The City of Cape Coral was incorporated in 1970 and operates under the Council/City Manager form of government. The City Council has eight members consisting of the mayor and seven members all elected at large on a nonpartisan basis. City Council is responsible for all policy-making functions of the government and retains the services of a City Attorney, City Auditor and City Manager. The City Manager is responsible for all administration of the City, which provides a comprehensive range of municipal services including general government, public safety, community services, public works, planning, utilities, and parks and recreation. Cape Coral is the 8th largest city by population and the 3rd largest by land mass in Florida. Cape Coral currently has a population of more than 200,000 residents and is experiencing high growth. As a pre-platted community, Cape Coral could have more than 360,000 residents at buildout. The city has a sub-tropical lifestyle with thousands of waterfront residential properties on almost 400 miles of canals. About two-thirds of these canals provide boaters with direct access to the Gulf of Mexico. Table 1 Mobilization and Demobilization (Not to exceed 3% of Total Construction Cost - Lines 2.03A-2.06R) Maintenance of Traffic (Not to exceed 0.5% of Total Construction Cost - Lines 2.03A-2.06R) Site Preparation -- Construction Stakeouts and Surveying Site Preparation -- Site Clearing and Demolition (including Removal of Existing Buildings) Site Preparation -- Excvavation Filling and Rough Grading to Proposed Grades Site Preparation -- Best Management Practices Facilities -- Skate Park Buidling Facilities -- Previous Stabilized Fire Department Access Facilities -- Concrete Sidewalk (4" thickness) Facilities -- Chainlink Fencing Facilities -- Six (6) Foot Single Swing Pedestrian Gate Site Utilities -- Connect to Existing Potable Water Service Site Utilities -- Two (2) inch HDPE Potable Water Services Site Utilities -- Connect to Existing Sanitary Service Site Utilities -- Six (6) SOR 26 PVC Sanitary Service Landscaping -- Gumbo Limbo Landscaping -- Pigeon Plum Landscaping -- Seagrape Landscaping -- Buttonwood Landscaping -- Dahoon Holly Landscaping -- Bald Cypress Landscaping -- American Beauty Berry Landscaping -- Dwarf Clusia Landscaping -- Crinum Lilly Landscaping -- Fire Bush Landscaping -- Red Ixora Landscaping -- Pink Muhly Landscaping -- Saw Palmetto Landscaping -- Walters Viburnum Landscaping -- Provista St Augustine Grass Landscaping -- Remove Existing Mahogany Landscaping -- Irrigation System Pressure and Flow Testing Landscaping -- Modify and Retrofit Exisitng Irrigation System Scope of Work THE REQUIREMENT The Work to be performed consists of the furnishing of all labor, materials, and equipment, and the performance of all Work included in this Contract. The summary of the Work is presented in Section 01 1000: SUMMARY THE SPECIFICATIONS The specifications and requirements are provided in the Attachment labeled Front-End Documents, Attachment Labeled Technical Specifications, and the Plans & Calcs Attachments. THE WORK The Work is comprised of the construction of a proposed building project to construct approximately 3,870 square feet comprising of : office space, multipurpose rooms, a concession area and a pro shop along with areas for storage and building support services. Legal Notice - ITB The City of Cape Coral, Florida, is seeking bids for Construction of Building at Eagle Skate Park , in accordance with 2026-ITB-PW-055-MR , in the State of Florida. A copy of the Invitation to Bid (ITB) Documents may be obtained online at https://procurement.opengov.com/portal/capecoralfl . Register to receive notifications of future opportunities and to view current solicitations. Sealed Bids will be publicly opened at Cape Coral City Hall, 1015 Cultural Park Blvd, Cape Coral, FL 33990 . The name of bidders responding to this bid and total bid dollar amount will be read at the bid opening. BIDS ARE DUE BY : 2:00 pm , Friday, December 18, 2026 - via Electronic Bid Platform (OpenGov) BIDS WILL OPEN: 02 :30 pm, November 20, 2026 - City Hall, 2 nd Floor, Room 252 NOTE: No questions will be accepted after 2:00 pm , Wednesday, December 2, 2026 , and all questions must be submitted through OpenGov at https://procurement.opengov.com/portal/capecoralfl . BIDS MUST BE RECEIVED ELECTRONICALLY ON THE BIDDING PLATFORM OPENGOV NO LATER THAN 2:00 pm , Friday, December 18, 2026 , BIDS SUBMITTED AFTER THAT TIME WILL NOT BE ACCEPTED. Pursuant to Florida State Statute 119.071 (2) Sealed bids, proposals or replies received by an agency pursuant to a competitive solicitation are exempt from s. 119.071(1) and s. 24(a), Art. I of the State Constitution until such time as the agency provides notice of intended decision or until 30 days after opening the bids, proposals, or final replies, whichever is earlier. BID SECURITY DOCUMENT(S) MUST BE INCLUDED WITH THE ELECTRONIC SUBMISSION PER THE DIRECTIONS LISTED IN THIE SOLICITATION. THE ORIGINAL(S) WILL BE REQUESTED FROM THE AWARDED CONTRACTOR PRIOR TO CONTRACT EXECUTION. The City reserves the right to reject any or all bids, award in whole or in part and to waive any irregularities or informalities when in the best interest of the citizens of the City of Cape Coral. By Order of the City Manager Kimberly Bruns, City Clerk MMC Released Date: Friday, October 2, 2026 Definitions Included in this section is a list of all definitions utilized by the City. Not all definitions will be utilized or apply to every solicitation issued. Definitions Addenda are issued electronically prior to the closing of solicitations which clarify, correct, or change the solicitation Requirements of the Contract Documents. Additional Services : The term “Additional Services” shall refer to such services as the City may request and authorize, in writing, that the Supplier or Program Manager (PM) perform relative to an Agreement which has not been identified in the original Scope of Services. Additional services shall be authorized by the execution of both Parties of an Agreement as a "Change Order", "Amendment" or "Work Authorization" when Work Authorizations apply. Agreement : The written contract between City and Contractor covering the work to be performed; other Contract Documents are attached to the Agreement and made a part thereof as provided therein. ARCHITECT/ENGINEERING (A/E) for this solicitation shall hereafter refer to City and/or City’s Engineering staff. Bid: The offer or proposal of the bidder setting forth the prices for the work to be performed. Also referred to as “e-bid” or electronic bid. Change Order : Document recommended by A/E (which is signed by Contractor and/or Owner and authorizes an addition, deletion or revision in the work, or an adjustment in the Contract Price or the Contract Time. City: Shall be understood as referring to the City of Cape Coral, Florida. City Representative : The term “City Representative” shall mean the person designated by the City (or their designee) to act on the City’s behalf with respect to the Program or Project and be the primary point of contact. Consultant: Provider of Services, can also be referred to as Proposer, FIRM, Consultant, Contractor or Awarded Firm. Construction Documents : The term “Construction Documents” shall mean the written specifications, design drawings and other specified documents that provide the requirements of construction provided under an agreement or Work Authorization. Contract Administrator : Wherever in the Contract the word “Contract Administrator” is used it shall be understood as referring to the Contract Administrator of the Owner, acting personally or through any assistants duly authorized in writing for such by the Owner. Contract Documents are the agreement, Addenda, Contractor’s response, except when it conflicts with any other contractual provision, the Notice to Proceed, the Bonds, this solicitation Package, these General Conditions, the Specification and Drawings, any Special Conditions, together with all Written Amendments, Change Orders, Work Change Directives or Field Orders. Contract Duration : The term “Contract Duration” shall mean the for agreed upon calendar days that are specified in the agreement or Work Authorizations. Can also be referred to as “Contract Time”. Contract Price is the monies payable by the City to the Contractor for completion of the work in accordance with the Contract Documents as stated in the Agreement or Work Authorization. Contract Time is the number of calendar days or the dates stated in the Agreement or Work Authorization. Contractor: Shall be understood as referring to the individual, corporation, or partnership whose name appears on the Contract. Days : As used in this Agreement, the term “days” means calendar day unless expressly stated otherwise Design-Build Firm: Provider of Services, can also be referred to as Proposer, FIRM, Consultant, Contractor or Awarded Firm Effective Date of the Agreement is the date indicated in the Agreement or Work Authorization on which it becomes effective, but if no such date is indicated it means the date on which the Agreement or Work Authorization is signed by the last party. Facility : The term “Facility” is defined as any City owned property. Final Completion : The term “Final Completion” is defined as the point when the full scope of work associated with any agreement or Work Authorization (WA) has been fully completed. Guaranteed Maximum Price : The term “Guaranteed Maximum Price (GMA)” is defined as the contractual cost established by the Contractor or Program Manager and accepted by the City for an agreement or Work Authorization (WA). MBE/WBE/SBE: Minority Business Enterprise/Women Business Enterprise/Small Business Enterprise. A certified minority business enterprise is defined by Florida Small and Minority Business Assistance Act of 1985. If applicable, the primary proposing firm should submit the Certified Minority Business (MBE – Minority Business Enterprise/WBE - Women Business Enterprise/ SBE – Small Business Enterprise) certification documentation. Notice to Proceed : The term “Notice to Proceed (NTP)” is defined as written notification by the owner or representative to start work and establishes the commencement of time for the agreement or Work Authorization (WA). Owner : Wherever in the Contract Documents the word “ Owner ” is used it shall be understood as referring to the City. Program : The term "Program" is all planning, budgeting, administration, scheduling, inspection, coordination, management, permitting, design, construction management, construction, and start-up services associated with all of the individual Work Authorizations to be identified and authorized in order to implement the Program, to the extent authorized by the City pursuant to this Agreement. Program Manager : The term “Program Manager” (PM) shall refer to the business entity which the enters into this agreement with the City and is responsible for all services required of this agreement or Work Authorization. Program Team : The term “Program Team” shall refer to the PM and its consultants, contractors and the City. Quote: The offer or proposal of the quoter setting forth the prices for the work to be performed or goods to be purchased. Also referred to as “e-bid” Submission of Bids It is imperative that the information submitted is precise, clear, and complete. All responses are to be submitted by uploading to OpenGov website and completing the Line Items located under the Line Items section. Responses not conforming to this format may be disqualified from further consideration. All information requested must be submitted. Failure to submit all information or responses which are substantially incomplete or lack key information may be rejected at the CITY’s discretion. Bids submitted without meeting ALL the requirements may be considered non-responsive. Solicitation Specifics Responses to Remain Effective Responses shall be effective for 120 days from Bid Opening Date or the Proposal Closing Date, and thereafter if accepted by the City for the term designated in this solicitation. By submitting a response you are in agreement with this timeframe. Contract Time The number of calendar days after the stipulated date of commencement in the Notice to Proceed within which, or the date by which, the Work is to be completed (the Contract Time) is set forth below and will be included in the fully executed Agreement. This contract will be for 365 calendar days for substantial completion and 395 calendar days for final completion from the commencement date indicated in the Notice to Proceed. License Requirement It is required that the respondent hold a valid Florida General Contractors license through the State of Florida to perform the work and have a local competency license and also be registered in the City of Cape Coral. Respondent will attach copies of the documents as proof of qualifications. Liquidated Damages The work to be performed under this Agreement may be subject to liquidated damages as identified in the technical specifications. The Contract time will commence on the day indicated in the Notice to Proceed. A formal Notice to Proceed shall be issued within thirty (30) days after the Effective Date of the Agreement. Liquidated damages will be assessed in the amount of $ 1,685 per calendar day for each day that the contract is not completed within 395 calendar days of the commencement date indicated in the Notice to Proceed. - Any work not completed beyond the completion date indicated in the contract: $ 1,685 per calendar day. Line Item Acknowledgement Line Items are used for obtaining pricing for both Bids and Request for Proposals. Line Items Entry is Required. All Line Items have been created under the Line Items Section. Suppliers MUST enter amounts for the Line Items directly in this section for their submission to be accepted. Bid Form (if provided) is NOT a Substitute. Uploading or Submitting a completed Bid Form (if provided) DOES NOT replace the requirement to enter amounts for Line Items. Ensure to enter line items amounts under the Line Items Section prior to submitting. Mobilization/Demobilization Costs are Not-to-Exceed 3% of base bid (total of line #'s 2.03 through 2.06 R ) Maintenance of Traffic Costs are Not-to-Exceed 0.5 % of base bid (total of line #'s 2.03 through 2.06R ) Line Items Supplier Acknowledgements Review the following items and confirm, provide additional information or upload the required completed document provided.
Published attachments
- Front-End Documents - 2026-ITB-PW-055-MR
- Technical Specifications - 2026-ITB-PW-055-MR
- Construction Plans - 2026-ITB-PW-055-MR
- Electrical Plans - 2026-ITB-PW-055-MR
- Plumbing Plans - 2026-ITB-PW-055-MR
- Mechanical Plans - 2026-ITB-PW-055-MR
- Structural Plans - 2026-ITB-PW-055-MR
- Site Landscape Calculations - 2026-ITB-PW-055-MR
- Energy Calcs - 2026-ITB-PW-055-MR
- Cape Coral Eagle Skate Park - 2026-ITB-PW-055-MR
- Construction_of_Building_at_Eagle_Skate_Park_(Addendum_#4_Revision).pdf
Addenda and notices
Addendum #1 · 1
Addendum #1 - 2026-ITB-PW-055-MR - Construction of Building at Eagle Skate Park - Issued to extend the due date to November 10,2026 at 2:00PM (EST) Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Addendum #2 - 2026-ITB-PW-055-MR - Construction of Building at Eagle Skate Park - Issued to extend the due date to November 20, 2026 at 2:00PM (EST)
Addendum #3 · 3
Addendum #3 is being issued to extend the closing date Until December 11, 2026 at 2:00PM ET. Questions will be answered with Addendum #4. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
Addendum #4 to answer questions.
- Executed Addendum#4 - 2026-ITB-PW-055-MR
- Attachment 1 - REVISED 00020 Legal Notice - 2026-ITB-PW-055-MR
- Attachment 4 - REVISED - Cape Coral Eagle Skate Park - 2026-ITB-PW-055-MR
- Attachment 3 - REVISED - Technical Specifications - 2026-ITB-PW-055-MR
- Attachment 2 - REVISED 00300 Bid Form - 2026-ITB-PW-055-MRpdf
Public questions and answers
The portal is saying bids due Nov 3 and the front end docs are saying October 28th. Please clarify.
Refer to Addendum #3 located in the "Addenda & Notices" Tab.
On the included "Front End Documents' document, the legal notice calls the question deadline 2pm on October 13, 2026. The legal notice included in the "Construction of Building at Eagle Skate Park" document and on OpenGov the question deadline is listed as 2pm on October 16, 2026. Please clarify which deadline for questions is correct.
Refer to Addendum #3 located in the "Addenda & Notices" Tab.
On the included "Front End Documents' document, the legal notice calls the bid due date 2pm on October 28, 2026. The legal notice included in the "Construction of Building at Eagle Skate Park" document and on OpenGov the bid due date is listed as 2pm on November 3, 2026. Please clarify which bid due date is correct.
Refer to Addendum #3 located in the "Addenda & Notices" Tab.
We do not see any pre-bid information listed but want to confirm there is in fact no pre-bid scheduled.
Refer to Addendum, #3 located in the "Addenda & Notices" Tab.
Open Gov indicates Due Date of Tuesday November 3, 2026 @ 2:00 PM. Front End Documents 2026-ITB-PW-055-MR indicates bids are due October 28, 2026 @ 2:00 PM. Please confirm which bid due date is correct.
Refer to Addendum, #3 located in the "Addenda & Notices" Tab.
Open Gov indicates question due to is Friday, October 16, 2026 @ 2:00 PM. Front End Documents 2026-ITB-PW-055-MR indicates questions are due October 13, 2026 @ 2:00 PM. Please confirm which question date is correct.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
It seems architectural drawing set is missing from the list of provided drawings.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Could you please confirm the budget.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
The Legal Notice indicates the bid due date is 10/28/2026. This website indicates bid date is 11/3/2026. Which is the correct bid date? Thank you.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Is there a Geotech report available?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Not seeing a changing station on the accessory schedule, may be required. Please advise if we should exclude.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Paragraph 7.06.A.4 states: “Contractor must perform no less than fifty (50%) of the total value of the Work less ‘Mobilization/Demobilization,’ ‘General Requirements,’ and specified ‘Allowances’ utilizing Contractor’s own employees.” Our company is interested in submitting a bid for this project; however, as a construction management company, we anticipate that a significant portion of the Work would be performed by qualified subcontractors across the various required trades. Please clarify whether the 50% self-performance requirement stated in Paragraph 7.06.A.4 is applicable to this project and, specifically, whether the requirement applies to the prime contractor/construction manager performing the Work with its own employees. The project includes numerous trades such as Concrete, Sitework, HVAC, Plumbing, Electric, & finishes that are typically subcontracted by all GCs. Please advise if this requirement can be removed/adjusted to allow all work to be subcontracted under a prime GC.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Per Sheet C-2.0, there are (2) existing structures (trailers) shown inside the project area. Please advise if these structures will be removed by others prior to the start of construction. Or shall bidders include the removal of the structures (trailers) in their bids?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Please advise if a Fire Alarm system is to be included in the new building construction.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Per Low Voltage Cabling Note on sheet E0.1 states "ALL LOW VOLTAGE CABLING, DEVICES, ETC. INCLUDING TELEPHONE, TELEVISION, DATA ETC. IS NOT INCLUDED ON THESE CONSTRUCTION DOCUMENTS AND SHALL BE UNDER SEPARATE PERMITS. COORDINATE WITH OWNER AND CONSTRUCTION MANAGER." Per Low Voltage Distribution key on sheet E0.1, Card Readers and Security cameras are referenced to be installed which conflict with the Low Voltage note stated above. Please clarify the Low Voltage Scope of work that is to be included by all bidders. If so, please provide all applicable specifications required.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
The finish schedule identifies CT-1 as Trinity Tile Group, Blue Ridge Collection, Clean Step Texture, Color 2267 Brown, 24" x 24". This product does not appear to be currently available through the manufacturer's/distributor's published product information. Please confirm whether CPT-1 is still available and provide a current product number/source or if an equivalent alternate carpet tile meeting the specified performance requirements would be approved.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Power sheet E2.0 indicates keynote 5 multiple times which indicates (3) ¾” spare conduits; Is the quantity per keynote occurrence or a total project allowance?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Will the project allow alternates/equals to the Energy Harness lighting package?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Will there be a preconstruction meeting? Is it mandatory?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Is there an engineer's estimate or city budget?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
On A5.1, detail 10, it shows a concealed countertop support bracket, but on the outside of detail 10 it does not look like they show any supports. Should this have the same support or subbase? On A3.1, detail 6, is the long counter to the left of the sink also stainless steel? On A3.2, detail 4, it shows a 4" backsplash. Is this true for all counter sides that butt against the walls?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
The civil plans do not show the electric service route. We are assuming it runs underground along the north grass strip next to the new water service, please confirm. Keynote 11 calls for (2) 2" fiber conduits to the "nearest connection point." Where is that point, and/or about how far? Keynote 6 calls for (3) 1" spare conduits to an exterior in-grade hand hole. The hand hole location is not shown. Where does it go, and who furnishes it?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Spec 2.01 calls for EMT. Is MC cable acceptable for branch circuits and fixture to fixture runs above the ceiling? Panel M shows surface mounted and Panel A shows flush, both in MEP 109. Please confirm.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Will a Fire Alarm be required on this project? None is shown on the drawings or specifications.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Please provide the specifications for the proposed chain-link fence and single-swing gate shown on C-4.0, including fence height, mesh size/gauge, framework sizes, finish/coating, and gate size/hardware. The proposed fence ties into the existing chain-link fence; please advise if the new fence and gate are to match the existing fence.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
This project includes a requirement that Contractor must perform at least 50% of the Work with its own employees. This will exclude many contractors from bidding. Will this requirement be enforced. If so, please consider reducing the percentage to 10%.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
The ITB documents reference the Jessica Lunsford Act and required compliance. To my knowledge, this wouldn’t apply as the project is not on school grounds. Is compliance with the Jessica Lunsford Act required for this project?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
B 26.02 states the project is partially grant funded with grants "shown as separate attachments," and the Bid Form indicates federal funding, but no grant attachments were posted. Please provide the grant documents and confirm: (a) the funding source and agency; (b) whether Davis-Bacon wage rates and certified payroll apply; (c) whether Build America, Buy America (BABA) or other domestic-content requirements apply; and (d) whether local vendor preference applies.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
IB 4.03.D states permit, impact, and inspection fees will be reimbursed at invoiced cost, but there is no bid line item for them, and the Building lump sum (01 0250, 2.04.A) "includes permitting." Should these fees be included in the bid or reimbursed separately? Who pays water and sewer tap, capacity, connection, and meter fees, and electric service charges?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Sheet P1.0 "Floor Plan - Plumbing" is listed on the A0.0 index but is not in the posted plumbing set. Please issue it. Please also confirm that Sheets L-1 through L-3 and IR-1/IR-2, marked "Site Permit Review," are bid documents, and that Sheets C-4.1, C-5.2, C-5.3, C-6.1, C-6.2, and the IR sheets, which are not on the A0.0 index, are part of the Contract Documents.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
SC-15.08.A sets a 3 year correction period, Section 01 7400 calls for a 1 year warranty, and SC-6.17 keeps the performance bond in force through the warranty period. Which period governs, and how long must the performance and payment bonds remain in force?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Do the $1,685/day liquidated damages apply at both Substantial Completion (365 days) and Final Completion (395 days)? Are the Owner's engineering and inspection costs under Section 4.04 charged in addition? Since the contractor pulls the permit, will contract time be extended if City permit review exceeds a stated period?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Bid line 2.03B includes demolition of existing buildings. Has an asbestos and hazardous materials survey been performed? If so, please provide it. If not, is abatement part of the contractor's scope?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
(a) The mobilization (3%) and MOT (0.5%) caps reference lines 2.01–2.06R, but the bid form uses lines 2.03A-2.06R. Which base applies? (b) Are unit-price items (2.05B HDPE water, 2.05D PVC sanitary, and landscaping) paid on measured installed quantities, with overruns paid at the bid unit prices? (c) Are there any allowances or alternates?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Sheet A3.1, Note 1 identifies some items as Owner Furnished, Contractor Installed, and Sheet A2.0 shows items as N.I.C. Please provide the complete list of OFCI and N.I.C. items, confirm the contractor's receiving, storage, and installation responsibilities, and confirm whether rough-in or blocking for N.I.C. items is in the contractor's scope.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Please confirm: (a) whether USL&H and Jones Act coverage is required; (b) whether pollution liability insurance applies; (c) whether the surety must be rated A-XII per SC-6.17, or whether the A / II minimum in the insurance section applies.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Several items appear to be carried over from other projects: "Six Test Wells and Three Observation Wells" on the Division 00 cover, road and "diesel unloading pad" testing in Section 01 4000, and water main tie-ins and a property mailing list in SC-10.03. Please confirm these items are not part of this project's scope.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Specification Book Division 28 Electronic Safety and Security states to refer to MEP drawings. MEP Drawing E0.1 Low Voltage Cabling Note states to Coordinate with Construction Manager and Owner. Low Voltage Symbols are captured on Print E2.0. Please provide Security Camera, Access Control and Cabling requirements and specifications.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
What is the City's budget for the project?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Electrical & Civil plans do not show any exterior or site lighting, please confirm.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
On page C-5.1 it appears that there is a new catch basin with two separate inverts. One for a 10in PVC with an invert elev of a 10.7 and 15in RCP with an invert of an 8.7. However, only one pipe is shown coming into the structure and it may connect to exist pipe, though the whole assembly appears on C-3.0. Similarly, the mitered end sections appear on both as well. Would you please clarify what is new and what is existing?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
1. Please confirm intent/requirement for fire sprinklers. Section 3 of building code analysis appears to be “unprotected, unsprinkled” while section 5 (fire protection) notates “required”
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Please confirm if this project includes overhead doors. It is listed in the specifications but cannot be located on the plans.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Can a Certified Building Contractor meet the license qualifications for this project? The scope of the project does fall well within a FL CBC qualification.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Front End Doc - Section 00800, SC-7.06.A.4, page 169, requires the contractor to perform at least 50% of the adjusted work value using its own employees, after deducting mobilization/demobilization, general requirements, and specified allowances. Please advise
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Due to the hurricane, can we have the bid due date extended? Us and others are struggling without power still.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Plan scaling is off on the Civil, Structural, and MEPs. The Architectural drawings seem correct.
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Is there a specification for camera system (manufacturer and model)?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Is there a specification (brand) for access controls?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
Is there a specification for data cable?
Refer to Addendum, #1 located in the "Addenda & Notices" Tab.
OpenGov categories
- 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
- 90927 · Building Construction, Educational
- 90930 · Building Construction (Not Otherwise Classified)
- 91275 · Quality Control Testing Services for Construction
- 91345 · Construction, Sewer and Storm Drain
- 91347 · Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps)
- 91356 · Construction, Utility/Underground Projects
- 91400 · Construction Services, Trade (New Construction)
- 91484 · Trade Services, Construction (Not Otherwise Classified)