virtual Project Manager, payment for use of VPM, and invitations to individuals who will collaborate on the VPM platform (City Engineering Staff, Contractor, Design Engineer, Construction Manager) Provide available records General support and assistance Attend project meetings Provide information related to City’s operations and maintenance of existing City-owned facilities Coordinate internal approvals for Contract Change Orders and the Notice of Completion Provide security access to the facility In addition to construction of the work, the construction contractor will provide the following: Field Office for CM : Temporary office space, office furniture, phone and data, and computers will be provided by the construction contractor for CM consultant’s use as per the project specifications. The field office will be located within the TRWQCF. See Section 01500 “Temporary Facilities and Controls” of the construction contract specifications for the full list of facilities to be provided by the construction manager. Internet Data Service : The construction contractor shall provide the CM consultant with internet data service as described in Section 01500 “Temporary Facilities and Controls” of the construction contract specifications. One (1) licensed copy of the contractor’s approved scheduling software INTRODUCTION The City of Turlock is requesting proposals from qualified firms to provide construction management services for City Project No. 25-058: Turlock Regional Water Quality Control Facility Primary Flotator Improvements Project. Proposals must be submitted before the deadline specified in the RFP. Qualified vendors should review the full RFP for submission requirements, scope of services, and evaluation criteria. BACKGROUND In the heart of California’s Central Valley, Turlock is the second largest city in Stanislaus County located 100 miles south of Sacramento, CA covering an area just over 16 square miles with a population of over 73,000. Turlock is a General Law City that operates under the Council/Manager form of government. The City of Turlock owns and maintains the Turlock Regional Water Quality Control Facility (TRWQCF), which treats wastewater from the City’s current population along with industries, businesses, California State University Stanislaus, the neighboring Community Service Districts of Denair and Keyes, and primary treated wastewater from the City of Ceres. The current permitted capacity of the TRWQCF is 20 MGD and is comprised of primary, secondary and tertiary treatment before being recycled for industrial cooling, irrigation purposes, the North Valley Regional Recycled Water Program or discharged into San Joaquin River. The facility has been constructed in multiple phases over a 50 year period. Several facilities related to flotation clarifier number 1 and 2, including flumes reconstruction, the air delivery systems, electrical motor control centers, sludge pumping system, grit conveyance pumps, yard piping, minor concrete, and asphalt concrete paving are in need of rehabilitation due to asset age and the corrosive environment of the TRWQCF. This project is intended to be funded solely through local funding sources without reliance on state or federal grants. Project plans and specifications have been prepared by Carollo Engineers for the subject project. Carollo Engineers will remain engaged in the project during construction as the engineer of record, by assisting City with bidding services and providing services during construction such as RFI and submittal review, and issuing design changes as needed given the conditions encountered during construction. Carollo Engineers will also provide the SCADA programming necessary to integrate the monitoring and operation of facilities included in the scope of work into the City’s SCADA system. City is in need of a qualified consultant to provide comprehensive construction management (CM) services. An agreement for construction is estimated to be approved by the City Council either concurrent with, or immediately before or after approval of an agreement for construction management services. City staff intend to not issue the Notice to Proceed to the contractor until the selected CM consultant agreement has been fully executed. City staff will work closely with Carollo Engineers and the selected CM consultant as a result of this RFP to provide proper oversight and management of the construction project’s progress. FORMAL PROPOSAL GUIDELINES Vendors are to provide the City with a proposal using the following guidelines: Each proposal must adhere to the following order and content of sections. Qualifications and Experience Provide a brief history of your business entity, years in business, and project team. Identify legal form, ownership, and senior officials of company. Identify the name and email of the main contact, including phone number and e-mail address, and the website address (if applicable). Include Unique Entity Identifier (SAM.GOV) If proposing a sub-consultant - describe the division of responsibilities between participating parties, and offices (location) that would be the primary participants. Describe professional experience and number of employees (licensed professionals, technical support) on the proposed project team. Methodology Section Provide a detailed description of the approach and methodology to be used to accomplish the Scope of Work of this RFP. The Methodology Section should include: An implementation plan that describes in detail the methods, including controls by which your firm or entity manages projects of the type sought by this RFP. Detailed description of efforts your firm or entity will undertake to achieve client satisfaction and to satisfy the requirements of the "Scope of Work" section. Detailed description of specific tasks you will require from City staff. Explain what the respective roles of City staff and your staff would be to complete the tasks specified in the Scope of Work. Proposers are encouraged to provide additional innovative and/or creative approaches for providing the service that will maximize time and cost-effective operations or increased performance capabilities. In addition, the City will consider proposals that offer alternative service delivery means and methods for services desired. Staffing Provide a list and resumes of individual(s) who will be working on this project, their relevant experience, and indicate the functions that each will perform and anticipated hours of service of each individual. Include the resumes and certifications through NACE and/or SSPC for the individuals proposed to provide coating inspection services. Similar Projects Provide a list of at least three (3) municipal/public agency references for similar services provided by your firm. The City reserves the right to contact any of the organizations or individuals listed. Information provided should include: Client Name Project Description Project start and end dates Client project manager name, telephone number, and e-mail address Fee Proposal All proposers shall submit a fee proposal that delineates tasks, hours, and cost for all staff working on the project. Proposals shall be valid for a minimum of 180 days following submission. PROCESS FOR SUBMITTING PROPOSALS Submission Process Proposals must be submitted electronically through the City's eProcurement Portal located at https://procurement.opengov.com/portal/cityofturlock . Proposal may be received up to, but no later than Monday, December 21, 2026 at 3:00 pm . The City eProcurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline, regardless of any technical difficulties, such as poor internet connections. City of Turlock strongly recommends completing your response well ahead of the deadline. The City reserves the right, without limitation and at its sole discretion, to accept or reject any or all proposals and/or terminate this RFP process at any time, for any reason, without notice and with no obligations. Vendor Questions and Clarifications All questions regarding this RFP must be submitted through the City's eProcurement Portal located at https://procurement.opengov.com/portal/cityofturlock . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City's eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. EVALUATION CRITERIA The City will screen and review all proposals according to the weighted criteria set forth below. While price is one basic factor for award, it is not the sole consideration. Please note that this RFP pertains to professional services, and the below referenced scoring rubric will be used as guidance only. Given the nature of the services, the City reserves the right to utilize its discretion in awarding the project. The City also reserves the right to negotiate pricing and contract terms. After reviewing the proposals, City Staff may conduct interviews with the top vendors. Staff will forward a recommendation to the City Council for final selection. The City reserves the right to reject all proposers and/or to invite other individuals and/or vendors to respond to this RFP if the proposals received are inadequate. Evaluation Criteria is as follows: SELECTION PROCESS The selection process will consist of three stages: Responsiveness Screening Proposals will first be screened to ensure responsiveness to the RFP. The City may reject as non-responsive any proposal that does not include the documents required to be submitted by this RFP. At any time during the evaluation process, the City reserves the right to request clarifications or additional information from any or all Proposers regarding their proposals. Proposal Review The Committee will review and score all responsive proposals based upon the Evaluation Criteria set forth above. The City may contact and evaluate the Proposer’s references, contact any Proposer to clarify any response or request revised or additional information, contact any current users of a Proposer’s services, solicit information from any available source concerning any aspect of a proposal, and seek and review any other information deemed pertinent to the evaluation process. Following conclusion of Phase 1 and Phase 2 of the evaluation process, the Committee will rank all Proposers according to the evaluation criteria set forth above. The Committee will conclude the evaluation process at this point, and make a recommendation for award. Negotiation Process Negotiations shall be confidential and not subject to disclosure to competing Proposers unless an agreement is reached. If contract negotiations cannot be concluded successfully within a time period determined by the City, the City may terminate negotiations and commence negotiations with the next highest scoring Proposer or withdraw the RFP. This process ensures that the awarded contract aligns with the City’s goals and proposal requirements. EX PARTE COMMUNICATIONS Proposers and Proposers’ representatives cannot communicate with the City Council members about this RFP. In addition, Proposers and Proposers’ representatives cannot communicate outside the procedures set forth in this RFP with an officer, employee or agent of the City, including any member of the evaluation panel, with the exception of the RFP Facilitator, regarding this RFP until after Contract Award. Proposers and their representatives are not prohibited, however, from making oral statements or presentations in public to one or more representatives of the City during a public meeting. A “Proposer” or “Proposer's representative” includes all of the Proposer’s employees, officers, directors, consultants and agents, any subcontractors or suppliers listed in the Proposer's proposal, and any individual or entity who has been requested by the Proposer to contact the City on the Proposer's behalf. CONFLICT OF INTEREST The Proposer warrants and re
Published attachments
OpenGov categories
- 95826 · Construction Management Services