Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Construction Manager-at-Risk for the Water Street Parking Garage Expansion Project

Description

The existing Water Street Garage, which currently provides close to 1,000 parking spaces, will be expanded to add approximately 250 net new spaces. This expansion is directly tied to one of the most significant developments in the city's history: the new Coast Guard Museum, currently under construction along New London's waterfront and slated to open in August 2027. Garage expansion construction is expected to break ground in the summer of 2027, with completion anticipated 12 to 18 months following groundbreaking — meaning the expanded facility will come online after the museum opens its doors. The museum is expected to draw over 300,000 visitors annually, and this garage expansion ensures the city will be ready to accommodate that demand with safe, modern, and convenient parking. Preconstruction Services Fee Construction Phase Services Fee - Construction Phase Services Profit (included in 2.) - Construction Phase Services Overhead (included in 2.) Construction Phase Services General Performance and Payment Bond – Identify the premium for 100% Performance and Payment Bond. Builders Risk Insurance - Identify the premium for Builders Risk Insurance. Other- you will need to identify any additional costs in the vendor submission forms section. Scope of Work CMAR for the Water Street Parking Garage Expansion Project See Attachments for Scope of Work. Introduction Summary & Special Instructions The existing Water Street Garage, which currently provides close to 1,000 parking spaces, will be expanded to add approximately 250 net new spaces. This expansion is directly tied to one of the most significant developments in the city's history: the new Coast Guard Museum, currently under construction along New London's waterfront and slated to open in August 2027. Garage expansion construction is expected to break ground in the summer of 2027, with completion anticipated 12 to 18 months following groundbreaking — meaning the expanded facility will come online after the museum opens its doors. The museum is expected to draw over 300,000 visitors annually, and this garage expansion ensures the city will be ready to accommodate that demand with safe, modern, and convenient parking. *Pre-proposal meeting is as follows: Join Zoom Meeting https://us06web.zoom.us/j/84423085884?pwd=9wFsoBqZWZw7wq3GR45oGwTvRhWCyS.1 Join and take notes https://us06web.zoom.us/j/84423085884?pwd=9wFsoBqZWZw7wq3GR45oGwTvRhWCyS.1&mynotes=on Meeting chat link https://us06web.zoom.us/launch/jc/84423085884 Meeting ID: 844 2308 5884 Passcode: 530691 One tap mobile +13017158592,,84423085884#,,,,*530691# US (Washington DC) +13052241968,,84423085884#,,,,*530691# US Join by SIP • 84423085884@zoomcrc.com Join instructions *Proposal opening is as follows: Join Zoom Meeting https://us06web.zoom.us/j/85673406955?pwd=J77yYJP6N22DxnCPHO1EeM4WEASbZT.1 Join and take notes https://us06web.zoom.us/j/85673406955?pwd=J77yYJP6N22DxnCPHO1EeM4WEASbZT.1&mynotes=on Meeting chat link https://us06web.zoom.us/launch/jc/85673406955 Meeting ID: 856 7340 6955 Passcode: 315275 One tap mobile +19292056099,,85673406955#,,,,*315275# US (New York) +13017158592,,85673406955#,,,,*315275# US (Washington DC) Join by SIP • 85673406955@zoomcrc.com Join instructions Timeline Release Project Date: October 28, 2026 Pre-Proposal Meeting (Non-Mandatory): November 4, 2026, 10:00am Join Zoom Meeting https://us06web.zoom.us/j/84423085884?pwd=9wFsoBqZWZw7wq3GR45oGwTvRhWCyS.1 Join and take notes https://us06web.zoom.us/j/84423085884?pwd=9wFsoBqZWZw7wq3GR45oGwTvRhWCyS.1&mynotes=on Meeting chat link https://us06web.zoom.us/launch/jc/84423085884 Meeting ID: 844 2308 5884 Passcode: 530691 One tap mobile +13017158592,,84423085884#,,,,*530691# US (Washington DC) +13052241968,,84423085884#,,,,*530691# US Join by SIP • 84423085884@zoomcrc.com Join instructions Question Submission Deadline: November 11, 2026, 2:00pm Response Submission Deadline: December 1, 2026, 2:30pm Submission of Proposals Response Submission Submit Electronic Responses via the City of New London's e-Procurement Portal https://procurement.opengov.com/portal/newlondonct Questions Bidders shall submit all inquiries regarding this bid via the City of New London's e-Procurement Portal, located at https://procurement.opengov.com/portal/newlondonct . Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the City of New London's e-Procurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Addenda Notification and Acknowledgement Addenda Notification: Bidders are required to register for an account via the e-Procurement Portal hosted by OpenGov. Once the bidder has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at https://procurement.opengov.com/portal/newlondonct Submission of Proposals All Invitation for Bids issued by the City of New London (City) will bind Proposers to the terms and conditions listed below, unless specified otherwise in any individual Invitation for Bids . Incorporated by reference into this contract are the provisions of Article IV., Section 2-66 through 2-71 and Section 2-73 of the Code of Ordinances of the City of New London. The contractor agrees to comply with the Code of Ordinances as they exist on the date of the contract and as they may be adopted or amended from time to time during the term of this contract and any amendments thereto. 1. Proposals must be submitted on forms supplied by the City of New London or in the format requested in the specifications. Telephone, facsimile or e-mail proposals will not be accepted in response to a Invitation for Bids . 2. The date and time proposals are to be opened are given in each Invitation for Bids issued. Proposals received after the specified date and time of the proposal opening given in each Invitation for Bids will not be considered. 3. Incomplete proposal forms may result in the rejection of the proposal. Amendments to proposals received by the Purchasing Agent after the date and time specified for the proposal opening shall not be considered. Proposals shall be computer prepared, typewritten or handwritten in ink. Proposals submitted in pencil shall be rejected. A person duly authorized to sign proposals for the proposer shall sign all proposals. Unsigned proposals shall be rejected. 4. Conditional proposals are subject to rejection in whole or in part. A conditional proposal is defined as one that limits, modifies, expands or supplements any of the terms and conditions and/or specifications of the Invitation for Bids . 5. Alternate proposals will not be considered. An alternate Proposal is defined as one that is submitted in addition to the proposer’s primary response to the Invitation for Bids . 6. Prices shall include delivery and transportation charges fully prepaid by the Contractor to the destination specified in the Invitation for Bids and subject only to cash discount. 7. Pursuant to Sections 12-412 and 12-412(1) of the Connecticut General Statutes, the City of New London is exempt from the payment of excise, transportation and sales taxes imposed by the Federal Government and/or the State. Such taxes must not be included in the proposal prices. 8. In the event of a discrepancy between the unit price and the extension, the unit price shall govern. 9. By its submission the Proposer represents that the proposal is not made in connection with any other Proposer submitting a proposal for the same commodity or commodities and is in all respects fair and without collusion or fraud. 10. All proposals will be opened virtually via OpenGov and ZOOM. The ZOOM link is Join Zoom Meeting https://us06web.zoom.us/j/85673406955?pwd=J77yYJP6N22DxnCPHO1EeM4WEASbZT.1 Join and take notes https://us06web.zoom.us/j/85673406955?pwd=J77yYJP6N22DxnCPHO1EeM4WEASbZT.1&mynotes=on Meeting chat link https://us06web.zoom.us/launch/jc/85673406955 Meeting ID: 856 7340 6955 Passcode: 315275 One tap mobile +19292056099,,85673406955#,,,,*315275# US (New York) +13017158592,,85673406955#,,,,*315275# US (Washington DC) Join by SIP • 85673406955@zoomcrc.com Join instructions . Guaranty or Surety Bid bonds, performance bonds, and labor and material bonds will be required as specified below. Guaranty or surety may be in the form of certified check. Bonds must meet the following requirements: Corporation – must be signed by an official of the corporation above their official title and the corporate seal must be affixed over the signature; Firm or Partnership - must be signed by all of the partners and indicate they are “doing business as”; Individual – must be signed by the owner and indicated as “Owner”. The surety company executing the bond or countersigning must be licensed in Connecticut and an official of the surety company must sign the bond with the corporate seal affixed over the signature. Signatures of two (2) witnesses for both the principal and the surety must appear on the bond. Power of attorney for the official signing the bond for the surety company must be submitted with the bond. Bid Bond – NOT REQUIRED FOR THIS PROJECT. Ten percent (10%) due at time of bid for all contract services and public works/construction projects that exceed twenty thousand dollars ($20,000.00) Performance Bond – REQUIRED ONCE GMP IS ESTABLISHED. One hundred percent (100%) of contract price for projects that exceed fifty thousand dollars ($50,000.00). Labor and Material Payment Bonds – REQUIRED ONCE GMP IS ESTABLISHED. One hundred percent (100%) of contract price for projects that exceed fifty thousand dollars ($50,000.00). Award 1. Award of this contract will be made to the lowest responsible, qualified proposer and will be based on net cost and City specifications. The City of New London reserves the right to reject any and all bids or parts thereof, to waive any informality and to award this contract to other than the low proposer and to make multiple awards if deemed in the best interest of the City. 2. The City of New London may reject any bidder in default of any prior contract or guilty of misrepresentation or any bidder with a member of its firm in default or guilty of misrepresentation. 3. The Purchasing Agent may correct inaccurate awards resulting from clerical or administrative errors. Other Requirements 1. The City has an employment preference goal that jobs be offered to local residents on public prevailing wage projects with thresholds great than $100,000 for renovation and $1,000,000 for new construction. For such projects, it is understood that contractors shall make a good faith effort to employ a participating workforce comprised of twenty-five (25%) local residents of New London County, CT, with residents of the City of New London, CT getting a priority representing fifty percent (50%) of said participation, which will include twenty-five percent (25%) female and minority. 2. The City has an employee training preference goal that apprenticeship opportunities be made available for state licensed trades on public prevailing wage projects with thresholds greater than $100,000 for renovation and $1,000,000 for new construction. For such projects, it is understood that contractors shall make a good faith effort to employ a minimum of ten percent (10%) of the workforce per state licensed trade as apprentices and, of this number, a minimum of fifty percent (50) shall be in the first year of apprenticeship training. Contract 1. The existence of a contract shall be determined in accordance with the requirements set forth above. 2. The Contractor shall not assign or otherwise dispose its contract or its right, title or interest, or its power to execute such contract to any other person, firm or corporation without the prior written consent of the City of New London. 3. Failure of a Contractor to deliver commodities or perform services as specified will constitute authority for the City of New London to purchase these commodities or services on the open market. The contractor agrees to promptly reimburse the City of New London for excess cost of these purchases. The purchases will be deducted from the contracted quantities. 4. The Contractor agrees to hold the City of New London harmless from liability of any kind for the use of any copyrighted or uncopyrighted composition, secret process, patented or unpatented invention furnished or used in the performance of the Contract; Guarantee its products against defective material or workmanship; repair damages of any kind, for which it is responsible to the premises or equipment, to its own work or to the work of other contractors; obtain and pay for all licenses, permits, fees etc., and to give all notices and comply with all requirements of the City of New London, the State of Connecticut and the U.S. Government. 5. The Contractor shall procure and maintain at their own expense, insurance of the types specified below, and in the amounts, as set forth herein. All insurance shall be carried with insurers authorized to do business in the State of Connecticut. Certificates of Insurance and/or actual policy and endorsement copies that are satisfactory to the City shall be filed in triplicate with the City before operations are begun and shall be endorsed to name the City of New London as Additional Insured on a primary and non-contributory basis per contract to all policies except Workers’ Compensation. The City expressly retains the right via endorsement to recover and/or subrogate for any and all damages caused by or resulting from the products or work of the Contractor or subcontractors on all policies, excluding Workers’ Compensation and Professional Liability. All policies shall be endorsed to include a Waiver of Subrogation in favor of the City of New London and shall contain a clause granting at least thirty (30) days prior written notice to the City of New London of intent to affect cancellation, non-renewal, or other material change which may have an adverse effect on the policies. The Contractor shall defend, indemnify, and hold the City of New London harmless from and against any claims that arise from the Work and Project to the fullest extent permitted by law. Insurance shall be in such forms as will protect the Contractor from all claims and liability for damages for bodily and personal injury, including accidental death, and for property damage, which may arise from operations under the Contract, whether such operations be by themselves, their subcontractors, or by anyone directly or indirectly employed or engaged by them. Insurance shall be written with Carriers approved in the State of Connecticut and with a minimum AM Best’s Rating of “A-“ VIII. In addition, all Carriers are subject to approval by the City of New London. If any policy is written on a “Claims Made” basis, the policy must be continually renewed for a minimum of two (2) years from the completion date of this contract. If the policy is replaced and/or the retroactive date is changed, then the expiring policy must be endorsed to extend the reporting period for claims for the policy in effect during the contract for two (2) years from the completion date. The following types of insurance shall be provided before starting and until final completion and acceptance of the Work and expiration of the guarantee period provided for in the Agreement. Liability Insurance: Minimum Coverage and Limits. The combined single limit of liability as respects bodily injury, personal injury, and property damage liability shall be as follows: Comprehensive General Liability Each Occurrence: $2,000,000 Aggregate: $2,000,000 Products/Completed Operations Aggregate: $2,000,000 Products/Completed Operations Aggregate: $1,000,000 Comprehensive Automobile Liability (including owned, borrowed, hired and non-owned) Any One Accident: $1,000,000 Professional Liability Each Occurrence: $5,000,000 Excess/Umbrella Liability Each Occurrence: $10,000,000 Workmen’s Compensation Insurance and Employer’s Liability Insurance. The Contractor shall procure and maintain at his own expense, worker’s compensation insurance as required by the appropriate worker’s compensation law or act. The policy shall be written in accordance with the statutory provisions of the State of Connecticut, and shall include a broad form “all states” endorsement in the event the operations require any interstate involvement as respects employers-employee relationship. WC Statutory Limits Employers’ Liability Each Accident $1,000,000 Employers’ Liability Disease Each Employee $1,000,000 Employers’ Liability Disease Policy Limit $1,000,000 Builder’s Risk Insurance, including coverage for damages to any existing buildings or contents, that shall remain in-force at all times during the contract at replacement cost. Property Damage Insurance for operations and completed operations and Contractor’s Protective Property Damage Insurance, each including coverage for injury to or destruction of wires or pipes and similar property and appurtenant apparatus and the collapse of or structural injury to any building or structure except those on which work under the Contract is being done. Blasting and explosion coverage shall be obtained if there is a need for blasting under the Contract, and no blasting shall be performed until such insurance has been secured. The Delivery 1. All products and equipment delivered must be new unless otherwise stated in the proposal specifications. 2. All deliveries will be to the locations specified by the City of New London. The City of New London does not have a loading dock therefore all Contractors will be responsible for inside delivery without assistance from City of New London personnel. 3. Payment terms are net 45 days after receipt of goods or invoice, whichever is later, unless otherwise specified. 4. Charges against a Contractor shall be deducted from current obligations. Money paid to the City of New London shall be payable to the Treasurer, City of New London. Saving Clause The Contractor shall not be liable for losses or delays in the fulfillment of the terms of the contract due to wars, acts of public enemies, strikes, fires, floods, acts of God or any other acts not within the control of or reasonably prevented by the Contractor. The contractor will give written notice of the cause and probable duration of any such delay. Advertising Contractors may not reference sales to the City of New London for advertising and promotional purposes without prior approval of the City of New London. Rights 1. The City of New London has sole and exclusive right and title to all printed material produced for the City of New London and the Contractor shall not copyright the printed matter produced under this contract. 2. The Contractor assigns to the City of New London all rights, title and interests in and to all causes of action it may have under Section 4 of the Clayton Act, 15 USC 15, or under Chapter 624 of the Connecticut General Statutes. This assignment occurs when the contractor is awarded the contract. 3. The Contractor agrees that it is in compliance with all applicable federal, state and local regulations, including but not limited to Connecticut General Statutes Section 7-148i. The Contractor also agrees that it will hold the City of New London harmless and indemnify the City of New London from any action which may arise out of any act by the Contractor concerning lack of compliance with these laws and regulations. All purchases will be in compliance with Sectio

Published attachments
Addenda and notices
  • Official Notice #1: Recording of pre-proposal conference · 1

  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Please confirm whether or not CGS § 4a-100 prequalification applies to this project.

    This does apply to this project.

  • Section 3, page 7, of the 13-page RFP states that a bid bond is not required for this project. However, Sections 6.4.7 (page 17) of the 26-page CMAR Scope of Work require a 5% security/bid bond with the proposal submission. Could the City please clarify whether a security/bid bond is required at the time of proposal submission? If required, please confirm the applicable bond percentage and calculation basis.

    A 10% bid bond based upon the proposed fee is required for this project.

  • Please clarify the required preconstruction services, including the number of estimates and associated design milestones (e.g., 90% CDs and GMP).

    Estimates needed for 90% and Final VE prior to Bid Documents hitting the market. GMP will be based on final bid values.

  • Please provide the anticipated construction hard cost budget to establish a consistent basis for fee proposals and ensure comparable submissions.

    Hard Cost for Construction has an estimated value of $20 Million based on current Municipal, State, and Federal Grants and Bonds.

Plain text

OpenGov categories

  • 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
  • 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
  • 91400 · Construction Services, Trade (New Construction)
  • 96800 · Public Works And Related Services