Skip to content
← Back to search
SolicitationClosed

Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

This notice is no longer open for responses. Find active opportunities

Description

Cape Cod Space Force Station (CCSFS) is an active-duty military installation containing ground-based radar systems critical to National Security. The Power Generation Microgrid project will be con?structed within the grounds of CCSFS in fa?cilities which are in restricted areas requir?ing enhanced security protocols. The im?pacted facilities are to remain occupied throughout construction with minimal dis?ruption to the mission requiring precise construction phasing of all project elements. The Power Generation Microgrid project is programmed within the Department of the Air Force Energy Resiliency, Conservation, and Investment Program and all work is in alignment with the resiliency goals of the program such as integrating a battery en?ergy storage system with an existing wind turbine and meeting the Uptime Institutes Tier IV redundancy criteria for all mission critical systems. Additionally, the project will upgrade the facilities protective barrier against High Altitude Electromagnetic Pulse events. Other major features of the project include the complete replacement of all fa?cility systems located in the onsite power generation plant, providing new back-up power assets with enhanced microgrid con?trols, and installing electrical duct banks throughout the site. The final microgrid configuration will incorporate all new equipment such as diesel-powered genera?tors, uninterrupted power supplies, critical and non-critical power distribution re?sources into a cohesive control scheme for prolonged mission reliability. All work must be executed to minimize disruptions to mis?sion critical operations and impacted pro?tective HEMP barriers.

Attachments

36 files · 4 links

Contacts

Observed opportunity history

This is the history collected by Gov Contract Finder. Times show when information was captured or a version was assembled, not when SAM.gov originally changed it. Earlier revisions may be missing.

Publications are grouped by matching evidence; revision relationships are inferred.

The original SAM.gov root publication has not been verified.

History
  1. Opportunity version

    Initial information

    Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

    Solicitation: W912WJ26RA003

    Publication: f9e536186d354e0e861a8368edb3182b

    Current publication

    Changed fields: AAC Code, Active, AdditionalInfoLink, ArchiveDate, ArchiveType, Award$, AwardAmount, AwardDate, AwardNumber, Awardee, BaseType, CGAC, City, ClassificationCode, CountryCode, Department/Ind.Agency, Description, FPDS Code, Industry, Link, NaicsCode, NoticeId, Office, OrganizationType, PopCity, PopCountry, PopState, PopStreetAddress, PopZip, PostedDate, PrimaryContact, ResponseDeadLine, SecondaryContact, SetASide, SetASideCode, Sol#, State, Sub-Tier, Title, Type, ZipCode, awardeeCageCode, awardeeUei, descriptionUrl, fullParentPathCode, fullParentPathName, groupingConfidence, logicalOpportunityId, naicsCodes, pointOfContact, resourceLinks, samNoticeId, samRootId, solicitationNumber, source, sourceResourceCount, sourceResourceIds

    First established information: Department/Ind.Agency, Description, Office, Sub-Tier

  2. Opportunity capture

    Initial information

    Construction Services of a Power Generation Microgrid at Cape Cod Space Force Station in Bourne, MA

    Solicitation: W912WJ26RA003

    Publication: f9e536186d354e0e861a8368edb3182b

    Current publication

Official sources

Notice on SAM.govsam.gov · Official U.S. government record (opens in a new tab)Plain text