The Board of County Commissioners of Okaloosa County, FL, are seeking a contractor to construct a security wall per the attached approved engineered drawings. General Requirements Site Work Concrete Masonry Metals Wood and Plastics Thermal and Moisture Protection Doors and Windows Finishes Specialties Equipment Furnishings Special Consideration Conveying Systems Mechanical/Plumbing Electrical TOTAL FOR COMPLETION Project Details Important Instructions for Electronic Submittals The County of Okaloosa is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments section for specifications and attachments. Courthouse Annex Security Wall Construction Okaloosa County is seeking a qualified contractor to construct a security wall per the engineered drawings provided at the Courthouse Annex @ 1940 LEWIS TURNER BLVD FORT WALTON BEACH FL 32547. The purpose of this project is to enhance the security of the facility by providing a security wall that meets all relevant safety and security standards. Delivery Requirements Timeline The project must be completed within 180 days from the date of the notice to proceed. Any delays must be communicated to the County immediately, along with a revised timeline for completion. Site Preparation and Cleanup The contractor is responsible for preparing the site, including any necessary demolition, excavation, and grading work. All debris and construction materials must be removed from the site upon completion of the project. The site must be restored to its original condition, or better, upon completion of the work. A comprehensive maintenance manual, including warranty information, must be provided to the County. By adhering to the above scope of work, Okaloosa County aims to ensure the successful completion of the Courthouse Annex Security Wall project, enhancing the security and safety of the facility for all occupants and visitors. Contractor will be responsible for running CAT6 cable to the vehicle gate opener. General Bid Conditions 1. PRE-BID ACTIVITY - ADDENDUM - Except as provided in this section, Respondents are prohibited from contacting or lobbying the County, County Administrator, Commissioners, County staff, and Selection Committee members, or any other person authorized on behalf of the County related or involved with the solicitation. All questions or inquiries must be received no later than the last day for questions (reference ITB & Respondent’s Acknowledgement form). Any addenda or other modification to the ITB documents will be issued by the County five (5) days prior to the date and time of closing, as a written addenda distributed to all prospective Respondents by posting to the OpenGov following website: https://procurement.opengov.com/portal/myokaloosa Such written addenda or modification shall be part of the bid documents and shall be binding upon each respondent. Each respondent is required to acknowledge receipt of any and all addenda in writing and submit with their bid. No respondent may rely upon any verbal modification or interpretation. 2. PREPARATION OF BID – The bid form is included with the bid documents. Additional copies may be obtained from the County. The respondent shall submit bids in accordance with the public notice. All blanks in the bid documents shall be completed by printing in ink or by typewriter in both words and numbers with the amounts extended, totaled and the bid signed. A bid price shall be indicated for each section, bid item, alternative, adjustment unit price item, and unit price item listed therein, or the words “No Bid”, “No Change”, or “Not Applicable” entered. No changes shall be made to the phraseology of the form or in the items mentioned therein. In case of any discrepancy between the written amount and the numerical figures, the written amount shall govern. Any bid which contains any omissions, erasures, alterations, additions, irregularities of any kind, or items not called for which shall in any manner fail to conform to the conditions of public notice inviting bids may be rejected. A bid submitted by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature). The official address of the partnership shall be shown below the signature. A bid submitted by a limited liability company shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature. A bid submitted by an individual shall show the respondent’s name and official address. A bid submitted by a joint venture shall be executed by each joint venture in the manner indicated on the bid form. The official address of the joint venture must be shown below the signature. The bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the form. The address and telephone # for communications regarding the bid shall be shown. If the respondent is an out-of-state corporation, the bid shall contain evidence of respondent’s authority and qualification to do business as an out-of-state corporation in the State of Florida. A state contractor license # for the State of Florida shall also be included on the bid form. Respondent shall be licensed in accordance with the requirements of Chapter 489, Florida Statutes. 3. INTEGRITY OF BID DOCUMENTS - Respondents shall use the original Bid documents provided by the Purchasing Department and enter information only in the spaces where a response is requested. Respondents may use an attachment as an addendum to the Bid documents if sufficient space is not available. Any modifications or alterations to the original bid documents by the respondent, whether intentional or otherwise, will constitute grounds for rejection of a bid. Any such modification or alteration that a respondent wish to propose must be clearly stated in the respondent’s response in the form of an addendum to the original bid documents. 4. SUBMITTAL OF BID – A bid shall be submitted electronically no later than the date and time prescribed on the Notice to Respondents. The responses submitted should be one (1) completed document, unless otherwise specified in the document. (DOCUMENTS REQUIRED IN VENDOR QUESTIONNAIRE ARE NOT INCLUDED IN THE ONE DOCUMENT LISTED ABOVE) 5. MODIFICATION & WITHDRAWAL OF BID - A bid may be modified or withdrawn by an appropriate document duly executed in the manner that a bid must be executed and delivered to the place where bids are to be submitted prior to the date and time for the opening of bids. If within 24 hours after bids are opened any respondent files a duly signed written notice with the County and promptly thereafter demonstrates to the reasonable satisfaction of the County that there was a material substantial mistake in the preparation of its bid, that respondent may withdraw its bid, and the bid security may be returned. Thereafter, if the work is rebid, that respondent will be disqualified from 1) further bidding on the work, and 2) doing any work on the contract, either as a subcontractor or in any other capacity. 6. BIDS TO REMAIN SUBJECT TO ACCEPTANCE – All bids will remain subject to acceptance or rejection for ninety (90) calendar days after the day of the bid opening, but the County may, in its sole discretion, release any bid and return the bid security prior to the end of this period. 7. IDENTICAL TIE BIDS - – In cases of identical procurement responses, the award shall be determined either by lot or on the basis of factors deemed to serve the best interest of the County. In the case of the latter, there must be adequate documentation to support such a decision. 8. CONDITIONAL & INCOMPLETE BIDS - Okaloosa County specifically reserves the right to reject any conditional bid and bids which make it impossible to determine t Bonding Requirements A Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of BIDDER’s maximum Bid price and in the form of a cashier’s check or a Bid Bond provided by the contractor's bonding agency. A copy of the Bid Security shall be uploaded with their bid. The original Bid security shall be delivered to the Issuing Office (c/o DeRita Mason, Okaloosa County Purchasing Department, 5479A Old Bethel Road, Crestview, FL 32536) within five business days from the date set forth to receive bids. Failure to deliver the Bid security within the five-business day window may cause the Bid to be declared non-responsive. The Bid security of the apparent Successful BIDDER will be retained until OWNER awards the contract to such BIDDER, and such BIDDER has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful BIDDER fails to execute and deliver the Contract Documents and furnish the required contract security within 10 days after the Notice of Award, OWNER may consider BIDDER to be in default, annul the Notice of Award and the Bid security of that BIDDER will be forfeited. The Bid security of other BIDDERs whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of ten (10) days after the effective date of the Agreement or sixty-one (61) days after the bid opening whereupon Bid security furnished by such BIDDERS will be released. Bid security of other BIDDERs that OWNER believes do not have a reasonable chance of receiving the award will be released within ten days after the Bid opening. Contractor shall furnish a performance bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of all of Contractor’s obligations under the Contract. These bonds shall remain in effect until one year after the date when final payment becomes due or until completion. Contractor must record said bond and return to the Purchasing Department for record keeping. Introduction Summary The Board of County Commissioners of Okaloosa County, FL, are seeking a contractor to construct a security wall per the attached approved engineered drawings. Timeline Release Project Date: November 4, 2026 Pre-Proposal Meeting (Mandatory): November 10, 2026, 9:00am 1940 Lewis Turner Blvd, Fort Walton Beach FL 32547 (meet on the steps at main entrance) Question Submission Deadline: November 12, 2026, 3:00pm Proposal Submission Deadline: December 2, 2026, 3:00pm Procurement Contact DeRita Mason Purchasing Manager 5479A Old Bethel Rd. Crestview , FL 32531 Email: dmason@myokaloosa.com Phone: (850) 689-5960 Insurance Requirements CONTRACTORS INSURANCE The Contractor shall not commence any work in connection with this Agreement until he has obtained all required insurance and the certificate of insurance has been approved by the Okaloosa County Risk Manager or designee. All insurance policies shall be with insurers authorized to do business in the State of Florida and having a minimum rating of A, Class X in the Best Key Rating Guide published by A.M. Best & Co. Inc. All insurance shall include the interest of all entities named and their respective officials, employees & volunteers of each and all other interests as may be reasonably required by Okaloosa County. The coverage afforded the Additional Insured under this policy shall be primary insurance. If the Additional Insured have other insurance that is applicable to the loss, such other insurance shall be on an excess or contingent basis. The amount of the company’s liability under this policy shall not be reduced by the existence of such other insurance. With the exception of Workers’ Compensation policies, the County shall be shown as an Additional Insured with Endorsement for each policy on the Certificate of Insurance. The County shall retain the right to reject all insurance policies that do not meet the requirement of this Agreement. Further, the County reserves the right to change these insurance requirements with 60-day notice to the Contractor. The County reserves the right at any time to require the Contractor to provide copies (redacted if necessary) of any insurance policies to document the insurance coverage specified in this Agreement. Any subsidiaries used shall also be required to obtain and maintain the same insurance requirements as are being required herein of the Contactor Any exclusions or provisions in the insurance maintained by the Contractor that excludes coverage for work contemplated in this agreement shall be deemed unacceptable and shall be considered breach of contract. Workers' Compensation Insurance The Contractor shall secure and maintain during the life of this Agreement Workers’ Compensation insurance for all of his employees employed for the project or any site connected with the work, including supervision, administration or management, of this project and in case any work is sublet, with the approval of the County, the Contractor shall require the Subcontractor similarly to provide Workers’ Compensation insurance for all employees employed at the site of the project, and such evidence of insurance shall be furnished to the County not less than ten (10) days prior to the commencement of any and all sub-contractual Agreements which have been approved by the County. Contractor must be in compliance with all applicable State and Federal workers’ compensation laws, including the U.S. Longshore Harbor Workers’ Act or Jones Act, if applicable. No class of employee, including the Contractor himself, shall be excluded from the Workers’ Compensation insurance coverage. The Workers’ Compensation insurance shall also include Employer’s Liability coverage and a Waiver of Subrogation in favor of the County on the Certificate of Insurance. If there is an existing approved State of Florida Exemption for Workers’ Compensation it must be provided to Okaloosa County. Limit: State Statutory Employer's Liability $500,000 each accident COMMERCIAL GENERAL LIABILITY INSURANCE The Contractor shall carry Commercial General Liability insurance against all claims for Bodily Injury, Property Damage and Personal and Advertising Injury liability caused by the Contractor. Commercial General Liability coverage shall include the following: Premises & Operations Liability Bodily Injury and Property Damage Liability Independent Contractors Liability Contractual Liability Products and Completed Operations Liability Contractor shall agree to keep in continuous force Commercial General Liability coverage for the length of the contract. Limit $1M each occurrence for Bodily Injury & Property Damage $1M each occurrence Products and completed operations $1M each occurrence Personal and Advertising Injury BUSINESS AUTOMOBILE LIABILITY Coverage must be afforded for all Owned, Hired, Scheduled, and Non-Owned vehicles for Bodily Injury and Property Damage. If the contractor does not own vehicles, the contractor shall maintain coverage for Hired & Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Policy. Contractor must maintain this insurance coverage throughout the life of this Agreement. Limit: $1M each accident (a combined single limit) Pollution/Environmental Liability Pollution Liability Insurance covering bodily injury, property damage, and cleanup costs arising from the release of pollutants. Minimum Limit: $1,000,000 per occurrence. NOTICE OF CLAIMS OR LITIGATION The Contractor agrees to report any incident or claim that results from performance of this Agreement. The County representative shall receive written notice in the form of a detailed written report describing the incident or claim within ten (10) days of the Contractor’s knowledge. In the event such incident or claim involves injury and/or property damage to a third party, verbal notification shall be given the same day the Contractor becomes aware of the incident or claim followed by a written detailed report within ten (10) days of verbal notification. INDEMNIFICATION & HOLD HARMLESS To the fullest extent permitted by law, Contractor shall indemnify and hold harmless the County, its officers and employees from liabilities, damages, losses, and costs including but not limited to reasonable attorney fees, to the extent caused by the negligence, recklessness, or wrongful conduct of the Contractor and other persons employed or utilized by the Contractor in the performance of this contract. CERTIFICATE OF INSURANCE Certificates of Insurance indicating the project name, number, and evidencing all required coverage and if applicable any State of Florida approved Workers’ Compensation Exemption must be submitted not less than 10 days prior to the commencement of any of the work. The certificate holder(s) shall be as follows: Okaloosa County Board of County Commissioners, 5479A Old Bethel Road, Crestview, Florida, 32536. The contractor shall provide a Certificate of Insurance to the County with a thirty (30) day prior written notice of cancellation; ten (10 days’ prior written notice if cancellation is for nonpayment of premium). In the event that the insurer is unable to accommodate the cancellation notice requirement, it shall be the responsibility of the contractor to provide the proper notice. Such notification shall be in writing by registered mail, return receipt requested, and Addressed to the Okaloosa County Purchasing Department at 5479-A Old Bethel Road, Crestview, FL 32536. In the event the contract term goes beyond the expiration date of the insurance policy, the contractor shall provide the County with an updated Certificate of insurance no later than ten (10) days prior to the expiration of the insurance currently in effect. The County reserves the right to suspend the contract until this requirement is met. The certificate shall indicate if coverage is provided under a claims-made or occurrence form. If any coverage is provided on a claims-made form, the certificate will show a retroactive date, which should be the same date of the initial contract or prior. All certificates shall be subject to Okaloosa County’s approval of adequacy of protection. All deductibles or SIRs, whether approved by Okaloosa County or not, shall be the Contractor’s full responsibility. In no way will the entities listed as Additional Insured be responsible for, pay for, be damaged by, or limited to coverage required by this schedule due to the existence of a deductible or SIR. GENERAL TERMS Any type of insurance or increase of limits of liability not described above which, the Contractor required for its own protection or on account of statute shall be its own responsibility and at its own expense. Any exclusions or provisions in the insurance maintained by the contractor that excludes coverage for work contemplated in this contract shall be deemed unacceptable and shall be considered breach of contract. The carrying of the insurance described shall in no way be interpreted as relieving the Contractor of any responsibility under this contract. Should the Contractor engage a subcontractor or sub-subcontractor, the same conditions will apply under this Agreement to each subcontractor and sub-subcontractor. The Contractor hereby waives all rights of subrogation against Okaloosa County and its employees under all the foregoing policies of insurance. EXCESS/UM
Published attachments
Public questions and answers
Are there any details on the sliding gate? It is difficult to price without them.
24' Aluminum cantilever sliding gate, Eclipse 100 or similar type/style.
Are we to procure a price on a sliding gate? Or will you provide an allowance to use your pre-selected vendor?
The gate should be - 24' Aluminum cantilever sliding gate, Eclipse 100 or similar type/style.
What door hardware is required for the hollow metal door?
Since the man gate serves as an emergency egress door, it must be equipped with hardware that complies with life safety and egress requirements. One of the following configurations is recommended: • A classroom/storeroom function lockset with the egress side located on the interior side of the perimeter wall, or • A standard commercial-grade lockset paired with an interior exit device (push bar) to provide unrestricted egress. Either configuration can be integrated with a standard outdoor-rated electric strike for access control purposes. Any additional door hardware and accessories, including but not limited to door closers, hinges, kick plates, weather stripping, thresholds, and related components, should be supplied and installed by a qualified door hardware contractor to ensure proper code compliance, functionality, and warranty coverage.
Are there more details regarding the access control? Any particular system or product requested?
Only access control requirement is conduit install and pulling provided low voltage combo cable to man door from the comm room.
Can you provide a teams link for the pre bid please.
The meeting is only in person; we are visiting the site during the meeting.
• Structural: o Are all cells in CMU wall to be grouted or only those that have reinforcing? • Architectural: o A1.11: Sliding aluminum gate is specified as “selected by owner”. Is there a basis of design so that we can provide an accurate price? Does new 4” thick concrete sidewalk require any reinforcing? If so, please specify. Please provide width of new concrete sidewalk east of the existing courthouse building. o A1.21: Enlarged Floor Plan #1: What is to be done with the existing landscaping where tree is to be removed? Wall Section #2: Overall height of proposed wall is shown as 10’-0” above top of footing. Does this take precedence over 9’-0” height above grade or does the 9’-0” height take precedence and height of proposed wall above top of footing may vary? Wall Section #2: Does 4” pre-finished aluminum trim need to be hurricane rated similar to a coping cap? Door Detail #6: Is there a basis of design for the access control system that is to be used? Need to make sure that the hollow metal door is prepped correctly which affects price. • Electrical: o E3: What are the exterior wall finishes that we are attaching conduit to and poking thru? Where it specifies to run conduit “over roof of holding cell building”, is the conduit to be attached to the wall or the roof? Are there any fire walls or smoke walls that will be penetrated? • General: o Will workers need to be badged to perform work? o Will workers need to pass background checks?
The gate should be - AMETCO 24' x 8' Aluminum cantilever sliding gate, Eclipse 100 design or similar type/style. No reinforcement of 4" thick sidewalk Sidewalk is 5 foot on the east side. Landscape replacement should be backfilled with fill dirt The wall should be 9’-0” height above grade Does 4” pre-finished aluminum trim should match existing facility type Exterior wall is split face SMU wall Workers will always have escort while onsite working on project, no badges needed. See Plans for additional details. A few of these questions need to be answered by I.T. staff
Is combo cable or CAT6 going to be run to the gate operator and rear gate? Will there be any electronics to install or is it just rough in of the wire?
Only 2 runs of conduit will be installed to the gate opener, 1 for power and 1 for possible future automation.
Can you confirm that they access controls are not being provided by the county and are part of this ITB?
All access controls WILL be provided by the county, with the exception of the contractor installing the conduit and provided combo cable.
Regarding the sliding gate, can you please provide a detail as to how you would like the sliding gate to slide into the curb? And, are we providing a concrete channel for it to slide into?
Curb should be cut out on both sides from the curb to the road. We won't need a channel. See plans.
Regarding the door. Is it hurricane rated? Door and frame gauge? Type of exit device? Keypad entry? Is there a hardware schedule?
See plans for specific door models needed.
There is concern about surrounding trees no making it after digging for the foundations. Should more trees be removed?
One is being removed based on plans, one other tree will be assessed during construction. If it has to be removed, County staff will take care of it.
Is the contractor to carry access controls or will this be handled by Okaloosa security? Hardware - Should exterior have a panic device? Is Telecommunication to be carried by the Contractor?
All access controls WILL be provided by the county, with the exception of the contractor installing the conduit and provided combo cable.
Please clarify the following: 1. Has the Owner selected a specific sliding gate or manufacturer? 2. Please provide the desired gate specifications, including material, height, overall width, finish, color, and any applicable design requirements. 3. Please provide the required operator and access control specifications. 4. Are there any specific requirements for the gate track, rollers, hardware, locking mechanism, or safety features? 5. Please confirm whether any associated accessories, including gate stops, guides, posts, and operator equipment, are to be included in the contract. The current information does not provide sufficient detail for bidding contractors to accurately determine the intended gate specifications and associated costs. Clarification is requested to ensure all contractors are pricing the same scope of work and that the proposed gate meets the Owner's expectations.
Already answered in previous question
1. What type of paint or protective coating is required for the exposed pipe bollards? Please specify the paint type, color, and finish. 2. Are the bollards to have welded steel caps at the top, or are they to be filled and finished with rounded concrete tops? 3. Is a primer or corrosion-resistant coating required prior to applying the finish coat? 4. Can bollard covers be used instead of painting? if so, will a protective coating still be required?
Bollards should match existing bollards onsite with sleeve covering. Protective paint under sleeve not required.
please specify the required size, location, and glazing type for the vision lite. Also, Is the vision lite required to be protected with a security grille or other protective assembly?
See plans.
In Document, G- FWBCH Annex Wall., there are notes circled in RED on the overhead photo indicating no CAT 6 cable required for the two entry locations. However, the key notes on the actual plans state in Note 1 - ""Provide Weather Proof J Box with TWO CAT 6 cable back to telcom Room." Which instruction should be followed to provide a accurate proposal for cabling?"
The only telecom cabling required will be to run the provided low voltage combo cable to the man door. A weatherproof box will need to be installed where the conduit exits the building. Both conduits (man door and gate open) will exit this box. Combo cable will go to man door and other conduit to gate opener will be empty.
1. Is the aluminum cantilever gate to be 8ft high or 9ft high? 2. Does the aluminum gate have chain link on it? 3. Is the aluminum cantilever gate to be powder coated a specific color? 4. Is there a specific type of gate operator that is to be installed for the aluminum cantilever gate? 5. What size posts are to be used to hang the aluminum cantilever gate?
See previous answered question and design plans.
What final site condition is expected from the contractor once construction is completed? Dressing / Fill, sodd , seed, hydro-sceeding?
All materials and waste removed. Fill dirt where needed and level.
What is to prevent the metal cap from oil canning? What is required on top of the block wall?
This detail is listed in the plans. Set S2